CN209524235U - A kind of mounting bracket for steel sleeve steel insulating tube - Google Patents
A kind of mounting bracket for steel sleeve steel insulating tube Download PDFInfo
- Publication number
- CN209524235U CN209524235U CN201920223080.5U CN201920223080U CN209524235U CN 209524235 U CN209524235 U CN 209524235U CN 201920223080 U CN201920223080 U CN 201920223080U CN 209524235 U CN209524235 U CN 209524235U
- Authority
- CN
- China
- Prior art keywords
- steel
- casing
- thermal insulation
- layer
- insulation pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Thermal Insulation (AREA)
Abstract
Description
技术领域technical field
本实用新型属于钢套钢保温管安装领域,具体是涉及一种用于钢套钢保温管的安装支架。The utility model belongs to the field of installation of a steel jacketed steel thermal insulation pipe, in particular to an installation bracket for a steel jacketed steel thermal insulation pipe.
背景技术Background technique
钢套钢蒸汽保温管保温在安装时,特别是在安装在外部时,通常是需要用安装支架将其架空设置在地面上,由于钢套钢保温管的重量大,安装支架基本是采用钢结构件进行安装,When installing the steel jacketed steel steam insulation pipe, especially when it is installed externally, it is usually necessary to use a mounting bracket to set it overhead on the ground. Due to the heavy weight of the steel jacketed steel insulation pipe, the installation bracket is basically a steel structure. parts to install,
然而钢结构无法有效避免冷桥的传递,导致冷量传送到保温管,影响了保温管的保温性能,同时因为保温管在安装前后都会因为安装环境和安装方法的因素,造成保温管的损坏,并且因为保温管需要安装在不同的平面上,目前的安装支架已不能满足要求。However, the steel structure cannot effectively avoid the transfer of the cold bridge, which leads to the transfer of cold energy to the insulation pipe, which affects the insulation performance of the insulation pipe. And because the insulation pipes need to be installed on different planes, the current installation brackets can no longer meet the requirements.
实用新型内容Utility model content
本实用新型的目的就在于提供一种用于钢套钢保温管的安装支架。The purpose of the utility model is to provide a mounting bracket for a steel jacketed steel thermal insulation pipe.
本实用新型所采用的的技术方案如下:The technical scheme adopted by the utility model is as follows:
一种用于钢套钢保温管的安装支架,包括上套管、下套管、支撑架、安装底座,所述上套管下端设置有所述下套管;An installation bracket for a steel jacketed steel thermal insulation pipe, comprising an upper casing, a lower casing, a support frame and an installation base, and the lower casing is provided at the lower end of the upper casing;
钢套钢保温管设置在所述上套管和所述下套管之间,所述上套管和所述下套管一侧均设置有连接块,两个转动架设置在所述上套管和所述下套管另一侧,连轴设置在两个所述转动架之间,第一连接螺栓设置在两个所述连接块上,所述下套管下端设置有两个所述支撑架,所述安装底座设置在所述支撑架下端,所述第二连接螺栓设置在所述支撑架和所述安装底座之间,固定螺栓设置在所述安装底座上;The steel jacketed steel thermal insulation pipe is arranged between the upper casing and the lower casing, a connecting block is arranged on one side of the upper casing and the lower casing, and two turrets are arranged on the upper casing On the other side of the pipe and the lower casing, the connecting shaft is arranged between the two turrets, the first connecting bolt is arranged on the two connecting blocks, and the lower end of the lower casing is provided with two a support frame, the installation base is arranged at the lower end of the support frame, the second connection bolt is arranged between the support frame and the installation base, and the fixing bolt is arranged on the installation base;
所述钢套钢保温管和所述上套管、所述下套管之间均设置有内护板,所述内护板和所述下套管之间设置有镶板,连杆设置在所述镶板下端,配合块设置在所述连杆外部,配合槽设置在所述配合块和所述下套管之间,所述内护板包括耐磨层、绝缘层、保温层、固定层,所述耐磨层下端设置有所述绝缘层,所述保温层设置在所述绝缘层下端,所述固定层设置在所述保温层下端。An inner shield is arranged between the steel jacketed steel insulation pipe, the upper casing and the lower casing, a panel is arranged between the inner shield and the lower casing, and the connecting rod is arranged on the At the lower end of the panel, a matching block is arranged outside the connecting rod, a matching groove is arranged between the matching block and the lower sleeve, and the inner shield includes a wear-resistant layer, an insulating layer, a thermal insulation layer, a fixed The insulating layer is arranged at the lower end of the wear-resistant layer, the insulating layer is arranged at the lower end of the insulating layer, and the fixing layer is arranged at the lower end of the insulating layer.
优选地:所述耐磨层、所述绝缘层、所述保温层、所述固定层之间通过胶粘连接,所述耐磨层材质为异戊橡胶,所述绝缘层材质为乙丙橡胶,所述保温层材质为氯丁橡胶,所述固定层材质为异戊橡胶。Preferably: the wear-resistant layer, the insulating layer, the thermal insulation layer, and the fixed layer are connected by gluing, the wear-resistant layer is made of isoprene rubber, and the insulating layer is made of ethylene-propylene rubber , the material of the thermal insulation layer is neoprene, and the material of the fixed layer is isoprene rubber.
如此设置,所述耐磨层、所述绝缘层、所述保温层、所述固定层起到了耐磨、绝缘、保温、减震的作用,保证了保温管在安装完成后有良好的工作环境,同时避免外部原因引发的管道损坏。In this way, the wear-resistant layer, the insulating layer, the thermal insulation layer and the fixed layer play the roles of wear resistance, insulation, heat preservation and shock absorption, which ensures that the thermal insulation pipe has a good working environment after the installation is completed. , while avoiding pipeline damage caused by external causes.
优选地:所述镶板镶嵌于所述内护板,所述连杆通过焊接和所述镶板连接,所述配合块和所述连杆一体成型,所述镶板材质为45号钢。Preferably, the panel is inlaid on the inner shield, the connecting rod is connected to the panel by welding, the matching block and the connecting rod are integrally formed, and the material of the panel is 45-gauge steel.
如此设置,所述镶板起安装作用,通过镶嵌连接保证了连接稳定性。In this way, the panels play the role of installation, and the connection stability is ensured through the inlaid connection.
优选地:所述配合槽和所述下套管一体成型。Preferably, the matching groove and the lower sleeve are integrally formed.
如此设置,所述耐磨层起安装作用,一体成型加工方便。In this way, the wear-resistant layer plays an installation role, and the integral molding process is convenient.
优选地:所述固定螺栓通过螺栓连接于所述安装底座,所述固定螺栓的规格为M15。Preferably, the fixing bolts are connected to the mounting base by bolts, and the specification of the fixing bolts is M15.
如此设置,所述固定螺栓起加固和安装作用,采用螺纹连接便于拆装。In this way, the fixing bolts play the role of reinforcement and installation, and the threaded connection is convenient for disassembly and assembly.
优选地:所述支撑架通过所述第二连接螺栓连接于所述安装底座,所述第二连接螺栓的规格为M10。Preferably, the support frame is connected to the mounting base through the second connecting bolt, and the specification of the second connecting bolt is M10.
如此设置,所述支撑架起支撑和安装通,通过卡接和螺栓连接,便于安装。In this way, the support frame can be supported and installed, and is connected by clamping and bolts, which is convenient for installation.
优选地:所述连接块通过焊接和所述上套管、所述下套管连接。Preferably, the connection block is connected to the upper casing and the lower casing by welding.
如此设置,所述连接块起连接和加固作用,通过焊接连接保证了连接强度。In this way, the connection blocks play the role of connection and reinforcement, and the connection strength is ensured through the welding connection.
本实用新型的有益效果为:The beneficial effects of the present utility model are:
1、结构合理,操作简单,使用方便;1. Reasonable structure, simple operation and convenient use;
2、使用分体式结构,便于在不同平面上进行安装;2. The split structure is used to facilitate installation on different planes;
3、利用内护板有效的保护管道在安装前后的环境,避免外部因素影响管道损坏。3. Use the inner guard plate to effectively protect the environment of the pipeline before and after installation, and avoid external factors from affecting the pipeline damage.
附图说明Description of drawings
附图是用来提供对本实用新型的进一步理解,并且构成说明书的一部分,与下面的具体实施方式一起用于解释本实用新型,但并不构成对本实用新型的限制。在附图中:The accompanying drawings are used to provide a further understanding of the present utility model, and constitute a part of the specification, and together with the following specific embodiments, are used to explain the present utility model, but do not constitute a limitation to the present utility model. In the attached image:
图1是本实用新型所述一种用于钢套钢保温管的安装支架的结构示意图;Fig. 1 is the structural representation of a kind of installation bracket for steel jacketed steel thermal insulation pipe according to the present utility model;
图2是本实用新型所述一种用于钢套钢保温管的安装支架的主视结构示意图;Figure 2 is a schematic front view of the structure of a mounting bracket for a steel jacketed steel thermal insulation pipe according to the present invention;
图3是本实用新型所述一种用于钢套钢保温管的安装支架的内护板安装结构示意图;3 is a schematic diagram of the installation structure of the inner guard plate of the installation bracket for the steel jacketed steel thermal insulation pipe according to the present invention;
图4是本实用新型所述一种用于钢套钢保温管的安装支架的内护板剖视图;4 is a cross-sectional view of an inner guard plate of a mounting bracket for a steel-jacketed steel thermal insulation pipe according to the present invention;
图5是本实用新型所述一种用于钢套钢保温管的安装支架的转动架结构示意图。5 is a schematic structural diagram of a turret of a mounting bracket used for a steel jacketed steel thermal insulation pipe according to the present invention.
附图标记说明如下:The reference numerals are explained as follows:
1、上套管;2、钢套钢保温管;3、下套管;4、第一连接螺栓;5、支撑架;6、安装底座;7、第二连接螺栓;8、固定螺栓;9、连接块;10、内护板;11、镶板;12、连杆;13、配合块;14、配合槽;15、耐磨层;16、绝缘层;17、保温层;18、固定层;19、转动架;20、连轴。1. Upper casing; 2. Steel jacketed steel insulation pipe; 3. Lower casing; 4. First connecting bolt; 5. Support frame; 6. Mounting base; 7. Second connecting bolt; 8. Fixing bolt; 9 , connecting block; 10, inner guard plate; 11, panel; 12, connecting rod; 13, matching block; 14, matching groove; 15, wear-resistant layer; 16, insulating layer; 17, thermal insulation layer; 18, fixed layer ; 19, turret; 20, connecting shaft.
具体实施方式Detailed ways
下面通过实施例结合附图进一步说明本实用新型。The present utility model is further described below through embodiments in conjunction with the accompanying drawings.
实施例1Example 1
如图1-图5所示,一种用于钢套钢保温管的安装支架,包括上套管1、下套管3、支撑架5、安装底座6,上套管1下端设置有下套管3,上套管1起保护作用,下套管3起保护作用;As shown in Figures 1 to 5, a mounting bracket for a steel jacketed steel thermal insulation pipe includes an upper casing 1, a lower casing 3, a support frame 5, and a mounting base 6, and the lower end of the upper casing 1 is provided with a lower casing Pipe 3, the upper casing 1 plays a protective role, and the lower casing 3 plays a protective role;
钢套钢保温管2设置在上套管1和下套管3之间,钢套钢保温管2起工作作用,上套管1和下套管3一侧均设置有连接块9,连接块9起连接作用,两个转动架19设置在上套管1和下套管3另一侧,转动架19起连接作用,连轴20设置在两个转动架19之间,连轴20起转动作用,第一连接螺栓4设置在两个连接块9上,第一连接螺栓4起连接作用,下套管3下端设置有两个支撑架5,支撑架5起支撑作用,安装底座6设置在支撑架5下端,安装底座6起安装作用,第二连接螺栓7设置在支撑架5和安装底座6之间,第二连接螺栓7起连接作用,固定螺栓8设置在安装底座6上,固定螺栓8起连接作用;The steel jacketed steel thermal insulation pipe 2 is arranged between the upper casing 1 and the lower casing 3, the steel jacketed steel thermal insulation pipe 2 plays a working role, and the upper casing 1 and the lower casing 3 are provided with connecting blocks 9 on one side. 9 plays a connecting role, the two turrets 19 are arranged on the other side of the upper casing 1 and the lower casing 3, the turret 19 plays a connecting role, the connecting shaft 20 is arranged between the two turrets 19, and the connecting shaft 20 rotates Function, the first connecting bolts 4 are arranged on the two connecting blocks 9, the first connecting bolts 4 play a connecting role, the lower end of the lower casing 3 is provided with two supporting frames 5, the supporting frames 5 play a supporting role, and the mounting base 6 is arranged on the At the lower end of the support frame 5, the mounting base 6 plays an installation role, the second connecting bolt 7 is arranged between the support frame 5 and the mounting base 6, the second connecting bolt 7 plays a connecting role, the fixing bolt 8 is arranged on the mounting base 6, and the fixing bolt 8 acts as a connection;
钢套钢保温管2和上套管1、下套管3之间均设置有内护板10,内护板10起保护作用,内护板10和下套管3之间设置有镶板11,镶板11起安装作用,连杆12设置在镶板11下端,配合块13设置在连杆12外部,配合块13起连接作用,配合槽14设置在配合块13和下套管3之间,配合槽14起连接作用,内护板10包括耐磨层15、绝缘层16、保温层17、固定层18,耐磨层15下端设置有绝缘层16,耐磨层15起耐磨作用,绝缘层16起绝缘作用,保温层17设置在绝缘层16下端,保温层17起保温作用,固定层18设置在保温层17下端,固定层18起支撑和减震作用。An inner shield 10 is arranged between the steel jacketed steel insulation pipe 2 and the upper casing 1 and the lower casing 3. The inner shield 10 plays a protective role, and a panel 11 is arranged between the inner shield 10 and the lower casing 3. , the panel 11 plays an installation role, the connecting rod 12 is arranged at the lower end of the panel 11, the matching block 13 is arranged outside the connecting rod 12, the matching block 13 plays a connecting role, and the matching groove 14 is arranged between the matching block 13 and the lower sleeve 3 , the matching groove 14 plays a connecting role, and the inner shield 10 includes a wear-resistant layer 15, an insulating layer 16, a thermal insulation layer 17, and a fixed layer 18. The lower end of the wear-resistant layer 15 is provided with an insulating layer 16, and the wear-resistant layer 15 plays a wear-resistant role. The insulating layer 16 plays an insulating role, the thermal insulating layer 17 is arranged on the lower end of the insulating layer 16, the thermal insulating layer 17 plays a thermal insulating role, and the fixed layer 18 is arranged on the lower end of the thermal insulating layer 17, and the fixed layer 18 plays the role of support and shock absorption.
工作原理:当需要安装时,先将安装底座6通过固定螺栓8安装在需要的平面上,再将内护板10通过连杆12和上套管1、下套管3、连接,然后利用上套管1、下套管3将设备套在钢套钢保温管2外部,内护板10起到了保护作用,抬起钢套钢保温管2,使支撑架5和安装底座6卡接,然后利用第二连接螺栓7固定支撑架5和安装底座6,当外部震动时,内护板10能够有效的过滤震动,当钢套钢保温管2内部流过热性流体时,内护板10能够有效的保温,当内护板10产生磨损时,只需拔下内护板10既可更换。Working principle: When it is necessary to install, first install the mounting base 6 on the required plane through the fixing bolts 8, and then connect the inner shield 10 with the upper casing 1 and the lower casing 3 through the connecting rod 12, and then use the upper The casing 1 and the lower casing 3 cover the equipment on the outside of the steel jacketed steel thermal insulation pipe 2, and the inner guard plate 10 plays a protective role. The support frame 5 and the mounting base 6 are fixed by the second connecting bolts 7. When the external vibration occurs, the inner shield 10 can effectively filter the vibration. When the inner shield 10 is worn out, it can be replaced by simply pulling out the inner shield 10.
实施例2Example 2
本实施例与实施例1的区别在于:The difference between this embodiment and Embodiment 1 is:
耐磨层15、绝缘层16、保温层17、固定层18之间通过胶粘连接,耐磨层15材质为异戊橡胶,绝缘层16材质为乙丙橡胶,保温层17材质为氯丁橡胶,固定层18材质为异戊橡胶,耐磨层15、绝缘层16、保温层17、固定层18起到了耐磨、绝缘、保温、减震的作用,保证了保温管在安装完成后有良好的工作环境,同时避免外部原因引发的管道损坏。The wear-resistant layer 15, the insulating layer 16, the thermal insulation layer 17, and the fixed layer 18 are connected by gluing, the wear-resistant layer 15 is made of isoprene rubber, the insulating layer 16 is made of ethylene-propylene rubber, and the thermal insulation layer 17 is made of neoprene rubber , the material of the fixed layer 18 is isoprene rubber, the wear-resistant layer 15, the insulating layer 16, the thermal insulation layer 17, and the fixed layer 18 play the role of wear resistance, insulation, heat preservation, and shock absorption, ensuring that the insulation pipe has good performance after installation. working environment, while avoiding pipe damage caused by external causes.
以上结合附图对本实用新型的优选实施方式做了详细说明,但本实用新型并不限于上述实施方式,在所属技术领域技术人员所具备的知识范围内,还可以在不脱离本实用新型宗旨的前提下作出各种变化。The preferred embodiments of the present utility model have been described in detail above with reference to the accompanying drawings, but the present utility model is not limited to the above-mentioned embodiments. Within the scope of knowledge possessed by those skilled in the art, the present utility model can also be used without departing from the purpose of the present utility model. Various changes are made under the premise.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201920223080.5U CN209524235U (en) | 2019-02-22 | 2019-02-22 | A kind of mounting bracket for steel sleeve steel insulating tube |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201920223080.5U CN209524235U (en) | 2019-02-22 | 2019-02-22 | A kind of mounting bracket for steel sleeve steel insulating tube |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN209524235U true CN209524235U (en) | 2019-10-22 |
Family
ID=68231449
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201920223080.5U Expired - Fee Related CN209524235U (en) | 2019-02-22 | 2019-02-22 | A kind of mounting bracket for steel sleeve steel insulating tube |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN209524235U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN113737806A (en) * | 2021-08-30 | 2021-12-03 | 大昌建设集团有限公司 | Disposable embedded pipeline structure and construction method |
| CN115523368A (en) * | 2022-10-09 | 2022-12-27 | 宜兴市宏业保温工程有限公司 | Laying method and laying equipment of heat insulation layer for power station boiler |
-
2019
- 2019-02-22 CN CN201920223080.5U patent/CN209524235U/en not_active Expired - Fee Related
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN113737806A (en) * | 2021-08-30 | 2021-12-03 | 大昌建设集团有限公司 | Disposable embedded pipeline structure and construction method |
| CN115523368A (en) * | 2022-10-09 | 2022-12-27 | 宜兴市宏业保温工程有限公司 | Laying method and laying equipment of heat insulation layer for power station boiler |
| CN115523368B (en) * | 2022-10-09 | 2023-08-11 | 宜兴市宏业保温工程有限公司 | Method and equipment for laying heat insulation layer for power station boiler |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN209524235U (en) | A kind of mounting bracket for steel sleeve steel insulating tube | |
| CN213145737U (en) | Compensator that shape of preapring for an unfavorable turn of events is strong in compressive property | |
| CN205674844U (en) | A kind of suspending soft cushion assembly | |
| CN211289185U (en) | A pipeline checkpost structure for antidetonation support | |
| CN202432121U (en) | Pipe clamp bracket | |
| CN207998888U (en) | A kind of large hydraulic excavator shock-absorbing device for radiator | |
| CN201074002Y (en) | Motorcycle radiator assemblage coupling mechanisms | |
| CN212536958U (en) | A kind of auxiliary installation tool for anti-seismic support and hanger | |
| CN210800402U (en) | Dust removal pipeline thermal compensation device | |
| CN210507527U (en) | Follow-on assembled underground pipe gallery wallboard positioner | |
| CN112503258B (en) | High-pressure hydraulic pipeline installation structure and method | |
| CN219242830U (en) | An easy-to-install cooling pipe installation base | |
| CN115416983A (en) | A whole machine boxing device applied to fast-packing generators | |
| CN202831647U (en) | Hydraulic pipeline transition assembly and engineering machinery | |
| CN207065852U (en) | A kind of copper pipe installs shock bracket | |
| CN219934325U (en) | Heat pump set with noise reduction function | |
| CN218408820U (en) | Pipeline installation strutting arrangement is used in municipal works construction | |
| CN214889447U (en) | Direct-buried composite heat-insulation pipe convenient to support | |
| CN206617665U (en) | A kind of support pipe clamp of through-flooring steel pipe | |
| CN207364450U (en) | A kind of planar slide heat-insulating bracket for steam heat preserving pipeline | |
| CN110925898A (en) | Outer quick-witted fixed bolster of air conditioner convenient to installation | |
| CN212203558U (en) | Compound expansion joint for desulfurization well | |
| CN223794796U (en) | Multi-pipe common-frame lateral anti-seismic supporting and hanging frame structure | |
| CN210739706U (en) | A antidetonation gallows for main equipment | |
| CN207092689U (en) | A kind of Multi-layer composite guardrail |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
| PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of utility model: A mounting bracket for steel jacketed steel insulation pipe Effective date of registration: 20220623 Granted publication date: 20191022 Pledgee: Industrial and Commercial Bank of China Limited Yutai sub branch Pledgor: JINING JUNENG THERMAL INSULATION BUILDING MATERIAL Co.,Ltd. Registration number: Y2022980008634 |
|
| PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
| PC01 | Cancellation of the registration of the contract for pledge of patent right |
Date of cancellation: 20230614 Granted publication date: 20191022 Pledgee: Industrial and Commercial Bank of China Limited Yutai sub branch Pledgor: JINING JUNENG THERMAL INSULATION BUILDING MATERIAL Co.,Ltd. Registration number: Y2022980008634 |
|
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20191022 |