CN209558957U - A kind of anticlogging cooler - Google Patents
A kind of anticlogging cooler Download PDFInfo
- Publication number
- CN209558957U CN209558957U CN201920126104.5U CN201920126104U CN209558957U CN 209558957 U CN209558957 U CN 209558957U CN 201920126104 U CN201920126104 U CN 201920126104U CN 209558957 U CN209558957 U CN 209558957U
- Authority
- CN
- China
- Prior art keywords
- dregs
- cooler
- cooler bin
- communicated
- fat
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Heat-Exchange Devices With Radiators And Conduit Assemblies (AREA)
Abstract
The utility model discloses a kind of anticlogging coolers, including cooler bin and dregs of fat collecting box, chamber door is threaded on the right side of the dregs of fat collecting box, water inlet line is communicated at the top of the cooler bin, and the bottom of cooler bin is communicated with outlet conduit, it is communicated with inflow pipeline on the right side of the cooler bin, the utility model relates to cooler technical fields.The anticlogging cooler, need cooling oil before entering cooler bin, the dregs of fat therein are filtered by the filtering for first passing through sieve plate, the dregs of fat filtered out mix oil and are collected by the first filter pipe by dregs of fat collecting box, and what be can be convenient when dregs of fat accumulation is full carries out disassembly, cleaning for dregs of fat collecting box, can be effectively prevented the dregs of fat occur inside cooler bin blocking cause cooler bin can not work normally, and it can intuitively be observed by the numerical value of differential pressure indicator come whether cooler blocks, blocking can be handled in advance, reduce unnecessary workload.
Description
Technical field
The utility model relates to cooler technical field, specially a kind of anticlogging cooler.
Background technique
Cooler is one kind of heat exchange equipment, is usually coolant to remove heat with water or air to cooling fluid,
There are dividing wall type cooler, spray cooler, jacket cooler and coil pipe type cooler etc., power plant's low temperature polytetrafluoroethylene (PTFE)
Cooler is that the new device equipment that power plant is reduction exhaust gas temperature progress waste heat recycling can using teflon heat exchanger
Acid corrosion is prevented, and flue-gas temperature is down within 100 degree, plastics cooler is that a kind of fluoroplastics that corrosion resistance is strong change
Hot device, China has also put into substantial contribution and manpower is dedicated to the exploitation of teflon heat exchanger, succeeds in developing " polyfluortetraethylene pipe
Plate limits swollen pressure heating welding " technique, solve the key technology of fluoroplastics tube-to-sheet joint, it is then, domestic various types of
The fluoroplastics cooler of type puts into production application successively and obtains good effect.
Oil is entered from an import in existing cooler, and one outlet comes out, circulation, because its inner passage compared with
It is small to cause easily to block, cause cooling effect poor, if smaller in screw rod mechanical cooler blocking dynamics, be not easy to find, lead to work
Work amount increase, investigation difficulty is larger, can reduce the processing efficiency of cooler, reduce the practicability of cooler.
Utility model content
In view of the deficiencies of the prior art, the utility model provides a kind of anticlogging cooler, and it is internal logical to solve it
Road is smaller to be caused easily to block, and causes cooling effect poor, if smaller in screw rod mechanical cooler blocking dynamics, be not easy to find, be led
Workload is caused to increase, the larger problem of investigation difficulty.
In order to achieve the above object, the utility model is achieved by the following technical programs: a kind of anticlogging cooler,
And the inner cavity of inflow pipeline is fixedly connected with sieve plate, and the surface of the inflow pipeline is communicated with the first filter pipe, and
The surface of first filter pipe is fixedly connected with switch valve, and the surface of first filter pipe is threaded with the first screw thread
Set, and the first thread bush is connected with the first fixing sleeve far from the threaded one end of the first filter pipe, first fixing sleeve
Be fixedly connected at the top of bottom end and dregs of fat collecting box, the top of the dregs of fat collecting box and be located at the first fixing sleeve left side fix
It is connected with the second fixing sleeve.
Preferably, the surface of second fixing sleeve is threaded with the second thread bush, and the inner cavity of the second thread bush
It is threadedly coupled the second filter pipe, the surface of second filter pipe is fixedly connected with check valve.
Preferably, one end of the inflow pipeline through cooler bin right wall and extend to the inner cavity of cooler bin, it is described into
The left end of oil-piping is fixedly connected with the first fixed -piping, and the left end of the first fixed -piping is communicated with spreading channel.
