CN209521736U - A kind of water conservancy construction handling device - Google Patents
A kind of water conservancy construction handling device Download PDFInfo
- Publication number
- CN209521736U CN209521736U CN201920210744.4U CN201920210744U CN209521736U CN 209521736 U CN209521736 U CN 209521736U CN 201920210744 U CN201920210744 U CN 201920210744U CN 209521736 U CN209521736 U CN 209521736U
- Authority
- CN
- China
- Prior art keywords
- placing groove
- plate
- fixedly installed
- transport desk
- arc
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a kind of water conservancy construction handling devices, including Transport Desk, the Transport Desk center of top offers placing groove, installation chamber is offered in Transport Desk, it installs there are two chambers, and it is located at the two sides of placing groove, side bottom is fixedly installed with hydraulic cylinder in installation cavity room, the hydraulic stem free end of hydraulic cylinder is fixedly installed with push plate, the top of Transport Desk offers arc placing groove along the longitudinal direction, arc placing groove has several, longitudinally run through on Transport Desk and offers through-hole, through-hole has several and is located at the underface of arc placing groove, one end of through-hole is connected to the inside bottom of arc placing groove, the other end and installation chamber of through-hole, push rod is fixedly installed at the top of push plate, push rod is slidably mounted in through-hole, the bottom of the Transport Desk is provided with mounting plate, the water conservancy construction handling device can The manpower for mutually colliding between steel pipe and consuming when can reduce carrying is avoided when carrying steel pipe.
Description
Technical field
The utility model relates to water conservancy construction field, specifically a kind of water conservancy construction handling device.
Background technique
Existing water conservancy construction handling device needs when moving steel pipe to Transport Desk when carrying the steel pipe for being used for water conservancy construction
A large amount of manpowers are consumed, moves to collide between steel pipe when transporting steel pipe after steel pipe and manufactures transportation-produced noise, while may
Damage steel pipe and Transport Desk, when steel pipe transporting to specified job location, due to steel pipe own form, cause steel pipe take out compared with
For difficulty.
Utility model content
The purpose of this utility model is to provide a kind of water conservancy construction handling devices, to solve to mention in above-mentioned background technique
Out the problem of.
To achieve the above object, the utility model provides the following technical solutions:
A kind of water conservancy construction handling device, including Transport Desk, the Transport Desk center of top offer placing groove, transport
Installation chamber is offered in platform, is installed there are two chambers, and be located at the two sides of placing groove, side bottom is fixed in installation cavity room
Hydraulic cylinder is installed, the hydraulic stem free end of hydraulic cylinder is fixedly installed with push plate, and the top of Transport Desk offers along the longitudinal direction
Arc placing groove, arc placing groove have several, and longitudinally through through-hole is offered on Transport Desk, through-hole has several and is located at arc
One end of the underface of shape placing groove, through-hole is connected to the inside bottom of arc placing groove, the other end and installation chamber of through-hole
It is connected to, is fixedly installed with push rod at the top of push plate, push rod is slidably mounted in through-hole, and the bottom of the Transport Desk is provided with installation
Plate, mounting plate is horizontally disposed, and the bottom of mounting plate is fixedly installed with supporting leg, and there are two supporting legs, and the bottom of supporting leg is fixed
Universal wheel is installed, left and right, which is run through, on two supporting legs offers sliding channel and be slidably fitted with placement in sliding channel
Plate, one end that placement plate is located on the inside of supporting leg are fixedly installed with one end of sliding panel and sliding sleeve, the other end of sliding panel respectively
It is slidably mounted in sliding sleeve, the bottom that the placement plate is located at one end on the outside of supporting leg is fixedly installed with folding shape support plate, folding
Electric telescopic rod is fixedly installed at the top of shape support plate, electric telescopic rod is through placement plate and is slidably mounted in placement plate,
It is fixedly installed at the top of electric telescopic rod and lifts platform.
It is pushed away as a further solution of the present invention: the top of the push rod is fixedly installed with arc by push rod spring
Plate, arc push plate are located in arc placing groove.
The bottom of the mounting plate is fixedly installed with one end of telescopic rod as a further solution of the present invention,
The other end of telescopic rod is fixedly mounted on the bottom of Transport Desk, is arranged on telescopic rod and is equipped with buffer spring.
Described lift offers rubbing surface as a further solution of the present invention, at the top of platform, lifts the top of platform
Portion two sides are fixedly installed with block.
Rotor plate, rotor plate are fixedly installed at the top of the Transport Desk as a further solution of the present invention,
There are two and be located at placing groove and installation chamber between, limit plate is rotatably equipped on rotor plate, limit plate bottom opens up
There is arc port and arc port and arc placing groove are corresponding.
The bottom of the limit plate is fixedly installed with clamping block, Transport Desk as a further solution of the present invention,
Top offer clamping groove compatible with clamping block.
Compared with prior art, the utility model has the beneficial effects that
The steel pipe for being used for water conservancy construction is placed on and lifts platform, starting electric telescopic rod, which utilizes, lifts platform for steel pipe support
The position flushed extremely and at the top of Transport Desk is lifted, steel pipe is put into arc placing groove, is consumed when to reducing steel pipe transporting
The manpower taken avoids the handling device from touching between steel pipe when transporting steel pipe by utilizing arc placing groove placing steel tubes
Manufacture noise is hit, is avoided when steel pipe transmission by using push rod spring because rigidity is occurred by external force vibration and arc placing groove
Damaged in collision arc placing groove is lifted push plate by using hydraulic cylinder after by steel pipe transporting to specified job location upwards,
Steel pipe is ejected using push rod, is difficult to take out after avoiding steel pipe transporting.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of water conservancy construction handling device.
Fig. 2 is the top view of limit plate in water conservancy construction handling device.
Fig. 3 is the enlarged drawing of push rod spring in water conservancy construction handling device.
In figure: placing groove 1, arc port 2, limit plate 3, arc placing groove 4, push rod spring 5, push rod 6, installation chamber 7, fortune
Defeated 8, mounting plate 9, lift platform 10, block 11, rotor plate 12, clamping block 13, push plate 14, hydraulic cylinder 15, arc push plate 16, branch
Support leg 17, placement plate 18, electric telescopic rod 19, universal wheel 20, sliding panel 21, sliding sleeve 22 and telescopic rod 23.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
Please refer to Fig. 1~3, in the utility model embodiment, a kind of water conservancy construction handling device, including Transport Desk 8, institute
It states 8 center of top of Transport Desk and offers placing groove 1, installation chamber 7 is offered in Transport Desk 8, is installed there are two chambers 7, and point
Not Wei Yu placing groove 1 two sides, installation 7 inside bottom of chamber is fixedly installed with hydraulic cylinder 15, and the hydraulic stem of hydraulic cylinder 15 is free
End is fixedly installed with push plate 14, and the top of Transport Desk 8 offers arc placing groove 4 along the longitudinal direction, and arc placing groove 4 has several
A, longitudinally through through-hole is offered on Transport Desk 8, through-hole has several and is located at the underface of arc placing groove 4, and the one of through-hole
End is connected to the inside bottom of arc placing groove 4, and the other end of through-hole is connected to installation chamber 7, the fixed peace in the top of push plate 14
Bottom equipped with push rod 6, push rod 6 are slidably mounted in through-hole, and the top of push rod 6 is fixedly installed with arc by push rod spring 5
Push plate 16, arc push plate 16 are located in arc placing groove 4, and the bottom of the Transport Desk 8 is provided with mounting plate 9, and mounting plate 9 is horizontal
Setting, the bottom of mounting plate 9 are fixedly installed with supporting leg 17, and there are two supporting legs 17, and the bottom of supporting leg 17 is fixedly installed with
Universal wheel 20, left and right is through offering sliding channel and be slidably fitted with placement plate in sliding channel on two supporting legs 17
18, one end that placement plate 18 is located at 17 inside of supporting leg is fixedly installed with one end of sliding panel 21 and sliding sleeve 22, sliding panel respectively
21 other end is slidably mounted in sliding sleeve 22, and the bottom that the placement plate 18 is located at the one end in 17 outside of supporting leg is fixedly mounted
There is folding shape support plate, roll over and be fixedly installed with electric telescopic rod 19 at the top of shape support plate, electric telescopic rod 19 runs through placement plate 18
And be slidably mounted in placement plate 18, the top of electric telescopic rod 19, which is fixedly installed with, lifts platform 10, the bottom of the mounting plate 9
It is fixedly installed with one end of telescopic rod 23, the other end of telescopic rod 23 is fixedly mounted on the bottom of Transport Desk 8, covers on telescopic rod 23
If being equipped with buffer spring, the top for lifting platform 10 offers rubbing surface, and the top two sides for lifting platform 10 are fixedly installed with
Block 11, the top of the Transport Desk 8 are fixedly installed with rotor plate 12, and there are two rotor plates 12 and is located at 1 He of placing groove
It installs between chamber 7, is rotatably equipped with limit plate 3 on rotor plate, 3 bottom of limit plate offers arc port 2 and arc port 2 and arc
Shape placing groove 4 is corresponding, and the bottom of the limit plate 3 is fixedly installed with clamping block 13, and the top of Transport Desk 8 offers and is clamped
The compatible clamping groove of block 13 when using the water conservancy construction handling device, slides placement plate 18, and placement plate 18 is breakked away outward
Dynamic extraction, the steel pipe for being used for water conservancy construction is placed on and lifts platform 10, starting electric telescopic rod 19 using lift platform 10 will
Steel pipe lift to the position that is flushed at the top of Transport Desk 8, steel pipe is put into arc placing groove 4, is removed steel pipe to reduce
It is transported to manpower spent when arc placing groove 4, carrying finishes, other equipment for being used for water conservancy construction are placed on and lift platform
It is carried in placing groove 1, steel pipe and the carrying of other water conservancy construction equipment finish, and slid inward placement plate 18 will lift platform 10 and receive
It receives to the lower section of mounting plate 9, by utilizing 4 placing steel tubes of arc placing groove, avoids handling device steel pipe when transporting steel pipe
Between collide and manufacture noise, because by external force vibration and arc placing groove 4 when avoiding steel pipe transmission by push rod spring 5
Rigid collision damage arc placing groove, which occurs, will be pushed away after by steel pipe transporting to specified job location by using hydraulic cylinder 15
Plate 14 is lifted upwards, is ejected steel pipe using push rod 6, is difficult to take out after avoiding steel pipe transporting.
