CN209524918U - Mapping laying out apparatus based on BIM - Google Patents

Mapping laying out apparatus based on BIM Download PDF

Info

Publication number
CN209524918U
CN209524918U CN201920338759.9U CN201920338759U CN209524918U CN 209524918 U CN209524918 U CN 209524918U CN 201920338759 U CN201920338759 U CN 201920338759U CN 209524918 U CN209524918 U CN 209524918U
Authority
CN
China
Prior art keywords
mounting box
slot
bar
bim
notch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920338759.9U
Other languages
Chinese (zh)
Inventor
关志一
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Jianwei Construction Management Co Ltd
Original Assignee
Jiangsu Jianwei Construction Management Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Jianwei Construction Management Co Ltd filed Critical Jiangsu Jianwei Construction Management Co Ltd
Priority to CN201920338759.9U priority Critical patent/CN209524918U/en
Application granted granted Critical
Publication of CN209524918U publication Critical patent/CN209524918U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Casings For Electric Apparatus (AREA)

Abstract

The utility model discloses a kind of mapping laying out apparatus based on BIM, it applies in BIM application field, its key points of the technical solution are that: including mounting box, the side of mounting box is equipped with open end, the top and bottom of mounting box are offering through slot at open end, it is connected with mounting plate jointly in the through slot of the top and bottom of mounting box, one end of mounting plate is connected with handle above mounting box, handle and the outside at the top of mounting box are inconsistent, mounting plate is rotatably connected to fixture block far from one end of handle, fixture block is vertical with the holding of the notch of the through slot of mounting box bottom outside, the length of fixture block is greater than the length of through slot notch, the thickness of fixture block is less than the width of through slot notch, master controller is installed in mounting box, first communication module, BIM data storage and second communication module and mapping module;What is had has the technical effect that reducing operator opens the operation difficulty that mounting box overhauls the component in mounting box.

Description

Mapping laying out apparatus based on BIM
Technical field
The utility model relates to BIM application field, in particular to a kind of mapping laying out apparatus based on BIM.
Background technique
In the implementation process of construction projects, whether the implementation degree for surveying and drawing setting-out can go on smoothly entire project Play conclusive effect.Accurately, carefully mapping setting-out work be not only related to an engineering whether can smooth construction in line with the drawings, And return construction quality and important technology guarantee is provided, it is work providing method and the means such as quality examination.
Notification number discloses a kind of mapping laying out apparatus based on BIM for the Chinese patent of CN206959846U, including outer Shell is provided with level meter at the top of shell, master controller, first communication module, BIM data storage and is provided in shell Two communication modules, master controller are connect by conducting wire with BIM data storage, and the output end of master controller passes through the second communication mould Block is connect with the network terminal, and the input terminal of master controller is connected by the output end of first communication module and mapping module, mapping Module includes microcontroller, and the input terminal of microcontroller passes through the output of conducting wire and geodimeter, video camera, electronic theodolite End connects, and display is equipped on the side wall of shell, and the input terminal of display is connected by the output end of conducting wire and master controller.
But the master controller of this mapping laying out apparatus, first communication module, BIM data storage and the second communication mould Block is arranged at the inside of shell, when master controller, first communication module, BIM data storage and second communication module occur When failure, it has not been convenient to which operator overhauls.
Utility model content
The purpose of the utility model is to provide a kind of mapping laying out apparatus based on BIM, its advantage is that: when in mounting box When component breaks down, the component in mounting box is overhauled convenient for operator.
The above-mentioned technical purpose of the utility model has the technical scheme that a kind of survey based on BIM Laying out apparatus, including mounting box are drawn, the side of the mounting box is equipped with open end, and the top and bottom of the mounting box are close Through slot is offered at open end, is connected with mounting plate, the installation in the through slot of the top and bottom of the mounting box jointly One end of plate is connected with handle above mounting box, and the handle and the outside at the top of mounting box are inconsistent, the mounting plate One end far from handle is rotatably connected to fixture block, and the fixture block is vertical with the holding of the notch of the through slot of mounting box bottom outside, institute The length for stating fixture block is greater than the length of through slot notch, and the thickness of the fixture block is less than the width of through slot notch, in the mounting box Master controller, first communication module, BIM data storage, second communication module and mapping module, the main control are installed Device is connect by conducting wire with BIM data storage, and the output end of the master controller passes through second communication module and the network terminal The input terminal of connection, the master controller is connect by first communication module with mapping module, the bottom installation of the mounting box There is supporting leg.
Through the above technical solutions, when master controller, first communication module, BIM data storage, second in mounting box When communication module and mapping module break down, operator is rotatablely installed the fixture block on plate, until leading on fixture block and mounting box The notch keeping parallelism of slot, then operator is removed mounting plate from the through slot on mounting box by handle, so that on mounting box Open end expose, consequently facilitating hand is reached in mounting box from open end and is examined to the component of failure by operator The possibility repaired and replaced.After maintenance, mounting plate is connected in through slot by operator again again, until on mounting plate Handle and the outside at the top of mounting box are inconsistent, and then operator is rotated further by fixture block, until fixture block and the through slot at the top of mounting box Notch keep vertical.The open end of mounting box is arranged to openable mode, reduce operator by mounting box open and it is right The difficulty that component in mounting box is overhauled, it is simple and convenient.
The utility model is further arranged to: detachable above the notch of the through slot on the mounting box at the top of mounting box It is connected with weather shield, the weather shield is L-shaped, and the weather shield shelters from the notch of through slot.
Through the above technical solutions, the setting of weather shield, the work to keep off the rain played for the through slot notch at the top of mounting box With, when reducing rainy day and carrying out mapping operations, rainwater flows in mounting box from the notch of through slot and to the possibility in mounting box, The possibility of failure is easy to happen to reduce component in mounting box due to touching rainwater.
The utility model is further arranged to: the side of the notch of the through slot on the mounting box at the top of mounting box opens up There is clamping groove, one end of the weather shield towards mounting box is connected in clamping groove.
Through the above technical solutions, weather shield is clamped by operator when operator needs when carrying out mapping operations in the rain In the clamping groove at the top of mounting box, so that the notch of through slot is blocked, play the role of keeping off the rain.When operator needs to pacify When loading board is removed from mounting box, operator pulls up weather shield out of clamping groove, consequently facilitating operator is by mounting plate from peace It is removed in through slot in mounted box.Between weather shield and mounting box by the way of being detachably connected, it will be kept off convenient for operator Rain plate is mounted and dismounted from mounting box.
The utility model is further arranged to: rubber layer, the outside of the mounting plate are installed on the cell wall of the through slot It is inconsistent away from the side of through slot cell wall with rubber layer.
Through the above technical solutions, the setting of rubber layer, so that the gap between mounting plate and the cell wall of through slot is by rubber It stops, reduces rainy day rainwater along the possibility in the interstitial flow to mounting box between mounting plate and through slot.
The utility model is further arranged to: there are three the supporting leg is set, three supporting legs are evenly distributed in The bottom of mounting box.
Through the above technical solutions, operator first supports three supporting legs on the ground simultaneously, three branch when measurement Support leg formed a trigone wimble structure, trigone wimble structure is more stable, thus increase connected between mounting box and supporting leg it is steady It is qualitative.
The utility model is further arranged to: the lower section of the mounting box is equipped with link block, three supporting leg installations Deviate from the side of mounting box in link block, the side of the link block towards mounting box is fixedly connected with rotation axis, the rotation Axis is rotatably connected on mounting box far from one end of link block.
Through the above technical solutions, when measurement, operator by after the stable support on the ground of supporting leg, operator according to Measurement needs to rotate mounting box along rotation axis, consequently facilitating the measurement angle of mounting box is adjusted to required position by operator It sets, entire mounting box is inconjunction with supporting leg without operator lifts on the ground and put again according to suitable angle, from And improve the efficiency of measurement.
The utility model is further arranged to: three supporting legs are hingedly connected to one that link block deviates from mounting box Side.
Through the above technical solutions, operator is by three supporting legs respectively around supporting leg and link block after measurement Between hinged place rotation space is accounted for when reducing three supporting leg rear distractions so that three supporting legs are in parastate With consequently facilitating operator is to supporting leg and mounting box, this is moved and stores.
The utility model is further arranged to: the rotation axis is set as retractable structure, and the rotation axis includes first Bar and the second bar, first rod set are located at the outside of the second bar, and first bar is fixedly connected on far from one end of the second bar Link block deviates from the side of supporting leg, and the described one end of second bar far from the first bar is rotatably connected on the bottom of mounting box by bearing Portion is equipped with the first screw rod on second bar and the first bar jointly, offers on the side wall of first bar for the first screw rod Mobile sliding slot is connected with fixed block on the lateral wall of first bar above sliding slot, is equipped on the fixed block Two screw rods, second screw rod are fixedly connected on the first screw rod close to one end of through slot, in fixed block on second screw rod Two sides be threaded with nut.
Through the above technical solutions, in mapping process, when needing to be adjusted the height of measurement, operator is by second The direction that nut on screw rod is directed away from fixed block is mobile, and then operator moves up and down the second bar in the first bar, directly Reach required length to the total length to combine between the first bar and the second bar, then operator again will be on the second screw rod The direction that nut is re-directed towards fixed block turns, until nut and fixed block are inconsistent.In this way, convenient for operator according to survey The combined height to the first bar and the second bar that needs of amount is adjusted, consequently facilitating operator is to height locating for mounting box It is adjusted to adapt to the needs of measurement, it is simple and convenient.
In conclusion the utility model has the following beneficial effects:
The mounting box for being equipped with multiple components is arranged to openable structure, when there is component failure, is convenient for Operator opens mounting box and overhauls to component.
Detailed description of the invention
Fig. 1 is the overall structure diagram of the present embodiment.
Fig. 2 is the enlarged drawing of part A in Fig. 1.
Fig. 3 is in the present embodiment for embodying the structural schematic diagram of mounting box internal structure.
Fig. 4 is the enlarged drawing of part B in Fig. 3.
Fig. 5 is in the present embodiment for embodying master controller, first communication module, BIM data storage, the second communication mould The flow chart of relationship between block, mapping module and display.
Appended drawing reference: 1, mounting box;2, open end;3, through slot;4, mounting plate;5, handle;6, fixture block;7, master controller; 8, first communication module;9, BIM data storage;10, second communication module;11, conducting wire;12, mapping module;121, microcontroller Device;122, geodimeter;123, video camera;124, electronic theodolite;13, display;14, supporting leg;15, weather shield;16, Clamping groove;17, rubber layer;18, link block;19, rotation axis;20, bearing;21, the first bar;22, the second bar;23, sliding slot;24, Fixed block;25, the first screw rod;26, the second screw rod;27, nut;28, the network terminal.
Specific embodiment
The utility model is described in further detail below in conjunction with attached drawing.
Embodiment: a kind of mapping laying out apparatus based on BIM is pacified in mounting box 1 with reference to Fig. 1 and Fig. 3, including mounting box 1 Equipped with master controller 7, first communication module 8, BIM data storage 9, second communication module 10 and mapping module 12, master control Device 7 processed is connect by conducting wire 11 with BIM data storage 9, and the output end of master controller 7 passes through second communication module 10 and network Terminal 28 connects, and the input terminal of master controller 7 is connect by first communication module 8 with mapping module 12.
With reference to Fig. 5, mapping module 12 includes microcontroller 121, geodimeter 122, video camera 123 and electronic theodolite 124, the input terminal of microcontroller 121 by conducting wire 11 and geodimeter 122, video camera 123, electronic theodolite 124 it is defeated Outlet connection.Mounting box 1(Fig. 1) lateral wall on display 13 is installed, the input terminal of display 13 passes through conducting wire 11 and main The output end of controller 7 connects.When measurement, operator starts master controller 7, at this time the geodimeter in mapping module 12 122,124 synchro measure of video camera 123 and electronic theodolite.After being measured, main control is sent to by first communication module 8 Device 7, master controller 7 are stored by BIM data storage 9, while master controller 7 is sent to by second communication module 10 The network terminal, and master controller 7 shows the data measured by display 13.
With reference to Fig. 3 and Fig. 4, the side of mounting box 1 is equipped with open end 2, and the top and bottom of mounting box 1 are close to open end Through slot 3 is offered at 2, is bonded with rubber layer 17 on the cell wall of through slot 3, it is common in the through slot 3 of the top and bottom of mounting box 1 It is connected with one piece of mounting plate 4, the outside of mounting plate 4 and rubber layer 17 are inconsistent away from the side of 3 cell wall of through slot.Rubber layer 17 Setting, increases the compactness connected between mounting plate 4 and through slot 3.One end of mounting plate 4 is welded in the top of mounting box 1 Handle 5, mounting plate 4 are rotatably connected to one piece of fixture block 6 far from one end of handle 5, and fixture block 6 extends the through slot 3 of 1 bottom of mounting box Outside and vertical with the holding of the notch of through slot 3, the length of fixture block 6 is greater than the length of 3 notch of through slot, and the thickness of fixture block 6 is less than The width of 3 notch of through slot.
With reference to Fig. 3 and Fig. 4, when needing to master controller 7, first communication module 8, the BIM data storage in mounting box 1 When 9 and second communication module 10 etc. are broken down, operator rotates fixture block 6, so that the notch of fixture block 6 and through slot 3 on mounting box 1 Keeping parallelism.Then operator by handle 5 by mounting plate 4 together with fixture block 6 simultaneously from the through slots of the top and bottom of mounting box 1 3 notch pulls out, so that the open end 2 of mounting box 1 is opened, consequently facilitating main control of the operator to being located in mounting box 1 The components such as device 7, first communication module 8, BIM data storage 9 and second communication module 10 are overhauled.After maintenance, Mounting plate 4 is connected in the through slot 3 of the top and bottom of mounting box 1 by operator again again, and elapses mounting plate 4 until installation Handle 5 on plate 4 and the outside at the top of mounting box 1 are inconsistent, close so that the open end 2 of mounting box 1 is mounted plate 4, so Operator is rotated further by fixture block 6 afterwards, so that fixture block 6 is vertical with the holding of the notch of through slot 3, so that fixture block 6 is by the notch of through slot 3 It shelters from.
With reference to Fig. 1, clamping groove 16 is offered in the side of the notch for the through slot 3 for being located at 1 top of mounting box on mounting box 1, One piece of weather shield 15 is connected in clamping groove 16, weather shield 15 is L-shaped.The outer of weather shield 15 extends to 1 top of mounting box The top of the notch of through slot 3, and the notch of through slot 3 will be sheltered from.The setting of weather shield 15, when reducing rainy day detection, Rainwater flows in mounting box 1 along the gap between the notch and mounting plate 4 of the through slot 3 at 1 top of mounting box and causes mounting box 1 The possibility that interior component breaks down, plays the effect kept off the rain.
With reference to Fig. 1 and Fig. 2, the lower section of mounting box 1 is equipped with link block 18, and three supporting legs 14, which are mounted on link block 18, to deviate from The side of mounting box 1, the side of link block 18 towards mounting box 1 are fixedly connected with rotation axis 19, and rotation axis 19 is far from link block 18 one end is rotatably connected on mounting box 1.The lower section of mounting box 1 is set there are three supporting leg 14, and three supporting legs 14 are hinged It is connected to the side that link block 18 deviates from mounting box 1, and three supporting legs 14 are uniformly distributed.When detection, operator is by three Supporting leg 14 supports on the ground, and three supporting legs 14 surround a stable trigone wimble structure, so that mounting box 1 is steady Fixed support is on the ground.Then operator needs to rotate mounting box 1 along rotation axis 19 according to measurement angle, until peace Mounted box 1 is adjusted to suitable angle.
With reference to Fig. 3, rotation axis 19 includes the first bar 21 and the second bar 22, and the first bar 21 is set in the outside of the second bar 22, First bar 21 is fixedly connected on the side that link block 18 deviates from supporting leg 14 far from one end of the second bar 22, and the second bar 22 is far from the One end of one bar 21 is rotatably connected on the bottom of mounting box 1 by bearing 20.The outside of bearing 20 and the bottom of mounting box 1 are welded Connection, the second bar 22 and the inside of the inner shaft of bearing 20 are welded to connect.It is equipped with one jointly on second bar 22 and the first bar 21 First screw rod 25 offers sliding slot 23(Fig. 2 on the side wall of first bar 21 along the vertical direction), the first screw rod 25 is fed through sliding slot 23 Extend to the outside of the first bar 21.It is welded with a fixed block 24 in the top of sliding slot 23 on the lateral wall of first bar 21, it is fixed Second screw rod 26 is equipped on block 24, the second screw rod 26 is welded on the first screw rod 25 close to one end of through slot 3, the second spiral shell A nut 27 is threaded in the two sides of fixed block 24 on bar 26.
With reference to Fig. 3, when detection, when the measurement of mounting box 1 height needs to adjust, operator is by two on the second screw rod 26 The direction that a nut 27 is directed away from fixed block 24 turns, and then moves the second bar 22 along the vertical direction of the first bar 21, The first screw rod 25 is along sliding slot 23(Fig. 2 on the first bar 21 at this time) it slides up and down, needed for the height of mounting box 1 is moved to Height when, two nuts 27 are re-directed towards fixed block 24 and turned by operator, until the two of two nuts 27 and fixed block 24 Side is inconsistent, and the second bar 22 is fixed in the first bar 21 at this time, and the length that the first bar 21 and the second bar 22 are combined is solid It is fixed.Rotation axis 19 is set as retractable structure, convenient for operator according to the height of required measurement to the first bar 21 and the second bar 22 Combined altitudes be adjusted so that height and position locating for mounting box 1 is identical as the height of required measurement.
The course of work: when measurement, operator supports three supporting legs 14 on the ground, and according to the height of required measurement The combined altitudes of first bar 21 and the second bar 22 are adjusted.Then operator starts master controller 7, at this time mapping module 12 Interior 124 synchro measure of geodimeter 122, video camera 123 and electronic theodolite.When event occurs in the component in mounting box 1 When barrier, operator removes weather shield 15 out of clamping groove 16, and then operator rotates fixture block 6, so that fixture block 6 and mounting box 1 The notch keeping parallelism of the through slot 3 of bottom, then operator removes mounting plate 4 from the through slot 3 of 1 top and bottom of mounting box, So that the open end 2 on mounting box 1 is opened, so that operator be facilitated to overhaul the component in mounting box 1.
This specific embodiment is only the explanation to the utility model, is not limitations of the present invention, ability Field technique personnel can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but As long as all by the protection of Patent Law in the scope of the claims of the utility model.

Claims (8)

1. a kind of mapping laying out apparatus based on BIM, it is characterised in that: including mounting box (1), the side of the mounting box (1) Equipped with open end (2), the top and bottom of the mounting box (1) offer through slot (3) at open end (2), described It is connected with jointly mounting plate (4) in the through slot (3) of the top and bottom of mounting box (1), one end of the mounting plate (4) is being installed It is connected with above box (1) handle (5), the handle (5) and the outside at the top of mounting box (1) are inconsistent, the mounting plate (4) One end far from handle (5) is rotatably connected to fixture block (6), the through slot (3) of the fixture block (6) and mounting box (1) bottom outside Notch keeps vertical, and the length of the fixture block (6) is greater than the length of through slot (3) notch, and the thickness of the fixture block (6) is less than through slot (3) width of notch, the mounting box (1) is interior to be equipped with master controller (7), first communication module (8), BIM data storage (9), second communication module (10) and mapping module (12), the master controller (7) are stored by conducting wire (11) and BIM data The output end of device (9) connection, the master controller (7) is connect by second communication module (10) with the network terminal, the master control The input terminal of device (7) processed is connect by first communication module (8) with mapping module (12), the bottom installation of the mounting box (1) There are supporting leg (14).
2. the mapping laying out apparatus according to claim 1 based on BIM, it is characterised in that: pacifying on the mounting box (1) It is removably connected with weather shield (15) above the notch of through slot (3) at the top of mounted box (1), the weather shield (15) is L-shaped, described Weather shield (15) shelters from the notch of through slot (3).
3. the mapping laying out apparatus according to claim 2 based on BIM, it is characterised in that: pacifying on the mounting box (1) The side of the notch of through slot (3) at the top of mounted box (1) offers clamping groove (16), and the weather shield (15) is towards mounting box (1) One end be connected in clamping groove (16).
4. the mapping laying out apparatus according to claim 1 based on BIM, it is characterised in that: on the cell wall of the through slot (3) It is installed with rubber layer (17), the outside and rubber layer (17) of the mounting plate (4) are inconsistent away from the side of through slot (3) cell wall.
5. the mapping laying out apparatus according to claim 1 based on BIM, it is characterised in that: the supporting leg (14) is equipped with Three, three supporting legs (14) are evenly distributed in the bottom of mounting box (1).
6. the mapping laying out apparatus according to claim 5 based on BIM, it is characterised in that: the lower section of the mounting box (1) Equipped with link block (18), three supporting legs (14) are mounted on the side that link block (18) deviate from mounting box (1), the connection The side of block (18) towards mounting box (1) is fixedly connected with rotation axis (19), and the rotation axis (19) is far from link block (18) One end is rotatably connected on mounting box (1).
7. the mapping laying out apparatus according to claim 6 based on BIM, it is characterised in that: three supporting legs (14) It is hingedly connected to the side that link block (18) deviate from mounting box (1).
8. the mapping laying out apparatus according to claim 7 based on BIM, it is characterised in that: rotation axis (19) setting For retractable structure, the rotation axis (19) includes the first bar (21) and the second bar (22), and first bar (21) is set in the The outside of two bars (22), first bar (21) are fixedly connected on link block (18) away from support far from the one end of the second bar (22) The side of leg (14), the one end of second bar (22) far from the first bar (21) are rotatably connected on mounting box by bearing (20) (1) bottom is equipped with the first screw rod (25) jointly on second bar (22) and the first bar (21), first bar (21) The sliding slot (23) mobile for the first screw rod (25) is offered on side wall, in sliding slot (23) on the lateral wall of first bar (21) Top is connected with fixed block (24), is equipped with the second screw rod (26) on the fixed block (24), and second screw rod (26) is close One end of through slot (3) is fixedly connected on the first screw rod (25), equal in the two sides of fixed block (24) on second screw rod (26) It is threaded with nut (27).
CN201920338759.9U 2019-03-16 2019-03-16 Mapping laying out apparatus based on BIM Expired - Fee Related CN209524918U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920338759.9U CN209524918U (en) 2019-03-16 2019-03-16 Mapping laying out apparatus based on BIM

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920338759.9U CN209524918U (en) 2019-03-16 2019-03-16 Mapping laying out apparatus based on BIM

Publications (1)

Publication Number Publication Date
CN209524918U true CN209524918U (en) 2019-10-22

Family

ID=68232445

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920338759.9U Expired - Fee Related CN209524918U (en) 2019-03-16 2019-03-16 Mapping laying out apparatus based on BIM

Country Status (1)

Country Link
CN (1) CN209524918U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112361187A (en) * 2020-11-02 2021-02-12 郭真琴 BIM-based construction measurement lofting device and lofting method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112361187A (en) * 2020-11-02 2021-02-12 郭真琴 BIM-based construction measurement lofting device and lofting method thereof
CN112361187B (en) * 2020-11-02 2022-10-04 梅州创丰建设工程有限公司 BIM-based construction measurement lofting device and lofting method thereof

Similar Documents

Publication Publication Date Title
CN209524918U (en) Mapping laying out apparatus based on BIM
CN204129422U (en) A kind of with clapping servicing unit
CN111541808B (en) Cell-phone glass panels flaw detection device
CN210346656U (en) Area measurement device for land planning
CN207717651U (en) A kind of light bulb appearance detecting device
CN207246722U (en) Environment detector support device
CN205176458U (en) Electronic slide rail
CN214425579U (en) Target self-adaptation tripod for water conservancy exploration
CN207586256U (en) For the rotary frame of semiconductor test apparatus
CN210431563U (en) Prompter device for news dissemination
CN208620005U (en) Total station tripod
CN208589962U (en) A kind of photovoltaic module hot spot detection device
CN112249360A (en) Method for assembling spacecraft structural plate
CN220439063U (en) Projector for linear algebra teaching
CN215640917U (en) Visual detection mechanism for black spot defects on sheet and ice cream support
CN216309766U (en) Electromechanical detection device with limiting function
CN215423888U (en) Ceramic tile show shelf
CN106442322B (en) Swing detection mechanism of camera
CN217822059U (en) Drum kit convenient to installation
CN209459867U (en) A kind of MTF test panel
CN215488784U (en) A installing support for environmental detection equipment
CN220264298U (en) Battery module detects unloading station
CN217904359U (en) Portable photovoltaic power generation and power station operation and maintenance monitoring simulation device
CN215164946U (en) Portable scenic spot management water conservancy diversion indicating device
CN215298674U (en) Outdoor signboard

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191022