Preferably, the left end of the spreading channel is communicated with the second fixed -piping, and the left end of the second fixed -piping connects
It is connected with flowline, one end of the flowline runs through the inner cavity of cooler bin and extends to the right side of cooler bin.
Preferably, the surface of the inflow pipeline and flowline passes through pipeline and is communicated with differential pressure indicator, and flowline
The surface in road is communicated with anti-blocking pipeline.
Preferably, the surface of the spreading channel is fixedly connected with radiating copper sheet.
Beneficial effect
The utility model provides a kind of anticlogging cooler.Have compared with prior art it is following the utility model has the advantages that
(1), anticlogging cooler, by being threaded with chamber door, the top of cooler bin on the right side of dregs of fat collecting box
Portion is communicated with water inlet line, and the bottom of cooler bin is communicated with outlet conduit, it is characterised in that: is communicated on the right side of cooler bin
Inflow pipeline, and the inner cavity of inflow pipeline is fixedly connected with sieve plate, and the surface of inflow pipeline is communicated with the first filter pipe,
And the surface of the first filter pipe is fixedly connected with switch valve, and the surface of the first filter pipe is threaded with the first screw thread
Set, and the first thread bush is connected with the first fixing sleeve, the bottom end of the first fixing sleeve far from the threaded one end of the first filter pipe
It is fixedly connected at the top of dregs of fat collecting box, the top of dregs of fat collecting box and is located on the left of the first fixing sleeve and is fixedly connected with the
Two fixing sleeves need cooling oil before entering cooler bin, and the dregs of fat therein are filtered by the filtering for first passing through sieve plate, filter
The dregs of fat out mix oil and are collected by the first filter pipe by dregs of fat collecting box, and can be convenient when dregs of fat accumulation is full
By dregs of fat collecting box carry out disassembly, cleaning, can be effectively prevented the dregs of fat occurs inside cooler bin block cause cooler bin can not
Work normally, and can intuitively be observed by the numerical value of differential pressure indicator come whether cooler blocks, can in advance to block into
Row processing, reduces unnecessary workload.
(2), the anticlogging cooler, being fixedly connected with radiating copper sheet spreading channel by the surface in spreading channel will
Oil liquid in inflow pipeline slowly reduced its by speed so that oil liquid can cool down more times in cooler bin,
And the heat in oil liquid can be enabled sufficiently to be shifted by water by radiating copper sheet, increase the radiating efficiency of cooler bin, increased
The practicability of cooler bin is added.
Detailed description of the invention
Fig. 1 is the main view of the utility model structure;
Fig. 2 is the cross-sectional view of the utility model structure;
Fig. 3 is the partial enlarged view in the utility model Fig. 2 at A;
Fig. 4 is the partial enlarged view in the utility model Fig. 2 at B.
In figure: 1- cooler bin, 2- dregs of fat collecting box, 3- chamber door, 4- water inlet line, 5- outlet conduit, 6- inflow pipeline, 7-
Sieve plate, the first filter pipe of 8-, 9- switch valve, the first thread bush of 10-, the first fixing sleeve of 11-, the second fixing sleeve of 12-, 13-
Second thread bush, the second filter pipe of 14-, 15- check valve, the first fixed -piping of 16-, 17- spreading channel, 18- second are fixed
Pipeline, 19- flowline, 20- differential pressure indicator, the anti-blocking pipeline of 21-, 22- radiating copper sheet.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
Fig. 1-4 is please referred to, the utility model provides a kind of technical solution: a kind of anticlogging cooler, including cooler bin 1
With dregs of fat collecting box 2, the right side of dregs of fat collecting box 2 is threaded with chamber door 3, and the top of cooler bin 1 is communicated with water inlet line 4,
And the bottom of cooler bin 1 is communicated with outlet conduit 5, and the right side of cooler bin 1 is communicated with inflow pipeline 6, inflow pipeline 6 with it is fuel-displaced
The surface of pipeline 19 passes through pipeline and is communicated with differential pressure indicator 20, and the surface of flowline 19 is communicated with anti-blocking pipeline 21, In
The bending of flowline 21 is connected to anti-blocking pipeline 21, and dregs of fat accumulation can be effectively prevented, and cooler bin 1 is run through in one end of inflow pipeline 6
Right wall and extend to the inner cavity of cooler bin 1, the left end of inflow pipeline 6 is fixedly connected with the first fixed -piping 16, and first
The left end of fixed -piping 16 is communicated with spreading channel 17, and the surface of spreading channel 17 is fixedly connected with radiating copper sheet 22, dispersion pipe
Road 17 by the oil liquid in inflow pipeline 6 slowly reduced its by speed so that oil liquid can cool down more in cooler bin 1
Time, and the heat in oil liquid can be enabled sufficiently to be shifted by water by radiating copper sheet 22, increase dissipating for cooler bin 1
The thermal efficiency increases the practicability of cooler bin 1, and the left end of spreading channel 17 is communicated with the second fixed -piping 18, and second is solid
The left end for determining pipeline 18 is communicated with flowline 19, and one end of flowline 19 runs through the inner cavity of cooler bin 1 and extends to cooling
The right side of case 1, and the inner cavity of inflow pipeline 6 is fixedly connected with sieve plate 7, and the surface of inflow pipeline 6 is communicated with the first filtering
Pipeline 8, and the surface of the first filter pipe 8 is fixedly connected with switch valve 9, and the surface of the first filter pipe 8 is threaded with
First thread bush 10, and the first thread bush 10 is connected with the first fixing sleeve 11 far from the threaded one end of the first filter pipe 8, the
The bottom end of one fixing sleeve 11 is fixedly connected with the top of dregs of fat collecting box 2, the top of dregs of fat collecting box 2 and be located at the first fixing sleeve
11 left side is fixedly connected with the second fixing sleeve 12, and the surface of the second fixing sleeve 12 is threaded with the second thread bush 13, and
The thread in inner cavity of second thread bush 13 connects the second filter pipe 14, and the surface of the second filter pipe 14 is fixedly connected with check valve
15, need cooling oil before entering cooler bin 1, the dregs of fat therein are filtered by the filtering for first passing through sieve plate 7, are filtered out
The dregs of fat mix oil and are collected by the first filter pipe 8 by dregs of fat collecting box 2, and can be convenient when dregs of fat accumulation is full
By dregs of fat collecting box 2 carry out disassembly, cleaning, can be effectively prevented the dregs of fat occurs inside cooler bin 1 block lead to 1 nothing of cooler bin
Method works normally, and can intuitively be observed by the numerical value of differential pressure indicator 20 come whether cooler 1 blocks, can be in advance to stifled
Capable processing is filled in, unnecessary workload is reduced.
When work, cooling water is injected out of water inlet line 4, is flowed out by outlet conduit 5, will need cooling oil liquid from
Injection, the dregs of fat are filtered before sieve plate 7 in inflow pipeline 6, and most of oil liquid is flowed along inflow pipeline 6 by spreading channel 17
Enter in flowline 19, oil cooled water in inflow pipeline 6 and flowline 19 takes away heat, and cooperation radiating copper sheet 22 will be hot
Amount distributes, and is flowed out afterwards by flowline 19, while the dregs of fat and fraction oil flow into dregs of fat collecting box along the first filter pipe 8
In 2, in dregs of fat collecting box 2, dregs of fat precipitating, oil flows into inflow pipeline 6 along the second filter pipe 14, when dregs of fat collecting box
2 when needing to clean, and turns off the switch that valve 9 rotates the first thread bush 10 and the second thread bush 12 removes dregs of fat collecting box 2, check valve
15 prevent oily adverse current, are cleaned by opening chamber door 3 to dregs of fat collecting box 2, are loaded onto again after cleaning.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality
Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation
In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to
Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those
Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment
Intrinsic element.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art,
It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired
Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.
Claims (6)
1. a kind of anticlogging cooler, including cooler bin (1) and dregs of fat collecting box (2), the right side of the dregs of fat collecting box (2)
It is threaded with chamber door (3), is communicated with water inlet line (4) at the top of the cooler bin (1), and the bottom of cooler bin (1) connects
It is connected with outlet conduit (5), it is characterised in that: be communicated with inflow pipeline (6) on the right side of the cooler bin (1), and inflow pipeline
(6) inner cavity is fixedly connected with sieve plate (7), and the surface of the inflow pipeline (6) is communicated with the first filter pipe (8), and
The surface of first filter pipe (8) is fixedly connected with switch valve (9), and the surface of first filter pipe (8) is threaded with
First thread bush (10), and the first thread bush (10) is connected with first far from the threaded one end of the first filter pipe (8) and fixes
It covers (11), is fixedly connected at the top of the bottom end and dregs of fat collecting box (2) of first fixing sleeve (11), the dregs of fat collecting box
(2) top and it is located on the left of the first fixing sleeve (11) and is fixedly connected with the second fixing sleeve (12).
2. a kind of anticlogging cooler according to claim 1, it is characterised in that: the table of second fixing sleeve (12)
Face is threaded with the second thread bush (13), and the thread in inner cavity of the second thread bush (13) connects the second filter pipe (14),
The surface of second filter pipe (14) is fixedly connected with check valve (15).
3. a kind of anticlogging cooler according to claim 1, it is characterised in that: one end of the inflow pipeline (6)
Through cooler bin (1) right wall and extend to the inner cavity of cooler bin (1), the left end of the inflow pipeline (6) is fixedly connected with
One fixed -piping (16), and the left end of the first fixed -piping (16) is communicated with spreading channel (17).
4. a kind of anticlogging cooler according to claim 3, it is characterised in that: the left end of the spreading channel (17)
It is communicated with the second fixed -piping (18), and the left end of the second fixed -piping (18) is communicated with flowline (19), it is described fuel-displaced
One end of pipeline (19) runs through the inner cavity of cooler bin (1) and extends to the right side of cooler bin (1).
5. a kind of anticlogging cooler according to claim 4, it is characterised in that: the inflow pipeline (6) with it is fuel-displaced
The surface of pipeline (19) passes through pipeline and is communicated with differential pressure indicator (20), and the surface of flowline (19) is communicated with anti-blocking pipeline
(21)。
6. a kind of anticlogging cooler according to claim 3, it is characterised in that: the surface of the spreading channel (17)
It is fixedly connected with radiating copper sheet (22).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920126104.5U CN209558957U (en) | 2019-01-25 | 2019-01-25 | A kind of anticlogging cooler |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920126104.5U CN209558957U (en) | 2019-01-25 | 2019-01-25 | A kind of anticlogging cooler |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209558957U true CN209558957U (en) | 2019-10-29 |
Family
ID=68307530
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920126104.5U Active CN209558957U (en) | 2019-01-25 | 2019-01-25 | A kind of anticlogging cooler |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209558957U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111928691A (en) * | 2020-07-20 | 2020-11-13 | 黄书安 | Anti-blocking heat exchanger |
-
2019
- 2019-01-25 CN CN201920126104.5U patent/CN209558957U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111928691A (en) * | 2020-07-20 | 2020-11-13 | 黄书安 | Anti-blocking heat exchanger |
CN111928691B (en) * | 2020-07-20 | 2022-08-02 | 青岛康景辉环境科技集团有限公司 | Anti-blocking heat exchanger |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209558957U (en) | A kind of anticlogging cooler | |
CN203352851U (en) | Water circulating cooling apparatus for induction heating equipment | |
CN204594316U (en) | A kind of on line cleaning device of forced-circulation evaporator | |
CN203964712U (en) | A kind of shell-tube type sewage heat exchanger | |
CN210602848U (en) | Recovery device of flue gas waste heat exchanger | |
CN104764359A (en) | Washing device of plate heat exchanger | |
CN209706605U (en) | One kind being based on steam cooling device | |
CN208302459U (en) | A kind of indirect type heat exchange cooling degreasing unit | |
CN203249525U (en) | Heat pipe type organic working medium falling film evaporator utilizing low temperature exhaust heat | |
CN203240955U (en) | Rubber ball washing device for heat pump | |
CN210731307U (en) | Recovery device and recovery system | |
CN206019419U (en) | Heat exchanger | |
CN204801017U (en) | Cooler for vacuum system with water jacket cooling | |
CN204963627U (en) | Direct primary sewage pipe plate heat exchanger | |
CN204281447U (en) | River water source heat pump water intaking Water quality processing system | |
CN209085381U (en) | A kind of cooler being conveniently replaceable water pipe | |
CN209524781U (en) | A kind of shell-and-tube cooling device peculiar to vessel | |
CN209638150U (en) | Hydraulic oil cooling device in a kind of hydraulic station | |
CN209423190U (en) | A kind of new and effective automatically cleaning super heat-conductive pipe takes off white device | |
CN207778761U (en) | A kind of air-cooler with dedusting function | |
CN105156306A (en) | Efficient oil-water heat exchange system of air compressor | |
CN215877888U (en) | Carbon black water closed circulation cooling system of natural gas acetylene preparation device | |
CN106152864A (en) | Condenser of central air conditioner on-line cleaning system | |
CN209279731U (en) | A kind of Easy dismountable high-performance heat exchanger | |
CN110157843A (en) | A kind of continuous reclaimer of blast furnace slag quenching water thermal energy |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |