CN209538003U - A kind of road gap filling repairing structure - Google Patents

A kind of road gap filling repairing structure Download PDF

Info

Publication number
CN209538003U
CN209538003U CN201920144935.5U CN201920144935U CN209538003U CN 209538003 U CN209538003 U CN 209538003U CN 201920144935 U CN201920144935 U CN 201920144935U CN 209538003 U CN209538003 U CN 209538003U
Authority
CN
China
Prior art keywords
slot
cementation
line
road
limbers
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920144935.5U
Other languages
Chinese (zh)
Inventor
王浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jishou University
Original Assignee
Jishou University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jishou University filed Critical Jishou University
Priority to CN201920144935.5U priority Critical patent/CN209538003U/en
Application granted granted Critical
Publication of CN209538003U publication Critical patent/CN209538003U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a kind of road gap fillings to repair structure, including slot and road, the slot is located in road, the bottom of the slot is placed with hydrophobic sponge, the upper end of the hydrophobic sponge is laterally fixed with the second filter, the upper end of second filter is filled with boulder bed, the upper end of the boulder bed is laterally fixed with the first filter, the upper end of first filter is filled with cementation of fissures glue-line, the upper end both side surface of the cementation of fissures glue-line offers limbers, and cementation of fissures glue-line is vertically run through in limbers, the limbers is multiple.The utility model offers limbers by the upper end both side surface in cementation of fissures glue-line, and limbers is made vertically to run through cementation of fissures glue-line, after base joint grouting glue repairs gap when rain weather, ponding can enter in slot along limbers, and pass sequentially through the bottom of boulder bed and hydrophobic sponge inflow slot, and be finally discharged from the two sides of road, prevent road ponding that can not be discharged.

Description

A kind of road gap filling repairing structure
Technical field
The utility model relates to road rehabilitation technical field, specially a kind of road gap filling repairs structure.
Background technique
Have an impact the beauty of road currently, various cracks occurs in cement pavement, and reduce the service life on road surface, causes There are many reason of pavement crack, in the case where traffic now is increasingly noisy, may further deteriorate, repair now to gap Compensating method is to use the method reparation for filling out base joint grouting glue, but base joint grouting glue solidification rear surface water flowing is poor, will affect road mostly The draining on surface keeps road surface relatively more sliding, be easy to cause traffic accident.Therefore, it is proposed that a kind of road gap filling is repaired Mend structure.
Utility model content
The purpose of this utility model is to provide a kind of road gap fillings to repair structure, by the upper end of cementation of fissures glue-line Both side surface offers limbers, and limbers is made vertically to run through cementation of fissures glue-line, rain after base joint grouting glue repairs gap When weather, ponding can enter in slot along limbers, and pass sequentially through the bottom of boulder bed and hydrophobic sponge inflow slot, and It is finally discharged from the two sides of road, prevents road ponding that can not be discharged, solve the problems, such as proposed in background technique.
To achieve the above object, the utility model provides the following technical solutions: a kind of road gap filling repairing structure, packet Include slot and road, the slot is located in road, and the bottom of the slot is placed with hydrophobic sponge, the hydrophobic sponge it is upper End is laterally fixed with the second filter, and the upper end of second filter is filled with boulder bed, and the upper end of the boulder bed is laterally fixed There is the first filter, the upper end of first filter is filled with cementation of fissures glue-line, and the upper end both side surface of the cementation of fissures glue-line opens up There is limbers, and cementation of fissures glue-line is vertically run through in limbers, the limbers is multiple, and multiple limbers are evenly distributed in filling Stitch the two sides of glue-line.
As a kind of preferred embodiment of the utility model, the surface of the cementation of fissures glue-line is fixed with sandstone, the sand Stone is multiple, and multiple sandstones are uniformly adhered to the surface of cementation of fissures glue-line.
As a kind of preferred embodiment of the utility model, the bottom surface of the slot is attached with waterproof layer, described The main component of waterproof layer is pitch.
As a kind of preferred embodiment of the utility model, the width of the slot is 4-8cm, and the upper end ratio of slot The wide 0.5cm in the lower end of slot.
As a kind of preferred embodiment of the utility model, the thickness of the cementation of fissures glue-line and boulder bed is 3cm, institute State hydrophobic sponge with a thickness of 2cm.
Compared with prior art, the beneficial effects of the utility model are as follows:
1. the road gap filling of the utility model repairs structure, opened up by the upper end both side surface in cementation of fissures glue-line There is limbers, and limbers is made vertically to run through cementation of fissures glue-line, after base joint grouting glue repairs gap when rain weather, ponding can be suitable Limbers enter in slot, and pass sequentially through the bottom that boulder bed and hydrophobic sponge flow into slot, and finally from the two of road Side discharge, prevents road ponding that can not be discharged.
2. the road gap filling of the utility model repairs structure, by being fixed with sandstone on the surface of cementation of fissures glue-line, and The surface for the encapsulating glue-line for being uniformly adhered to multiple sandstones can increase the degree of roughness of encapsulating film surface, in vehicle At road traveling to encapsulating glue-line upper end, it is ensured that wheel will not skid.
3. the road gap filling of the utility model repairs structure, waterproof layer is attached with by the bottom surface in slot, When the ponding on road surface is entered in slot by limbers, the waterproof layer of bottom can prevent moisture from entering road bottom In soil, water flow is avoided to destroy roadbed.
Detailed description of the invention
Upon reading the detailed description of non-limiting embodiments with reference to the following drawings, other spies of the utility model Sign, objects and advantages will become more apparent upon:
Fig. 1 is the overall structure diagram that the utility model road gap filling repairs structure;
Fig. 2 is the upper end face structural schematic diagram that the utility model road gap filling repairs structure.
In figure: 1, slot;2, road;3, hydrophobic sponge;4, waterproof layer;5, sandstone;6, cementation of fissures glue-line;7, the first filter; 8, boulder bed;9, the second filter;10, limbers.
Specific embodiment
To be easy to understand the technical means, creative features, achievement of purpose, and effectiveness of the utility model, below In conjunction with specific embodiment, the utility model is further described.
The utility model provides a kind of technical solution referring to FIG. 1-2: a kind of road gap filling repairing structure, including Slot 1 and road 2, the slot 1 are located in road 2, and the bottom of the slot 1 is placed with hydrophobic sponge 3, the hydrophobic sponge 3 upper end is laterally fixed with the second filter 9, and the upper end of second filter 9 is filled with boulder bed 8, the upper end of the boulder bed 8 It is laterally fixed with the first filter 7, the upper end of first filter 7 is filled with cementation of fissures glue-line 6, the upper end two of the cementation of fissures glue-line 6 Side surface offers limbers 10, and cementation of fissures glue-line 6 is vertically run through in limbers 10, and the limbers 10 is multiple and multiple Limbers 10 is evenly distributed in the two sides of cementation of fissures glue-line 6.
(Fig. 1 and Fig. 2 are please referred to) in the present embodiment, and limbers is offered by the upper end both side surface in cementation of fissures glue-line 6 10, and make limbers 10 vertically through cementation of fissures glue-line 6, after base joint grouting glue repairs gap when rain weather, ponding can be along Limbers 10 enters in slot 1, and passes sequentially through the bottom of boulder bed 8 and the inflow slot 1 of hydrophobic sponge 3, and finally from road Two sides discharge, prevent road ponding that can not be discharged.
Wherein, the surface of the cementation of fissures glue-line 6 is fixed with sandstone 5, and the sandstone 5 is multiple, and multiple sandstones 5 are uniform It is attached to the surface of cementation of fissures glue-line 6.
(Fig. 1 and Fig. 2 are please referred to) in the present embodiment by being fixed with sandstone 5 on the surface of cementation of fissures glue-line 6, and make multiple sand The surface for the encapsulating glue-line 6 that stone 5 is uniformly adhered to, can increase the degree of roughness on 6 surface of encapsulating glue-line, in vehicle on road surface When traveling to encapsulating 6 upper end of glue-line, it is ensured that wheel will not skid.
Wherein, the bottom surface of the slot 1 is attached with waterproof layer 4, and the main component of the waterproof layer 4 is pitch.
(Fig. 1 is please referred to) in the present embodiment by being attached with waterproof layer 4 in the bottom surface of slot 1, when the product on road surface When water is entered in slot 1 by limbers 10, the waterproof layer 4 of bottom can prevent moisture from entering in the soil of road bottom, Water flow is avoided to destroy roadbed.
Wherein, the width of the slot 1 is 4-8cm, and the upper end of slot 1 is 0.5cm wider than the lower end of slot 1.
Wherein, the thickness of the cementation of fissures glue-line 6 and boulder bed 8 is 3cm, the hydrophobic sponge 3 with a thickness of 2cm.
When a kind of road gap filling repairing structure uses, the top half fluting of slot 1 is made into its ratio first The bottom of slot 1 is slightly larger, and the structure that then will be constructed into specification in slot 1 can beautify gap, in rainwater weather, The ponding on road surface can be entered in slot 1 by limbers 10, successively after boulder bed 8 and hydrophobic sponge 3, enter slot 4 upper end of waterproof layer of 1 bottom, last rainwater are discharged out of slot 1 to the two sides on road surface, when vehicle travels, 6 table of cementation of fissures glue-line The sandstone in face can increase the frictional force on its surface, prevent wheel-slip.
The basic principles and main features of the present invention and the advantages of the present invention have been shown and described above, for For those skilled in the art, it is clear that the present invention is not limited to the details of the above exemplary embodiments, and without departing substantially from this In the case where the spirit or essential attributes of utility model, the utility model can be realized in other specific forms.Therefore, no matter From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the utility model is by institute Attached claim rather than above description limit, it is intended that will fall within the meaning and scope of the equivalent elements of the claims All changes are embraced therein.It should not treat any reference in the claims as limiting related right It is required that.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art The other embodiments being understood that.

Claims (5)

1. a kind of road gap filling repairs structure, including slot (1) and road (2), it is characterised in that: slot (1) position In road (2), the bottom of the slot (1) is placed with hydrophobic sponge (3), and the upper end of the hydrophobic sponge (3) is laterally fixed Have the second filter (9), the upper end of second filter (9) is filled with boulder bed (8), and the upper end of the boulder bed (8) is laterally solid Surely have the first filter (7), the upper end of first filter (7) is filled with cementation of fissures glue-line (6), the upper end of the cementation of fissures glue-line (6) Both side surface offers limbers (10), and limbers (10) vertically run through cementation of fissures glue-line (6), and the limbers (10) is more It is a, and multiple limbers (10) are evenly distributed in the two sides of cementation of fissures glue-line (6).
2. a kind of road gap filling according to claim 1 repairs structure, it is characterised in that: the cementation of fissures glue-line (6) Surface be fixed with sandstone (5), the sandstone (5) be it is multiple, and multiple sandstones (5) are uniformly adhered to cementation of fissures glue-line (6) Surface.
3. a kind of road gap filling according to claim 1 repairs structure, it is characterised in that: the bottom of the slot (1) Portion surface is attached with waterproof layer (4), and the main component of the waterproof layer (4) is pitch.
4. a kind of road gap filling according to claim 1 repairs structure, it is characterised in that: the width of the slot (1) Degree is 4-8cm, and the upper end of slot (1) is 0.5cm wider than the lower end of slot (1).
5. a kind of road gap filling according to claim 1 repairs structure, it is characterised in that: the cementation of fissures glue-line (6) Thickness with boulder bed (8) is 3cm, the hydrophobic sponge (3) with a thickness of 2cm.
CN201920144935.5U 2019-01-28 2019-01-28 A kind of road gap filling repairing structure Expired - Fee Related CN209538003U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920144935.5U CN209538003U (en) 2019-01-28 2019-01-28 A kind of road gap filling repairing structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920144935.5U CN209538003U (en) 2019-01-28 2019-01-28 A kind of road gap filling repairing structure

Publications (1)

Publication Number Publication Date
CN209538003U true CN209538003U (en) 2019-10-25

Family

ID=68271923

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920144935.5U Expired - Fee Related CN209538003U (en) 2019-01-28 2019-01-28 A kind of road gap filling repairing structure

Country Status (1)

Country Link
CN (1) CN209538003U (en)

Similar Documents

Publication Publication Date Title
CN101148856B (en) Asphalt macadam stress absorption layer and construction method thereof
CN201280677Y (en) Improved ultrathin antiskid paving structure of epoxy resins
CN107476164B (en) Embedded ultra-thin wearing layer and its construction method for road upper layer
CN107805987A (en) The hassock layer Foam lightweight soil road structure and construction method in deep soft foundation section
CN107190604B (en) A kind of bicycle expressway girder steel paving structure and its paving method
CN206328650U (en) A kind of highway subgrade pipe strengthening structure
CN112281572A (en) Construction method of stress absorbing layer asphalt pavement
CN209538003U (en) A kind of road gap filling repairing structure
CN107964874A (en) A kind of assembly concrete guardrail construction method
CN209555695U (en) A kind of assembled composite permeable pavement structure
CN207452609U (en) A kind of hassock layer Foam lightweight soil road structure in deep soft foundation section
CN207176527U (en) Bridge Crack bracing means
CN206266985U (en) A kind of new automobile stone material pits rampway structure
CN203795263U (en) ECC durable colored pavement structure
CN207749382U (en) A kind of drainage pavement structure in sponge city
CN203346758U (en) Pervious sidewalk structure
CN107288007A (en) A kind of asphalt paving structure with safeguard measure
CN208088158U (en) A kind of railway overpass wind prevention and sand resistance plate
CN209099091U (en) A kind of pavement structure of suitable water country and town style and features
CN208668211U (en) A kind of people's row porous pavement
CN207193694U (en) A kind of asphalt paving structure with safeguard measure
CN203411895U (en) Drainage facility for highway bridge floor
CN207017100U (en) A kind of bicycle expressway girder steel paving structure
CN209099797U (en) A kind of lossless reparation structure of building basement foig
CN205934635U (en) Roller compacted concrete interlayer structure suitable for arch slope highway

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191025

Termination date: 20210128

CF01 Termination of patent right due to non-payment of annual fee