CN209517533U - A kind of heater - Google Patents
A kind of heater Download PDFInfo
- Publication number
- CN209517533U CN209517533U CN201821820082.4U CN201821820082U CN209517533U CN 209517533 U CN209517533 U CN 209517533U CN 201821820082 U CN201821820082 U CN 201821820082U CN 209517533 U CN209517533 U CN 209517533U
- Authority
- CN
- China
- Prior art keywords
- heating chamber
- heating
- shell
- heating tube
- heater
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Pipe Accessories (AREA)
Abstract
The utility model discloses a kind of heaters, including the pressure gauge for monitoring heating chamber air pressure for being equipped with the shell of heating chamber, being located on shell, the heating tube for being located in heating chamber and being heated to material, it is located at the temperature transducer for being used to monitor heating tube shell temperature in heating chamber, the shockproof bar for preventing heating tube from shaking, shockproof bar is securely removably connected on shell.Heating tube, which is removably secured, to be mounted on flange, and installing and dismounting and the replacement of heating tube are facilitated.Flange is equipped with the shockproof bar for preventing heating tube from shaking, and slows down the vibration of heating tube during the work time, and the risk for reducing heating tube damage or even being broken increases the service life of fluid heater.Heater is equipped with temperature transducer, easily monitors the temperature in heating chamber.Heater is equipped with pressure gauge, easily monitors the pressure of heating chamber.Second transition conduit is equipped with cleaning passage, easily cleans to heater body.
Description
Technical field
The utility model relates to heater technical fields, more particularly, to a kind of heater suitable for fluid foods.
Background technique
Heater is the equipment heated to material, in order to make heating effect reach maximization, existing heater
Material import and export fixes the both ends for being located at hot zone respectively, but during heating, the heating component for being located at hot zone is normal
It can often be burnt beyond rated temperature, influence heater service life, or heating component not up to requires temperature and does nothing
Imitate work.Existing fluid heater heats element is usually heating tube, there are problems that being easily broken off damage, and heating tube
Replacement not easy to disassemble.
Utility model content
Utility model aims to solve problem above, provide a kind of more safety and stability, facilitate installing and dismounting, with
And the heater for preventing heating tube to be broken.
The technical scheme in the invention for solving the above technical problem is:
A kind of heater, including the pressure for being used to monitor heating chamber air pressure for being equipped with the shell of heating chamber, being located on shell
Table, the heating tube for being located in heating chamber and being heated to material are located at and are used to monitor heating tube shell temperature in heating chamber
Temperature transducer, the shockproof bar for preventing heating tube from shaking, shockproof bar are securely removably connected on shell.The above technology
In scheme, heating tube heats the material for entering heating chamber, and during heating, the air pressure in heating chamber can become
Change, the air pressure in heating chamber is monitored by pressure gauge with can be convenient, so that staff can be by pressure gauge in time
Judge whether the air pressure in heating chamber is safe air pressure, prevents the dangerous work such as the explosion caused due to air pressure is excessive in heating chamber
It is dynamic;The temperature that heating chamber can be easily and intuitively monitored by temperature transducer, so that staff learns in which can be convenient
Temperature in heating chamber, judge heat cavity temperature whether be material heating needed for temperature, prevent material or heater because
It highly damages or heating chamber not up to requires temperature and does non-productive work;Shockproof bar can effectively slow down heating tube and exist
Vibration in the course of work or in the operation such as heating tube installing and dismounting, the wind for having reduced heating tube damage or even being broken
Danger, increases the service life of fluid heater.
Preferably, housing wall is equipped with the first pipe that communicates with heating chamber, first pipe, which is equipped with, to be used for and pressure gauge
The first detachably connected connector, so that pressure gauge is detachably arranged on shell.In above technical scheme, connect by first
Head pressure gauge is removably mounted on shell, staff can according to the actual situation by pressure gauge install to facilitate observation
Position, also can be convenient ground installing and dismounting, replacement damage or different model pressure gauge.
Preferably, shell one end is equipped with the feed inlet that material is imported to heating chamber, the shell other end, which is equipped with, will heat it
Discharge port derived from material afterwards, heating chamber are equipped with the hot zone between feed inlet and discharge port, and heating tube and thermometric pass
Sensor is detachably arranged in hot zone respectively.In above technical scheme, under outer power, material is transferred to by feed inlet and sets
Hot zone in heater, the heating tube being located in hot zone heat material, and the material after heating is by hot zone
Continuation is transmitted forward, and heater is transmitted out after discharge port, realizes the function of continuous heating material.
Preferably, heater further includes the flange for being securely removably connected at shell one end, heating tube is removably
It being fixedly mounted on flange, shockproof bar, which is removably secured, to be located on flange, and heating tube length is less than heating cavity length, thus plus
Heat pipe, which is removably secured, to be mounted in hot zone.In above technical scheme, by the installation and removal of flange, make heating tube and
Shockproof bar can be convenient from heater installing and dismounting, be convenient for changing heating tube and shockproof bar.
It is mounted on flange preferably, temperature transducer is removably secured, so that temperature transducer is removably solid
Dingan County is in hot zone.In above technical scheme, by the installation and removal of flange, can be convenient temperature transducer from
Installing and dismounting on heater is convenient for changing the temperature transducer of damage or replaces the temperature transducer of different model.
Preferably, feed inlet includes second pipe, second pipe is equipped with the second connector.In above technical scheme, pass through
Heater and external structure are detachably connected by the second connector, so that the material in external structure enters heating by feed opening
It is intracavitary;Second connector can also be connected from different external structures, and different external structures need to only have opposite with the second connector
The connector answered, different external structures are equipped with different materials, to realize the function of heating different material.
Preferably, discharge port includes third pipeline, third duct wall is equipped with temperature-measuring port, third pipeline be equipped with for
The connected third connector in outside.In above technical scheme, heater and external structure are detachably connected by third connector,
To which material enters in external structure by discharge port;Temperature measuring equipment measurement material can be used by temperature-measuring port and flow through heater
The temperature heated afterwards.
Preferably, further including the pump transported material in heating chamber.In above technical scheme, pump provides transmission material
Power, realize material and continue to flow through the function of transmitting out heater after heating chamber, heating.
Preferably, pump is removably equipped with First Transition pipeline corresponding with feed inlet, connects with external material source
The second transition conduit connect, pump are detachably connected with feed inlet, external material source respectively;By the second transition conduit by object
Material is sent to First Transition pipeline by pumping from external material source, is transported to material from feed inlet by First Transition pipeline
In heating chamber.In above technical scheme, the power as transmission material is pumped, material is pumped from external material source and is transmitted to
In heating chamber, realizes material and continue to flow through the function of transmitting out heater after heating chamber, heating.
Preferably, First Transition pipeline and the second transition conduit are equipped with controlled valve, the second transition conduit is equipped with clear
Clean channel, the cleaning passage connector being linked together with cleaning passage, cleaning siphunculus are located at the switch being located in the second transition conduit
Between valve and pump.In above technical scheme, material entrance is controlled by adjusting the controlled valve on First Transition pipeline and is added
The intracavitary flow velocity of heat, the working efficiency of best heater is promoted according to the different operating power of heating tube;Pass through control second
Controlled valve in transition conduit controls the switch of material transferring;In heater work, cleaning passage connector is sealed, is being added
When hot device does not work, opening cleaning passage connector makes the second transition conduit communicate with outside air or connect by cleaning passage
Head makes the second transition passage be connected with pure water, closes the controlled valve being located in the second transition conduit, and unlatching is located at the first mistake
The controlled valve on pipeline is crossed, the transmission power provided by pump transmits outside air or pure water for a whole set of internal structure
It is cleaned.
The utility model has the beneficial effect that
1, heating tube, which is removably secured, is mounted on flange, facilitates installing and dismounting and the replacement of heating tube.
2, flange is equipped with the shockproof bar for preventing heating tube from shaking, and slows down the vibration of heating tube during the work time, reduces
Heating tube is damaged the risk of even fracture, increases the service life of fluid heater.
3, heater is equipped with temperature transducer, easily monitors the temperature in heating chamber.
4, heater is equipped with pressure gauge, easily monitors the pressure of heating chamber.
5, the second transition conduit is equipped with cleaning passage, easily cleans to heater body.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model.
Fig. 2 is the heating tube of the utility model, shockproof bar, the assembling structure schematic diagram between flange.
In figure: 1, heating chamber, 2, shell, 3, pressure gauge, 4, heating tube, 5, temperature transducer, 6, shockproof bar, the 7, first pipe
Road, the 8, first connector, 9, feed inlet, 91, second pipe, 10, discharge port, 101, third pipeline, 11, hot zone, 12, flange,
13, the second connector, 14, temperature-measuring port, 15, third connector, 16, pump, 17, First Transition pipeline, the 18, second transition conduit, 19, open
Closing valve, 20, cleaning passage, 21, cleaning passage connector, 22, external material source.
Specific embodiment
The utility model is further described below in conjunction with drawings and embodiments.
As shown in Figs. 1-2, the heater of the present embodiment is used for including being equipped with the shell 2 of heating chamber 1, being located on shell 2
It monitors the pressure gauge 3 of 1 air pressure of heating chamber, the heating tube 4 for being located in heating chamber 1 and material being heated, be located in heating chamber 1
Temperature transducer 5 for monitoring heating chamber temperature, the shockproof bar 6 for preventing heating tube 4 from shaking, shockproof bar 6 is removably
It is fixedly connected on shell 2.
In the present embodiment, 2 wall of shell is equipped with the first pipe 7 that communicates with heating chamber 1, first pipe 7 be equipped with for
The first detachably connected connector 8 of pressure gauge, so that pressure gauge 3 is detachably arranged on shell 2.
In the present embodiment, 2 one end of shell is equipped with the feed inlet 9 that material is imported to heating chamber 1, and 2 other end of shell is equipped with will
Discharge port 10 derived from material after heating, heating chamber 1 are equipped with the hot zone 11 between feed inlet 9 and discharge port 10,
Heating tube 4 and temperature transducer 5 are detachably arranged in respectively in hot zone 11.
In the present embodiment, heater further includes the flange 12 for being securely removably connected at 2 one end of shell, and heating tube 4 can
It is removedly fixed and is mounted on flange 12, shockproof bar 6, which is removably secured, to be located on flange 12, and 4 length of heating tube is less than heating
1 length of chamber, is mounted in hot zone 11 so that heating tube 4 is removably secured.
In the present embodiment, temperature transducer 5, which is removably secured, to be mounted on flange 12, so that temperature transducer 5 is removable
It is fixedly mounted on unloading in hot zone 11.
In the present embodiment, feed inlet 9 includes second pipe 91, and second pipe 91 is equipped with the second connector 13;Discharge port 10 wraps
Third pipeline 101 is included, 101 wall of third pipeline is equipped with temperature-measuring port 14, and third pipeline 101 is equipped with the third for being communicated with the outside
Connector 15.
In the present embodiment, heater further includes the pump 16 transported material in heating chamber 1;Pump 16 removably be equipped with
The corresponding First Transition pipeline 17 of feed inlet 9, the second transition conduit 18 connect with external material source 22, pump 16 respectively with
Feed inlet 9, external material source 22 are detachably connected;Material is passed through from external material source 22 by the second transition conduit 18
It crosses pump 16 and pumps to First Transition pipeline 17, be transported to material in heating chamber 1 from feed inlet 9 by First Transition pipeline 17.
In the present embodiment, First Transition pipeline 17 and the second transition conduit 18 are equipped with controlled valve 19, the second coupling tube
Road 18 be equipped with cleaning passage 20, with the detachably connected cleaning passage connector 21 of cleaning passage 20, cleaning passage connector 21
Between the controlled valve 19 and pump 16 being located in the second transition conduit 18.
Each embodiment is described in a progressive manner in specification, the highlights of each of the examples are with other realities
The difference of example is applied, the same or similar parts in each embodiment may refer to each other.To the above-mentioned of the disclosed embodiments
Illustrate, professional and technical personnel in the field is made to can be realized or use the utility model.Various modifications to these embodiments are to this
Will be apparent for the professional technician in field, the general principles defined herein can not depart from it is practical
In the case where novel spirit or scope, realize in other embodiments.Therefore, the utility model is not intended to be limited to herein
Shown in these embodiments, and be to fit to the widest scope consistent with the principles and novel features disclosed herein.
Claims (10)
1. a kind of heater, it is characterised in that: be used to supervise including being equipped with the shell (2) of heating chamber (1), being located on shell (2)
Survey the pressure gauge (3) of heating chamber (1) air pressure, the heating tube (4) for being located in heating chamber (1) and being heated to material, be located at plus
Temperature transducer (5), the shockproof bar (6) for preventing heating tube (4) from shaking for being used to monitor heating chamber temperature in hot chamber (1),
Shockproof bar (6) is securely removably connected on shell (2).
2. heater according to claim 1, it is characterised in that: shell (2) wall is equipped with the communicated with heating chamber (1)
One pipeline (7), first pipe (7) are equipped with for first connector (8) detachably connected with pressure gauge, thus pressure gauge (3)
It is detachably arranged on shell (2).
3. heater according to claim 1 or 2, it is characterised in that: shell (2) one end, which is equipped with, imports heating chamber for material
(1) feed inlet (9), shell (2) other end are equipped with discharge port (10) derived from the material after heating, and heating chamber (1) is set
There is the hot zone (11) between feed inlet (9) and discharge port (10), heating tube (4) and temperature transducer (5) are removable respectively
It is located at unloading in hot zone (11).
4. heater according to claim 3, it is characterised in that: further include being securely removably connected at shell (2) one
The flange (12) at end, heating tube (4), which is removably secured, to be mounted on flange (12), and shockproof bar (6), which is removably secured, to be located at
On flange (12), heating tube (4) length is less than heating chamber (1) length, so that heating tube (4) is removably secured and is mounted on fever
In area (11).
5. heater according to claim 4, it is characterised in that: temperature transducer (5) is removably secured the method for being mounted on
On blue (12), it is mounted in hot zone (11) so that temperature transducer (5) is removably secured.
6. heater according to claim 4 or 5, it is characterised in that: feed inlet (9) includes second pipe (91), and second
Pipeline (91) is equipped with the second connector (13).
7. heater according to claim 6, it is characterised in that: discharge port (10) includes third pipeline (101), third pipe
Road (101) wall is equipped with temperature-measuring port (14), and third pipeline (101) is equipped with the third connector (15) for being communicated with the outside.
8. heater described according to claim 1 or 2 or 4 or 5 or 7, it is characterised in that: further include transporting material to heating
Pump (16) in chamber (1).
9. heater according to claim 8, it is characterised in that: pump (16) is removably equipped with opposite with feed inlet (9)
The First Transition pipeline (17) answered, the second transition conduit (18) connect with external material source (22), pump (16) respectively with into
Material mouth (9), external material source (22) are detachably connected;By the second transition conduit (18) by material from external material source
(22) First Transition pipeline (17) are pumped to by pump (16), it is by First Transition pipeline (17) that material is defeated from feed inlet (9)
It is sent in heating chamber (1).
10. heater according to claim 9, it is characterised in that: First Transition pipeline (17) and the second transition conduit
(18) it is equipped with controlled valve (19), it is detachable that the second transition conduit (18) is equipped with cleaning passage (20) and cleaning passage (20)
The cleaning passage connector (21) of ground connection, cleaning passage connector (21) are located at the controlled valve being located on the second transition conduit (18)
(19) between pump (16).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821820082.4U CN209517533U (en) | 2018-11-06 | 2018-11-06 | A kind of heater |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821820082.4U CN209517533U (en) | 2018-11-06 | 2018-11-06 | A kind of heater |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209517533U true CN209517533U (en) | 2019-10-18 |
Family
ID=68192010
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821820082.4U Active CN209517533U (en) | 2018-11-06 | 2018-11-06 | A kind of heater |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209517533U (en) |
-
2018
- 2018-11-06 CN CN201821820082.4U patent/CN209517533U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2354707A2 (en) | A condensation management system, a furnace including the same and a condensation collection box | |
CN207379040U (en) | Gas heater | |
CN209517533U (en) | A kind of heater | |
CN207751176U (en) | A kind of noise reduction heat gun | |
CN106247616B (en) | A kind of high-efficient hot air furnace | |
CN205607205U (en) | Automatic heating radiator | |
WO2016074632A1 (en) | Sensor integrated device | |
CN208302397U (en) | A kind of psychro-environment Special bag type dust collector | |
CN206410316U (en) | Detachable electric heater device peculiar to vessel | |
CN202470839U (en) | A high-efficiency and energy-saving steam melting water plate type heat-exchanger machine set | |
CN215294562U (en) | Composite robot explosion-proof system | |
CN110157482A (en) | A kind of fin cooled gasification burner tip | |
CN221300518U (en) | Connecting pipeline of decompression furnace and decompression tower | |
CN110469831A (en) | A kind of Commercial steam generator | |
CN210829714U (en) | Improved device of wastewater treatment sludge screw pump | |
CN216012540U (en) | Gas detection early warning device for chemical product delivery | |
CN2570690Y (en) | Gas-fired boiler | |
CN217900190U (en) | Air preheating mechanism for wet-process waste acid preparation pyrolysis | |
CN221324467U (en) | Converter vaporization boiler | |
CN218435819U (en) | Rapid cooling device for temporary hot blast valve | |
CN216342349U (en) | Steam turbine cooling is with steam volume control system | |
CN210950816U (en) | Pipeline detection auxiliary device | |
CN220168704U (en) | Heat abstractor for electric actuator | |
CN212055075U (en) | Protection system of water supply unit pump body | |
CN219141114U (en) | High-temperature protection structure of heat exchanger |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |