CN209530138U - A kind of new vapor condensing plant - Google Patents

A kind of new vapor condensing plant Download PDF

Info

Publication number
CN209530138U
CN209530138U CN201822214068.6U CN201822214068U CN209530138U CN 209530138 U CN209530138 U CN 209530138U CN 201822214068 U CN201822214068 U CN 201822214068U CN 209530138 U CN209530138 U CN 209530138U
Authority
CN
China
Prior art keywords
pipe
vapor condensing
vapor
collector
reaction kettle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201822214068.6U
Other languages
Chinese (zh)
Inventor
吴红华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Yuxing Building Waterproof Material Co Ltd
Original Assignee
Suzhou Yuxing Building Waterproof Material Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Yuxing Building Waterproof Material Co Ltd filed Critical Suzhou Yuxing Building Waterproof Material Co Ltd
Priority to CN201822214068.6U priority Critical patent/CN209530138U/en
Application granted granted Critical
Publication of CN209530138U publication Critical patent/CN209530138U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Vaporization, Distillation, Condensation, Sublimation, And Cold Traps (AREA)

Abstract

The utility model discloses a kind of new vapor condensing plants, including vapor condensing collector, the upper end fixing seal seamless connection of the vapor condensing collector has one end of first pipe, the other end of the first pipe is circumscribed with reaction kettle, the also fixing seal seamless connection of the upper end of the vapor condensing collector has one end of second pipe, the other end of the second pipe is circumscribed with water ring vacuum pump, the side of the vapor condensing collector is fixedly installed with outlet pipe, is fixedly installed with manually-operated gate on the outlet pipe.The new vapor condensing plant, the both ends of first pipe are connected with reaction kettle and vapor condensing collector respectively, the junction of first pipe and reaction kettle is bent downwardly inclination, vapor is set after extraction, to immediately enter inside vapor condensing collector inside reaction kettle, be condensed into water droplet, shorten the time vacuumized, the consumption of the energy is reduced, while improving the efficiency of dehydration, reduces the cost of production.

Description

A kind of new vapor condensing plant
Technical field
The utility model relates to condensation water collection technical field, specially a kind of new vapor condensing plant.
Background technique
Chemical raw materials many at present, needs to vacuumize dehydration before use, it is therefore an objective to reduce chemical side reactions, improve and produce Quality, present overwhelming majority dewatering types are to heat reaction kettle, are installed additional in reaction kettle top parallel or to updip Oblique pipe-line equipment, other end connection vacuum pump vacuumize dehydration.
But the vapor of present dewatering type extraction kettle is easy in parallel or acclivitous metal tube It is aggregated (especially winter is even more so, because metal tube temperature is low) on wall, is dropped onto the metal reaction kettle of heating, it is so anti- Multiple circulation, considerably increases and vacuumizes the required time, and electricity power consumption, which is significantly increased, causes the pumpdown time long, is dehydrated Low efficiency improves production cost.
Utility model content
The purpose of this utility model is to provide a kind of new vapor condensing plants, to solve to mention in above-mentioned background technique Condensed water is easy on parallel or acclivitous metal pipe-wall agglutination (especially winter is even more so, because of metal tube out Temperature is low), it drops onto the metal reaction kettle of heating, recycles repeatedly, considerably increase and vacuumize required time, energy The problem of source power consumption is significantly increased, and causes the pumpdown time long, and dehydration efficiency is low, improves production cost.
To achieve the above object, the utility model provides the following technical solutions: a kind of new vapor condensing plant, including Vapor condensing collector, the upper end fixing seal seamless connection of the vapor condensing collector have one end of first pipe, The other end of the first pipe is circumscribed with reaction kettle, and the upper end of the vapor condensing collector also fixing seal is seamlessly connected There is one end of second pipe, the other end of the second pipe is circumscribed with water ring vacuum pump, the vapor condensing collector Side is fixedly installed with outlet pipe, is fixedly installed with manually-operated gate on the outlet pipe.
Preferably, the first pipe second pipe and outlet pipe are stainless steel material production, and first pipe the Two pipelines and outlet pipe external spray have one layer of paint.
Preferably, the junction of the first pipe and reaction kettle is bent downwardly inclination, and first pipe is with reaction kettle Sealing seamless connection.
Preferably, the vapor condensing collector is cube structure, and the lower end surface four of vapor condensing collector Angle is fixed with support foot.
It preferably, is vacuum state inside the vapor condensing collector, and vapor condensing collector is whole by not Rust Steel material is welded.
Preferably, the second pipe and external water ring vacuum pump are sealing seamless connection, and water ring vacuum pump is BA Type water ring vacuum pump.
Compared with prior art, the utility model has the beneficial effects that the new vapor condensing plant, utilizes two root canals Road, wherein the both ends of first pipe are connected with reaction kettle and vapor condensing collector respectively, the both ends difference of second pipe It is connected with water ring vacuum pump and vapor condensing collector, wherein the junction of first pipe and reaction kettle, which is bent downwardly, inclines Tiltedly, vapor is made after extraction, to immediately enter inside vapor condensing collector inside reaction kettle, be condensed into water droplet, with biography The collection mode of system is different, avoids vapor and is easy to coagulate on the parallel or acclivitous metal pipe-wall nowadays installed Collection, to condensed water will not be caused to be added dropwise in reaction kettle, shortens the time vacuumized, reduces the consumption of the energy, simultaneously The efficiency for improving dehydration reduces the cost of production, with nowadays to the dewatering type of raw material compared with, the dewatering type it is de- The water time (moisture≤500ppm) was reduced to 5 hours by original 9 hours, and power consumption is reduced to 422kwh by original 501.5kwh, Practicability is very high, and the equipment is integrally stainless steel material production, avoids the possibility got rusty, extends the use of equipment Service life, the outside in two root canal roads are coated with paint, improve the aesthetics of equipment entirety.
Detailed description of the invention
Fig. 1 is the utility model schematic perspective view;
Fig. 2 is the utility model positive structure diagram;
Fig. 3 is the utility model backsight structural representation;
Fig. 4 is the utility model side structure schematic view;
Fig. 5 is the utility model overlooking structure diagram.
In figure: 1, first pipe;2, vapor condensing collector;3, second pipe;4, outlet pipe;5, manually-operated gate.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
Fig. 1-5 is please referred to, the utility model provides a kind of technical solution: a kind of new vapor condensing plant, including the One pipeline 1, vapor condensing collector 2, second pipe 3, outlet pipe 4 and manually-operated gate 5, vapor condensing collector 2 it is upper End fixing seal seamless connection has one end of first pipe 1, and the other end of first pipe 1 is circumscribed with reaction kettle, vapor condensation The also fixing seal seamless connection of the upper end of collector 2 has one end of second pipe 3, and the other end of second pipe 3 is circumscribed with water ring Vacuum pump, the side of vapor condensing collector 2 are fixedly installed with outlet pipe 4, manually-operated gate 5 are fixedly installed on outlet pipe 4.
Further, 1 second pipe 3 of first pipe and outlet pipe 4 are stainless steel material production, and first pipe 1 Second pipe 3 and 4 external spray of outlet pipe have one layer of paint, prevent 1 second pipe 3 of first pipe and outlet pipe 4 from getting rusty, prolong The service life of long equipment improves whole aesthetics.
Further, the junction of first pipe 1 and reaction kettle is bent downwardly inclination, and first pipe 1 is with reaction kettle Sealing seamless connection, vapor after extraction, are immediately entered inside vapor condensing collector 2, are condensed into inside reaction kettle Water droplet, it is different from traditional collection mode, it avoids vapor and is easy in the parallel or acclivitous gold nowadays installed Belong to and being aggregated on tube wall, to condensed water will not be caused to be added dropwise in reaction kettle, shortens the time vacuumized, reduce the energy Consumption, while the efficiency of dehydration is improved, reduce the cost of production.
Further, vapor condensing collector 2 is cube structure, and the lower end surface four of vapor condensing collector 2 Angle is fixed with support foot, is collected by vapor condensing collector 2 to the vapor in reaction kettle, vapor is in vapor 2 internal condensation of condensing collector is at condensed water.
It further, is vacuum state inside vapor condensing collector 2, and vapor condensing collector 2 is whole by not The phenomenon that rust Steel material is welded, vapor condensing collector 2 is avoided to get rusty, extends the service life of equipment.
Further, second pipe 3 and external water ring vacuum pump are sealing seamless connection, and water ring vacuum pump is 2BA Type water ring vacuum pump, for vapor condensing collector 2 through second pipe 3 under the extraction of water ring vacuum pump, inside becomes vacuum, To be extracted to the vapor inside reaction kettle.
Working principle: first installing equipment, by the fixed company of the first pipe 1 of 2 upper end of vapor condensing collector It is connected to reaction kettle, then the second pipe 3 of 2 upper end of vapor condensing collector is fixedly attached to water ring vacuum pump, then Start water ring vacuum pump, water ring vacuum pump is extracted the air inside vapor condensing collector 2 by second pipe 3, makes water The vapor condensing collector 2 of 2 inner vacuum of steam condensing collector, inner vacuum passes through in 1 abstraction reaction kettle of first pipe The vapor in portion, vapor enter directly into 2 internal condensation of vapor condensing collector into condensed water by first pipe 1, when When condensed water inside vapor condensing collector 2 runs up to a certain amount of, staff opens manually-operated gate 5, vapor Condensed water inside condensing collector 2 is discharged by outlet pipe 4, and wherein first pipe 1 and the junction of reaction kettle are bent downwardly Inclination makes vapor after extraction, immediately enter inside vapor condensing collector 2 inside reaction kettle, be condensed into water droplet, with Traditional collection mode is different, avoids vapor and is easy on the parallel or acclivitous metal pipe-wall nowadays installed Agglutination, to condensed water will not be caused to be added dropwise in reaction kettle, shortens the time vacuumized, reduces the consumption of the energy, together When improve the efficiency of dehydration, reduce the cost of production, first pipe 1, second pipe 3, goes out vapor condensing collector 2 Water pipe 4 and manually-operated gate 5 are stainless steel material production, effectively avoid the possibility got rusty, extend the service life of equipment, It is coated with paint outside first pipe 1 and second pipe 3 simultaneously, improves whole aesthetics, and nowadays raw material is taken off Water mode is compared, and the dewatering time (moisture≤500ppm) of the dewatering type was reduced to 5 hours by original 9 hours, power consumption 422kwh is reduced to by original 501.5kwh, practicability is very high.
Finally it should be noted that the above content is only to illustrate the technical solution of the utility model, rather than it is practical to this The limitation of novel protected range, those skilled in the art to the technical solution of the utility model carry out it is simple modification or Person's equivalent replacement, all without departing from the spirit and scope of technical solutions of the utility model.

Claims (6)

1. a kind of new vapor condensing plant, including vapor condensing collector (2), it is characterised in that: the vapor is cold The upper end fixing seal seamless connection of solidifying collector (2) has one end of first pipe (1), the other end of the first pipe (1) It is circumscribed with reaction kettle, the also fixing seal seamless connection of the upper end of the vapor condensing collector (2) has the one of second pipe (3) End, the other end of the second pipe (3) are circumscribed with water ring vacuum pump, and the side of the vapor condensing collector (2) is fixed It is equipped with outlet pipe (4), is fixedly installed with manually-operated gate (5) on the outlet pipe (4).
2. the new vapor condensing plant of one kind according to claim 1, it is characterised in that: the first pipe (1) Two pipelines (3) and outlet pipe (4) are stainless steel material production, and first pipe (1) second pipe (3) and outlet pipe (4) External spray has one layer of paint.
3. the new vapor condensing plant of one kind according to claim 1, it is characterised in that: the first pipe (1) with The junction of reaction kettle is bent downwardly inclination, and first pipe (1) and reaction kettle are sealing seamless connection.
4. the new vapor condensing plant of one kind according to claim 1, it is characterised in that: the vapor condensation is collected Device (2) is cube structure, and the lower end surface Corner Strapped of vapor condensing collector (2) has support foot.
5. the new vapor condensing plant of one kind according to claim 1, it is characterised in that: the vapor condensation is collected It is vacuum state inside device (2), and vapor condensing collector (2) is integrally welded by stainless steel material.
6. the new vapor condensing plant of one kind according to claim 1, it is characterised in that: the second pipe (3) with External water ring vacuum pump is sealing seamless connection, and water ring vacuum pump is 2BA type water ring vacuum pump.
CN201822214068.6U 2018-12-27 2018-12-27 A kind of new vapor condensing plant Expired - Fee Related CN209530138U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822214068.6U CN209530138U (en) 2018-12-27 2018-12-27 A kind of new vapor condensing plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822214068.6U CN209530138U (en) 2018-12-27 2018-12-27 A kind of new vapor condensing plant

Publications (1)

Publication Number Publication Date
CN209530138U true CN209530138U (en) 2019-10-25

Family

ID=68266914

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822214068.6U Expired - Fee Related CN209530138U (en) 2018-12-27 2018-12-27 A kind of new vapor condensing plant

Country Status (1)

Country Link
CN (1) CN209530138U (en)

Similar Documents

Publication Publication Date Title
CN205389785U (en) Solar energy water supply system is used in saline and alkaline land
CN105587015B (en) Fresh water collection device
CN206512782U (en) A kind of comprehensive captation
CN107409858A (en) A kind of simple plastic greenhouse Crop evapotranspiration based on semiconductor refrigerating pipe condenses irrigation system
CN209530138U (en) A kind of new vapor condensing plant
CN210292897U (en) Steam condensate water heat recovery utilizes system of feed production
CN100471795C (en) Seawater desalting device
CN101890251A (en) High-temperature smoke dehumidifying device
CN111435055B (en) Method for completely eliminating cooling tower plume
CN205012402U (en) Open -air distillation water intake device
CN208563442U (en) A kind of air moisture condensing unit
CN110410772A (en) A kind of medium temperature and medium pressure reducing-and-cooling plant
CN214657408U (en) Sponge urban rainfall self-circulation seepage storage structure
CN208998586U (en) Double parallel closed cooling tower
CN207379319U (en) A kind of spray condenser system
CN203068765U (en) Collection, recovery and utilization system of air conditioner condensation water
CN208312207U (en) A kind of municipal administration energy-saving type vertical greening street lamp
CN207088150U (en) One kind being capable of the water-saving steam-cured pond of concrete tubular pile
CN207295844U (en) A kind of condensation water collecting device
CN112376676A (en) Sponge city oozes row structure and sponge city water circulating system
CN206145782U (en) Do hot dry rock layer heat supply unit with import and export temperature monitoring point
CN206257984U (en) A kind of cooling tower for reclaiming vapours
CN211585275U (en) Methanol steam emptying and recycling mechanism of pre-rectifying tower of methanol plant
CN219776408U (en) Cross flow closed cooling tower with drying prevention and cooling efficiency enhancement of all layers of condensing pipes
CN204678313U (en) Gravity Separation formula condensed water automatic collector

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191025

Termination date: 20211227