CN209516184U - Fence electric discharge Work tool - Google Patents
Fence electric discharge Work tool Download PDFInfo
- Publication number
- CN209516184U CN209516184U CN201920101054.5U CN201920101054U CN209516184U CN 209516184 U CN209516184 U CN 209516184U CN 201920101054 U CN201920101054 U CN 201920101054U CN 209516184 U CN209516184 U CN 209516184U
- Authority
- CN
- China
- Prior art keywords
- rod
- bolt
- mounting base
- conducting rod
- conducting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000009413 insulation Methods 0.000 claims abstract description 7
- 239000011324 bead Substances 0.000 claims description 12
- 230000014759 maintenance of location Effects 0.000 claims description 12
- 210000000515 tooth Anatomy 0.000 claims description 5
- 238000012360 testing method Methods 0.000 abstract description 5
- 238000000034 method Methods 0.000 description 8
- 238000009434 installation Methods 0.000 description 5
- 238000010586 diagram Methods 0.000 description 3
- 238000012423 maintenance Methods 0.000 description 3
- 239000000725 suspension Substances 0.000 description 3
- 230000001965 increasing effect Effects 0.000 description 2
- 230000002708 enhancing effect Effects 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000000737 periodic effect Effects 0.000 description 1
Abstract
Fence electric discharge Work tool provided by the utility model, one end of conducting rod is equipped with conducting rod eave tile, running through on conducting rod has third bolt, the periphery of third bolt and the two sides for being located at conducting rod are socketed with second spring lock gasket, second nut and third nut are installed on third bolt, conducting wire is fixed between second nut and third nut and positioned at the periphery of third bolt, Earth pile-head is installed on conducting wire, universal joint is installed on conducting rod and between conducting rod eave tile and the second bolt, it is fixed between universal joint and conducting rod by the first bolt, multistage retractable rod mounting base is equipped with by universal joint mounting base on universal joint, multistage retractable rod is plugged in multistage retractable rod mounting base, fastening bolt for limiting multistage retractable rod is installed in multistage retractable rod mounting base, fastening bolt is installed on fastening bolt Handle is equipped with insulation handle on multistage retractable rod.The utility model testing efficiency is high, and safety and stability is good.
Description
Technical field
The utility model relates to the technical field of power test equipment more particularly to fence electric discharge Work tools.
Background technique
With the continuous improvement of grid automation operation level, realize that the substation of nobody or few people on duty gradually popularizes,
And substation security system comes into being on this basis.The strong adaptability of high voltage pulse electronic enclosure and high deterrent force it is excellent
Point becomes the indispensable a part of substation security system.The high voltage pulse electronic enclosure of substation is by external dimension
Declaration form position carries out periodic maintenance.Operations staff's discovery when operations staff carries out an acceptance inspection, does not have after maintenance work
Whether the function that specific purpose tool can detecte fence is normal;In addition, fence and the family of part 220kV outdoor substation
External equipment is closer, and after electronic fence host closes power supply, fence still has induced voltage, and maintenance staff are not dedicated
Electric discharge security tool, there are personal safety hidden danger.
Summary of the invention
The purpose of this utility model is to provide fence electric discharge Work tool, testing efficiency is high, safety and steady
It is qualitative good.
In order to achieve the above object, the utility model adopts the following technical solution: fence electric discharge Work tool, packet
Conducting rod is included, one end of the conducting rod is equipped with conducting rod eave tile, and running through on the conducting rod has third bolt, the third
The periphery of bolt and the two sides for being located at conducting rod are socketed with second spring lock gasket, the side of the third bolt far from conducting rod
Second nut and third nut are installed, are fixed between second nut and third nut and positioned at the periphery of third bolt
Conducting wire, the conducting wire are equipped with Earth pile-head far from one end of third bolt, on the conducting rod and be located at conducting rod eave tile and
Universal joint is installed between the second bolt, is fixed between the universal joint and conducting rod by the first bolt, it is described universal
Connector is equipped with universal joint mounting base, the described one end of universal joint mounting base far from universal joint far from one end of conducting rod
Multistage retractable rod mounting base is installed, the multistage retractable rod mounting base is plugged with multistage far from one end of Universal-head mounting base and stretches
Contracting bar is equipped with the fastening bolt for limiting multistage retractable rod in the multistage retractable rod mounting base, installs on the fastening bolt
There is fastening bolt handle, the multistage retractable rod is equipped with insulation handle far from one end of multistage retractable rod mounting base.
Further, the conducting rod is equipped with sliding slot far from one end of conducting rod eave tile, is slidably fitted in the sliding slot
Second bolt, one end on second bolt far from conducting rod are socketed with the first springlock gasket, the first springlock pad
Piece is equipped with the first nut far from one end of conducting rod.
Further, the multistage retractable rod includes level-one telescopic rod, second level telescopic rod and three-level telescopic rod, the second level
Telescopic rod is scalable to be mounted between level-one telescopic rod and three-level telescopic rod, and the three-level telescopic rod is mounted on multistage retractable rod peace
It fills on seat, the level-one telescopic rod is equipped with insulation handle far from one end of second level telescopic rod.
Further, the conducting rod eave tile is equipped with gag lever post mounting base and fixed link installation close to the side of conducting rod
, gag lever post is rotatably installed with by the second shaft in the gag lever post mounting base, passes through first in the fixed link mounting base
Shaft is rotatably installed with fixed link, and the fixed link is equipped with multiple limiting tooths, the gag lever post close to the side of conducting rod eave tile
It is equipped with and is used for the perforative channel of fixed link, the vias inner walls are equipped with close to the side of fixed link equipped with the first retention bead
With the second retention bead, limiting groove is formed between first retention bead and the second retention bead.
Further, the spacing between the conducting rod eave tile and sliding slot is L, 11cm≤L≤24cm.
After adopting the above technical scheme, the utility model has the advantages that
1, the tilt angle that conducting rod is adjusted by universal joint, conducting rod is delivered to by multistage retractable rod need into
Row needs to be suspended on conducting rod eave tile on the fence conducting wire of electric discharge and the fence for carrying out electric discharge is needed to lead
On line, realized by the Earth pile-head of conducting wire connection to fence progress discharge test, the periphery of third bolt and positioned at conduction
The two sides socket second spring of bar locks gasket, junction can be made more to stablize durable, avoid the loosening of equipment in use process
It falls off.During use, the controllability of universal joint makes equipment operation meet multi-angle demand.
2, it can be directed to the not collinear spacing of fence of different model, by setting sliding slot on conducting rod, so that first
Bolt can slide in sliding slot, realize the adjusting of spacing between the first bolt and conducting rod eave tile, increase effectively short circuit bar
Contact validity between fence enhances equipment operating accuracy and stability.Simultaneously by separate on the second bolt
One end of conducting rod is socketed the first springlock gasket, junction can be made more to stablize durable, avoid equipment in use process
Loose or dislocation.
3, form multistage retractable rod by level-one telescopic rod, second level telescopic rod and three-level telescopic rod by setting, when use
More convenient, more convenient and efficient when can be improved conducting rod suspension is operated, and the fence of different height can be carried out
Operation.
4, by installing gag lever post mounting base and fixed link mounting base on conducting rod eave tile, pass through in gag lever post mounting base
Second shaft rotation installation gag lever post, rotates installation fixed link by first rotating shaft in fixed link mounting base, in use, fixed
Bar telescopic moving in the channel on gag lever post, gag lever post can be clamped the electric wire of fence, improve Work tool
Stability when suspension, and according to various sizes of fence electric wire, fixed link can be made to move in channel, mobile mistake
Cheng Zhong can realize the fixation to fixed link, by fixing with the limiting groove on the limiting tooth and gag lever post in fixed link
Bar realizes that gag lever post limits different scale electronic fence electric wires to the support of gag lever post, and effectively increasing the Work tool makes
The stability and flexibility of used time.
5, by controlling the spacing between conducting rod eave tile and sliding slot in 11cm~24cm, it is ensured that the Work tool can be examined
The demand for surveying substation's fence different model line spacing, improves the flexibility that the electric discharge Work tool uses.
Detailed description of the invention
The utility model is described in further detail with reference to the accompanying drawing:
Fig. 1 be the utility model proposes fence electric discharge Work tool structural schematic diagram;
Fig. 2 be the utility model proposes fence electric discharge Work tool in conducting rod top view;
Fig. 3 is the partial enlargement diagram in Fig. 1 at A;
Fig. 4 is the partial enlargement diagram in Fig. 3 at B.
Specific embodiment
Below in conjunction with drawings and the specific embodiments, the utility model is described in further detail.It is to be appreciated that
Following "upper", "lower", "left", "right", " longitudinal direction ", " transverse direction ", "inner", "outside", "vertical", "horizontal", "top", "bottom" etc. refer to
Show that the word of orientation or positional relationship is based only upon orientation or positional relationship shown in the drawings, only for the purposes of describing the utility model
It is described with simplifying, rather than device/element of indication or suggestion meaning must have a particular orientation or with specific orientation structure
It makes and operates, therefore should not be understood as limiting the present invention.
As shown in Figs 1-4, fence electric discharge Work tool provided by the utility model, including conducting rod 8, conducting rod
8 one end is equipped with conducting rod eave tile 9, through there is a third bolt 17 on conducting rod 8, the periphery of third bolt 17 and is located at conduction
The two sides of bar 8 are socketed with second spring lock gasket 13, and third bolt 17 is equipped with 15 He of the second nut far from the side of conducting rod 8
Third nut 16 is fixed with conducting wire 18, conducting wire between second nut 15 and third nut 16 and positioned at the periphery of third bolt 17
18 one end far from third bolt 17 are equipped with Earth pile-head 19, on conducting rod 8 and are located at conducting rod eave tile 9 and the second bolt 11
Between universal joint 7 is installed, fixed by the first bolt 10 between universal joint 7 and conducting rod 8, universal joint 7 is far from leading
One end of electric pole 8 is equipped with universal joint mounting base 6, and universal joint mounting base 6 is equipped with multistage far from one end of universal joint 7
Telescopic rod mounting base 3, multistage retractable rod mounting base 3 are plugged with multistage retractable rod 2 far from one end of Universal-head mounting base 6, multistage
Fastening bolt 5 for limiting multistage retractable rod 2 is installed in telescopic rod mounting base 3, fastening bolt handle 4 is installed on fastening bolt 5,
Multistage retractable rod 2 is equipped with insulation handle 1 far from one end of multistage retractable rod mounting base 3.Conducting rod is adjusted by universal joint 7
Conducting rod 8 is delivered to the fence conducting wire for need electric discharge by multistage retractable rod 2 by 8 tilt angle
On, conducting rod eave tile 9 is suspended on the fence conducting wire for needing to carry out electric discharge, the Earth pile-head connected by conducting wire 18
19 realize to fence progress discharge test, the periphery of third bolt 17 and the two sides socket second spring for being located at conducting rod 8
Gasket 13 is locked, junction can be made more to stablize durable, avoid the loose or dislocation of equipment in use process.In the process used
In, the controllability of universal joint 7 makes equipment operation meet multi-angle demand.
In the present embodiment, conducting rod 8 is equipped with sliding slot 23 far from one end of conducting rod eave tile 9, is slidably installed in sliding slot 23
There is the second bolt 11, one end far from conducting rod 8 is socketed with the first springlock gasket 13, the first springlock pad on the second bolt 11
Piece 13 is equipped with the first nut 12 far from one end of conducting rod 8.It can be directed to the not collinear spacing of fence of different model, led to
It crosses on conducting rod 8 and sets sliding slot 23, the first bolt 11 is slided in sliding slot 23, realize the first bolt 11 and conducting rod
The adjusting of spacing between eave tile 9 increases effectively the contact validity being shorted between bar and fence, enhancing equipment work essence
Degree and stability.The first springlock gasket 13 is socketed by one end on the second bolt 11 far from conducting rod 8 simultaneously, can be made
Junction is more stablized durable, avoids the loose or dislocation of equipment in use process.
In the present embodiment, multistage retractable rod 2 includes level-one telescopic rod 201, second level telescopic rod 202 and three-level telescopic rod
203, second level telescopic rod 202 is scalable to be mounted between level-one telescopic rod 201 and three-level telescopic rod 203, and three-level telescopic rod 203 is pacified
In multistage retractable rod mounting base 3, level-one telescopic rod 201 is equipped with insulation handle 1 far from one end of second level telescopic rod 202.
Form multistage retractable rod 2 by level-one telescopic rod 201, second level telescopic rod 202 and three-level telescopic rod 203 by setting, when use
It operates more convenient, can be improved more convenient and efficient when conducting rod 8 is hung, and can carry out to the fence of different height
Operation.
In the present embodiment, conducting rod eave tile 9 is equipped with gag lever post mounting base 27 close to the side of conducting rod 8 and fixes
Bar mounting base 24 is rotatably installed with gag lever post 20 by the second shaft 28 in gag lever post mounting base 27, in fixed link mounting base 24
It is rotatably installed with fixed link 21 by first rotating shaft 25, fixed link 21 is equipped with multiple limiting tooths close to the side of conducting rod eave tile 9
26, gag lever post 20, which is equipped with, is used for the perforative channel 22 of fixed link 21, and 22 inner wall of channel is equipped with close to the side of fixed link 21
Equipped with the first retention bead 29 and the second retention bead 30, limit is formed between the first retention bead 29 and the second retention bead 30
Groove 31.By installing gag lever post mounting base 27 and fixed link mounting base 24 on conducting rod eave tile 9, in gag lever post mounting base 27
Installation gag lever post 20 is rotated by the second shaft 28, passes through the rotation installation fixed link of first rotating shaft 25 in fixed link mounting base 24
21, in use, the telescopic moving in the channel 22 on gag lever post 20 of fixed link 21, gag lever post 20 can be to the electric wires of fence
It is clamped, improves stability when Work tool suspension, and according to various sizes of fence electric wire, fixed link can be made
21 move in channel 22, can be recessed by the limiting tooth 26 in fixed link 21 and the limit on gag lever post 20 in mobile process
The fixation to fixed link 21 is realized in the cooperation of slot 31, realizes 20 pairs of gag lever post different sizes to the support of gag lever post 20 by fixed link 21
Fence electric wire is limited, and stability and flexibility when the Work tool uses are effectively increased.
In the present embodiment, the spacing between conducting rod eave tile 9 and sliding slot 23 is L, 11cm≤L≤24cm.By making to lead
Spacing between electric pole eave tile 9 and sliding slot 23 is controlled in 11cm~24cm, it is ensured that the Work tool is able to detect substation's electronics and encloses
The demand of column different model line spacing improves the flexibility that the electric discharge Work tool uses.
It is understood that the first bolt 10 of the junction connection between universal joint 7 and conducting rod 8 can lead to
Yin-yang nut to be crossed to be reinforced, the 8 junction contact area of use one side conducting rod of yin-yang nut increases, enhance stability,
Another aspect safe distance further increases, and further increases to the guarantee of personal safety, and conducting rod matches more with universal joint 7
It is perfect.
It is understood that the controllability of universal joint 7, enables a device to meet multi-angle demand, meet personnel behaviour
Make the angle problem in the angle and equipment contact reliability adjustment process of convenience, can be solved perfectly.
In addition to above preferred embodiment, for the utility model there are also other embodiments, those skilled in the art can root
It is made various changes and modifications according to the utility model, without departing from the spirit of the utility model, should belong to the utility model
Range defined in appended claims.
Claims (5)
1. fence electric discharge Work tool, including conducting rod, which is characterized in that one end of the conducting rod is equipped with conduction
Bar eave tile, through there is a third bolt on the conducting rod, the periphery of the third bolt and two sides for being located at conducting rod are socketed with
Second spring locks gasket, and the third bolt is equipped with the second nut and third nut far from the side of conducting rod, and described second
It is fixed with conducting wire between nut and third nut and positioned at the periphery of third bolt, the conducting wire is pacified far from one end of third bolt
Equipped with Earth pile-head, universal joint is installed on the conducting rod and between conducting rod eave tile and the second bolt, described ten thousand
It is fixed between connector and conducting rod by the first bolt, the universal joint is equipped with universal joint far from one end of conducting rod
Mounting base, the universal joint mounting base are equipped with multistage retractable rod mounting base far from one end of universal joint, and the multistage is stretched
Contracting bar mounting base is plugged with multistage retractable rod far from one end of Universal-head mounting base, is equipped in the multistage retractable rod mounting base
For limiting the fastening bolt of multistage retractable rod, fastening bolt handle is installed, the multistage retractable rod is far from more on the fastening bolt
One end of grade telescopic rod mounting base is equipped with insulation handle.
2. fence electric discharge Work tool according to claim 1, which is characterized in that the conducting rod is far from conductive
One end of bar eave tile is equipped with sliding slot, and the second bolt is slidably fitted in the sliding slot, separate conducting rod on second bolt
One end is socketed with the first springlock gasket, and the first springlock gasket is equipped with the first nut far from one end of conducting rod.
3. fence electric discharge Work tool according to claim 1, which is characterized in that the multistage retractable rod includes
Level-one telescopic rod, second level telescopic rod and three-level telescopic rod, the second level telescopic rod is scalable to be mounted on level-one telescopic rod and three-level
Between telescopic rod, the three-level telescopic rod is mounted in multistage retractable rod mounting base, and the level-one telescopic rod is flexible far from second level
One end of bar is equipped with insulation handle.
4. fence electric discharge Work tool according to claim 1, which is characterized in that the conducting rod eave tile is close
The side of conducting rod is equipped with gag lever post mounting base and fixed link mounting base, is revolved in the gag lever post mounting base by the second shaft
Turn that gag lever post is installed, fixed link is rotatably installed with by first rotating shaft in the fixed link mounting base, the fixed link is close
The side of conducting rod eave tile is equipped with multiple limiting tooths, and the gag lever post, which is equipped with, is used for the perforative channel of fixed link, the channel
Inner wall is equipped with close to the side of fixed link equipped with the first retention bead and the second retention bead, first retention bead and
Limiting groove is formed between two retention beads.
5. fence electric discharge Work tool according to claim 1, which is characterized in that the conducting rod eave tile and cunning
Spacing between slot is L, 11cm≤L≤24cm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920101054.5U CN209516184U (en) | 2019-01-21 | 2019-01-21 | Fence electric discharge Work tool |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920101054.5U CN209516184U (en) | 2019-01-21 | 2019-01-21 | Fence electric discharge Work tool |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209516184U true CN209516184U (en) | 2019-10-18 |
Family
ID=68201673
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920101054.5U Active CN209516184U (en) | 2019-01-21 | 2019-01-21 | Fence electric discharge Work tool |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209516184U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113959625A (en) * | 2021-10-15 | 2022-01-21 | 广东韶钢松山股份有限公司 | Bolt torque detection device |
CN113959625B (en) * | 2021-10-15 | 2024-05-10 | 广东韶钢松山股份有限公司 | Bolt torque detection device |
-
2019
- 2019-01-21 CN CN201920101054.5U patent/CN209516184U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113959625A (en) * | 2021-10-15 | 2022-01-21 | 广东韶钢松山股份有限公司 | Bolt torque detection device |
CN113959625B (en) * | 2021-10-15 | 2024-05-10 | 广东韶钢松山股份有限公司 | Bolt torque detection device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107565411A (en) | A kind of electric power cabinet instrument fixed support | |
CN105548635A (en) | Electric energy meter connector assembly | |
CN209516184U (en) | Fence electric discharge Work tool | |
CN208420852U (en) | A kind of mining mine hole air detecting device | |
CN210316809U (en) | Infrared induction warning electric power operation rail | |
CN214626886U (en) | Bird-falling and nesting prevention device for electric power tower | |
CN201204270Y (en) | Insertion/hanging type cayman cable fastener type grounding wire | |
CN209043298U (en) | A kind of Project Supervising detection device | |
CN106940402A (en) | For high-power transformer and the special testing tool of bulky switch D.C. resistance | |
CN106908638A (en) | A kind of ready-package electric energy meter and electric energy metering box | |
CN215053330U (en) | Subway foundation pit envelope monitoring facilities | |
CN207530121U (en) | A kind of earthing or grounding means for petroleum works | |
CN207893505U (en) | The adjustable shadowless lamp structure of multi-angle for neurosurgery | |
CN106451239A (en) | Power support for cable installation | |
CN215681007U (en) | Prevent weighing down rope switching-over device and install earth connection instrument | |
CN220817045U (en) | Wall body fracture monitoring devices convenient to location | |
CN220628605U (en) | Observe angularly adjustable ammeter case | |
CN214044973U (en) | Grounding structure for lightning conductor of angle steel tower in electric power engineering | |
CN211667516U (en) | Air conditioner detection device | |
CN220421192U (en) | Outdoor high-voltage multifunctional metering cabinet | |
CN218510754U (en) | Stainless steel bracket for mounting aviation obstruction light | |
CN220672869U (en) | DC grounding system device | |
CN213744049U (en) | Portable seat type fan | |
CN216673480U (en) | Rock migration observation data processing system | |
CN219393728U (en) | Locking mechanism of passive grounding lock |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |