CN209543728U - Weather simulation laboratory with air control structure - Google Patents

Weather simulation laboratory with air control structure Download PDF

Info

Publication number
CN209543728U
CN209543728U CN201822208265.7U CN201822208265U CN209543728U CN 209543728 U CN209543728 U CN 209543728U CN 201822208265 U CN201822208265 U CN 201822208265U CN 209543728 U CN209543728 U CN 209543728U
Authority
CN
China
Prior art keywords
control structure
simulation
natural environment
simulation laboratory
wind
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201822208265.7U
Other languages
Chinese (zh)
Inventor
及洪泉
王钊
马凯
银洋
陈建树
陆涛
杨冰
李立刚
邢其敬
李干
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING ESHENGTAIHE CTRL TECH Co Ltd
State Grid Corp of China SGCC
State Grid Beijing Electric Power Co Ltd
Original Assignee
BEIJING ESHENGTAIHE CTRL TECH Co Ltd
State Grid Corp of China SGCC
State Grid Beijing Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING ESHENGTAIHE CTRL TECH Co Ltd, State Grid Corp of China SGCC, State Grid Beijing Electric Power Co Ltd filed Critical BEIJING ESHENGTAIHE CTRL TECH Co Ltd
Priority to CN201822208265.7U priority Critical patent/CN209543728U/en
Application granted granted Critical
Publication of CN209543728U publication Critical patent/CN209543728U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a kind of weather simulation laboratory with air control structure, comprising: natural environment simulation laboratory, Simulation house, natural environment simulator, detection structure and control structure, natural environment simulation laboratory have accommodation space;Simulation house setting is divided into external environment lab space and interior environment lab space in accommodation space, and by accommodation space;Natural environment simulator includes wind simulated assembly, and wind simulated assembly is arranged in outer environmental experiment space;Detection structure includes wind speed measurement device, and external environment lab space is arranged in wind speed measurement device;Control structure is electrically connected with wind simulated assembly and wind speed measurement device, to control the operating status of wind simulated assembly by the testing result of wind speed measurement device.The technical solution of the utility model effectively solves the wind speed in weather emulation experiment in the prior art room can not monitor and control the problem of.

Description

Weather simulation laboratory with air control structure
Technical field
The utility model relates to the technical fields of environmental simulation experiment, in particular to a kind of with air control structure Weather simulation laboratory.
Background technique
Currently, home and abroad environment simulated experiment generally carries out in weather emulation experiment room, blowing simulation is generally used Wind-tunnel carries out, but under high wind speed and the biggish operating condition of blowing area, which has significant limitations, and experimental piece is only It can be placed in wind-tunnel, cannot be coupled with other experiments, wind tunnel experiment has at high cost, the limitation of experimental piece size is stringent etc. Problem.And can not monitor and control blowing wind speed.
Utility model content
The main purpose of the utility model is to provide a kind of weather simulation laboratories with air control structure, existing to solve There is wind speed in the weather emulation experiment room in technology can not monitor and the problem of control.
To achieve the goals above, the utility model provides a kind of weather simulation laboratory with air control structure, packet It includes: natural environment simulation laboratory, Simulation house, natural environment simulator, detection structure and control structure, natural environment mould Draft experiment room has accommodation space;Simulation house is arranged in accommodation space, and accommodation space is divided into external environment experiment sky Between and interior environment lab space;Natural environment simulator includes wind simulated assembly, and wind simulated assembly is arranged in outer environmental experiment Space;Detection structure includes wind speed measurement device, and external environment lab space is arranged in wind speed measurement device;Control structure and wind simulated assembly It is electrically connected with wind speed measurement device, to control the operating status of wind simulated assembly by the testing result of wind speed measurement device.
Further, wind simulated assembly includes blower fan structure and air guide structure, the air inlet and blower fan structure of air guide structure Air outlet hermetically connect.
Further, blower fan structure includes mobile bracket and blower, and mobile bracket is movably disposed at natural environment mould On the ground of draft experiment room, blower setting is on mobile bracket.
Further, air guide structure includes ventilating duct, and ventilating duct setting is on mobile bracket, the air inlet and wind of ventilating duct The air outlet of machine structure is connected, and the cross-sectional area of the air inlet of ventilating duct is greater than the cross-sectional area of the air outlet of ventilating duct.
Further, detection structure further includes the first infrared radiation thermometer, and the first infrared radiation thermometer is arranged in natural environment mould In draft experiment room, and it is electrically connected with control structure.
Further, detection structure further includes the second infrared radiation thermometer, and the second infrared radiation thermometer is arranged in Simulation house, And it is electrically connected with control structure.
Further, natural environment simulator further includes Simulation of Snowfall component, Simulation of Snowfall component and control structure electricity Connection, Simulation of Snowfall component include spray head and snowfall pump, and spray head is pumped with snowfall to be connected by water pipe, and spray head is arranged in natural ring The roof of border simulation laboratory.
Further, detection structure further includes snowfall detector, and snowfall detector is arranged in natural environment simulation laboratory It is interior and be electrically connected with control structure.
Further, detection structure further includes alarm assemblies, and alarm assemblies are electrically connected with control structure, so that wind speed measurement The testing result of device deviates the alarm of predetermined value alarm component.
Further, weather simulation laboratory further includes control room, and control structure further includes display, and display setting exists In control room.
Using the technical solution of the utility model, Simulation house and natural environment are set in natural environment simulated experiment room Simulator, natural environment simulator include wind simulated assembly, and to simulate blowing, natural environment simulated experiment is also set in room It is equipped with detection structure, detection structure includes wind speed measurement device, for detecting the wind speed in natural environment simulated experiment room, and will inspection It surveys result and is transferred to control structure, control structure is according to the operating status of the blast velocity control wind simulated assembly detected, so that wind Speed maintains preset value.The technical solution of the utility model effectively solves in weather emulation experiment in the prior art room Wind speed can not monitor and control the problem of.
Detailed description of the invention
The accompanying drawings constituting a part of this application is used to provide a further understanding of the present invention, this is practical Novel illustrative embodiments and their description are not constituteed improper limits to the present invention for explaining the utility model. In the accompanying drawings:
Fig. 1 shows the cross-sectional view of the embodiment of the weather simulation laboratory according to the present utility model with air control structure Schematic top plan view;
Fig. 2 shows the left view schematic diagrams of the wind simulated assembly of weather simulation laboratory shown in FIG. 1;And
Fig. 3 shows the schematic front view of the blower fan structure of wind simulated assembly shown in Fig. 2.
Wherein, the above drawings include the following reference numerals:
10, natural environment simulation laboratory;11, external environment lab space;12, interior environment lab space;20, room is simulated Room;30, natural environment simulator;31, wind simulated assembly;311, blower fan structure;312, air guide structure;32, Simulation of Snowfall group Part;40, control room.
Specific embodiment
It should be noted that in the absence of conflict, the features in the embodiments and the embodiments of the present application can phase Mutually combination.The utility model will be described in detail below with reference to the accompanying drawings and embodiments.
As shown in Figure 1 to Figure 3, the weather simulation laboratory with air control structure of the present embodiment, comprising: natural environment mould Draft experiment room 10, Simulation house 20, natural environment simulator 30, detection structure and control structure, natural environment simulated experiment Room 10 has accommodation space;The setting of Simulation house 20 is divided into external environment lab space in accommodation space, and by accommodation space 11 and interior environment lab space 12;Natural environment simulator 30 includes wind simulated assembly 31, and wind simulated assembly 31 is arranged outside Environmental experiment space 11;Detection structure includes wind speed measurement device, and external environment lab space 11 is arranged in wind speed measurement device;Control structure It is electrically connected with wind simulated assembly 31 and wind speed measurement device, to control wind simulated assembly 31 by the testing result of wind speed measurement device Operating status.
Using the technical solution of the present embodiment, Simulation house 20 and natural ring are set in natural environment simulation laboratory 10 Border simulator 30, natural environment simulator 30 includes wind simulated assembly 31, to simulate blowing, natural environment simulated experiment Detection structure is additionally provided in room 10, detection structure includes wind speed measurement device, for detecting in natural environment simulation laboratory 10 Wind speed, and will test result and be transferred to control structure, control structure is according to the blast velocity control wind simulated assembly 31 detected Operating status, so that wind speed maintains preset value.The technical solution of the present embodiment efficiently solves weather in the prior art Wind speed in emulation experiment room can not monitor and the problem of control.
As shown in Figures 2 and 3, in the technical scheme of this embodiment, wind simulated assembly 31 includes blower fan structure 311 and leads The air inlet of wind structure 312, air guide structure 312 is hermetically connect with the air outlet of blower fan structure 311.Air guide structure 312 can be with Wind is oriented to predetermined position, and wind can be converged as required air quantity.
As shown in Figures 2 and 3, in the technical scheme of this embodiment, blower fan structure 311 includes mobile bracket and blower, Mobile bracket is movably disposed on the ground of natural environment simulation laboratory 10, and blower setting is on mobile bracket.Six Blower is fixed on mobile bracket, and mobile bracket is movably disposed on the ground of natural environment simulation laboratory 10.It is mobile The height of bracket is 3000mm, and 6 Fans on mobile bracket, can reduce the land occupation face of blower in the array setting of 3 rows 2 column Product, and fan assembly can be moved and be rotated on the ground by footed tumbler universal caster wheel, can pass through Mobile fan structure 311 adjust the conditions such as wind-force, the air quantity of different location in natural environment simulation laboratory 10.Six Fans are axial-flow type wind Machine.Blower is using T35-8# axial flow blower, and flow is 25000m3/h, and wind pressure 200Pa, blower includes motor, motor function Rate is 7.5kw to 4 grades, diameter 890mm, shares 6, power of fan 7.5kw, this fan static pressure is low, and outlet air is uniform, wind It measures larger, can satisfy the airflow effects of the requirement in natural environment simulated experiment room, and size is small, can reduce to the greatest extent and account for With the space in natural environment simulated experiment room, guarantee the return air effect in natural environment simulated experiment room.In addition, this blower Energy consumption it is smaller, excessive inner heat source will not be brought to natural environment simulation laboratory 10, it is ensured that natural environment simulation is real Test the uniformity of the temperature and humidity in room 10.Wind simulated assembly 31 can also manually control, and specifically, directly input the motor of blower Frequency converter frequency values, to control the revolving speed of blower, and then control the wind speed in natural environment simulation laboratory 10.
As shown in Figures 2 and 3, in the technical scheme of this embodiment, air guide structure 312 includes ventilating duct, and ventilating duct is set It sets on mobile bracket, the air inlet of ventilating duct is connected with the air outlet of blower fan structure 311, the cross section of the air inlet of ventilating duct Product is greater than the cross-sectional area of the air outlet of ventilating duct.The shell of air guide structure 312 is stainless steel material.Stainless steel material is firm resistance to With, and have biggish quality, it is not easy to it is moved under the influence of the wind, and will not leak out, the wind that blower fan structure 311 is blown out exists After air guide structure 312, air quantity has almost no change, and required air quantity can be transported to specified by air guide structure 312 Position.The cross section of the air inlet of air guide structure 312 is 2m × 3m, the cross section of the air outlet of air guide structure 312 be 1.5m × 3m.The air outlet of blower fan structure 311 is 2m × 3m, and the air inlet of such air guide structure 312 can be with the outlet air of blower fan structure 311 Mouth is adapted, and the air outlet of air guide structure 312 has carried out shrinking setting, is conducive to the air outlet for increasing air guide structure 312 in this way Go out monsoon intensity.The air outlet of air guide structure 312 is additionally provided with damping screen.Damping screen and air guide structure 312 cooperate, available Air-supply uniformity of the precision within 1m/s.
As shown in Figure 1, in the technical scheme of this embodiment, detection structure further includes the first infrared radiation thermometer, first is red Outer temperature measurer setting is electrically connected in natural environment simulation laboratory 10, and with control structure.The setting of first infrared radiation thermometer exists In external environment lab space 11, with the temperature of real-time monitoring external environment lab space 11.It is also set up in external environment lab space 11 There is heat-exchanger rig, heat-exchanger rig includes evaporator and electric heater, and heat-exchanger rig is electrically connected with control structure, so that external environment is real The temperature tested in space 11 maintains preset value.
As shown in Figure 1, in the technical scheme of this embodiment, detection structure further includes the second infrared radiation thermometer, second is red Outer temperature measurer setting is electrically connected in Simulation house 20, and with control structure.Second infrared radiation thermometer is for measuring Simulation house Temperature in 20, and be compared with the temperature in external environment lab space 11, to test under different temperatures environment to simulation The influence of temperature in house 20.
As shown in Figure 1, in the technical scheme of this embodiment, natural environment simulator 30 further includes Simulation of Snowfall component 32, Simulation of Snowfall component 32 is electrically connected with control structure, and Simulation of Snowfall component 32 includes that spray head and snowfall pump, and spray head and snowfall pump It is connected by water pipe, the roof of natural environment simulation laboratory 10 is arranged in spray head.When needing snowfall, external environment is tested Temperature setting in space 11 is 0 DEG C hereinafter, at this moment opening snowfall pump, water is transported to the spray head on roof by water pipe, from spray Droplet at head spray, becomes tiny ice crystal under the action of low temperature, drops on ground, with snowfall simulation.
As shown in Figure 1, in the technical scheme of this embodiment, detection structure further includes snowfall detector, snowfall detector It is arranged in natural environment simulation laboratory 10 and is electrically connected with control structure.Snowfall detector using ultrasonic distance measurement principle come The thickness of snowfall is measured, snowfall detector is connected with control system, by measured snowfall real-time delivery to control system, so Judged whether to have reached expected snowfall by control system afterwards, in addition, control system is also connected with snowfall pump, control structure can To control the operating frequency of the motor of snowfall pump, to control snowfall intensity and snowfall.In addition, when detecting that snowfall reaches expected After it is required that, control system can also close snowfall pump, stop snowfall.
As shown in Figure 1, in the technical scheme of this embodiment, detection structure further includes alarm assemblies, alarm assemblies and control Structure electrical connection processed, so that the testing result of wind speed measurement device deviates the alarm of predetermined value alarm component.Alarm form can be Sound-light alarm, for example, alarm lamp issues feux rouges, buzzer sending sound when the testing result of wind speed measurement device deviates predetermined value Sound.
As shown in Figure 1, in the technical scheme of this embodiment, weather simulation laboratory further includes control room 40, control knot Structure further includes display, and display is arranged in control room 40.Display can with temperature that real-time display detection structure detects, The parameters such as snowfall.Wall surface between control room 40 and external environment lab space 11 is provided with insulating layer, to prevent control room Equipment in 40 by external environment lab space 11 high temperature or low temperature influenced and damaged.
The above descriptions are merely preferred embodiments of the present invention, is not intended to limit the utility model, for this For the technical staff in field, various modifications and changes may be made to the present invention.It is all in the spirit and principles of the utility model Within, any modification, equivalent replacement, improvement and so on should be included within the scope of protection of this utility model.

Claims (10)

1. a kind of weather simulation laboratory with air control structure characterized by comprising
Natural environment simulation laboratory (10), the natural environment simulation laboratory (10) have accommodation space;
Simulation house (20), Simulation house (20) setting are divided into the accommodation space, and by the accommodation space External environment lab space (11) and interior environment lab space (12);
Natural environment simulator (30), the natural environment simulator (30) include wind simulated assembly (31), the wind mould Quasi- component (31) are arranged in the external environment lab space (11);
Detection structure, the detection structure include wind speed measurement device, and the external environment lab space is arranged in the wind speed measurement device (11);
Control structure, the control structure is electrically connected with the wind simulated assembly (31) and the wind speed measurement device, to pass through The testing result of the wind speed measurement device controls the operating status of the wind simulated assembly (31).
2. the weather simulation laboratory according to claim 1 with air control structure, which is characterized in that the wind simulation group Part (31) includes blower fan structure (311) and air guide structure (312), the air inlet and the blower knot of the air guide structure (312) The air outlet of structure (311) hermetically connects.
3. the weather simulation laboratory according to claim 2 with air control structure, which is characterized in that the blower fan structure It (311) include that mobile bracket and blower, the mobile bracket are movably disposed at the natural environment simulation laboratory (10) Ground on, the blower is arranged on the mobile bracket.
4. the weather simulation laboratory according to claim 3 with air control structure, which is characterized in that the air guide structure It (312) include ventilating duct, the ventilating duct is arranged on the mobile bracket, the air inlet of the ventilating duct and the blower knot The air outlet of structure (311) is connected, and the cross-sectional area of the air inlet of the ventilating duct is greater than the transversal of the air outlet of the ventilating duct Area.
5. the weather simulation laboratory according to claim 3 with air control structure, which is characterized in that the detection structure It further include the first infrared radiation thermometer, the first infrared radiation thermometer setting is interior in the natural environment simulation laboratory (10), and It is electrically connected with the control structure.
6. the weather simulation laboratory according to claim 5 with air control structure, which is characterized in that the detection structure Further include the second infrared radiation thermometer, second infrared radiation thermometer setting in the Simulation house (20), and with the control Structure electrical connection.
7. the weather simulation laboratory according to claim 1 with air control structure, which is characterized in that the natural environment Simulator (30) further includes Simulation of Snowfall component (32), and the Simulation of Snowfall component (32) is electrically connected with the control structure, The Simulation of Snowfall component (32) includes spray head and snowfall pump, and the spray head is pumped with the snowfall to be connected by water pipe, described Spray head is arranged on the roof of the natural environment simulation laboratory (10).
8. the weather simulation laboratory according to claim 7 with air control structure, which is characterized in that the detection structure Further include snowfall detector, snowfall detector setting in the natural environment simulation laboratory (10) and with the control Structure electrical connection.
9. the weather simulation laboratory according to any one of claim 1 to 8 with air control structure, which is characterized in that The detection structure further includes alarm assemblies, and the alarm assemblies are electrically connected with the control structure, so that the wind speed measurement The testing result of device deviates alarm assemblies alarm when predetermined value.
10. the weather simulation laboratory according to any one of claim 1 to 8 with air control structure, which is characterized in that The weather simulation laboratory further includes control room (40), and the control structure further includes display, and the display setting exists In the control room (40).
CN201822208265.7U 2018-12-26 2018-12-26 Weather simulation laboratory with air control structure Active CN209543728U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822208265.7U CN209543728U (en) 2018-12-26 2018-12-26 Weather simulation laboratory with air control structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822208265.7U CN209543728U (en) 2018-12-26 2018-12-26 Weather simulation laboratory with air control structure

Publications (1)

Publication Number Publication Date
CN209543728U true CN209543728U (en) 2019-10-25

Family

ID=68266830

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822208265.7U Active CN209543728U (en) 2018-12-26 2018-12-26 Weather simulation laboratory with air control structure

Country Status (1)

Country Link
CN (1) CN209543728U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111547101A (en) * 2020-05-22 2020-08-18 上海应用技术大学 Equivalent test device for wheel temperature rise caused by friction between wheel set and air of high-speed train
CN113465957A (en) * 2021-05-17 2021-10-01 中国人民解放军第六九O五工厂 Antenna lift mast wind-resistant simulation test system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111547101A (en) * 2020-05-22 2020-08-18 上海应用技术大学 Equivalent test device for wheel temperature rise caused by friction between wheel set and air of high-speed train
CN111547101B (en) * 2020-05-22 2023-03-28 上海应用技术大学 Equivalent test device for wheel temperature rise caused by friction between wheel set and air of high-speed train
CN113465957A (en) * 2021-05-17 2021-10-01 中国人民解放军第六九O五工厂 Antenna lift mast wind-resistant simulation test system

Similar Documents

Publication Publication Date Title
CN103292835B (en) A kind of comprehensive detection simulation experiment device for fire detection performance
CN209543728U (en) Weather simulation laboratory with air control structure
CN208283033U (en) A kind of experimental study device based on downburst wind-tunnel
CN206762902U (en) A kind of high-low temperature test chamber of uniformity of temperature profile
CN109915331A (en) Wind-driven generator icing weatherability experimental system and test method
CN109781783A (en) A kind of multi-functional moisture synchronism detection experimental bench
CN106863563A (en) Concrete sample curing room and its humidity regulation method
CN109398769A (en) The normal pressure heat examination check system of large-scale walk-in type manned spacecraft
CN207540759U (en) A kind of municipal underground pipeline lane Ventilation simulation experimental provision
CN108756996A (en) A kind of mine hot wet environment simulating experiment porch
CN106959266B (en) Xenon lamp and UV composite weather-proof test box
CN108801890A (en) A kind of integrated islands and reefs marine atmosphere comprehensive simulation acceleration test apparatus
CN214174947U (en) Constant temperature and humidity control system of detection room
CN108872488A (en) A kind of Catastrophe climate simulator
CN212595781U (en) Constant temperature and humidity box
CN209543638U (en) Weather simulation laboratory with rainfall detection structure
CN104848884B (en) Device and method for testing sensor performance of gas flow rate, temperature and humidity
CN210090049U (en) Performance detection device for heat preservation equipment
CN209085891U (en) A kind of hot dry wind generation simulator
CN207623820U (en) A kind of high-impact testing stand environment temperature and humidity control device
CN214320179U (en) High-low temperature damp-heat test box
CN206081136U (en) Steam aspirator
CN206588133U (en) A kind of laboratory ventilation rack
CN207962991U (en) A kind of energy conservation and environmental protection maintenance conditions device and air-conditioning
CN110361215A (en) A kind of heat-preserving equipment device for detecting performance and method

Legal Events

Date Code Title Description
GR01 Patent grant