The working principle of the utility model is: sliding placement plate 18 when using the water conservancy construction handling device, placing
The extraction of the outside Slideslip of plate 18, the steel pipe for being used for water conservancy construction is placed on and lifts platform 10,19 benefit of starting electric telescopic rod
With lift platform 10 by steel pipe lift to the position that is flushed at the top of Transport Desk 8, steel pipe is put into arc placing groove 4, to subtract
Spent manpower, carrying finish when having lacked steel pipe transporting to arc placing groove 4, other equipment for being used for water conservancy construction are put
It sets and is carried on lifting platform in placing groove 1, steel pipe and the carrying of other water conservancy construction equipment finish, slid inward placement plate 18
The storage of platform 10 will be lifted and avoid the handling device from transporting by utilizing 4 placing steel tubes of arc placing groove to the lower section of mounting plate 9
It collides between steel pipe when defeated steel pipe and manufactures noise, avoided when steel pipe transmission by push rod spring 5 because being shaken by external force
Rigid collision occurs with arc placing groove 4 and damages arc placing groove, after by steel pipe transporting to specified job location, by using
Hydraulic cylinder 15 lifts push plate 14 upwards, is ejected steel pipe using push rod 6, is difficult to take out after avoiding steel pipe transporting.
Although the utility model is described in detail with reference to the foregoing embodiments, come for those skilled in the art
Say, it is still possible to modify the technical solutions described in the foregoing embodiments, or to part of technical characteristic into
Row equivalent replacement, within the spirit and principle of the utility model, any modification, equivalent replacement, improvement and so on should all
It is included within the scope of protection of this utility model.
Claims (6)
1. a kind of water conservancy construction handling device, including Transport Desk (8), it is characterised in that: Transport Desk (8) center of top is opened
Equipped with placing groove (1), installation chamber (7) is offered in Transport Desk (8), there are two installations chamber (7), and is located at placing groove
(1) two sides, installation chamber (7) inside bottom are fixedly installed with hydraulic cylinder (15), and the hydraulic stem free end of hydraulic cylinder (15) is solid
Dingan County is equipped with push plate (14), and the top of Transport Desk (8) offers arc placing groove (4) along the longitudinal direction, and arc placing groove (4) has
Several, longitudinally through through-hole is offered on Transport Desk (8), through-hole has several and is located at the underface of arc placing groove (4),
One end of through-hole is connected to the inside bottom of arc placing groove (4), and the other end of through-hole is connected to installation chamber (7), push plate
(14) it is fixedly installed at the top of push rod (6), push rod (6) is slidably mounted in through-hole, and the bottom of the Transport Desk (8) is provided with
Mounting plate (9), mounting plate (9) is horizontally disposed, and the bottom of mounting plate (9) is fixedly installed with supporting leg (17), and supporting leg (17) has
Two, the bottom of supporting leg (17) is fixedly installed with universal wheel (20), and left and right, which is run through, on two supporting legs (17) offers sliding
It through slot and is slidably fitted in sliding channel placement plate (18), placement plate (18) is located at the difference of one end on the inside of supporting leg (17)
It is fixedly installed with one end of sliding panel (21) and sliding sleeve (22), the other end of sliding panel (21) is slidably mounted in sliding sleeve (22),
The bottom that the placement plate (18) is located at one end on the outside of supporting leg (17) is fixedly installed with folding shape support plate, folding shape support plate
Top is fixedly installed with electric telescopic rod (19), and electric telescopic rod (19) is through placement plate (18) and is slidably mounted on placement plate
(18) it on, is fixedly installed at the top of electric telescopic rod (19) and lifts platform (10).
2. water conservancy construction handling device according to claim 1, it is characterised in that: pass through at the top of the push rod (6)
Push rod spring (5) is fixedly installed with arc push plate (16), and arc push plate (16) is located in arc placing groove (4).
3. water conservancy construction handling device according to claim 1, it is characterised in that: the bottom of the mounting plate (9) is solid
Dingan County is equipped with the one end of telescopic rod (23), and the other end of telescopic rod (23) is fixedly mounted on the bottom of Transport Desk (8), telescopic rod
(23) it is arranged on and buffer spring is installed.
4. water conservancy construction handling device according to claim 1, it is characterised in that: described lift is opened at the top of platform (10)
Equipped with rubbing surface, the top two sides for lifting platform (10) are fixedly installed with block (11).
5. water conservancy construction handling device according to claim 1, it is characterised in that: the top of the Transport Desk (8) is solid
Dingan County is equipped with rotor plate (12), and there are two rotor plates (12) and is located between placing groove (1) and installation chamber (7), rotation
It is rotatably equipped on plate limit plate (3), limit plate (3) bottom offers arc port (2) and arc port (2) and arc placing groove
(4) corresponding.
6. water conservancy construction handling device according to claim 5, it is characterised in that: the bottom of the limit plate (3) is solid
Dingan County is equipped with clamping block (13), offers at the top of Transport Desk (8) and clamping block (13) compatible clamping groove.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920210744.4U CN209521736U (en) | 2019-02-19 | 2019-02-19 | A kind of water conservancy construction handling device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920210744.4U CN209521736U (en) | 2019-02-19 | 2019-02-19 | A kind of water conservancy construction handling device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209521736U true CN209521736U (en) | 2019-10-22 |
Family
ID=68230625
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920210744.4U Expired - Fee Related CN209521736U (en) | 2019-02-19 | 2019-02-19 | A kind of water conservancy construction handling device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209521736U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112376608A (en) * | 2020-10-27 | 2021-02-19 | 安徽省无为市建筑安装总公司 | Existing building foundation steel pipe underpins construction equipment |
CN112977247A (en) * | 2021-01-29 | 2021-06-18 | 河北冰虫环保科技有限公司 | Prefabricated part transporting and installing equipment for prefabricated building and implementation method thereof |
-
2019
- 2019-02-19 CN CN201920210744.4U patent/CN209521736U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112376608A (en) * | 2020-10-27 | 2021-02-19 | 安徽省无为市建筑安装总公司 | Existing building foundation steel pipe underpins construction equipment |
CN112977247A (en) * | 2021-01-29 | 2021-06-18 | 河北冰虫环保科技有限公司 | Prefabricated part transporting and installing equipment for prefabricated building and implementation method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209521736U (en) | A kind of water conservancy construction handling device | |
CN108821134B (en) | Construction equipment hoisting device | |
CN203941806U (en) | Integral turnover platform | |
CN212174278U (en) | Install convenient balanced hoist of hoist and mount building carrier plate | |
CN208637967U (en) | A kind of novel cable frame that damping is well convenient for lifting and is adjusted | |
CN106379829A (en) | Material lifting system for construction machinery | |
CN109264319A (en) | A kind of jacking translation device | |
CN209954062U (en) | Steel sheet unloading platform | |
CN212424385U (en) | Telescopic lifting device, setting machine and brick holding machine | |
CN209889305U (en) | Solar panel transports frame | |
CN208453983U (en) | A kind of autoclaved lime-sand brick code blanking device | |
CN107055345B (en) | Diao Sheng mechanisms | |
CN201362376Y (en) | Steel pipe sheathing auxiliary device of overhead traveling crane | |
CN215948671U (en) | High-hardness fireproof steel calcium plate with coating | |
CN220662807U (en) | Steel plate conveying device for ship construction | |
CN211736508U (en) | Triangular steel structure support frame | |
CN205023705U (en) | Work platform is transported in hoist and mount | |
CN219363019U (en) | Lifting device for toughened glass conveying | |
CN218145217U (en) | Car stop device is used in elevator maintenance | |
CN212759259U (en) | Self-propelled trolley for coating workshop | |
CN215926790U (en) | Lifting device for curtain wall installation | |
CN204074849U (en) | A kind of support roller device of profile bender | |
CN219429600U (en) | Plate lifting and transporting device | |
CN206016424U (en) | A kind of removable adjustable protecting wire net support | |
CN219279293U (en) | Lifting and hoisting device for heavy machinery |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20191022 Termination date: 20210219 |
|
CF01 | Termination of patent right due to non-payment of annual fee |