CN209568378U - A kind of shearing resistance shearing stress cylinder concrete pipe of jacking construction method - Google Patents

A kind of shearing resistance shearing stress cylinder concrete pipe of jacking construction method Download PDF

Info

Publication number
CN209568378U
CN209568378U CN201920086000.6U CN201920086000U CN209568378U CN 209568378 U CN209568378 U CN 209568378U CN 201920086000 U CN201920086000 U CN 201920086000U CN 209568378 U CN209568378 U CN 209568378U
Authority
CN
China
Prior art keywords
concrete
pipe
tube body
steel cylinder
cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920086000.6U
Other languages
Chinese (zh)
Inventor
张秀菲
章伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIANJIN HEHAI PIPE INDUSTRY Co Ltd
Original Assignee
TIANJIN HEHAI PIPE INDUSTRY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN HEHAI PIPE INDUSTRY Co Ltd filed Critical TIANJIN HEHAI PIPE INDUSTRY Co Ltd
Priority to CN201920086000.6U priority Critical patent/CN209568378U/en
Application granted granted Critical
Publication of CN209568378U publication Critical patent/CN209568378U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Rod-Shaped Construction Members (AREA)

Abstract

The utility model discloses a kind of shearing resistance shearing stress cylinder concrete pipes of jacking construction method, including pipe of concrete, steel cylinder is fixedly connected on the inner sidewall of the pipe of concrete, the first tube body is fixedly connected between one end of the steel cylinder and the inner sidewall of pipe of concrete, the steel cylinder is fixedly connected with the second tube body on the inner sidewall of first tube body one end, and Concrete Filled object is filled in the portion void between first tube body and the second tube body.The utility model is by will be integrally welded between the first tube body, the second tube body, steel cylinder, so that its mutual connection is more secured, it is stronger to the ability to bear of shear stress, to prevent from leading to pipe of concrete breakage, cracking because shear stress is beyond limit is born during jacking.

Description

A kind of shearing resistance shearing stress cylinder concrete pipe of jacking construction method
Technical field
The utility model relates to pipe of concrete technical field more particularly to a kind of shearing resistance shearing stress steel of jacking construction method Cylinder pipe of concrete.
Background technique
Jacking construction method is also jacking, in construction, by power transmission top iron and guide rail, with being supported on base Pipe is pressed into soil layer by the hydraulic jack cheated on back seat, while being excavated and being transported the positive soil of pipe.When first segment pipe is whole After heading into soil layer, then by the followed continuation jacking of double section tube, a section section pipe is headed into this way, interface is performed, builds up Culvert pipe.
During jacking, concrete ceiling coil used by palisades or soil layer drag effect because steel cylinder is Built-in, steel cylinder itself does not stress, therefore a shear stress can be generated in the tube body of pipe of concrete, mainly acts on two pipes Coupling part between body, under the action of shear stress, concrete ceiling coil is easy to cracking, breakage.
Utility model content
Purpose of the utility model is to solve disadvantages existing in the prior art, such as: during jacking, Concrete ceiling coil used can be generated a shear stress in the tube body of pipe of concrete by the drag effect of palisades or soil layer, main The coupling part between two tube bodies is acted on, under the action of shear stress, concrete ceiling coil is easy to cracking, breakage.
To achieve the goals above, the utility model adopts the technical scheme that
A kind of shearing resistance shearing stress cylinder concrete pipe of jacking construction method, including pipe of concrete, the pipe of concrete It is fixedly connected with steel cylinder on inner sidewall, the first pipe is fixedly connected between one end of the steel cylinder and the inner sidewall of pipe of concrete Body, the steel cylinder are fixedly connected with the second tube body, first tube body and the second pipe on the inner sidewall of first tube body one end Concrete Filled object is filled in portion void between body, on the inner sidewall of first tube body and the lateral wall of the second tube body On be equipped with screw thread, pipe of concrete is stretched out in one end of the steel cylinder, and the steel cylinder stretches out the inside barrel of pipe of concrete one end With screw thread is equipped in outside cylinder wall.
Preferably, wooden backing plate is bonded with by glue on one end side wall of the pipe of concrete.
Preferably, the pipe of concrete is equipped with annular groove close to the one side wall of wooden backing plate, and the wooden backing plate leans on The one side wall of nearly pipe of concrete is equipped with corresponding groove, is equipped with rubber washer in the groove.
Preferably, reinforced frame is equipped in the tube body of the pipe of concrete.
Preferably, it is fixedly connected by welding together between first tube body and steel cylinder, the steel cylinder and the second pipe It is fixedly connected by welding together between body.
Preferably, multiple symmetrically arranged welding blocks are welded between first tube body and the second tube body.
In the utility model, the beneficial effects of the utility model are:
1, it is fixedly connected by welding between the first tube body and steel cylinder together, passes through welding between steel cylinder and the second tube body It is fixed together, multiple symmetrically arranged welding blocks are welded between the first tube body and the second tube body by welding block makes first Tube body, the second tube body, integrally welded between steel cylinder, connection is more secured between each other, more to the ability to bear of shear stress By force, to prevent from leading to pipe of concrete breakage, cracking because shear stress is beyond limit is born during jacking.
2, by reinforced frame being arranged, is pushed away to further enhance pipe of concrete in push pipe in the casting process of pipe of concrete Into the ability in the process, bearing shear stress.
3, it is connected between the first tube body and the second tube body by the screwed threaded one end of steel cylinder, by two sections of coagulations When native pipe is installed together, wooden backing plate can be prevented because steel cylinder rotary force is excessive, the bottom end of steel cylinder extruded concrete pipe to Cause pipe of concrete bottom end damaged, under the extruding of wooden backing plate and pipe of concrete, the rubber washer being arranged in groove is squeezed Compressive strain is sealed processing to the gap connected between wooden backing plate and pipe of concrete.
Detailed description of the invention
Fig. 1 be the utility model proposes a kind of jacking construction method shearing resistance shearing stress cylinder concrete pipe front knot Structure schematic diagram;
Fig. 2 be the utility model proposes a kind of jacking construction method shearing resistance shearing stress cylinder concrete pipe installation company Connect status diagram.
In figure: 1 pipe of concrete, 2 steel cylinders, 3 first tube bodies, 4 second tube bodies, 5 Concrete Filled objects, 6 welding blocks, 7 reinforced frames, 8 rubber washers, 9 wooden backing plates.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.
In the description of the present invention, it should be understood that term " on ", "lower", "front", "rear", "left", "right", The orientation or positional relationship of the instructions such as "top", "bottom", "inner", "outside" is to be based on the orientation or positional relationship shown in the drawings, and is only For ease of description the utility model and simplify description, rather than the device or element of indication or suggestion meaning must have it is specific Orientation, be constructed and operated in a specific orientation, therefore should not be understood as limiting the present invention.
Referring to Fig.1-2, the shearing resistance shearing stress cylinder concrete pipe of a kind of jacking construction method, including pipe of concrete 1, coagulation Reinforced frame 7 is equipped in the tube body of native pipe 1, by the way that reinforced frame 7, Lai Zengqiang concrete is arranged in the casting process of pipe of concrete 1 Pipe 1 bears the ability of shear stress during jacking, to prevent because shear stress is excessive, beyond pipe of concrete 1 Tolerance range and lead to 1 bodies splittable of pipe of concrete, breakage, can not normal use.
Steel cylinder 2 is fixedly connected on the inner sidewall of pipe of concrete 1, between one end of steel cylinder 2 and the inner sidewall of pipe of concrete 1 It is fixedly connected with the first tube body 3, steel cylinder 2 is fixedly connected with the second tube body 4 on the inner sidewall of 3 one end of the first tube body, and first Concrete Filled object 5 is filled in portion void between tube body 3 and the second tube body 4.
It is fixedly connected by welding together between first tube body 3 and steel cylinder 2, passes through weldering between steel cylinder 2 and the second tube body 4 It connecing and is fixed together, the fixed effect of welding is secured, and saves material, and it is simple to operate, it can be obviously improved The fastness connected between the fastness and the second tube body 4 and steel cylinder 2 connected between first tube body 3 and steel cylinder 2, and enhance the One tube body 3, steel cylinder 2, between the second tube body 4 connection structure globality.
It is welded with multiple symmetrically arranged welding blocks 6 between first tube body 3 and the second tube body 4, by welding block 6, makes the first pipe Body 3, the second tube body 4, integrally welded between steel cylinder 2, connection is more secured between each other, more to the ability to bear of shear stress By force, screw thread is equipped on the inner sidewall of the first tube body 3 and on the lateral wall of the second tube body 4, pipe of concrete is stretched out in one end of steel cylinder 2 1, and screw thread, the one end of pipe of concrete 1 are equipped in the inside barrel of the stretching of steel cylinder 21 one end of pipe of concrete and outside cylinder wall Wooden backing plate 9 is bonded with by glue on wall.
During wooden backing plate 9 can prevent from installing between both ends pipe of concrete 1, by steel cylinder 2 screwed one When end is threaded between the first tube body 3 and the second tube body 4, because 2 rotary force of steel cylinder is excessive, 2 extruded concrete pipe 1 of steel cylinder Bottom end is equipped with annular groove, wood close to the one side wall of wooden backing plate 9 so as to cause the breakage of 1 bottom end of pipe of concrete, pipe of concrete 1 Matter backing plate 9 is equipped with corresponding groove close to the one side wall of pipe of concrete 1, rubber washer 8 is equipped in groove, in wooden backing plate 9 Under extruding with pipe of concrete 1, the rubber washer 8 being arranged in groove is deformed, to wooden backing plate 9 and pipe of concrete 1 Between the gap that connects be sealed processing.
In the utility model, when user uses the device, by welding block 6 by the first tube body 3, the second tube body 4 and steel cylinder 2 It is welded into an entirety, so that pipe of concrete 1 is promoted during jacking, to the ability to bear of shear stress, thus Reduce influence of the shear stress to 1 tube body of pipe of concrete, by the way that reinforced frame 7 is arranged in the casting process of pipe of concrete 1, comes Pipe of concrete 1 is further enhanced during jacking, bears the ability of shear stress, by steel cylinder 2 screwed one End is threaded between the first tube body 3 and the second tube body 4, when two section concrete pipes 1 are installed together, wooden backing plate 9 It can prevent because 2 rotary force of steel cylinder is excessive, the bottom end of 2 extruded concrete pipe 1 of steel cylinder is damaged so as to cause 1 bottom end of pipe of concrete, Under the extruding of wooden backing plate 9 and pipe of concrete 1, the rubber washer 8 being arranged in groove is deformed, to wooden backing plate 9 The gap connected between pipe of concrete 1 is sealed processing.
The preferable specific embodiment of the above, only the utility model, but the protection scope of the utility model is not It is confined to this, anyone skilled in the art is within the technical scope disclosed by the utility model, practical according to this Novel technical solution and its utility model design are subject to equivalent substitution or change, should all cover the protection model in the utility model Within enclosing.

Claims (6)

1. a kind of shearing resistance shearing stress cylinder concrete pipe of jacking construction method, including pipe of concrete (1), which is characterized in that institute It states and is fixedly connected on the inner sidewall of pipe of concrete (1) steel cylinder (2), one end of the steel cylinder (2) and the inside of pipe of concrete (1) It is fixedly connected between wall the first tube body (3), the steel cylinder (2) is fixedly connected on the inner sidewall of the first tube body (3) one end Have the second tube body (4), Concrete Filled object is filled in the portion void between first tube body (3) and the second tube body (4) (5), on the inner sidewall of first tube body (3) and it is equipped with screw thread on the lateral wall of the second tube body (4), the steel cylinder (2) Pipe of concrete (1) is stretched out in one end, and the steel cylinder (2) stretches out on the inside barrel and outside cylinder wall of pipe of concrete (1) one end Equipped with screw thread.
2. a kind of shearing resistance shearing stress cylinder concrete pipe of jacking construction method according to claim 1, which is characterized in that Wooden backing plate (9) are bonded with by glue on one end side wall of the pipe of concrete (1).
3. a kind of shearing resistance shearing stress cylinder concrete pipe of jacking construction method according to claim 2, which is characterized in that One side wall of the pipe of concrete (1) close to wooden backing plate (9) is equipped with annular groove, and the wooden backing plate (9) is close to coagulation The one side wall of soil pipe (1) is equipped with corresponding groove, is equipped with rubber washer (8) in the groove.
4. a kind of shearing resistance shearing stress cylinder concrete pipe of jacking construction method according to claim 1, which is characterized in that Reinforced frame (7) are equipped in the tube body of the pipe of concrete (1).
5. a kind of shearing resistance shearing stress cylinder concrete pipe of jacking construction method according to claim 1, which is characterized in that Be fixedly connected by welding together between first tube body (3) and steel cylinder (2), the steel cylinder (2) and the second tube body (4) it Between be fixedly connected by welding together.
6. a kind of shearing resistance shearing stress cylinder concrete pipe of jacking construction method according to claim 1, which is characterized in that Multiple symmetrically arranged welding blocks (6) are welded between first tube body (3) and the second tube body (4).
CN201920086000.6U 2019-01-18 2019-01-18 A kind of shearing resistance shearing stress cylinder concrete pipe of jacking construction method Expired - Fee Related CN209568378U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920086000.6U CN209568378U (en) 2019-01-18 2019-01-18 A kind of shearing resistance shearing stress cylinder concrete pipe of jacking construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920086000.6U CN209568378U (en) 2019-01-18 2019-01-18 A kind of shearing resistance shearing stress cylinder concrete pipe of jacking construction method

Publications (1)

Publication Number Publication Date
CN209568378U true CN209568378U (en) 2019-11-01

Family

ID=68333075

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920086000.6U Expired - Fee Related CN209568378U (en) 2019-01-18 2019-01-18 A kind of shearing resistance shearing stress cylinder concrete pipe of jacking construction method

Country Status (1)

Country Link
CN (1) CN209568378U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111271529A (en) * 2019-12-20 2020-06-12 漳州明威建材发展有限公司 Reinforced concrete pipe and manufacturing process thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111271529A (en) * 2019-12-20 2020-06-12 漳州明威建材发展有限公司 Reinforced concrete pipe and manufacturing process thereof

Similar Documents

Publication Publication Date Title
CN209568378U (en) A kind of shearing resistance shearing stress cylinder concrete pipe of jacking construction method
CN203201146U (en) Spacers for column template reinforcement
CN208057139U (en) A kind of tension and compression coupling deformation anchor pole
CN204225906U (en) Large deformation hollow steel tube concrete support
CN204187120U (en) Supporting post-rod
CN203701433U (en) Lateral welding lap joint structure of vertical reinforcements and steel sleeve of assembled wall
CN101745983A (en) A kind of tubular pile pre-stress stretching device
CN107202046A (en) A kind of plunger combination oil cylinder with guide sleeve axle
CN203298939U (en) Comprehensive test device for pipe interface sealing and hydraulic circulation
CN201924350U (en) Bolt-type mechanical connecting clamp for pulling-resistant pipe pile
CN205663107U (en) Anti steel bar connection structure of splitting of concrete
CN201605725U (en) Connecting structure of concrete steel bar and steel rib
CN204250261U (en) The plug-in type connection structure of the five-way on road cycling vehicle frame and Chain stay
CN207608810U (en) A kind of vertical damping decompressor in bridge bottom end
CN208431457U (en) A kind of relay well with anti-soil effect
CN208634608U (en) A kind of pipe fitting of included sealing device
CN211736494U (en) Reinforced structure additionally provided with balcony slab
CN210484822U (en) High-ductility cement underground water pipe installation and connection structure
CN214660239U (en) Plug-in type quick connection steel frame joint
CN203671223U (en) Pedal structure
CN216265662U (en) Quick mounting structure of H steel
CN211085896U (en) Compression test device for highway engineering
CN209603383U (en) The connection of efficient energy-saving and emission-reducing high tensile reinforcement squeezes grouting architectural prefab
CN204040475U (en) A kind of composite core formwork combination square chest tension bracket
CN214064188U (en) Industrial high-strength spiral plastic pipe

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191101

Termination date: 20210118