CN209536783U - A kind of ultralong overweight combined plate handling balance boom device - Google Patents

A kind of ultralong overweight combined plate handling balance boom device Download PDF

Info

Publication number
CN209536783U
CN209536783U CN201822059868.5U CN201822059868U CN209536783U CN 209536783 U CN209536783 U CN 209536783U CN 201822059868 U CN201822059868 U CN 201822059868U CN 209536783 U CN209536783 U CN 209536783U
Authority
CN
China
Prior art keywords
equalizer bar
lifting
underbeam
upper beam
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201822059868.5U
Other languages
Chinese (zh)
Inventor
马克南
曲文武
宋晓雨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dalian Shipbuilding Industry Co Ltd
Original Assignee
Dalian Shipbuilding Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dalian Shipbuilding Industry Co Ltd filed Critical Dalian Shipbuilding Industry Co Ltd
Priority to CN201822059868.5U priority Critical patent/CN209536783U/en
Application granted granted Critical
Publication of CN209536783U publication Critical patent/CN209536783U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model discloses a kind of ultralong overweight combined plate handlings to balance boom device, including equalizer bar upper beam (8) and the equalizer bar upper beam (8) equalizer bar underbeam (9) disposed in parallel, reinforcement structure (10) are connected between the equalizer bar upper beam (8) and the equalizer bar underbeam (9).Equalizer bar upper beam (8) the top interval is set there are two symmetrical first lifting lug (12).Several second lifting lugs (13) are arranged on the equalizer bar underbeam (9), the second lifting lug (13) lower part is connected with board (a) by two lifting ropes (11).The utility model uses light material under conditions of intensity qualification, does not generate arch deformation in hoisting process and safety greatly improves, carry out intensity and LOAD FOR by finite element.Solve the problems, such as deformation and safety.

Description

A kind of ultralong overweight combined plate handling balance boom device
Technical field
The present invention relates to combined plates to lift field, flat more specifically to a kind of ultralong overweight combined plate handling Balance beam device.
Background technique
Current cabin hatch lid top panel combined plate handling generally hangs wirerope using lifting equipment and passes through matched plate Card carries out the operation of handling combined plate.As shown in fig. 7, the schematic diagram of existing hoisting structure, the lower part of crane suspension centre (1) is to hang With wirerope (2), the both ends of wirerope are connected to the first plate suspension centre (3) and the second plate on lifting plate (5) top On material suspension centre (4).Lifting plate (5) is lifted the both ends of plate (5) by effect of weight during lifting it can be seen from Fig. 7 Often be bent downwardly deformation, plate sling after stay deformation 6, plate sling after arch deformation 7.Due to 400,000 tons of ores in sand form Shipload cabin hatch board plate is mostly overlength, overweight combination based plate, and the veneer thickness of these combined plates is usually 8-11mm, phase To relatively thin, as the bending deformation phenomenon generated in Fig. 7 is particularly acute in lifting operation.
Moreover, wirerope allows distracted angle [alpha] to have limitation, usual α in hoisting operation safety operation institute allowed band ≤ 60 ° of angles, thus along lifting plate (5) length direction distribution two groups of boards between spacing i.e. the first plate suspension centre (3) and Spacing between second plate suspension centre (4) is smaller.Therefore, when lifting plate (5) specification is too long or plate thickness compared with Bao Shi, since distance is smaller between the first plate suspension centre (3) and the second plate suspension centre (4) of panel length directional spreding, And the lifting plate (5) for stretching out suspension centre two sides is longer, under the influence of its self weight, lifting plate (5) bending deformation is just further tight Weight frequently can lead to lifting plate (5) and generate permanent deformation, and since the amount of staying at lifting plate (5) both ends is excessive, often very Difficulty is sling, or even can lead to occur during handling the danger that plate slides because plate two sides are in outside the effective control range of handling Danger.
Summary of the invention
The quality and operation that invention aims to solve the problem that the deformation of the combined plate during handling, guarantees lifting plate The problem of the safety of personnel.
In order to achieve the above object, invention provides a kind of ultralong overweight combined plate handling balance boom device, including balance Beam upper beam, with equalizer bar upper beam equalizer bar underbeam disposed in parallel, the equalizer bar upper beam and the equalizer bar underbeam it Between be connected with reinforcement structure;
Equalizer bar upper beam top interval is set there are two symmetrical first lifting lug;
Several second lifting lugs are arranged on the equalizer bar underbeam, second lifting lug lower part passes through two lifting rope connections There is board.
Preferably, the reinforcement structure is that several slanting steel pipes are horizontal with the oblique angle α and the oblique angle (180 ° of-α) each other It is integral to head and the tail connection group.
Preferably, the equalizer bar upper beam and the equalizer bar underbeam are lightweight square steel tube.
Preferably, the board includes being hinged on the caliper with the caliper for accommodating the lifting plate recess The top of the nipper of recess front end, the nipper is equipped with loser.
Preferably, the nipper is connect by spring with the caliper, the nipper and the lifting plate after lifting Material is at locking state.
The present invention uses light material under conditions of intensity qualification, does not generate arch deformation and safety in hoisting process Property greatly improve, pass through finite element and carry out intensity and LOAD FOR.Solve the problems, such as deformation and safety.
Detailed description of the invention
Fig. 1 is the schematic view of the front view of ultralong overweight combined plate handling balance boom device of the present invention.
Fig. 2 is the floor map of suspension centre position of the present invention.
Fig. 3 is the side structure schematic view of ultralong overweight combined plate handling balance boom device of the present invention.
Fig. 4 be ultralong overweight combined plate handling described in invention balance boom device reinforcement structure with
The enlarged structure schematic diagram of equalizer bar underbeam connection.
Fig. 5 is the schematic view of the front view of diamond shape reinforcement structure.
Fig. 6 is that horizontal steel plate hoisting clamp structural diagrams of hanging are intended to.
Fig. 7 is the schematic view of the front view of the boom hoisting of existing large-sized sheet material.
Wherein: 1, crane suspension centre, 2, handling wirerope, the 3, first plate suspension centre, the 4, second plate suspension centre, 5, lifting plate Material, 6, plate sling after stay deformation, 7, plate sling after arch deformation, 8, equalizer bar upper beam, 9, equalizer bar underbeam, 10, reinforcement structure, 11, lifting rope, the 12, first lifting lug, the 13, second lifting lug, 14, the suspension centre on plate, 16, groove welding position, 17, reinforcement structure surrounding weld seam, 18, nipper, 18a, loser, 19, spring, 20, caliper.
Specific embodiment
As shown in Fig. 1~5, the present invention includes equalizer bar upper beam 8 and the equalizer bar upper beam 8 equalizer bar disposed in parallel Underbeam 9 is connected with reinforcement structure 10 between the equalizer bar upper beam 8 and the equalizer bar underbeam 9;If the reinforcement structure 10 is It does slanting steel pipe group is connected with oblique (180 ° of-α) angle transverse direction head and the tail with the oblique angle α each other and is integral.The equalizer bar upper beam 8 It is lightweight square steel tube with the equalizer bar underbeam 9.The 8 top interval of equalizer bar upper beam is set there are two symmetrical first lifting lug 12;Several second lifting lugs 13 are arranged on the equalizer bar underbeam 9,13 lower part of the second lifting lug is connected by two lifting ropes 11 It is connected to board a.
As shown in fig. 6, the board a includes being hinged on the pincers with the caliper 20 for accommodating lifting 5 recess of plate The top of the nipper 18 of the recess front end of body 20, the nipper 18 is equipped with loser 18a.The nipper 18 by spring 19 with it is described Caliper 20 connects, and is being kept between the nipper 18 and the lifting plate 5 after lifting as locking state.
Embodiment:
As shown in Figures 1 to 3, a kind of ultralong overweight combined plate handling balances boom device, is made using the square steel tube of light weight Equalizer bar upper beam 8 and equalizer bar underbeam 9, and use the square steel tube oblique welding equalizer bar upper beam 8 and the equalizer bar underbeam 9 Between reinforcement structure 10 as diamond shape, the reinforcement structure 10 by the connection type between several square steel tubes be Oblique 45 Degree and Oblique 135 degree laterally join end to end and form a whole, and install two the first lifting lugs 12 in the equalizer bar upper beam 8, and two First lifting lug 12 is separately mounted at a quarter of the equalizer bar upper beam 8 from left to right and at 3/4ths.Institute It states equalizer bar underbeam 9 and four the second lifting lugs 13 is installed, four second lifting lugs 13 are separately mounted to the four of 9 lower part of underbeam Equally divided position, 2 typical lifting ropes 11 of the lower setting of each second lifting lug 13.
As shown in figure 4, the junction structure of the reinforcement structure 10 of diamond shape and the equalizer bar underbeam 9 are as follows: described to add The left and right ends of strong structure 10 are groove welding position 16, and rear and front end is reinforcement structure surrounding weld seam 17.
When in use, as shown in Figure 1, lifting equipment will be hung using wirerope with the two of the equalizer bar upper beam 8 first Ear lifting lug 12 connects, and entire ultralong overweight combined plate handling can be balanced boom device and sling, by four the second lifting lugs of underbeam Lifting rope 11 is installed, connection is horizontal at each lower extreme point of the lifting rope 11 hangs steel plate board a i.e. hoisting tongs at 13.As shown in figure 3, so Afterwards by it is horizontal hang steel plate and be mounted on need the combined plate corresponding position of handling, balance boom device in ultralong overweight combined plate handling Under effect, the stress point along panel length direction increases, and four 13 spacing of the second lifting lug are average, each suspension centre mean forced. Simultaneously as the spacing between two groups of suspension centres increases, the length that plate both ends are stretched out except suspension centre is smaller, is unlikely to generate serious Stay deformation.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto, Anyone skilled in the art within the technical scope of the present disclosure, according to the technique and scheme of the present invention and its Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.

Claims (5)

1. a kind of ultralong overweight combined plate handling balances boom device, which is characterized in that including equalizer bar upper beam (8), with it is described Equalizer bar upper beam (8) equalizer bar underbeam (9) disposed in parallel, between the equalizer bar upper beam (8) and the equalizer bar underbeam (9) It is connected with reinforcement structure (10);
Equalizer bar upper beam (8) the top interval is set there are two symmetrical first lifting lug (12);On the equalizer bar underbeam (9) Several the second lifting lugs (13) are arranged with, the second lifting lug (13) lower part is connected with board (a) by two lifting ropes (11).
2. the handling of ultralong overweight combined plate balances boom device according to claim 1, which is characterized in that the reinforcement structure (10) for several slanting steel pipes, to connect group with oblique (180 ° of-α) angle transverse direction head and the tail with the oblique angle α each other integral.
3. the handling of ultralong overweight combined plate balances boom device according to claim 1, which is characterized in that on the equalizer bar Beam (8) and the equalizer bar underbeam (9) are lightweight square steel tube.
4. the handling of ultralong overweight combined plate balances boom device according to claim 1, which is characterized in that the board (a) Including the caliper (20) with accommodating lifting plate (5) recess, it is hinged on the nipper (18) of the recess front end of the caliper (20), The top of the nipper (18) is equipped with loser (18a).
5. the handling of ultralong overweight combined plate balances boom device according to claim 4, which is characterized in that the nipper (18) It is connect by spring (19) with the caliper (20), the nipper (18) and the lifting plate (5) are at locking shape after lifting State.
CN201822059868.5U 2018-12-07 2018-12-07 A kind of ultralong overweight combined plate handling balance boom device Active CN209536783U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822059868.5U CN209536783U (en) 2018-12-07 2018-12-07 A kind of ultralong overweight combined plate handling balance boom device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822059868.5U CN209536783U (en) 2018-12-07 2018-12-07 A kind of ultralong overweight combined plate handling balance boom device

Publications (1)

Publication Number Publication Date
CN209536783U true CN209536783U (en) 2019-10-25

Family

ID=68263712

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822059868.5U Active CN209536783U (en) 2018-12-07 2018-12-07 A kind of ultralong overweight combined plate handling balance boom device

Country Status (1)

Country Link
CN (1) CN209536783U (en)

Similar Documents

Publication Publication Date Title
CN205653032U (en) Deformed steel flats vertical hoisting device
CN108946475B (en) Overturning and hoisting system and method for horizontal equipment
CN209536783U (en) A kind of ultralong overweight combined plate handling balance boom device
CN207243234U (en) A kind of steel structure modularization house universal hanger
CN202046793U (en) Special strut for ultra-long flexible steel plate
CN202609768U (en) Special lifting device for crane beam brake plate
CN107601257A (en) Large scale arc special hoisting bar and its application method
CN205034957U (en) I -steel is hoist for handling
CN207861716U (en) C-type hanging apparatus under a kind of beam, plate
CN203475318U (en) Cable-clamp-free hanging appliance used for anchoring stay cable at tower end in cable bent tower steel anchor beam area
CN202953704U (en) Cross beam for single-hook lifting steel plate
CN202754699U (en) Overlong steel plate balance hoisting beam
CN115258909A (en) Horizontal-lifting tail sliding system and method for offshore wind turbine tower
CN204689351U (en) A kind of H profile steel structural elements suspender
CN114314309A (en) Adjustable lifting appliance for underwater vehicle
CN213085209U (en) Balance beam type component hoisting device
CN204917646U (en) Hoist and mount compensating beam
CN211496566U (en) Ring type balance beam for replacing high-altitude vertical equipment
CN208916608U (en) A kind of prefabricated superimposed sheet Special-purpose hanger grid beam
CN110080083B (en) Method for installing basket type steel truss arch main chord member
CN209242475U (en) A kind of suspender
CN106829723A (en) Single loop wheel machine lifts gravity center eccentric horizontal tank technique
CN207566714U (en) Large scale arc panel special hoisting bar
CN208327118U (en) A kind of color steel plate hoist tool
CN205061329U (en) Lifting tool for steel plate

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant