CN209575708U - A kind of novel environment friendly Practical multifunction person stub pile prepared from wood - Google Patents

A kind of novel environment friendly Practical multifunction person stub pile prepared from wood Download PDF

Info

Publication number
CN209575708U
CN209575708U CN201920060381.0U CN201920060381U CN209575708U CN 209575708 U CN209575708 U CN 209575708U CN 201920060381 U CN201920060381 U CN 201920060381U CN 209575708 U CN209575708 U CN 209575708U
Authority
CN
China
Prior art keywords
pile body
stake
hole
human
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920060381.0U
Other languages
Chinese (zh)
Inventor
吴家会
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201920060381.0U priority Critical patent/CN209575708U/en
Application granted granted Critical
Publication of CN209575708U publication Critical patent/CN209575708U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a kind of novel environment friendly Practical multifunction person stub pile prepared from wood, including human-like pile body, the upper end of the human-like pile body is connect with suspension apparatus, the lower end of the human-like pile body is provided with pedestal, the front end of the human-like pile body is detachably provided with spring fingerprint group, footing and several hands, the human-like pile body includes pile body, head stake, arm stake and lock screw, and the upper end of the pile body is connected with head stake, and the upper end two sides of the pile body are removably connected with arm stake;Compared with prior art, the beneficial effects of the utility model are: spring fingerprint group, footing and stake hand are convenient for the practice of various hand position, and after removing stake hand, footing, arm stake and spring fingerprint group, person stub pile prepared from wood had both become human-like sandbag, can exercise oneself in boxing, free combat, the function of tae kwon do and anti-, human-like pile body can more intuitively be practiced striking itself for " people " type in the effect for physically playing emulation.

Description

A kind of novel environment friendly Practical multifunction person stub pile prepared from wood
Technical field
The utility model relates to person stub pile prepared from wood technical field, in particular to a kind of novel environment friendly Practical multifunction person stub pile prepared from wood.
Background technique
Person stub pile prepared from wood is the wushu equipment used when contacting hand position, is mainly made of, can practice pile body footing and stake hand For tempering the firm property of hand contact portion point, whole body mass activity as enemy's body when hand position.The flexibility of footwork;
The most structure of person stub pile prepared from wood in currently available technology is simple, is interspersed together fixed of several rod wood, makes With person stub pile prepared from wood training when, not only the appearance of person stub pile prepared from wood differs greatly with " people " shape, and in hitting drill person stub pile prepared from wood own Position is all fixed, the effect for practicing impact with true man can not be simulated in practice, for this purpose, it is proposed that a kind of Novel ring Protect Practical multifunction person stub pile prepared from wood.
Summary of the invention
The purpose of this utility model is to provide a kind of novel environment friendly Practical multifunction person stub pile prepared from wood, to solve above-mentioned background skill The problem of being proposed in art.
The technical solution of the utility model is achieved in that a kind of novel environment friendly Practical multifunction person stub pile prepared from wood, including people Type pile body, human-like pile body are wood materials, and PU foaming or silica gel have been wrapped up outside wood materials, avoid practitioner's hand and encounter Wood and it is injured;The upper end of the human-like pile body is connect with suspension apparatus, and the lower end of the human-like pile body is provided with pedestal, described The front end of human-like pile body is detachably provided with spring fingerprint group, footing and several hands;
The human-like pile body includes that pile body, head stake, arm stake and lock screw, the upper end of the pile body are connected with head Stake, the upper end two sides of the pile body are removably connected with arm stake;
The arm stake includes large arm pile body, forearm pile body and connecting rod, positioned at the large arm pile body of the pile body left end arm stake Front end is provided with a forearm pile body, is arranged positioned at the large arm pile body front end of the pile body right end arm stake there are two forearm pile body, Be mutually 30-degree angle between two forearm pile bodies, the connecting rod is set to the rear end of large arm pile body, the connecting rod intert into In the perforation of pile body side, the surface of the connecting rod is provided in the axial direction with three second location holes, and described in adjacent two Second location hole is identical in the radially angulation of connecting rod, and the perforation Inner Front End offers the first threaded locating hole, position In offering the first dorsal pore on the pile body of the perforation rear end, the lock screw passes through second location hole spiral shell out of first dorsal pore It is connected in the first threaded locating hole, is bolted in the first threaded locating hole when lock screw passes through three different second location holes When, forearm pile body can be located at horizontal position, face upward 60 degree and under face upward 30 degree of position;
The upper end of the pile body offers the first slot, and the lower end of the head stake offers the second slot, and described first Symmetrical above and below in slot and the second slot to be fixedly installed with spring retaining sleeve, spring retaining sleeve is cup type, described in upper and lower two It is connected with spring between spring retaining sleeve, first through hole, the first through hole are offered on the closed end of the spring retaining sleeve It is inside arranged with the threaded shank of double end caging bolt, the diameter of the double end caging bolt bolt head is greater than the diameter of first through hole, Keep the bolt shank of double end caging bolt movable in first through hole, but bolt head can be limited by first through hole and consolidate in spring In fixed set, when practitioner strikes head stake, the bending angle of head stake can be limited;
The suspension apparatus includes telescoping boom and lifting rope, and the rear end of the telescoping boom is equipped with attachment base, the company Offer mounting hole on joint chair, be provided with pulley in the rear and front end on the downside of the telescoping boom, one end of the lifting rope with The other end of the hanging ring connection of head stake upper end, the lifting rope connects around two pulleys and sand hill hook, the sand hill hook Lower end connect with sand hill;
The pedestal includes pedestal, the first fixing bolt and the second fixing bolt, and the section of the pedestal is horizontal D word Shape allows pedestal itself to play the effect of tumbler, and pedestal is that cast iron materials support, raising stability, under the pedestal End is detachably equipped with support rod, and the first connecting tube, first connection are vertically installed at the upper surface center of the pedestal It is arranged with the second connecting tube in pipe, the upper end of second connecting tube is installed on pile body lower end, on second connecting tube side Several tapped through holes are offered from top to bottom, and second fixing bolt passes through first from the upper side of the first connecting tube and connects Adapter tube is bolted in tapped through hole, is passed through the first connecting tube by the second fixing bolt and is screwed in different tapped through holes, can To play the role of adjusting the second connecting tube upper and lower position in the first connecting tube, so as to adjust the height of human-like pile body.
Preferably, the upper surface outer rim of the pedestal offers several the first jacks, is located at first jack lower end Pedestal bottom surface offer the second jack, the support rod interts upwards into the second jack, and the upper end of the support rod opens up There is the second tapped blind hole, first fixing bolt is passed down through the first jack and is bolted in the second tapped blind hole, makes under pedestal The support rod at end is fixed on pedestal by the first fixing bolt, installation and removal of the bar easy to support in pedestal lower end.
Preferably, the spring fingerprint group includes connecting plate, spring fingerprint, positioning pipe and third fixing bolt, the company The front end of fishplate bar is equipped with several spring fingerprint, and the rear end of the connecting plate is equipped with several positioning pipes, the positioning pipe Intert in the first positioning hole opened up into pile body front end, the inside of the first positioning hole is also provided with the first tapped blind hole, institute It states that third fixing bolt passes through connecting plate from front to back and positioning pipe is bolted in the first tapped blind hole, makes spring fingerprint group can be with The Fast Installation and disassembly in pile body front end are realized by third fixing bolt.
Preferably, the rear end of several stake hands backs through pile body and is located at the second dorsal pore that pile body rear end opens up It is interior, third through-hole is offered on the stake hand rear end in second dorsal pore, the first positioning is interspersed in the third through-hole Pin, the first positioning pin can will be connected and fixed between stake hand and pile body.
Preferably, the rear end of the footing backs through the lower end of pile body and is located at the third dorsal pore that pile body rear end opens up It is interior, the second through-hole is offered on the footing rear end in the third dorsal pore, is interspersed with the second positioning in second through-hole Pin, the second positioning pin can will be connected and fixed between footing and pile body.
Compared with prior art, the utility model has the beneficial effects that the front end by human-like pile body is detachably provided with Spring fingerprint group, footing and several hands, convenient for the practice of various hand position, and when dismounting stake hand, footing, arm stake and spring After fingerprint group, person stub pile prepared from wood had both become human-like sandbag, can exercise oneself in boxing, free combat, the function of tae kwon do and anti-, and can be targetedly The various elbow methods for practicing praise spring boxing include pile body, head stake, arm stake by human-like pile body, and the upper end of pile body is connected with head stake, The upper end two sides of pile body are removably connected with arm stake, make itself " people " type of human-like pile body, are physically playing emulation Effect can more intuitively be practiced striking, while practitioner can be allowed to understand most reasonable approach when different parts are practiced, such as Fist, the palm, forearm and elbow;By being located at the large arm pile body front end setting of pile body right end arm stake, there are two forearm pile bodies, can play The effect for imitating opponent's swing can practice the attack for coping with other side's one hand swing fist, be interted by connecting rod into pile body side In perforation, the surface of connecting rod is provided in the axial direction with three second location holes, and two adjacent second location holes are in connecting rod Radially angulation it is identical, perforation Inner Front End offer the first threaded locating hole, positioned at perforation rear end pile body on open up There is the first dorsal pore, lock screw passes through second location hole out of first dorsal pore and is bolted in the first threaded locating hole, so that not only Arm stake can be disassembled from pile body, can also be passed through different second location holes by lock screw and be bolted in the first screw thread Positioning hole realizes that the different angle of arm stake is adjusted, and convenient for the different pendulum arm angle of practice reply attacker, passes through pile body and head It is connected with spring between two spring retaining sleeves in portion's stake, and limit is connected to double end limit between two spring retaining sleeves Bolt, so that practitioner is in impact impact head stake, head stake can be bended backward centainly in the upper end of pile body with active force Angle, and under spring force can practitioner receive power after reset, keep the posture on head even more like in true man by State when attack;It is connect by hanging ring with suspension apparatus by the upper end of human-like pile body, the lower end of human-like pile body is provided with bottom Seat, pedestal includes the pedestal and be mounted on the dismountable support rod in pedestal lower end that section is horizontal D font, when support rod is pacified It can guarantee that human-like pile body is fixed the position of pile body when being struck when dress, can be played to fall in support rod disassembly rear base The effect of father-in-law can be swung when being struck with stress, and suspension apparatus can conveniently balance entire human-like pile body with The counterweight of sand hill, can allow human-like pile body under tumbler state quickly return just;By being arranged with the second company in the first connecting tube Adapter tube, the upper end of the second connecting tube is installed on pile body lower end, offers several screw threads from top to bottom on the second connecting tube side Through-hole, the second fixing bolt pass through the first connecting tube from the upper side of the first connecting tube and are bolted in tapped through hole, make second Fixing bolt can play the role of adjusting pile body height.
Detailed description of the invention
Fig. 1 is the utility model schematic perspective view;
Fig. 2 is the assembly schematic perspective view of the utility model pile body and arm stake;
Fig. 3 is the schematic structural cross-sectional view that the utility model pile body is connect with head stake;
Fig. 4 is the schematic perspective view of the utility model base position;
Fig. 5 is the schematic structural cross-sectional view of the utility model base position;
Fig. 6 is the assembly schematic perspective view of the utility model spring fingerprint group and pile body;
Fig. 7 is the schematic structural cross-sectional view that the utility model spring fingerprint group is connect with pile body;
The schematic structural cross-sectional view that Fig. 8 is the utility model footing, stake hand is connect with pile body.
In figure: 1, human-like pile body, 11, pile body, 111, perforation, the 112, first dorsal pore, the 113, first threaded locating hole, 114, Second dorsal pore, 115, third dorsal pore 116, the first slot, 117, first positioning hole, the 118, first tapped blind hole, 12, head stake, 121, the second slot, 13, arm stake, 131, large arm pile body, 132, forearm pile body, 133, connecting rod, 134, second location hole, 14, Lock screw, 15, double end caging bolt, 16, spring, 17, spring retaining sleeve, 171, first through hole, 18, hanging ring, 2, suspention dress It sets, 21, telescoping boom, 22, lifting rope, 23, pulley, 24, attachment base, 241, mounting hole, 25, sand hill hook, 26, sand hill, 3, bottom Seat, 31, pedestal, the 311, first jack, the 312, second jack, 32, support rod, the 321, second tapped blind hole, the 33, first fixed spiral shell Bolt, the 34, first connecting tube, the 35, second connecting tube, 351, tapped through hole, the 36, second fixing bolt, 4, spring fingerprint group, 41, Connecting plate, 42, spring fingerprint, 43, positioning pipe, 44, third fixing bolt, 5, footing, the 501, second through-hole, 6, stake hand, 601, Third through-hole, the 7, first positioning pin, the 8, second positioning pin.
Specific embodiment
In order to be best understood from the utility model technology contents, specific embodiment is provided below, the utility model is done into one The explanation of step.
Referring to Fig. 1 to 8, a kind of novel environment friendly Practical multifunction person stub pile prepared from wood, including human-like pile body 1, human-like pile body 1 are wooden Material, and PU foaming or silica gel have been wrapped up outside wood materials, it avoids practitioner's hand and encounters wood and injured, the human-like stake The upper end of body 1 is connect with suspension apparatus 2, and the lower end of the human-like pile body 1 is provided with pedestal 3, and the front end of the human-like pile body 1 can Disassembly is provided with spring fingerprint group 4, footing 5 and several hands 6, convenient for the practice of various hand position, and when remove stake hand 5, After footing 6, arm stake 13 and spring fingerprint group 4, person stub pile prepared from wood had both become human-like sandbag, can exercise oneself in boxing, free combat, tae kwon do Function and anti-, and can targetedly practice the various elbow methods of praise spring boxing.
The human-like pile body 1 includes pile body 11, head stake 12, arm stake 13 and lock screw 14, the upper end of the pile body 11 It is connected with head stake 12, the upper end two sides of the pile body 11 are removably connected with arm stake 13, make itself " people " of human-like pile body Type can more intuitively be practiced striking, while practitioner can be allowed to understand different parts in the effect for physically playing emulation Most reasonable approach when practice, such as fist, the palm, forearm and elbow.
The arm stake 13 includes large arm pile body 131, forearm pile body 132 and connecting rod 133, is located at the 11 left end arm of pile body 131 front end of large arm pile body of stake 13 is provided with a forearm pile body 132, positioned at the large arm pile body of the 11 right end arm stake 13 of pile body The setting of 131 front ends is mutually 30-degree angle, two forearm pile bodies 132 between two forearm pile bodies 132 there are two forearm pile body 132 The effect for imitating opponent's swing can be played, the attack for coping with other side's one hand swing fist can be practiced;The connecting rod 133 is set to The rear end of large arm pile body 131, the connecting rod 133 are interted into the perforation 111 of 11 side of pile body, the table of the connecting rod 133 Face is provided in the axial direction with three second location holes 134, and two adjacent second location holes 134 are in the diameter of connecting rod 133 Upward angulation is identical, and 111 Inner Front Ends of the perforation offer the first threaded locating hole 113, is located at 111 rear ends of the perforation Pile body 11 on offer the first dorsal pore 112, the lock screw 14 passes through 134 spiral shell of second location hole out of first dorsal pore 112 It is connected in the first threaded locating hole 113, is bolted in the first screw thread when lock screw 14 passes through three different second location holes 134 When in location hole 113, forearm pile body 132 can be located at horizontal position, face upward 60 degree and under face upward 30 degree of position, not only Arm stake 13 can be disassembled from pile body 11, can also be passed through different second location holes 134 by lock screw 14 and be spirally connected It is adjusted in the different angle for realizing arm stake 13 in the first threaded locating hole 113, convenient for the different swing arm angle of practice reply attacker Degree.
The upper end of the pile body 11 offers the first slot 116, and the lower end of the head stake 12 offers the second slot 121, it is symmetrical above and below in first slot 116 and the second slot 121 to be fixedly installed with spring retaining sleeve 17, spring retaining sleeve 17 For cup type, it is connected with spring 16 between two upper and lower spring retaining sleeves 17, on the closed end of the spring retaining sleeve 17 First through hole 171 is offered, the threaded shank of double end caging bolt 15, the double end limit are arranged in the first through hole 171 The diameter of 15 bolt head of bolt is greater than the diameter of first through hole 171, allows the bolt shank of double end caging bolt 15 first It is movable in through-hole 171, but bolt head can be limited in spring retaining sleeve 17 by first through hole 171, strike head stake in practitioner When 12, the bending angle of head stake 12 can be limited, and for practitioner at impact impact head stake 12, head stake 12 can be in pile body 11 upper end bends backward certain angle with active force, and can be multiple after practitioner receives power under the action of 16 power of spring Position, makes even more like state when true man are under attack of the posture on head.
The suspension apparatus 2 includes telescoping boom 21 and lifting rope 22, and the rear end of the telescoping boom 21 is equipped with attachment base 24, mounting hole 241 is offered on the attachment base 24, is provided with pulley in the rear and front end of 21 downside of telescoping boom 23, one end of the lifting rope 22 is connect with the hanging ring 18 of head 12 upper ends of stake, and the other end of the lifting rope 22 bypasses two pulleys 23 connect with sand hill hook 25, and the lower end of the sand hill hook 25 is connect with sand hill 26.
The pedestal 3 includes pedestal 31, the first fixing bolt 33 and the second fixing bolt 36, and the section of the pedestal 31 is Horizontal D font allows pedestal 31 itself to play the effect of tumbler, and pedestal 31 is cast iron materials support, improves stability, The lower end of the pedestal 31 is detachably equipped with support rod 32, when support rod 32 install when can guarantee human-like pile body 1 by The position of pile body 11 is fixed when impact, and the effect of tumbler can be played by dismantling rear base in support rod 32, when being struck It can be swung with stress, and suspension apparatus 2 can conveniently balance the counterweight of entire human-like pile body 1 and sand hill 26, can allow people Quickly the returning just under tumbler state of type pile body 1;The first connecting tube is vertically installed at the upper surface center of the pedestal 31 34, the second connecting tube 35 is arranged in first connecting tube 34, and the upper end of second connecting tube 35 is installed under pile body 11 End, offers several tapped through holes 351 on 35 side of the second connecting tube from top to bottom, second fixing bolt 36 from The upper side of first connecting tube 34 passes through the first connecting tube 34 and is bolted in tapped through hole 351, passes through the second fixing bolt 36 It is screwed to across the first connecting tube 34 in different tapped through holes 351, the second connecting tube 35 of adjustment can be played in the first connection The effect of upper and lower position in pipe 34, so as to adjust the height of human-like pile body 1.
Specifically, the upper surface outer rim of the pedestal 31 offers several the first jacks 311, it is located at described first and inserts 31 bottom surface of pedestal of 311 lower end of hole offers the second jack 312, and the support rod 32 interts into the second jack 312 upwards, institute The upper end for stating support rod 32 offers the second tapped blind hole 321, and first fixing bolt 33 is passed down through 311 spiral shell of the first jack It is connected in the second tapped blind hole 321, is fixed on the support rod 32 of 31 lower end of pedestal on pedestal 31 by the first fixing bolt 33, Installation and removal of the bar 32 easy to support in 31 lower end of pedestal.
Specifically, the spring fingerprint group 4 includes the fixed spiral shell of connecting plate 41, spring fingerprint 42, positioning pipe 43 and third Bolt 44, the front end of the connecting plate 41 are equipped with several spring fingerprint 42, and the rear end of the connecting plate 41 is equipped with several Positioning pipe 43, the positioning pipe 43 intert in the first positioning hole 117 opened up into 11 front end of pile body, the first positioning hole 117 Inside be also provided with the first tapped blind hole 118, the third fixing bolt 44 passes through connecting plate 41 and positioning pipe from front to back 43 are bolted in the first tapped blind hole 118, realize spring fingerprint group 4 in 11 front end of pile body by third fixing bolt 44 Fast Installation and disassembly.
Specifically, the rear end of several stake hands 6 backs through pile body 11 and is located at 11 rear end of pile body opens up the In two dorsal pores 114, third through-hole 601, the third through-hole are offered on 6 rear end of stake hand in second dorsal pore 114 The first positioning pin 7 is interspersed in 601, the first positioning pin 7 can will be connected and fixed between stake hand 6 and pile body 11.
Specifically, the rear end of the footing 5 backs through the lower end of pile body 11 and is located at 11 rear end of pile body opens up the In three dorsal pores 115, the second through-hole 501, second through-hole are offered on 5 rear end of footing in the third dorsal pore 115 The second positioning pin 8 is interspersed in 501, the second positioning pin 8 can will be connected and fixed between footing 5 and pile body 11.
Working principle are as follows: when reusing the utility model, arm stake 13 is connect with pile body 11, according to the hand position to be practiced The upper end of human-like pile body 1 is being connect by hanging ring 18 with suspension apparatus 2 by the position angle of adjustable arm stake 13, by the Two fixing bolts 36 pass through the height that the first connecting tube 34 is screwed to the human-like pile body 1 of adjustment in different tapped through holes 351, in white silk When practising impact, head stake 12 is understood in the upper end of pile body 11 as active force bends backward certain angle, and in 16 power of spring It can be resetted after practitioner receives power under effect, make even more like state when true man are under attack of the posture on head, supporting Bar 32, which dismantles rear base, can play the effect of tumbler, can be swung when being struck with stress, and 2 energy side of suspension apparatus Just the efficiently counterweight of balance entire human-like pile body 1 and sand hill 26, can allow human-like pile body 1 quickly returning under tumbler state Just.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this Within the spirit and principle of utility model, any modification, equivalent replacement, improvement and so on should be included in the utility model Protection scope within.

Claims (5)

1. a kind of novel environment friendly Practical multifunction person stub pile prepared from wood, including human-like pile body (1), it is characterised in that: the human-like pile body (1) Upper end connect with suspension apparatus (2), the lower end of the human-like pile body (1) is provided with pedestal (3), the human-like pile body (1) Front end is detachably provided with spring fingerprint group (4), footing (5) and several hands (6);
The human-like pile body (1) includes pile body (11), head stake (12), arm stake (13) and lock screw (14), the pile body (11) upper end is connected with head stake (12), and the upper end two sides of the pile body (11) are removably connected with arm stake (13);
The arm stake (13) includes large arm pile body (131), forearm pile body (132) and connecting rod (133), is located at the pile body (11) Large arm pile body (131) front end of left end arm stake (13) is provided with a forearm pile body (132), is located at the pile body (11) right end arm There are two forearm pile body (132), the connecting rod (133) is set to large arm stake for large arm pile body (131) the front end setting of stake (13) The rear end of body (131), the connecting rod (133) are interted into the perforation (111) of pile body (11) side, the connecting rod (133) Surface be provided in the axial direction with three second location holes (134), and two adjacent second location holes (134) are in connecting rod (133) radially angulation is identical, and described perforation (111) Inner Front End offers the first threaded locating hole (113), is located at institute It states and is offered the first dorsal pore (112) on the pile body (11) of perforation (111) rear end, the lock screw (14) is from the first dorsal pore (112) second location hole (134) are passed through in be bolted in the first threaded locating hole (113);
The upper end of the pile body (11) offers the first slot (116), and the lower end of the head stake (12) offers the second slot (121), first slot (116) is fixedly installed with spring retaining sleeve (17) with symmetrical above and below in the second slot (121), up and down Two spring retaining sleeves (17) between be connected with spring (16), offered on the closed end of the spring retaining sleeve (17) First through hole (171), the interior threaded shank for being arranged with double end caging bolt (15) of the first through hole (171), the double end limit The diameter of bolt (15) bolt head is greater than the diameter of first through hole (171);
The suspension apparatus (2) includes telescoping boom (21) and lifting rope (22), and the rear end of the telescoping boom (21) is equipped with company Joint chair (24) offers mounting hole (241) on the attachment base (24), in the rear and front end on the downside of the telescoping boom (21) It is provided with pulley (23), one end of the lifting rope (22) is connect with the hanging ring (18) of head stake (12) upper end, the lifting rope (22) The other end connect around two pulleys (23) with sand hill hook (25), the lower end and sand hill (26) of the sand hill hook (25) connect It connects;
The pedestal (3) includes pedestal (31), the first fixing bolt (33) and the second fixing bolt (36), the pedestal (31) Section is horizontal D font, and the lower end of the pedestal (31) is detachably equipped with support rod (32), the upper table of the pedestal (31) It is vertically installed at the center of face the first connecting tube (34), is arranged with the second connecting tube (35), institute in first connecting tube (34) The upper end for stating the second connecting tube (35) is installed on pile body (11) lower end, opens up from top to bottom on the second connecting tube (35) side There are several tapped through holes (351), second fixing bolt (36) passes through first from the upper side of the first connecting tube (34) Connecting tube (34) is bolted in tapped through hole (351).
2. a kind of novel environment friendly Practical multifunction person stub pile prepared from wood according to claim 1, it is characterised in that: the pedestal (31) Upper surface outer rim offer several the first jacks (311), be located at the first jack (311) lower end pedestal (31) bottom surface It offers the second jack (312), the support rod (32) is interted upwards into the second jack (312), the support rod (32) Upper end offers the second tapped blind hole (321), and first fixing bolt (33) is passed down through the first jack (311) and is bolted in In two tapped blind holes (321).
3. a kind of novel environment friendly Practical multifunction person stub pile prepared from wood according to claim 1, it is characterised in that: the spring fingerprint Group (4) includes connecting plate (41), spring fingerprint (42), positioning pipe (43) and third fixing bolt (44), the connecting plate (41) Front end several spring fingerprint (42) are installed, the rear end of the connecting plate (41) is equipped with several positioning pipes (43), institute Positioning pipe (43) is stated to intert in the first positioning hole (117) that opens up into pile body (11) front end, the first positioning hole (117) it is interior Portion is also provided with the first tapped blind hole (118), and the third fixing bolt (44) passes through connecting plate (41) and positioning from front to back Pipe (43) is bolted in the first tapped blind hole (118).
4. a kind of novel environment friendly Practical multifunction person stub pile prepared from wood according to claim 1, it is characterised in that: several described stakes The rear end of hand (6) backs through pile body (11) and is located in the second dorsal pore (114) for opening up of pile body (11) rear end, is located at described the It is offered third through-hole (601) on stake hand (6) rear end in two dorsal pores (114), is interspersed with first in the third through-hole (601) Positioning pin (7).
5. a kind of novel environment friendly Practical multifunction person stub pile prepared from wood according to claim 1, it is characterised in that: the footing (5) Rear end back through the lower end of pile body (11) and be located in the third dorsal pore (115) that opens up of pile body (11) rear end, be located at described It is offered the second through-hole (501) on footing (5) rear end in third dorsal pore (115), the is interspersed in second through-hole (501) Two positioning pins (8).
CN201920060381.0U 2019-01-05 2019-01-05 A kind of novel environment friendly Practical multifunction person stub pile prepared from wood Expired - Fee Related CN209575708U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920060381.0U CN209575708U (en) 2019-01-05 2019-01-05 A kind of novel environment friendly Practical multifunction person stub pile prepared from wood

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920060381.0U CN209575708U (en) 2019-01-05 2019-01-05 A kind of novel environment friendly Practical multifunction person stub pile prepared from wood

Publications (1)

Publication Number Publication Date
CN209575708U true CN209575708U (en) 2019-11-05

Family

ID=68353642

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920060381.0U Expired - Fee Related CN209575708U (en) 2019-01-05 2019-01-05 A kind of novel environment friendly Practical multifunction person stub pile prepared from wood

Country Status (1)

Country Link
CN (1) CN209575708U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2022228591A1 (en) * 2021-04-25 2022-11-03 Serak Michal Training device for combat sports, martial arts techniques, self-defense or for training of armed forces
CN115501567A (en) * 2021-06-07 2022-12-23 刘明珍 Movable adjustable humanoid boxing fighting sandbag

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2022228591A1 (en) * 2021-04-25 2022-11-03 Serak Michal Training device for combat sports, martial arts techniques, self-defense or for training of armed forces
CN115501567A (en) * 2021-06-07 2022-12-23 刘明珍 Movable adjustable humanoid boxing fighting sandbag

Similar Documents

Publication Publication Date Title
CN209575708U (en) A kind of novel environment friendly Practical multifunction person stub pile prepared from wood
US20110118092A1 (en) Martial Arts Training Apparatus
US20170136330A1 (en) Martial arts training device
US5944639A (en) Quick change adjustable height speed bag
CN109692459A (en) A kind of grapple training rotation fist target
CN208448584U (en) A kind of multi-functional wushu training equipment
CN106310629B (en) A kind of recreation and body-building sandbag
CN201492890U (en) Professional boxing exercise target machine
CN101543675A (en) Prizefighting training target machine
CN205198890U (en) Foldable badminton exercise device
CN206597290U (en) A kind of body-building boxing seat
CN208031822U (en) A kind of martial arts training apparatus
WO2007014490A1 (en) Boxing exercise device
KR20130070068A (en) Safety device for barbell
CN205494863U (en) Aerify football training door
CN211087577U (en) Swing sledge skill exerciser
CN207076083U (en) A kind of vertical boxing equipment
CN211486364U (en) Safe and practical protection device for barbell bench press and deep squat strength training
CN206391493U (en) A kind of shockproof basketball frame easy to use
CN206473076U (en) A kind of seat fitness equipment
CN214861078U (en) Composite set is used in training of solid sphere
JP3103130U (en) Volleyball practice equipment
CN201205439Y (en) Health chair for box exercise
CN215136693U (en) Can dismantle gasbag formula wushu apparatus for sports
RU64920U1 (en) UNIVERSAL SIMULATOR "PARTNER" FOR EXERCISING RECEPTIONS OF HAND Fighting

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191105

Termination date: 20210105