CN209568411U - A kind of hydraulic engineering concrete blinding - Google Patents
A kind of hydraulic engineering concrete blinding Download PDFInfo
- Publication number
- CN209568411U CN209568411U CN201920045854.XU CN201920045854U CN209568411U CN 209568411 U CN209568411 U CN 209568411U CN 201920045854 U CN201920045854 U CN 201920045854U CN 209568411 U CN209568411 U CN 209568411U
- Authority
- CN
- China
- Prior art keywords
- plugboard
- hydraulic engineering
- concrete blinding
- jack
- column
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The utility model relates to the technical fields of hydraulic engineering, more particularly, to a kind of hydraulic engineering concrete blinding, it includes several frameworks being mutually inserted and plugboard, the framework includes boundary frame area and is fixed on the column of boundary frame area two sides vertically, several jacks arranged in parallel are offered on column, are equipped in the two sides of plugboard for being inserted into jack and plugboard and framework being made to realize relatively-stationary inserted link;It is extended with the limit plate for being connected to plugboard two sides respectively in the two sides of column, abuts the locating piece for having insertion jack and inserted link being made to find corresponding jack accurately on plugboard.The utility model substantially increases the construction efficiency of hydraulic engineering by providing a kind of hydraulic engineering concrete blinding, enabling inserted link rapid alignment jack and being inserted into complete the assembling of concrete blinding.
Description
Technical field
The utility model relates to the technical fields of hydraulic engineering, more particularly, to a kind of hydraulic engineering concrete blinding.
Background technique
Concrete blinding is also known as concrete form, is a kind of temporary supporting structure, it can make concrete structure, component by rule
Fixed position, geometric dimension forming, and the external loads of template self weight and effect on it can be born.It is used in hydraulic engineering
The purpose of concrete blinding, be in order to guarantee the quality of hydraulic engineering and construction safety, accelerate the construction speed of hydraulic engineering with
And reduce engineering cost.Based on purpose used above, it is desirable that on the one hand concrete blinding needs to have good load-bearing property, separately
It on the one hand can more convenient and fast assembled formation.The concrete blinding of the prior art is mainly common wooden boards, is in several sheets,
It needs to carry out manual splicing according to Supporting Object chamfered shape when use, moreover, it lacks mechanical connection machine between each other
Structure is needed through the manual bondage of wire, and this mode not only expends a large amount of human resources, but also molding effect is bad,
It is difficult to bear biggish external force load, leverages the construction speed of hydraulic engineering.
Existing notification number is a kind of water conservancy and hydropower concrete blinding of CN208168334U, and the concrete blinding is by several
Framework and several plugboard grafting form;Wherein, the framework includes boundary frame area, column, bottom slot, lateral slot, jack,
There are two the columns, two columns vertical both ends for being fixedly connected on boundary frame area respectively, offers bottom on boundary frame area and inserts
Slot, lateral slot is offered on column, and the bottom slot and two lateral slots are interconnected, are also provided on column several
Jack;The plugboard includes plate face, groove body, through-hole, gap, magnet inserted link, and several be parallel to each other is offered in plate face
Groove body, each groove body bottom all have several through-holes, and gap, the edge of the plate face are offered in the one side edge of the plate face
Place is connected with several magnet inserted links.
Prior art among the above has the following deficiencies: the concrete blinding in documents in an assembling process,
It is inserted into after needing the jack in the magnet inserted link alignment post by plugboard.Mainly still due to on-site assembly concrete blinding
Splice by hand, therefore construction personnel often still can influence construction efficiency due to magnet inserted link is difficult to alignment receptacles.
Utility model content
The purpose of the utility model is to provide a kind of hydraulic engineering concrete blindings, enable inserted link rapid alignment jack
And be inserted into complete the assembling of concrete blinding, substantially increase the construction efficiency of hydraulic engineering.
The above-mentioned purpose of utility model of the utility model has the technical scheme that
A kind of hydraulic engineering concrete blinding, including several frameworks being mutually inserted and plugboard, the framework includes
Boundary frame area and the column for being fixed on boundary frame area two sides vertically, offer several jacks arranged in parallel on column, are inserting
The two sides of fishplate bar are equipped with for being inserted into jack and plugboard and framework being made to realize relatively-stationary inserted link;It is equal in the two sides of column
It is extended with the limit plate for being connected to plugboard two sides respectively, abutting on plugboard has insertion jack and inserted link is made to find corresponding jack accurately
Locating piece.
By using above-mentioned technical proposal, the limit plate that extends outwardly is set in the two sides of column respectively, when needing to carry out
It when the splicing of plugboard and framework, is inserted into plugboard between two pieces of limit plates from the external world, lateral limit is carried out to plugboard
Position.Then plugboard is placed in from top to bottom on the locating piece being previously inserted in corresponding jack, at this time the inserted link on plugboard with
The jack of corresponding position is coaxial on column, then pushes plugboard to framework and makes in inserted link insertion jack to complete concrete mould
The assembling of plate.Time needed for assembling concrete blinding is greatly saved in this set, to effectively increase hydraulic engineering
Construction efficiency.
The utility model is further arranged to: locating piece includes the cylinder and be fixed on column that end is used to be inserted into jack
The limited block in body end portion, cylinder are equipped with guiding surface in the end backwards to limited block.
By using above-mentioned technical proposal, the cylinder on locating piece is more easily inserted into jack, favorably
In reducing cylinder and the frictionally damage that touches at jack openings, while guiding surface is provided with the installation for being conducive to raising locating piece
Efficiency.
The utility model is further arranged to: limit plate offers to slide with limited block in the side towards plugboard to be cooperated
Limiting slot.
By using above-mentioned technical proposal, advantageously reduces locating piece and occur during being inserted into jack around column axis
A possibility that rotation, when so that plugboard being placed on locating piece, the inserted link of plugboard can be precisely directed to inserting on column
Hole effectively increases the packaging efficiency of concrete blinding.Process of the setting of limiting slot simultaneously to locating piece insertion corresponding jack
Play a kind of guiding role.
The utility model is further arranged to: limited block is equipped with hand handle in the side backwards to cylinder.
By using above-mentioned technical proposal, one point of application of construction personnel is given, so that construction personnel extracts by hand handle
It is easier to exert a force when locating piece.
The utility model is further arranged to: rubber layer is covered on guiding surface.
Guiding surface can be carried out by using above-mentioned technical proposal using the elasticity and wearability of rubber layer itself
Protection is conducive to the degree of wear for mitigating guiding surface.
The utility model is further arranged to: anti-skid chequer is equipped in hand handle.
By using above-mentioned technical proposal, the frictional force between hand handle and hand can be increased, reduce the possibility of hand skidding
Property.
The utility model is further arranged to: limit plate offers location hole in the side backwards to plugboard, in location hole
It is equipped with and is connected to limited block and limited block and limit plate is made to keep relatively-stationary bolt.
By using above-mentioned technical proposal, when locating piece is inserted into corresponding jack, inserted towards positioning hole insertion
It sells and is connected to bolt on limited block, advantageously reduce locating piece and taken off in the installation process of plugboard because vibrating or hitting
Out a possibility that jack, the smooth assembling of concrete blinding has been effectively ensured.
The utility model is further arranged to: being equipped with annulus in the end of bolt.
By using above-mentioned technical proposal, give one point of application of construction personnel so that construction personnel when pulling out bolt more
It is easy force.
In conclusion the advantageous effects of the utility model are as follows:
1. first lateral limit can be carried out to plugboard by the way that the limit plate to extend outwardly is arranged in the two sides of column respectively
Position, then by the way that locating piece to be inserted into jack, when so that plugboard being placed on locating piece, the inserted link of plugboard can be accurately
Jack in alignment post, so that the time needed for assembling concrete blinding is greatly saved, effectively increases hydraulic engineering
Construction efficiency.
2. being more easily inserted into the cylinder on locating piece in jack by setting guiding surface, being conducive to
Cylinder and the frictionally damage that touches at jack openings are reduced, while the installation for being conducive to improve locating piece that is provided with of guiding surface is imitated
Rate.
3. advantageously reducing locating piece by opening up the limiting slot with limited block sliding cooperation on limit plate and being inserted in insertion
A possibility that occurring during hole around column axis rotation, when so that plugboard being placed on locating piece, the inserted link of plugboard
The jack that can be precisely directed on column effectively increases the packaging efficiency of concrete blinding, while the setting pair of limiting slot
The process of locating piece insertion corresponding jack plays a kind of guiding role.
Detailed description of the invention
Fig. 1 is a kind of general structure schematic diagram of hydraulic engineering concrete blinding of the utility model.
Fig. 2 is the structural schematic diagram of locating piece in the utility model.
In figure, 1, framework;11, boundary frame area;12, column;121, jack;13, limit plate;131, limiting slot;132, it positions
Hole;14, bolt;141, annulus;15, locating piece;151, cylinder;152, guiding surface;153, limited block;154, hand handle;
2, plugboard;21, inserted link;22, groove body;221, through-hole.
Specific embodiment
The utility model is described in further detail below in conjunction with attached drawing.
It referring to Fig.1, is a kind of hydraulic engineering concrete blinding disclosed by the utility model, including framework 1 and plugboard
2.In the present embodiment, framework 1 includes boundary frame area 11 and is fixed on the column 12 of 11 two sides of boundary frame area vertically, in column 12
Two sides offer multiple jacks 121 along the extending direction of column 12.Jack 121 be blind hole and jack 121 axis perpendicular to
Plane where framework 1.
Referring to Fig.1, limit plate 13 is extended in the other two sides of column 12.In the present embodiment, two pieces of limit plates 13
121 two sides of jack are located at, and the extending direction of limit plate 13 is parallel to the axis of jack 121.
Referring to Fig.1, limit plate 13 offers limiting slot 131 on the side surface towards jack 121.In the present embodiment
In, the extending direction of 131 length of limiting slot is parallel to the axis of jack 121.
Referring to Fig.1, limit plate 13 offers location hole 132 in the side backwards to jack 121.In the present embodiment, it positions
The axis in hole 132 is equipped with bolt 14 in location hole 132 perpendicular to the axis of jack 121, is equipped with annulus in the end of bolt 14
141。
Referring to Fig.1 with Fig. 2, locating piece 15 is inserted in jack 121.In the present embodiment, locating piece 15 includes end
Cylinder 151 and the limited block 153 for being fixed on 151 end of cylinder, cylinder 151 are equipped with guiding in the end backwards to limited block 153
Inclined-plane 152 is covered with rubber layer on guiding surface 152.
Referring to Fig.1 with Fig. 2, limited block 153 is in the side backwards to cylinder 151 equipped with hand handle 154.In the present embodiment, In
Hand handle 154 is equipped with anti-skid chequer.
Referring to Fig.1 with Fig. 2, it is equipped in the two sides of plugboard 2 for being inserted into jack 121 and keeping plugboard 2 and framework 1 real
Existing relatively-stationary inserted link 21.In the present embodiment, groove body 22 is offered on plugboard 2, the width of groove body 22 is equal to grafting
The thickness of plate 2 offers multiple through-holes 221 along the extending direction of 22 length of groove body in 22 bottom of groove body, and the axis of through-hole 221 hangs down
Directly in the extending direction of groove body 22.
The working principle of the present embodiment are as follows: when needing to assemble concrete blinding, plugboard 2 is mutually first assembled into I-shaped
Then type is inserted into locating piece 15 in the jack 121 of corresponding position.When the limited block 153 on locating piece 15 is sliding along limiting slot 131
After moving until cylinder 151 is completely inserted into jack 121, towards location hole 132 in plug bolt 14 to make locating piece 15 with
Keep relatively fixed between limiting slot 131.
It is inserted into side of the plugboard 2 with inserted link 21 between two pieces of limit plates 13 of column 12 from the external world, at this time
Limit plate 13 carries out cross spacing to plugboard 2.It is placed in plugboard 2 from top to bottom on locating piece 15, at this time plugboard 2
On inserted link 21 and the jack 121 of corresponding position on column 12 it is coaxial, then push plugboard 2 to framework 1 and plug in inserted link 21
Enter in jack 121.Plugboard 2 after the installation is completed, first catch annulus 141 extract bolt 14, then catch hand handle 154 extract positioning
Block 15, concrete blinding completes assembling at this time.
The present embodiment, can be first to plugboard 2 by the way that the limit plate 13 to extend outwardly is arranged in the two sides of column 12 respectively
Cross spacing is carried out, then by the way that locating piece 15 to be inserted into jack 121, when so that plugboard 2 being placed on locating piece 15, grafting
The inserted link 21 of plate 2 can be precisely directed to the jack 121 on column 12, to be greatly saved needed for assembling concrete blinding
Time effectively increases the construction efficiency of hydraulic engineering.
The embodiment of present embodiment is the preferred embodiment of the utility model, and not limitation is originally practical new according to this
The protection scope of type, therefore: the equivalence changes that all structures, shape, principle according to the utility model are done should all be covered by practical
Within novel protection scope.
Claims (8)
1. a kind of hydraulic engineering concrete blinding, including several frameworks (1) being mutually inserted and plugboard (2), feature exists
In: the framework (1) includes boundary frame area (11) and is fixed on the column (12) of boundary frame area (11) two sides vertically, in column (12)
On offer several jacks arranged in parallel (121), be equipped in the two sides of plugboard (2) for being inserted into jack (121) simultaneously
Plugboard (2) and framework (1) are made to realize relatively-stationary inserted link (21);
The limit plate (13) for being connected to plugboard (2) two sides respectively is extended in the two sides of column (12), plugboard supports on (2)
The locating piece (15) for being connected to insertion jack (121) and inserted link (21) being made to find corresponding jack (121) accurately.
2. a kind of hydraulic engineering concrete blinding according to claim 1, it is characterised in that: locating piece (15) includes end
The limited block (153) that portion is used for the cylinder (151) that is inserted into jack (121) and is fixed on cylinder (151) end, cylinder
(151) guiding surface (152) are equipped in the end backwards to limited block (153).
3. a kind of hydraulic engineering concrete blinding according to claim 2, it is characterised in that: limit plate (13) is in direction
The side of plugboard (2) offers the limiting slot (131) with limited block (153) sliding cooperation.
4. a kind of hydraulic engineering concrete blinding according to claim 3, it is characterised in that: limited block (153) is being carried on the back
Hand handle (154) are equipped with to the side of cylinder (151).
5. a kind of hydraulic engineering concrete blinding according to claim 4, it is characterised in that: in guiding surface (152)
On be covered with rubber layer.
6. a kind of hydraulic engineering concrete blinding according to claim 5, it is characterised in that: set on hand handle (154)
There is anti-skid chequer.
7. a kind of hydraulic engineering concrete blinding according to claim 1, it is characterised in that: limit plate (13) is backwards
The side of plugboard (2) offers location hole (132), is equipped in location hole (132) and is connected to limited block (153) and makes to limit
Block (153) and limit plate (13) keep relatively-stationary bolt (14).
8. a kind of hydraulic engineering concrete blinding according to claim 7, it is characterised in that: in the end of bolt (14)
Equipped with annulus (141).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920045854.XU CN209568411U (en) | 2019-01-10 | 2019-01-10 | A kind of hydraulic engineering concrete blinding |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920045854.XU CN209568411U (en) | 2019-01-10 | 2019-01-10 | A kind of hydraulic engineering concrete blinding |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209568411U true CN209568411U (en) | 2019-11-01 |
Family
ID=68333187
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920045854.XU Withdrawn - After Issue CN209568411U (en) | 2019-01-10 | 2019-01-10 | A kind of hydraulic engineering concrete blinding |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209568411U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114016676A (en) * | 2021-12-09 | 2022-02-08 | 江苏晟唐合智建筑设计有限公司 | Structure for preventing slope roof steps from sliding down and construction method thereof |
-
2019
- 2019-01-10 CN CN201920045854.XU patent/CN209568411U/en not_active Withdrawn - After Issue
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114016676A (en) * | 2021-12-09 | 2022-02-08 | 江苏晟唐合智建筑设计有限公司 | Structure for preventing slope roof steps from sliding down and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206053324U (en) | A kind of curved adjustable securing member of building template list | |
CN209568411U (en) | A kind of hydraulic engineering concrete blinding | |
CN211714589U (en) | Template piece joint draw-in groove device | |
CN206722965U (en) | A kind of wind-power electricity generation main frame of achievable Fast Installation | |
CN105947368B (en) | Combined pallet | |
CN208072968U (en) | Beam side plate template | |
CN204697428U (en) | For the cabinet base of communications equipment room | |
CN208329652U (en) | A kind of laminated floor slab hoisting structure | |
CN207245206U (en) | A kind of steel truss assembly moulding bed that can accurately adjust | |
CN213233927U (en) | Building concatenation type curtain | |
CN214870505U (en) | Stacking frame for placing vertical prefabricated components | |
CN103978703B (en) | Positioning device of embedded screw sleeve and manufacturing method of segmented blade shell | |
CN203854992U (en) | Plate transportation rack | |
CN204850424U (en) | Aluminum alloy template | |
CN204826605U (en) | Novel aluminum alloy template | |
CN205654079U (en) | Instrument formula wall form system that fissure of displacement was arranged | |
CN207273489U (en) | A kind of stitching portion of hyperbola pier shaft improves structure | |
CN220376199U (en) | Tower body section connection structure | |
CN221095610U (en) | Assembled floor dowel steel connection structure | |
CN102359183B (en) | X-shaped bent colored ribbon and making method thereof | |
CN215889284U (en) | Operation platform for debugging experiment site construction | |
CN210086805U (en) | Landscape wall construction template and landscape wall construction device | |
CN201627283U (en) | Stainless steel composite wall surface | |
CN220336102U (en) | Assembled building frame | |
CN203830413U (en) | Machine frame for cold-roll steel sheets |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20191101 Effective date of abandoning: 20200217 |