CN209561099U - Right-angled intersection is fixed by army cap - Google Patents
Right-angled intersection is fixed by army cap Download PDFInfo
- Publication number
- CN209561099U CN209561099U CN201920773115.2U CN201920773115U CN209561099U CN 209561099 U CN209561099 U CN 209561099U CN 201920773115 U CN201920773115 U CN 201920773115U CN 209561099 U CN209561099 U CN 209561099U
- Authority
- CN
- China
- Prior art keywords
- puller bolt
- pipeline section
- main body
- connection
- groove
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Laying Of Electric Cables Or Lines Outside (AREA)
Abstract
The utility model relates to electrical equipment technical fields, and it is fixed by army cap specifically to disclose a kind of right-angled intersection, comprising: connection main body, the connection main body include the first pipeline section, the second pipeline section and the third pipeline section that diameter is sequentially increased;Supported flange, the supported flange are set in the outside of the third pipeline section;Holding device, the holding device include: connection ring, and the connection ring is set in the connection main body;First puller bolt, first puller bolt are horizontally disposed with and extend transversely through the connection ring and connected with the side with the connection main body;Second puller bolt, second puller bolt are vertically arranged and longitudinally through the connection ring to connect with the top surface of the connecting flange.Right-angled intersection provided by the utility model is fixed by army cap, can effectively overcome the problems, such as that being inserted into boss is easy to skid off insertion hole during the installation process.
Description
Technical field
It is fixed by army cap that the utility model relates to electrical equipment technical fields more particularly to a kind of right-angled intersection.
Background technique
In order to facilitate the connection for realizing cable and shaft tower etc., need using as shown in Figure 1 by army cap, referring to Fig. 1, general
Cap includes connection main body 1 and supported flange 2, connects main body 1 and supported flange 2 is equipped with location hole 3, when being assembled, the two
Location hole 3 to be aligned, in order to both make to be aligned, connection main body 1 is equipped with insertion hole 101, and supported flange 2 is equipped with insertion boss
201, when being inserted into the insertion insertion of boss 201 hole 101, just realize the alignment of two location holes 3.
In operation, often only one operator carries out the assembly and disassembly of army cap, two hands will take tool or
Person takes fixing bolt etc., can not vacate a hand and be fixed and clamped flange 2 and connection main body 1;Sometimes, army cap needs are mounted on
When inclined position, due to being in inclined state, and the height for being inserted into boss 201 will not be very high, and insertion boss 201 is easy for
Insertion hole 101 is skidded off, and then leads to the alignment failure of two location holes 3.
Therefore, it is necessary to improve army cap to existing, insertion boss is overcome to be easy to skid off insertion during the installation process
The problem of hole.
Utility model content
One purpose of the utility model is, it is fixed by army cap to provide a kind of right-angled intersection, can effectively overcome insertion
Boss is easy the problem of skidding off insertion hole during the installation process.
To achieve these objectives, it is fixed by army cap to provide a kind of right-angled intersection for the utility model, comprising:
Main body is connected, the connection main body includes the first pipeline section, the second pipeline section and the third pipeline section that diameter is sequentially increased, institute
It states and is installed with connecting flange on the outside of the lower end of third pipeline section, the connecting flange is equipped with insertion hole;
Supported flange, the supported flange are set in the outside of the third pipeline section and are located at the upper of the connecting flange
Side, the bottom of the supported flange are equipped with and the insertion boss that inserts in the hole described in insertion;
Holding device, the holding device include:
Connection ring, the connection ring are set in the connection main body;
First puller bolt, first puller bolt be horizontally disposed with and extend transversely through the connection ring with the connection
The side of main body connects;
Second puller bolt, second puller bolt be vertically arranged and longitudinally through the connection ring with the connection
The top surface of flange connects.
Preferably, the quantity of first puller bolt is at least two, the distance between adjacent two first puller bolt
It is equal.
Preferably, the quantity of second puller bolt is at least two, the distance between adjacent two first puller bolt
It is equal.
Preferably, first puller bolt and the second puller bolt are equipped with rubber close to the side of the connection main body
Pad.
Preferably, the central location of the bottom of the connection ring is equipped with the first groove upwardly extended, first groove
Slot bottom be equipped with the second groove for upwardly extending;
The lower end of first pipeline section is located in second groove, and it is recessed that the upper end of second pipeline section is located at described first
In slot;
Alternatively,
The lower end of second pipeline section is located in second groove, and it is recessed that the upper end of the third pipeline section is located at described first
In slot.
The utility model has the beneficial effects that: it is fixed by army cap to provide a kind of right-angled intersection, insertion can be effectively overcome
Boss is easy the problem of skidding off insertion hole during the installation process.
Detailed description of the invention
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment
Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is only
It is some embodiments of the utility model, for those of ordinary skill in the art, before not making the creative labor property
It puts, can also be obtained according to these attached drawings other attached drawings.
Fig. 1 is the existing structural schematic diagram by army cap described in background technique;
Fig. 2 is the fixed structural schematic diagram by army cap of right-angled intersection that embodiment provides;
Fig. 3 is the structural schematic diagram for the holding device that embodiment provides.
In figure:
1, main body is connected;101, it is inserted into hole;102, the first pipeline section;103, the second pipeline section;104, third pipeline section;105, it connects
Flange;
2, supported flange;201, it is inserted into boss;
3, location hole;
4, holding device;401, connection ring;4011, the first groove;4012, the second groove;402, the first puller bolt;
403, the second puller bolt;404, rubber pad.
Specific embodiment
It is practical below in conjunction with this to enable the purpose of this utility model, feature, advantage more obvious and understandable
Attached drawing in new embodiment, the technical scheme in the utility model embodiment is clearly and completely described, it is clear that under
The described embodiments are only a part of the embodiments of the utility model in face, and not all embodiment.Based on the utility model
In embodiment, all other implementation obtained by those of ordinary skill in the art without making creative efforts
Example, fall within the protection scope of the utility model.
In the description of the present invention, it should be understood that when a component is considered as " connection " another component,
It can be directly to another component or may be simultaneously present the component being centrally located.When a component is considered as
" setting exists " another component, it, which can be, is set up directly on another component or may be simultaneously present the group being centrally located
Part.
In addition, the indicating positions such as term " length " " short " "inner" "outside" or positional relationship for the orientation that is shown based on attached drawing or
Person's positional relationship is merely for convenience of description the utility model, rather than the device or original part of indication or suggestion meaning must have
There is this specific orientation, operated with specific orientation construction, should not be understood as the limitation of the utility model with this.
Further illustrate the technical solution of the utility model below with reference to the accompanying drawings and specific embodiments.
Referring to FIG. 1 to FIG. 3, it is fixed by army cap, including connection main body 1, compression that the present embodiment provides a kind of right-angled intersections
Flange 2 and holding device 4.
The connection main body 1 includes the first pipeline section 102, the second pipeline section 103 and the third pipeline section 104 that diameter is sequentially increased,
Connecting flange 105 is installed on the outside of the lower end of the third pipeline section 104, the connecting flange 105 is equipped with insertion hole 101;
The supported flange 2 is set in the outside of the third pipeline section 104 and is located at the top of the connecting flange 105, the compression
The bottom of flange 2 is equipped with and is inserted into the insertion boss 201 being inserted into hole 101.
The holding device 4 includes connection ring 401, the first puller bolt 402 and the second puller bolt 403.The connection
Ring 401 is set in the connection main body 1;First puller bolt 402 is horizontally disposed and extends transversely through the connection ring 401
It is connected with the side with the connection main body 1;Second puller bolt 403 is vertically arranged and longitudinally through the connection
Ring 401 with the top surface of the connecting flange 105 to connect.
Preferably, the quantity of first puller bolt 402 is at least two, between adjacent two first puller bolt 402
Be equidistant.The quantity of second puller bolt 403 is at least two, between adjacent two first puller bolt 402 away from
From equal.Specifically, such be provided with is conducive to uniformly apply clamping force to connection main body 1.
Preferably, the central location of the bottom of the connection ring 401 is equipped with the first groove 4011 for upwardly extending, and described the
The slot bottom of one groove 4011 is equipped with the second groove 4012 upwardly extended.The lower end of first pipeline section 102 is located at described second
In groove 4012, the upper end of second pipeline section 103 is located in first groove 4011;Alternatively, second pipeline section 103
Lower end is located in second groove 4012, and the upper end of the third pipeline section 104 is located in first groove 4011.Specifically
Ground, the setting of two grooves are that connection ring 401 is stuck in connection main body 1 for convenience, realize the positioning of connection ring 401.
Preferably, the first puller bolt 402 and the second puller bolt 403 are equipped with close to the side of the connection main body 1
Rubber pad 404, for it is anti-skidding and prevent puller bolt scratch connection main body 1.
Right-angled intersection provided in this embodiment is fixed as follows by the army cap course of work:
1. supported flange 2 is placed in connection main body 1, make to be inserted into the insertion insertion of boss 201 hole 101, two location holes 3 are right
Together;In the present embodiment, insertion boss 201 is not completely shown in figure to be more than two;
2. holding device 4 is inserted in from top to bottom, it is stuck in connection ring 401 in the second pipeline section 103 and third pipeline section 104
Junction;
3. rotating the first puller bolt 402, it is in close contact the first puller bolt 402 with third pipeline section 104;
4. rotating the second puller bolt 403, it is in close contact the second puller bolt 403 with connecting flange 105;
5. being attached using fixing bolt through two location holes 3 and wall or shaft tower etc., and then complete army cap
Installation can remove holding device 4 finally, rotating backward the first puller bolt 402 and unclamping holding device 4.
It is understood that 1 structure of connection main body of three-stage is conducive to adapt to the holding device 4 of different-diameter size.
Right-angled intersection provided in this embodiment is fixed by army cap, and insertion boss 201 can effectively be overcome to be easy installing
The problem of insertion hole 101 are skidded off in journey.
Above embodiments are only to illustrate the technical solution of the utility model, rather than its limitations;Although referring to aforementioned reality
Example is applied the utility model is described in detail, those skilled in the art should understand that: it still can be to preceding
Technical solution documented by each embodiment is stated to modify or equivalent replacement of some of the technical features;And these
It modifies or replaces, the spirit and model of various embodiments of the utility model technical solution that it does not separate the essence of the corresponding technical solution
It encloses.
Claims (5)
1. a kind of right-angled intersection is fixed by army cap characterized by comprising
It connects main body (1), connection main body (1) includes the first pipeline section (102), the second pipeline section (103) that diameter is sequentially increased
With third pipeline section (104), connecting flange (105), the connecting flange are installed on the outside of the lower end of the third pipeline section (104)
(105) it is equipped with insertion hole (101);
Supported flange (2), the supported flange (2) are set in the outside of the third pipeline section (104) and are located at the connection method
The top of blue (105), the bottom of the supported flange (2) are equipped with and are inserted into the insertion boss being inserted into hole (101)
(201);
Holding device (4), the holding device (4) include:
Connection ring (401), the connection ring (401) are set on the connection main body (1);
First puller bolt (402), first puller bolt (402) is horizontally disposed and extends transversely through the connection ring (401)
It is connected with the side with connection main body (1);
Second puller bolt (403), second puller bolt (403) are vertically arranged and longitudinally through the connection ring (401)
To be connected with the top surface of the connecting flange (105).
2. right-angled intersection according to claim 1 is fixed by army cap, which is characterized in that first puller bolt
(402) quantity is at least two, and the distance between adjacent two first puller bolt (402) is equal.
3. right-angled intersection according to claim 1 is fixed by army cap, which is characterized in that second puller bolt
(403) quantity is at least two, and the distance between adjacent two first puller bolt (402) is equal.
4. right-angled intersection according to claim 1 is fixed by army cap, which is characterized in that first puller bolt
(402) and the side of close connection main body (1) of the second puller bolt (403) is equipped with rubber pad (404).
5. right-angled intersection according to claim 1 is fixed by army cap, which is characterized in that the bottom of the connection ring (401)
The central location in portion is equipped with the first groove (4011) upwardly extended, and the slot bottom of first groove (4011), which is equipped with, to be upwardly extended
The second groove (4012);
The lower end of first pipeline section (102) is located in second groove (4012), the upper end position of second pipeline section (103)
In first groove (4011);
Alternatively,
The lower end of second pipeline section (103) is located in second groove (4012), the upper end position of the third pipeline section (104)
In first groove (4011).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920773115.2U CN209561099U (en) | 2019-05-27 | 2019-05-27 | Right-angled intersection is fixed by army cap |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920773115.2U CN209561099U (en) | 2019-05-27 | 2019-05-27 | Right-angled intersection is fixed by army cap |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209561099U true CN209561099U (en) | 2019-10-29 |
Family
ID=68313826
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920773115.2U Active CN209561099U (en) | 2019-05-27 | 2019-05-27 | Right-angled intersection is fixed by army cap |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209561099U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113565009A (en) * | 2021-07-09 | 2021-10-29 | 无锡金诚工程技术服务有限公司 | Combined type stay cable general cap capable of being installed quickly and installation method thereof |
-
2019
- 2019-05-27 CN CN201920773115.2U patent/CN209561099U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113565009A (en) * | 2021-07-09 | 2021-10-29 | 无锡金诚工程技术服务有限公司 | Combined type stay cable general cap capable of being installed quickly and installation method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209561099U (en) | Right-angled intersection is fixed by army cap | |
CN106763019A (en) | A kind of attachment means for being applied to fast assembling-disassembling cable drag chain | |
CN201606393U (en) | Guy table connecting device | |
CN208680061U (en) | A kind of device for pipe dredging | |
CN209085852U (en) | A kind of New energy automobile motor air-tightness detection tool | |
CN204768793U (en) | Get cooperation structure of liquid spare and test tube subassembly | |
CN104036993B (en) | A kind of frock for installing vacuum circuit breaker sleeve pipe | |
CN205533612U (en) | Bonding operating block and bonding frock | |
CN208084472U (en) | A kind of pcb board puncher fast compressing device | |
CN107228254B (en) | A kind of integrated control system for vibroflotation construction | |
CN209670922U (en) | A kind of attachment device of multi-section one chip fission tourist bus and top drive | |
CN209294643U (en) | A kind of pipe joint protective device | |
CN210444548U (en) | Adjustable electrostatic discharge device for oiling machine | |
CN205369031U (en) | Portable trolley track | |
CN217401969U (en) | Flaring type high-abrasion-resistance gas pipeline joint | |
CN214889482U (en) | Pipeline connection conversion device for water supply and drainage | |
CN208565431U (en) | A kind of solid drag chain section | |
CN210053044U (en) | Power box for electric power distribution | |
CN201927435U (en) | Pin of strain insulator string | |
CN206613937U (en) | A kind of oil level indicator decompressor | |
CN209190554U (en) | A kind of turbine installation center positioning device | |
CN216275645U (en) | Rotary excavating full-sleeve lock catch connecting device | |
CN209250192U (en) | A kind of spare hoistway of communication engineering | |
CN214365996U (en) | Split type production tree | |
CN208345533U (en) | A kind of host load carrier |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |