CN209549690U - Gas controlling device and Mill Systems - Google Patents

Gas controlling device and Mill Systems Download PDF

Info

Publication number
CN209549690U
CN209549690U CN201822263374.9U CN201822263374U CN209549690U CN 209549690 U CN209549690 U CN 209549690U CN 201822263374 U CN201822263374 U CN 201822263374U CN 209549690 U CN209549690 U CN 209549690U
Authority
CN
China
Prior art keywords
gas
port
controlling device
valve
selection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201822263374.9U
Other languages
Chinese (zh)
Inventor
高华
徐金陵
张一新
李朋宾
黄延超
周正
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Power Polytron Technologies Inc
Original Assignee
Power Polytron Technologies Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Power Polytron Technologies Inc filed Critical Power Polytron Technologies Inc
Priority to CN201822263374.9U priority Critical patent/CN209549690U/en
Application granted granted Critical
Publication of CN209549690U publication Critical patent/CN209549690U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sampling And Sample Adjustment (AREA)

Abstract

The utility model relates to gas controlling devices and Mill Systems, belong to gas monitoring techniques field, gas controlling device includes sampling probe and sampling line, gas detection module and selection valve mechanism are provided on sampling line, selecting valve mechanism includes three ports, first port and second port are arranged on sampling line, gas controlling device further includes scavenging pipeline and purging module, purge one end of the gas output end connection scavenging pipeline of module, the third port of the other end connection selection valve mechanism of scavenging pipeline, it is connected to by the first port of control selections valve mechanism with the selection of second port, realize gas detection module to the gas componant and/or Concentration Testing in sampling probe;It is connected to by the second port of control selections valve mechanism with the selection of third port, reaches the gas for purging module generation in sampling line via scavenging pipeline, acted on by the purging of high pressure gas, avoid the obstruction of sampling probe and sampling line.

Description

Gas controlling device and Mill Systems
Technical field
The utility model belongs to gas monitoring techniques field, and in particular to gas controlling device and Mill Systems.
Background technique
Application publication number is that the Chinese utility model patent application of CN108421631A discloses a kind of solid fuel processing Safety system is provided with carbonomonoxide concentration sensor in the material conveying pipe of flour mill.Under normal circumstances, it is grinding Sampling probe is arranged in the somewhere of powder machine, draws sampling line from sampling probe, is detected in sampling line by gas detection equipment Gas concentration.But since there are the larger temperature difference inside and outside flour mill, while the dust concentration for the generation that is milled is higher, therefore, In Liquid water is easy to produce in sampling process in sampling probe, and then blocks sampling probe or subsequent sampling line, causes to examine Survey is not smooth, or even causes conduit failure.
Utility model content
The purpose of the utility model is to provide gas controlling devices and Mill Systems, set for solving existing gas detection It is standby to be easy to produce liquid water in sampling probe in sampling process, and then block sampling probe or subsequent sampling line, it makes At the ill problem of detection.
In order to solve the above technical problems, the utility model proposes a kind of gas controlling device, including sampling probe be connected to The sampling line of the sampling probe is provided with gas detection module on sampling line, is provided with selector valve on the sampling line Door machine structure, the selection valve mechanism include three ports, and first port and second port are arranged on sampling line, and described Second port is laid between the sampling probe and the first port, the gas controlling device further include scavenging pipeline and Module is purged, the gas output end of the purging module is connected to one end of the scavenging pipeline, the other end of the scavenging pipeline The third port of the selection valve mechanism is connected, the selection valve mechanism can be realized the choosing of first port and second port Connection or second port is selected to be connected to the selection of third port.
The choosing that the gas controlling device of the utility model passes through the first port and second port of control selections valve mechanism Connection is selected, realizes gas detection module to the gas concentration and/or composition detection in sampling probe;Pass through control selections valve machine The second port of structure is connected to the selection of third port, and the gas for purging module generation is made to reach sampling line via scavenging pipeline In, acted on by purging of the high pressure gas in sampling line, enter high pressure gas in sampling probe, to sampling probe into Horizontal high voltage purging, gets rid of the sundries in sampling probe, avoids the obstruction of sampling probe and the obstruction of sampling line, effectively protects Barrier gas componant and/or Concentration Testing are gone on smoothly, and improve the working efficiency of gas controlling device.
Meanwhile the utility model also proposes a kind of Mill Systems, including coal pulverizer and above-mentioned gas monitoring device, is used for Detect the gas componant or concentration in coal pulverizer.Above-mentioned gas monitoring device is applied to Mill Systems by the utility model, by Carbon monoxide in coal pulverizer is also required to detect, and the gas detection equipment of existing coal pulverizer can equally produce in sampling process It is easy to produce liquid water in raw sampling probe, and then blocks sampling probe or subsequent sampling line, to cause detection not Smooth problem, therefore, to solve this problem, the Mill Systems of the utility model are real by using above-mentioned gas monitoring device Show the gas componant and/or Concentration Testing in coal pulverizer, effectively increases the working efficiency of gas detection.
To filter out the dust in sampling line, on the sampling line between the selection valve mechanism and gas detection module It is provided with a buffering dedusting mechanism or at least two buffering dedusting mechanisms that set gradually, each lower end for buffering dedusting mechanism It is provided with the pollution discharge structure for the sewage that condensation generates to be discharged.
Preferably, the pollution discharge structure includes blowoff line, and each buffering dedusting mechanism is connected to blowdown by sewage draining exit Pipeline is provided with sewage draining valve on the blowoff line, by blowoff line by by the dust of each buffering dedusting mechanism dredge to Fixed location controls the discharge of the dust of each buffering dedusting mechanism by the sewage draining valve on blowoff line.Or the row Dirty structure is only sewage draining exit, reaches blowdown purpose, without blow-off line and sewage draining valve is arranged.
Preferably, two buffering dedusting mechanisms are set on the sampling line, and the gas controlling device further includes removing contamination Pipeline, one end of the pipeline of removing contamination by tee tube be connected to the first buffering dedusting mechanism and the second buffering dedusting mechanism it Between.For the pipeline of removing contamination for the purge gas that circulates, purge gas blows to the first buffering dedusting mechanism by tee tube shunting respectively With the second buffering dedusting mechanism, the dust of purging is discharged by pollution discharge structure.
For convenience of the flow direction of control purge gas, choosing of removing contamination is provided between the tee tube and the second buffering dedusting mechanism Valve to be selected, is removed contamination when valve being selected to open, purge gas blows to the first buffering dedusting mechanism and the second buffering dedusting mechanism respectively, It removes contamination when valve being selected to close, purge gas blows to the first buffering dedusting mechanism.
Further, the other end of the pipeline of removing contamination is connected to the gas output end of the purging module, by purging mould Block generates the purge gas for blowing to the first buffering dedusting mechanism and the second buffering dedusting mechanism.Alternatively, the pipeline of removing contamination is another One end is directly connected to high-pressure air source, without being connected to the gas output end of purging module.
For convenience of the sample temperature degree on monitoring sampling line, the gas controlling device further includes control module, Yi Jiyong In the temperature detecting module of detection first port output sample temperature degree, the control module sampling connects the temperature detection mould Block.
For the automatic control for realizing selection valve mechanism, further, the controller control connects the selection valve Mechanism, this selects valve mechanism for three-way magnetic valve, and the automatic control of selection valve mechanism is realized by controller.
When gas controlling device is not provided with above-mentioned buffering dedusting mechanism, the gas controlling device further includes that helical form is cold Solidifying water trap, the lower end of the helical form condensate drain trap are connected to sampling line, the upper end of the helical form condensate drain trap It is connected to the test side of the gas detection module, which is used to exclude the moisture in air flue.
When above-mentioned buffering dedusting mechanism is arranged in gas controlling device, the selection valve mechanism and gas concentration detect mould At least two buffering dedusting mechanisms set gradually are provided on sampling line between block, wherein the selection valve mechanism First buffering dedusting mechanism is connected, the gas controlling device further includes helical form condensate drain trap, the helical form condensation The lower end of water trap is connected to the upper end of the last one buffering dedusting mechanism, and the upper end of the helical form condensate drain trap is connected to institute The test side of gas detection module is stated, which is used to exclude the moisture in air flue.
In addition, offering sample gas outlet on the last one described buffering dedusting mechanism, the sample gas outlet is connected to sample Gas discharge line is provided with sample gas discharge valve on the sample gas discharge line.After gas detection module detection, pass through The sample gas discharge valve on sample gas discharge line is controlled, sample gas is completely exhausted out, is ready for next sample gas detection.
Further, the gas controlling device further includes cooling selection three-way valve, cooling to select the first of three-way valve Port is purge gas air inlet, and the gas input of the purging module is arranged in the second port of cooling selection three-way valve The third port at place, cooling selection three-way valve is connected to the helical form condensate drain trap by cooling line.When selection is connected to When the first port and second port of cooling selection three-way valve, enter purge gas from the gas input of purging module, Realize the purging effect of purging;When the first port and third port of selection connection three-way valve, purge gas is made to enter spiral shell Shape condensate drain trap is revolved, realizes the purging cooling of test sample gas to be checked.
Detailed description of the invention
Fig. 1 is a kind of gas controlling device schematic diagram of the utility model;
Fig. 2 is the gas purge schematic diagram of the gas controlling device of the utility model;
Fig. 3 is the overheating protection process schematic of the gas controlling device of the utility model;
Fig. 4 is the process schematic of removing contamination of the gas controlling device of the utility model;
Label declaration in attached drawing is as follows:
1-sampling probe, the 2-the first buffering dedusting mechanism, the 3-the second buffering dedusting mechanism, 4-gas detection modules, 5-purging modules, 6-helical form condensate drain traps, 7-temperature detecting modules, 8-duff pipes, 9-scavenging pipelines, 10-is clear Dirty pipeline, 11-blowoff lines, 12-coal pulverizers, SV1-, which removes contamination, selects valve, and SV2-removes contamination valve, SV3-cooling selection Three-way valve, first port, second port, the third port of 31,32,33-cooling selection three-way valves, SV4-sample gas discharge Valve, SV5-sewage draining valve, SV6-three-way magnetic valve, first port, the second port, of 61,62,63-three-way magnetic valves Three ports, SV7-purging valve, 201-sewage draining exits, 301-sewage draining exits.
Specific embodiment
The utility model proposes a kind of gas controlling device, the gas componant detection being not only suitable in coal pulverizer is also suitable Gas concentration detection in flour mill.It is practical new to this in conjunction with attached drawing below for detecting the gas concentration in coal pulverizer The specific embodiment of type is further described.
Gas controlling device as shown in Figure 1, including the sampling probe 1 for extracting sample gas in coal pulverizer 12, connection is taken The gas detection module 4 being arranged on the sampling line and sampling line of sample probe 1.It is sintered that sampling probe 1 is built-in with two-stage Filter prevents from entering dust in sampling probe 1.Three-way magnetic valve SV6 is provided on sampling line, three-way magnetic valve SV6 includes Three ports, wherein the first port 61 and second port 62 of three-way magnetic valve SV6 is arranged on sampling line, and second end Mouth 62 is arranged close to sampling probe 1.Gas controlling device further includes scavenging pipeline 9 and purging module 5, purges the gas of module 5 Output end is connected to one end of scavenging pipeline 9, the third port 63 of the other end connection three-way magnetic valve SV6 of scavenging pipeline 9.
The first port 61 and second port 62 that the gas controlling device of the utility model passes through control three-way magnetic valve SV6 Selection connection, realize that gas detection module 4 detects the gas concentration of sample gas, pass through the second of control three-way magnetic valve SV6 Port 62 is connected to the selection of third port 63, and the high pressure gas for purging the generation of module 5 is made to reach probe tube via scavenging pipeline 9 Lu Zhong is acted on by purging of the high pressure gas in sampling line, avoids the resistance of the obstruction and sampling line of sampling probe 1 Plug, the detection of effective guarantee gas concentration are gone on smoothly, and improve the working efficiency of gas controlling device.
In Fig. 1, to filter out the dust in sampling line, taking between the three-way magnetic valve SV6 and gas detection module It is arranged on sample pipeline there are two the buffering dedusting mechanism set gradually, the respectively first buffering dedusting mechanism 2 and the second buffering are removed Dirt mechanism 3, the lower end for respectively buffering dedusting mechanism (2,3) are provided with the pollution discharge structure of the sewage for condensation generation to be discharged, the row Dirty structure includes blowoff line 11, respectively buffers dedusting mechanism (2,3) by sewage draining exit (201,301) and is connected to blowoff line 11, sewage draining valve SV5 is provided on blowoff line 11, and the sewage draining valve SV5 passed through on blowoff line 11 controls each buffering dedusting The discharge of dust and condensed water (or coal slurry of dust and condensed water formation) in mechanism (2,3), will be each slow by blowoff line 11 The dust and condensed water (or coal slurry of dust and condensed water formation) for rushing dedusting mechanism (2,3) are expelled to fixed location, such as arrange Out into the duff pipe 8 of coal pulverizer 12.
As other embodiments, the pollution discharge structure for respectively buffering the lower end setting of dedusting mechanism (2,3) is only sewage draining exit (201,301) reach blowdown purpose, without blow-off line 11 and sewage draining valve SV5 is arranged.
Gas controlling device further includes pipeline 10 of removing contamination, and the one end for pipeline 10 of removing contamination is connected to by tee tube in the first buffering Between dedusting mechanism 2 and the second buffering 3 mechanism of dedusting, for the pipeline of removing contamination for the purge gas that circulates, purge gas passes through threeway Pipe shunting blows to the first buffering dedusting mechanism 2 and the second buffering dedusting mechanism 3 respectively, by the dust of purging and condensed water (or coal The coal slurry that powder and condensed water are formed) it is discharged by pollution discharge structure.
For convenience of the flow direction of control purge gas, it is provided with and removes contamination between above-mentioned tee tube and the second buffering dedusting mechanism 3 Valve SV1 is selected, is removed contamination when valve SV1 being selected to open, purge gas blows to the first buffering dedusting mechanism 2 and the second buffering respectively Dedusting mechanism 3, remove contamination select valve SV1 close when, purge gas blows to the first buffering dedusting mechanism 2.
The other end of pipeline 10 of removing contamination be connected to the gas output end of purging module 5, is generated by purging module and is blowed to the The purge gas of one buffering dedusting mechanism 2 and the second buffering dedusting mechanism 3.As other embodiments, the another of pipeline 10 of removing contamination One end is directly connected to high-pressure air source, without being connected to the gas output end of purging module 5.
For convenience of the control of scavenging pipeline 9 and pipeline 10 of removing contamination, purging valve SV7 is provided on scavenging pipeline 9 (for pulse Valve), it is provided with the valve SV2 that removes contamination on pipeline 10 of removing contamination (for pulse valve).
For convenience of the sample temperature degree on monitoring sampling line, gas controlling device further includes control module, and control module is adopted Sample is connected with temperature detecting module 7, and temperature detecting module 7 is used to detect the sample that the first port 61 of three-way magnetic valve SV6 exports Temperature degree.
Controller control connection three-way magnetic valve SV6 in the present embodiment, to realize the automatic control of three-way magnetic valve SV6 System, as other embodiments, three-way magnetic valve SV6 can be replaced using other selection valve mechanisms, such as non-automatic control Three-way valve, only by manually controlling three ports of three-way valve, equally can be realized three energizations without being controlled with controller The function of magnet valve SV6.
To exclude the moisture in gas, gas controlling device further includes helical form condensate drain trap 6, helical form condensed water outlet The lower end of device 6 is connected to the upper end of the second buffering dedusting mechanism 3, and the upper end of helical form condensate drain trap 6 is connected to gas detection mould The test side of block 4.
Sample gas outlet is offered on second buffering dedusting mechanism 3, sample gas outlet is connected to sample gas discharge line, sample gas row Outlet pipe road is provided with sample gas discharge valve SV4, after gas detection module 4 detects, by controlling sample gas discharge line On sample gas discharge valve SV4, sample gas is completely exhausted out, is ready for next sample gas detection.
In Fig. 1, gas controlling device further includes cooling selection three-way valve SV3, cooling to select the first of three-way valve SV3 Port 31 is purge gas air inlet, and the gas that purging module 5 is arranged in the second port 32 of cooling selection three-way valve SV3 is defeated Enter at end, the third port 33 of cooling selection three-way valve SV3 is connected to helical form condensate drain trap 6 by cooling line.It is elected When selecting the first port 31 and second port 32 of the cooling selection three-way valve SV3 of connection, make purge gas from the gas of purging module 5 Body input terminal enters, and realizes the purging effect of purging;When the first port 31 and third port 33 of selection connection three-way valve SV3 When, so that purge gas is entered helical form condensate drain trap 6, realizes the purging cooling of test sample gas to be checked.
The gas controlling device of the utility model not only has the function of gas concentration measurement, also has gas purging, overheat Protection and decontamination function.
As shown in Figure 1, the gas concentration measurement process of gas controlling device is as follows:
Since coal pulverizer internal pressure is greater than atmospheric pressure, the sample gas containing coal dust inside coal pulverizer inside coal pulverizer it is micro- just Enter sampling probe 1 under the action of pressure, enters sampling line after the two-stage sintered filter filtering inside sampled probe 1, by In coal pulverizer internal high temperature, sample gas can be condensed into water after entering sampling line, therefore increase buffering in the minimum position of pipeline and remove Dirt mechanism, buffering dedusting mechanism 3 including the first buffering dedusting mechanism 2 and second, (quantity of buffering dedusting mechanism can also basis Concrete condition setting), each dedusting mechanism bottom that buffers is provided with sewage draining exit (201,301), needs to inspect periodically buffering dust removal machine Structure simultaneously discharges water.Sample gas by helical form condensate drain trap 6 enter gas detection module 4 sample tap measure, sample gas according to Arrow direction circulation in Fig. 1, after measurement, sample gas is dirty along pipeline with the condensed water in helical form condensate drain trap 6 To the second buffering dedusting mechanism 3, atmosphere is discharged into using sample gas discharge line and sample gas discharge valve SV4.
The measured value of detection is passed through quad and RS485 signal is used to be transferred to host computer by gas detection module 4, on The measured value and given threshold that position machine is detected according to gas detection module 4 are compared, and judge whether the measured value exceeds setting Threshold value issues alarm signal if exceeding.
It is carried out between gas concentration measurement in gas controlling device, needs to carry out gas to sampling line and sampling probe to blow It sweeps, as shown in Fig. 2, the gas purge of gas controlling device are as follows:
Purge time default first, when default purge time starts, the valve SV2 that removes contamination is closed, cooling selection triple valve Door 31 mouthfuls of first port of SV3 is connected to 32 mouthfuls of second port, the second port 62 of three-way magnetic valve SV6 and 63 mouthfuls of third port Connection, purging valve SV7 are opened, and purge gas carries out pulsed purging according to the arrow direction in Fig. 2, presets purge time knot Gas controlling device then carries out gas concentration measurement after beam.
When the temperature that controller is detected by temperature detecting module 7 is lower than setting lower limit temperature, sampling pipe is determined Blocking carries out gas purging to sampling line and sampling probe again according to above-mentioned gas purge.Default purge time knot Shu Hou issues alarm signal extremely if controller still is below setting lower limit temperature by the temperature that temperature detecting module 7 detects DCS (Distributed Control System, dcs) informs that operations staff needs to carry out sampling probe Depth cleaning.
As shown in figure 3, the overheating protection process of gas controlling device is as follows:
When summer, environment temperature was high, need to cool down in entrance gas controlling device, cooling selection three-way valve The first port 31 of SV3 is connected to third port 33, and purge gas is persistently blown according to the arrow direction in Fig. 3 by cooling line Enter helical form condensate drain trap 6, realizes that the temperature in gas controlling device is constant.When controller is examined by temperature detecting module 7 When the temperature measured is higher than setting ceiling temperature, closing, which is removed contamination, selects valve SV1, and the gas concentration for stopping gas controlling device being surveyed Amount, solenoid valve SV1 are in off state stopping measurement, increase the air-blowing quantity of purge gas in cooling line, dense until meeting gas The beginning condition of measurement is spent, gas controlling device can just carry out gas concentration measurement.The beginning condition of gas concentration measurement can To be arranged according to specific needs, a kind of beginning condition of gas concentration measurement are as follows: the temperature in detection helical form condensate drain trap It is less than or waits set temperatures.
As shown in figure 4, the process of removing contamination of gas controlling device is as follows:
Gas controlling device is after running for a period of time inside two buffering dedusting mechanisms there are dust accumulation and water (i.e. coal slime), It opens sewage draining valve SV5 and the valve SV2 that removes contamination, closes sample gas discharge valve SV4 and purging valve SV7, close three-way magnetic valve The first port 31 of the second port 62 and third port 63 of SV6, cooling selection three-way valve SV3 is connected to second port 32, Purge gas buffers the coal slime in dedusting mechanism 2 and the second buffering dedusting mechanism 3 according to the arrow direction purging first in Fig. 4, Coal slime is expelled in duff pipe 8 by blowoff line 11, also, poor due to existing between the outlet of coal pulverizer 12 and duff pipe 8 Pressure, more conducively discharge coal slime.Meanwhile it being equipped with peep hole on two buffering filters, when observing that first is slow by peep hole When rushing that the purging of dedusting mechanism 2 is not clean, the second buffering dedusting mechanism 3 purges clean, valve SV1 is selected to realize by closing to remove contamination The independent purging function of first buffering dedusting mechanism 2.
The gas controlling device of gas controlling device in compared with the prior art, the utility model has the advantages that
A. since there are the larger temperature difference inside and outside coal pulverizer, while the dust concentration that coal-grinding generates is higher, in the prior art Gas controlling device is easy to produce liquid water in sampling process, blocks sampling line, and sampling pump is easy to damage.And the utility model By inside coal pulverizer positive pressure as sampling power, no longer setting sampling pump, reduce product cost.
B. gas controlling device in the prior art filters out coal dust using multi-stage filter formula filter assemblies, due to coal powder density Higher, filter core service life is shorter, needs largely to replace the filter core of filer element type filter assemblies, and maintenance is inconvenient, and operating cost is high. And the gas controlling device of the utility model buffers dedusting mechanism by two filters and two without filer element type filter assemblies Mode reaches preferable dust removing effects.
C. the utility model exports the temperature of sample gas by the first port that installation temperature detecting module detects three-way magnetic valve Degree, judges whether sampling line blocks, and the gas that gas controlling device is opened when sampling pipe blocking purges function.
D. it is connected by the pipeline of the duff pipe of the sewage draining exit and coal pulverizer of buffering dedusting mechanism, utilizes high-pressure air source pulse Purging makes the coal slime retained inside gas controlling device return to the coal chute of coal pulverizer, reduces maintenance workload.
The above is only the preferred embodiment of the present invention, is not intended to limit the utility model, for this field Technical staff for, various modifications and changes may be made to the present invention.For example, the temperature detecting module of the present embodiment is selected The model of the temperature sensor of larger temperature detection range, temperature sensor can be selected in the market.The present embodiment Gas detection module can be selected according to specific gas detection demand, such as only need detection gas ingredient, selected and only examined The sensor of gas componant is surveyed as gas detection module, such as needs to detect the concentration of certain gas, selects and is directed to certain gas Concentration sensor.
For another example, this implementation removes the dust in sample gas by setting buffering dedusting mechanism, as other embodiments, this reality The gas controlling device for applying example can be not provided with buffering dedusting mechanism, when being not provided with buffering dedusting mechanism, to exclude in gas Moisture, the lower end of helical form condensate drain trap is connected to sampling line, the upper end connection gas inspection of helical form condensate drain trap Survey the test side of module.
For another example, the purging module of the present embodiment can be purger, such as hair dryer or gas pump, for generating height It calms the anger body.If what is inputted from the first port 31 of cooling selection three-way valve SV3 is originally high pressure gas, the purging of the present embodiment Module can also be a high pressure gas input port or an impulse blowing device (for example, a kind of arteries and veins of model TNP01 Rush blow device), external high pressure gas is laggard by the pulse control of the high pressure gas input port or impulse blowing device Enter scavenging pipeline.
For another example, the present embodiment can use the buffering dedusting mechanism of model GLHC1000, can also use other models, The quantity of dedusting mechanism is buffered either one, is also possible to two or more, buffering dust removal machine is arranged according to specific demand The quantity of structure.
For another example, the valve SV2 and purging valve SV7 that removes contamination of the present embodiment is pulse valve, can according to need and is selected Pulse valve model, such as TMF-Z-20.
It should be noted that the positional terms such as upper end, lower end in the utility model, be only each other relative concept or with The normal operating condition of product is reference, and be should not be regarded as restrictive.

Claims (10)

1. a kind of gas controlling device is arranged on sampling line including sampling probe and the sampling line for being connected to the sampling probe There is gas detection module, which is characterized in that selection valve mechanism, the selection valve mechanism packet are provided on the sampling line Three ports are included, first port and second port are arranged on sampling line, and the second port is laid in the sampling and visits Between head and the first port, the gas controlling device further includes scavenging pipeline and purges module, the purging module Gas output end is connected to one end of the scavenging pipeline, and the other end of the scavenging pipeline connects the of the selection valve mechanism Three ports, the selection valve mechanism can be realized first port and be connected to the selection of second port or second port and third The selection of port is connected to.
2. gas controlling device according to claim 1, which is characterized in that the selection valve mechanism and gas detection mould A buffering dedusting mechanism or at least two buffering dedusting mechanisms that set gradually are provided on sampling line between block, respectively The lower end of buffering dedusting mechanism is provided with the pollution discharge structure for the sewage that condensation generates to be discharged, and the pollution discharge structure is blowdown Mouthful.
3. gas controlling device according to claim 1, which is characterized in that the gas controlling device further includes control mould Block and the temperature detecting module that sample temperature degree is exported for detecting first port, the control module are separately connected temperature detection Module and the selection valve mechanism, it is described to select valve mechanism for three-way magnetic valve.
4. gas controlling device according to claim 1, which is characterized in that the gas controlling device further includes helical form The lower end of condensate drain trap, the helical form condensate drain trap is connected to sampling line, the helical form condensate drain trap it is upper End is connected to the test side of the gas detection module.
5. gas controlling device according to claim 2, which is characterized in that the selection valve mechanism and gas concentration are examined At least two buffering dedusting mechanisms set gradually are provided on the sampling line surveyed between module, wherein the selection valve Mechanism connects first buffering dedusting mechanism, and the gas controlling device further includes helical form condensate drain trap, the helical form The lower end of condensate drain trap is connected to the upper end of the last one buffering dedusting mechanism, and the upper end of the helical form condensate drain trap connects Lead to the test side of the gas detection module.
6. gas controlling device according to claim 4 or 5, which is characterized in that the gas controlling device further includes cold But three-way valve is selected, cooling selects the first port of three-way valve for purge gas air inlet, cooling selection three-way valve Second port is arranged at the gas input of the purging module, and the third port of cooling selection three-way valve passes through cooling tube Road is connected to the helical form condensate drain trap.
7. gas controlling device according to claim 5, which is characterized in that opened on the last one described buffering dedusting mechanism Equipped with sample gas outlet, the sample gas outlet is connected to sample gas discharge line, and sample gas row is provided on the sample gas discharge line Valve out.
8. gas controlling device according to claim 2, which is characterized in that two bufferings are arranged on the sampling line and remove Dirt mechanism, the gas controlling device further include removing contamination pipeline and to remove contamination and select valve, and one end of the pipeline of removing contamination passes through three Siphunculus connection is between the first buffering dedusting mechanism and the second buffering dedusting mechanism, the other end for pipeline of removing contamination and the purging mould The gas output end of block is connected to, and described remove contamination selects valve connection between the tee tube and the second buffering dedusting mechanism.
9. gas controlling device according to claim 2, which is characterized in that the pollution discharge structure includes blowoff line, respectively Buffering dedusting mechanism is connected to blowoff line by sewage draining exit, is provided with sewage draining valve on the blowoff line.
10. a kind of Mill Systems, including coal pulverizer, which is characterized in that further include such as the described in any item gas of claim 1-9 Body monitoring device, the gas controlling device are used to detect the gas componant or concentration in the coal pulverizer.
CN201822263374.9U 2018-12-31 2018-12-31 Gas controlling device and Mill Systems Active CN209549690U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822263374.9U CN209549690U (en) 2018-12-31 2018-12-31 Gas controlling device and Mill Systems

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822263374.9U CN209549690U (en) 2018-12-31 2018-12-31 Gas controlling device and Mill Systems

Publications (1)

Publication Number Publication Date
CN209549690U true CN209549690U (en) 2019-10-29

Family

ID=68306658

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822263374.9U Active CN209549690U (en) 2018-12-31 2018-12-31 Gas controlling device and Mill Systems

Country Status (1)

Country Link
CN (1) CN209549690U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109550582A (en) * 2018-12-31 2019-04-02 光力科技股份有限公司 A kind of gas controlling device and a kind of Mill Systems

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109550582A (en) * 2018-12-31 2019-04-02 光力科技股份有限公司 A kind of gas controlling device and a kind of Mill Systems
CN109550582B (en) * 2018-12-31 2023-10-10 光力科技股份有限公司 Gas monitoring device and coal mill system

Similar Documents

Publication Publication Date Title
CN109999583A (en) A kind of bag-type dust removing system and method for diagnosing faults based on cloud platform
CN102791352A (en) Filter bypass
KR101793550B1 (en) Gas analyzing system
CN205643314U (en) Gaseous composition sensor probe of integrated form and detection structure
JP2009115079A (en) Water washing apparatus and washing method of gas turbine compressor
CN106324197B (en) A kind of atmosphere pollution detection means for being easy to cleaning
CN209549690U (en) Gas controlling device and Mill Systems
CN105107302A (en) Cloth bag leakage detecting device for cloth bag dust collector and leakage detecting method of cloth bag leakage detecting device
CN109737898A (en) A kind of system for realizing on-line testing water wall high temperature corrosion
CN104502159A (en) Gas sampling and detecting device
CN211602593U (en) Self-cleaning air sampling header pipe
CN107631916A (en) A kind of more dot matrix high-temperature sampling probes of gaseous contaminant
CN109550582A (en) A kind of gas controlling device and a kind of Mill Systems
CN104390818A (en) Smoke constant speed constant current sampling device and method
CN1973196A (en) Probe and system for extracting gases from a process environment
CN207366277U (en) A kind of flue gas discharge continuous monitoring system
CN102879529A (en) Wet type sample gas analyzing system applicable to monitoring of combustion conditions of coal-fired kilns
CN204142704U (en) Smoke pollution harvester
CN208125714U (en) A kind of high-temperature, high pressure fluid pH value measuring device
CN206540885U (en) A kind of anti-blocking VOCs on-Line Monitor Devices of oil removing
CN207585975U (en) A kind of polluted gas continuous sampling device
CN109100185A (en) A kind of flue gas pretreatment system sampling back-blowing device
CN202075090U (en) Gas pressure sampling device
CN208367864U (en) Comprehensive survey device for fire
CN208653907U (en) A kind of pipe-line system with sensor protection effect

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant