CN209536741U - It is a kind of for installing the attachment device of the upright of frame of elevator hoistway with steel structure additional - Google Patents

It is a kind of for installing the attachment device of the upright of frame of elevator hoistway with steel structure additional Download PDF

Info

Publication number
CN209536741U
CN209536741U CN201920059476.0U CN201920059476U CN209536741U CN 209536741 U CN209536741 U CN 209536741U CN 201920059476 U CN201920059476 U CN 201920059476U CN 209536741 U CN209536741 U CN 209536741U
Authority
CN
China
Prior art keywords
pillar stand
upright
frame
attachment device
installing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920059476.0U
Other languages
Chinese (zh)
Inventor
李鷟祥
王锐
曾小鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Lianzhi Construction Equipment Co Ltd
Original Assignee
Guangdong Lianzhi Construction Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Lianzhi Construction Equipment Co Ltd filed Critical Guangdong Lianzhi Construction Equipment Co Ltd
Priority to CN201920059476.0U priority Critical patent/CN209536741U/en
Application granted granted Critical
Publication of CN209536741U publication Critical patent/CN209536741U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

The utility model provides a kind of for installing the attachment device of the upright of frame of elevator hoistway with steel structure additional, it is adapted to the production and application of upright of frame attachment device technical field, the attachment device of upright of frame for installing elevator hoistway with steel structure additional includes, upper pillar stand and lower pillar stand, lower pillar stand is located at upper pillar stand bottom end, upper beam and lower beam there are two being respectively welded in front of upper pillar stand and lower pillar stand, and angle is respectively welded upper connector and lower connector on the inside of two upper beams and lower beam, the utility model has the beneficial effects that: passing through setting upper beam, lower beam, upper connector, lower connector and high-strength bolt, quickly upper pillar stand and lower pillar stand can be installed to together, and it is stronger to install stability, improve the practicability of the attachment device of upright of frame of this kind for installing elevator hoistway with steel structure additional, it solves existing Attachment device for installing the upright of frame of elevator hoistway with steel structure additional is not easy to installation and the not strong problem of stability.

Description

It is a kind of for installing the attachment device of the upright of frame of elevator hoistway with steel structure additional
Technical field
The utility model relates to upright of frame attachment device technical fields, more particularly, to one kind for installing elevator steel knot additional The attachment device of the upright of frame of structure hoistway.
Background technique
Frame column is exactly the load for bearing beam and plate in frame structure and transmitting, and load is transmitted to basis, is main Vertical supporting structure, current steel construction install the connection between elevator shaft column additional, all use vertical connecting plate, bolt substantially The fixed mode of level, the attachment device of upright of frame are easy to be influenced by steel specs, and not only installation difficulty is larger, Er Qiean It is unstable to fill effect.
Utility model content
Technical problem to be solved by the utility model is: in view of the problems of the existing technology, providing a kind of for adding The attachment device for filling the upright of frame of elevator hoistway with steel structure solves existing for installing the frame of elevator hoistway with steel structure additional The attachment device of column is not easy to installation and the not strong problem of stability.
The technical problems to be solved in the utility model is realized using following technical scheme: one kind is for installing elevator steel knot additional The attachment device of the upright of frame of structure hoistway includes:
Upper pillar stand and lower pillar stand, the lower pillar stand are located at upper pillar stand bottom end, weld respectively in front of the upper pillar stand and lower pillar stand Connect there are two upper beam and lower beam, and on the inside of two upper beams and lower beam angle be respectively welded upper connector and Lower connector, the upper connector and lower connector top are provided with screw hole, and two screwhole positions are corresponding, two screw holes Internal screw thread is connected with high-strength bolt, and the high-strength bolt is connected by screw hole with upper connector and lower connector.
Preferably, the upper pillar stand is located along the same line with lower pillar stand.
Preferably, the upper pillar stand and lower pillar stand maintain an equal level with upper beam and lower beam bottom end respectively.
Preferably, two upper beams and lower beam are all connected with rectangular shape.
Preferably, two upper beams are identical as the length of two lower beams.
Compared with prior art, the utility model has the beneficial effects that by setting upper beam, lower beam, upper connector, Lower connector and high-strength bolt can quickly install upper pillar stand and lower pillar stand to together, and it is stronger to install stability, is promoted This kind is used to install additional the practicability of the attachment device of the upright of frame of elevator hoistway with steel structure, solves existing for installing additional The attachment device of the upright of frame of elevator hoistway with steel structure is not easy to installation and the not strong problem of stability.
Detailed description of the invention
Fig. 1 is the utility model overall structure frontal planar schematic diagram.
Fig. 2 is the right view plane schematic diagram of the utility model overall structure.
Fig. 3 is the utility model overall structure schematic top plan view.
Marked in the figure: 1- upper pillar stand, 101- upper beam, 102- upper connector, 2- lower pillar stand, 201- lower beam, under 202- Connector, 3- high-strength bolt.
Specific embodiment
In order to make the purpose of the utility model, technical solutions and advantages more clearly understood, with reference to the accompanying drawing and specifically The utility model is described in detail in embodiment, it should be understood that specific embodiment described herein is only used to explain this Utility model is not used to limit the utility model.
As shown in Figure 1-3, it is a kind of for installing the attachment device of the upright of frame of elevator hoistway with steel structure additional, it is described for adding The attachment device for filling the upright of frame of elevator hoistway with steel structure includes: upper pillar stand 1 and lower pillar stand 2, and the lower pillar stand 2 is located at upper vertical 1 bottom end of column, the upper pillar stand 1 are located along the same line with lower pillar stand 2, are respectively welded in front of the upper pillar stand 1 and lower pillar stand 2 Two upper beams 101 and lower beam 201, two upper beams 101 are identical as the length of two lower beams 201, and two The upper beam 101 and lower beam 201 are all connected with rectangular shape, the upper pillar stand 1 and lower pillar stand 2 respectively with upper beam 101 and 201 bottom end of lower beam maintains an equal level, and two upper beams 101 are respectively welded upper connector with 201 inside angle of lower beam 102 and lower connector 202, the upper connector 102 is provided with screw hole, and two screwhole positions pair with lower 202 top of connector It answers, two screw hole internal screw threads are connected with high-strength bolt 3, and the high-strength bolt 3 passes through screw hole and upper connector 102 and lower company Fitting 202 is connected, and upper pillar stand 1 can be placed in parallel on lower pillar stand 2 by user when connecting upper pillar stand 1 and lower pillar stand 2 Side, while upper beam 101 being made to be directed at lower beam 201, upper connector 102 is directed at lower connector 202, and makes two screw holes pair Then high-strength bolt 3 is screwed into two screw holes by standard, upper connector 102 can link together with lower connector 202, and Upper pillar stand 1 will splice with lower pillar stand 2, and since stitching direction maintains an equal level, the Impact direction of high-strength bolt 3 is vertical direction, upper pillar stand 1 Connection between lower pillar stand 2 is also more firm, and the upper pillar stand 1 and lower pillar stand 2 respectively with upper beam 101 and lower beam 201 bottom ends maintain an equal level, and upper beam 101 is identical as the length of lower beam 201, and suitable for the column of plurality of specifications, applicability is preferable.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, and should refer to Out, any modifications, equivalent replacements, and improvements made within the spirit and principle of the present invention etc. should all include It is within the protection scope of the utility model.

Claims (5)

1. a kind of for installing the attachment device of the upright of frame of elevator hoistway with steel structure additional, it is characterised in that: described one kind is used for The attachment device of upright of frame for installing elevator hoistway with steel structure additional includes:
Upper pillar stand (1) and lower pillar stand (2), the lower pillar stand (2) are located at upper pillar stand (1) bottom end, the upper pillar stand (1) and lower pillar stand (2) upper beam (101) and lower beam (201) there are two being respectively welded in front of, and two upper beams (101) and lower beam (201) inside angle is respectively welded upper connector (102) and lower connector (202), the upper connector (102) and lower company Fitting (202) top is provided with screw hole, and two screwhole positions are corresponding, and two screw hole internal screw threads are connected with high-strength bolt (3), the high-strength bolt (3) is connected by screw hole with upper connector (102) and lower connector (202).
2. it is according to claim 1 a kind of for installing the attachment device of the upright of frame of elevator hoistway with steel structure additional, it is special Sign is: the upper pillar stand (1) is located along the same line with lower pillar stand (2).
3. it is according to claim 1 a kind of for installing the attachment device of the upright of frame of elevator hoistway with steel structure additional, it is special Sign is: the upper pillar stand (1) and lower pillar stand (2) maintain an equal level with upper beam (101) and lower beam (201) bottom end respectively.
4. it is according to claim 1 a kind of for installing the attachment device of the upright of frame of elevator hoistway with steel structure additional, it is special Sign is: two upper beams (101) and lower beam (201) are all connected with rectangular shape.
5. it is according to claim 1 a kind of for installing the attachment device of the upright of frame of elevator hoistway with steel structure additional, it is special Sign is: two upper beams (101) are identical as the length of two lower beams (201).
CN201920059476.0U 2019-01-14 2019-01-14 It is a kind of for installing the attachment device of the upright of frame of elevator hoistway with steel structure additional Expired - Fee Related CN209536741U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920059476.0U CN209536741U (en) 2019-01-14 2019-01-14 It is a kind of for installing the attachment device of the upright of frame of elevator hoistway with steel structure additional

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920059476.0U CN209536741U (en) 2019-01-14 2019-01-14 It is a kind of for installing the attachment device of the upright of frame of elevator hoistway with steel structure additional

Publications (1)

Publication Number Publication Date
CN209536741U true CN209536741U (en) 2019-10-25

Family

ID=68269693

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920059476.0U Expired - Fee Related CN209536741U (en) 2019-01-14 2019-01-14 It is a kind of for installing the attachment device of the upright of frame of elevator hoistway with steel structure additional

Country Status (1)

Country Link
CN (1) CN209536741U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112479109A (en) * 2020-12-10 2021-03-12 周明霞 Hydraulic lifting device for masonry platform

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112479109A (en) * 2020-12-10 2021-03-12 周明霞 Hydraulic lifting device for masonry platform
CN112479109B (en) * 2020-12-10 2024-04-12 周明霞 Hydraulic lifting device for masonry platform

Similar Documents

Publication Publication Date Title
CN209536741U (en) It is a kind of for installing the attachment device of the upright of frame of elevator hoistway with steel structure additional
CN205134558U (en) Good steel constructs beam column connecting piece
CN210032088U (en) Easily install steel construction assembled node
CN203403537U (en) Beam column connection structure
CN207844882U (en) Steel column and crane girder connecting structure
CN203403539U (en) Novel beam column connecting structure
CN209874050U (en) Cantilever beam and upright post connecting structure
CN203373032U (en) Combined balance weight of crawler crane
CN208479515U (en) A kind of load-bearing connector of photovoltaic bracket
CN209382306U (en) One kind shaking counterweight fixture used in vibration test
CN203719096U (en) Air conditioner outdoor unit support frame
CN205134556U (en) Improved connecting piece for steel -structure beam columns
CN204823925U (en) Balance arm for hoist
CN205275069U (en) Tower crane attaches wall connection structure
CN216451079U (en) Fixing device for communication construction wiring
CN215889317U (en) Adjustable steel pipe crossing frame base
CN205153125U (en) Steel constructs beam column connecting piece
CN205134555U (en) Steel connection member
CN205171673U (en) Angle brace mechanism for steel structure
CN211266260U (en) Anti-wire-jumping grounding pulley
CN203080698U (en) Windproof column top connection node of steel structure
CN204961467U (en) Quick erection joint locking device of structure
CN204781997U (en) A device subassembly that is used for stretch -draw fork ear formula cable or steel pull -rod
CN213383773U (en) Balance support for IGV axle
CN209685193U (en) A kind of rectangle hooping structure for tower crane attached wall pull rod and building junction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191025

CF01 Termination of patent right due to non-payment of annual fee