CN209513996U - The inconsistent time check instrument of portable high-pressure Switch Three-Phase - Google Patents

The inconsistent time check instrument of portable high-pressure Switch Three-Phase Download PDF

Info

Publication number
CN209513996U
CN209513996U CN201821937467.9U CN201821937467U CN209513996U CN 209513996 U CN209513996 U CN 209513996U CN 201821937467 U CN201821937467 U CN 201821937467U CN 209513996 U CN209513996 U CN 209513996U
Authority
CN
China
Prior art keywords
button
control module
input terminal
module
phase
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821937467.9U
Other languages
Chinese (zh)
Inventor
辛茗
陶增辉
沈小勇
胡阳
李长福
王川
卢秋锦
杨远朋
李显伟
邓湖川
刘冰
王有强
孙嘉琪
严军明
庄习超
管磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Turpan Power Supply Co Of Xinjiang Power Co Ltd
State Grid Corp of China SGCC
Original Assignee
Turpan Power Supply Co Of Xinjiang Power Co Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Turpan Power Supply Co Of Xinjiang Power Co Ltd, State Grid Corp of China SGCC filed Critical Turpan Power Supply Co Of Xinjiang Power Co Ltd
Priority to CN201821937467.9U priority Critical patent/CN209513996U/en
Application granted granted Critical
Publication of CN209513996U publication Critical patent/CN209513996U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

This application involves a kind of breaker calibration equipment more particularly to a kind of inconsistent time check instrument of portable high-pressure Switch Three-Phase;It includes box body, power supply, controller, timing module, the first external channel, the second external channel;Box body, power supply, controller, timing module are loaded on tray interior;Controller includes the first control module independent, the second control module, third control module, the 4th control module, the 5th control module and the first button, the second button, third button, the 4th button, the 5th button that control each control module switch respectively.Due to implementing above-mentioned technical proposal, the application need to only be directed to circuit breaker contact point mode, phase pattern, press corresponding first button or the second button or third button or the 4th button or the 5th button;It is easy to operate, human and material resources and the time of consumption are reduced, improves repair and maintenance efficiency, helps that operating personnel is quick and easy must to complete task.

Description

The inconsistent time check instrument of portable high-pressure Switch Three-Phase
Technical field
This application involves a kind of breaker calibration equipment more particularly to a kind of portable high-pressure Switch Three-Phase inconsistent times Tester.
Background technique
According to technical requirements, 220kV breaker now runs and is all split-phase breaker, in the maintenance repair maintenance workers of substation The work such as the verification of 220kV breaker three phases un identical protection, time setting are paid much attention in work, unbalanced three-phase lines time setting Have very important significance to breaker and network system, so accurately timing need to be carried out to the unbalanced three-phase lines time.But by Uneven in personnel's business skill level, laboratory apparatus is big, quality is big, attachment is more, and power supply is included, is limited by field power supply, tests Prepare, tool arranges, and keeping in check for the factors such as in-situ FTIR spectroelectrochemitry time length needs to consume a large amount of human and material resources and time.
Summary of the invention
The purpose of the application is to propose a kind of easy to operate, the portable high-pressure Switch Three-Phase of raising repair and maintenance efficiency Inconsistent time check instrument.
The application is achieved in that the inconsistent time check instrument of portable high-pressure Switch Three-Phase comprising box body, electricity Source, controller, timing module, the first external channel, the second external channel;Box body, power supply, controller, timing module are loaded on Tray interior;Controller includes the first control module independent, the second control module, third control module, the 4th control Module, the 5th control module and the first button, the second button, third button, the 4th that control each control module switch respectively Button, the 5th button;First external channel be respectively connected to the upper input terminal of the first control module, the second control module it is upper Input terminal, the upper input terminal of third control module, the upper input terminal of the 4th control module, the 5th control module it is upper defeated Enter terminal;Second external channel is respectively connected to the lower input terminal of the lower input terminal of the first control module, the second control module The lower input terminal of son, the lower input terminal of third control module, the lower input terminal of the 4th control module, the 5th control module Son;The output terminal of first control module, the output terminal of the second control module, the output terminal of third control module, the 4th The output terminal of control module, the 5th control module output terminal be connected to after timing module and power series;Timing mould The reset signal input terminal of block is connected with reset button;First button, the second button, third button, the 4th button, the 5th press Button, reset button are distributed on box body side by side.
Due to implementing above-mentioned technical proposal, the application is by the way that breaker two-phase breaker is normally opened or normally closed contact connects respectively Enter the first external channel, the second external channel;It is not required to change the mode of connection repeatedly later, removes existing complex experiment and prepare, grasp Make, Recovery Process, need to only be directed to circuit breaker contact point mode, phase pattern, press corresponding first button or the second button or the Three buttons or the 4th button or the 5th button;It is easy to operate, human and material resources and the time of consumption are reduced, repair and maintenance is improved Efficiency, helps that operating personnel is quick and easy must complete task.
Detailed description of the invention
The specific structure of the application is provided by drawings and examples below:
Fig. 1 is the application external structure schematic diagram;
Fig. 2 is the application wiring schematic diagram.
Legend: 1. box bodys, 2. power supplys, 3. timing modules, 4. first external channels, 5. second external channels, 6. first controls Molding block, 7. second control modules, 8. third control modules, 9. the 4th control modules, 10. the 5th control modules, 11. first press Button, 12. second buttons, 13. third buttons, 14. the 4th buttons, 15. the 5th buttons, 16. reset button.
Specific embodiment
The application is not limited by following embodiments, can be determined according to the technical solution of the application and actual conditions specific Embodiment.
As shown in Figure 1, the inconsistent time check instrument of portable high-pressure Switch Three-Phase includes box body 1, power supply 2, controller, One timing module 3, the second timing module 3, the first external channel 4, the second external channel 5;Including box body 1, power supply 2, controller, Timing module 3 is loaded on inside box body 1;Controller includes the first control module 6 independent, the second control module 7, third Control module 8, the 4th control module 9, the 5th control module 10 and control respectively each control module switch the first button 11, Second button 12, third button 13, the 4th button 14, the 5th button 15;First external channel 4 is respectively connected to the first control mould The upper input terminal of block 6, the upper input terminal of the second control module 7, the upper input terminal of third control module 8, the 4th control The upper input terminal of the upper input terminal of module 9, the 5th control module 10;Second external channel 5 is respectively connected to the first control The lower input terminal of module 6, the lower input terminal of the second control module 7, the lower input terminal of third control module 8, the 4th control The lower input terminal of the lower input terminal of molding block 9, the 5th control module 10;The output terminal of first control module 6, the second control The output terminal of molding block 7, the output terminal of third control module 8, the output terminal of the 4th control module 9, the 5th control mould The output terminal of block 10 concatenates after being connected to timing module 3 with power supply 2;The reset signal input terminal of timing module 3 is connected with Reset button 16;First button 11, the second button 12, third button 13, the 4th button 14, the 5th button 15, reset button 16 It is distributed on box body 1 side by side.
Embodiment 1 presses the first button 11, when corresponding to breaker quartile: A phase breaker normal opened contact being taken to tap into outside first Road 4 is connected, the normally opened node of B phase breaker is taken to tap into the lower input terminal of the second external channel 5 and corresponding first control module 6 Son is Disconnected mode, it is assumed that when displacement, which occurs, for A phase breaker closes a floodgate, the first control module 6 is counted after collecting displacement information When module 3 start timing;When B, C phase breaker and A phase circuit breaker position are inconsistent, the three-phase circuit time relay differentiates starting Timing, after the stipulated time, three phases un identical protection acts tripping A phase breaker, and A phase breaker conjugates, the first control Timing module 3 stops timing after module 6 collects displacement information, completes unbalanced three-phase lines time check under the mode and tests.
Embodiment 2 presses the second button 12, when corresponding to breaker coincidence, A phase breaker normally closed contact is taken to tap into outside first Road 4 is connected, the normally closed node of B phase breaker is taken to tap into the second external channel 5;When displacement separating brake occurs for A phase breaker, the second control Timing module 3 starts timing after molding block 7 collects displacement information;B phase breaker and A phase circuit breaker position are inconsistent, and three The circuitry phase time relay differentiates starting timing, and after the stipulated time, three phases un identical protection acts tripping B, C phase breaker, B Phase breaker conjugates, and timing module 3 stops timing after the second control module 7 collects displacement information, completes under the mode Unbalanced three-phase lines time check experiment.
Embodiment 3 presses third button 13, when corresponding to breaker coincidence, A phase breaker normally closed contact is taken to tap into outside first Road 4 is connected, the normally closed node of B phase breaker is taken to tap into the second external channel 5;When displacement separating brake occurs for B phase breaker, third control Timing module 3 starts timing after molding block 8 collects displacement information;A phase breaker and B phase circuit breaker position are inconsistent, and three The circuitry phase time relay differentiates starting timing, and after the stipulated time, three phases un identical protection acts tripping A, C phase breaker, A Phase breaker conjugates, and timing module 3 stops timing after third control module 8 collects displacement information, completes under the mode Unbalanced three-phase lines time check experiment.
Embodiment 4 presses the 4th button 14, when corresponding to breaker coincidence, A phase breaker normal opened contact is taken to tap into outside first Road 4 is connected, the normally opened node of B phase breaker is taken to tap into the second external channel 5;When displacement, which occurs, for A phase breaker closes a floodgate, the 4th control Timing module 3 starts timing after molding block 9 collects displacement information;B phase breaker and A phase circuit breaker position are inconsistent, and three The circuitry phase time relay differentiates starting timing, and after the stipulated time, three phases un identical protection acts tripping B, C phase breaker, B Phase breaker conjugates, and timing module 3 stops timing after the 4th control module 9 collects displacement information, completes under the mode Unbalanced three-phase lines time check experiment.
Embodiment 5 presses the 5th button 15, when corresponding to breaker coincidence, A phase breaker normal opened contact is taken to tap into outside first Road 4 is connected, the normally opened node of B phase breaker is taken to tap into the second external channel 5;When displacement, which occurs, for B phase breaker closes a floodgate, the 5th control Timing module 3 starts timing after molding block 10 collects displacement information;A phase breaker and B phase circuit breaker position are inconsistent, and three The circuitry phase time relay differentiates starting timing, and after the stipulated time, three phases un identical protection acts tripping A, C phase breaker, A Phase breaker conjugates, and timing module 3 stops timing after the 5th control module 10 collects displacement information, completes under the mode Unbalanced three-phase lines time check experiment.
Embodiment 1 is into embodiment 5, timing module 3 after each control module acquisition displacement information and acquisition information Beginning, stopping timing being realized by relay in the prior art, be those skilled in the art's customary means.Such as in reality Apply in example 2, timing module 3 be equipped with the first time switch normally opened contact, the second time switch normally-closed contact, the first timing after The upper input terminal that electric apparatus coil is packed into the second control module 7 corresponds to internal wiring, and the second time switch coil is packed into second The lower input terminal of control module 7 corresponds to internal wiring;It is defeated in the second control module 7 when displacement separating brake occurs for A phase breaker Enter terminal and corresponds to that internal wiring work, corresponding first time switch coil obtains electric, the first time switch normally opened contact and close It closes to which timing module 3 is started to work, when B phase breaker conjugates, the lower input terminal of the second control module 7 corresponds to inner wire Road work, corresponding second time switch coil obtain electric, the second time switch normally-closed contact and disconnect to which timing module 3 stops Only work.
First external channel 4, the second external channel 5 can be distributed in 1 side of box body, conveniently accessible relay tip.First Button 11, the second button 12, third button 13, the 4th button 14, the 5th button 15, reset button 16 are distributed in box body 1 side by side It is upper and can correspond to and be labeled, accordingly even when operating personnel's working experience is few, professional skill is poor, operating personnel also can it is quick, The timework for accurately carrying out unbalanced three-phase lines, reduces preparation, reduces operation difficulty, intuitively obtains operating result.
The above technical characteristic constitutes the most preferred embodiment of the application, with stronger adaptability and best implementation effect Fruit can increase and decrease inessential technical characteristic according to actual needs, to meet the needs of different situations.

Claims (1)

1. a kind of inconsistent time check instrument of portable high-pressure Switch Three-Phase, it is characterised in that: including box body, power supply, controller, Timing module, the first external channel, the second external channel;Box body, power supply, controller, timing module are loaded on tray interior;Control Device processed includes the first control module independent, the second control module, third control module, the 4th control module, the 5th control Molding block and the first button of each control module switch is controlled respectively, the second button, third button, the 4th button, the 5th is pressed Button;First external channel is respectively connected to the upper input terminal of the first control module, the upper input terminal of the second control module, The upper input terminal of three control modules, the upper input terminal of the 4th control module, the 5th control module upper input terminal;Second External channel is respectively connected to the lower input terminal of the first control module, the lower input terminal of the second control module, third control The lower input terminal of module, the lower input terminal of the 4th control module, the 5th control module lower input terminal;First control mould The output of the output terminal of block, the output terminal of the second control module, the output terminal of third control module, the 4th control module Terminal, the 5th control module output terminal be connected to after timing module and power series;The reset signal of timing module is defeated Enter end and is connected with reset button;First button, the second button, third button, the 4th button, the 5th button, reset button are side by side It is distributed on box body.
CN201821937467.9U 2018-11-23 2018-11-23 The inconsistent time check instrument of portable high-pressure Switch Three-Phase Active CN209513996U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821937467.9U CN209513996U (en) 2018-11-23 2018-11-23 The inconsistent time check instrument of portable high-pressure Switch Three-Phase

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821937467.9U CN209513996U (en) 2018-11-23 2018-11-23 The inconsistent time check instrument of portable high-pressure Switch Three-Phase

Publications (1)

Publication Number Publication Date
CN209513996U true CN209513996U (en) 2019-10-18

Family

ID=68190191

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821937467.9U Active CN209513996U (en) 2018-11-23 2018-11-23 The inconsistent time check instrument of portable high-pressure Switch Three-Phase

Country Status (1)

Country Link
CN (1) CN209513996U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110687386A (en) * 2019-11-05 2020-01-14 国网山西省电力公司阳泉供电公司 Three-phase inconsistent protection test box for circuit breaker body

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110687386A (en) * 2019-11-05 2020-01-14 国网山西省电力公司阳泉供电公司 Three-phase inconsistent protection test box for circuit breaker body

Similar Documents

Publication Publication Date Title
CN105189191B (en) Method and charging device for running the charging device charged for the single-phase charging of motor vehicle accumulator and multiphase
CN106383308B (en) Automatic opening and closing test equipment for charge control circuit breaker
CN107110903A (en) Transformer testing device and transformer testing method
CN103779967B (en) For TT&C system and the observing and controlling module thereof of distribution power automation terminal
CN104793028B (en) A kind of three-phase multifunctional test power device and its test method
CN103777172B (en) Reliability testing system of intelligent electric meter and method thereof
CN107271899B (en) A kind of test method of more specification voltage generating sets
CN209513996U (en) The inconsistent time check instrument of portable high-pressure Switch Three-Phase
CN110928196A (en) Double-star combined test energy simulation and monitoring system
CN107271731A (en) It is a kind of can wirelessly transmitting data clamp on amperemeter
CN104865521A (en) Instrument and method for testing action time of hand-held time relay
CN104569801A (en) Characteristic test device and method for alternating-and-direct-current dual-purpose low-voltage circuit breaker
CN206460144U (en) A kind of extra-high voltage switch intelligent device for measuring
CN206161803U (en) Take accuse circuit breaker automatic opening/closing switching test equipment
CN208224365U (en) A kind of load ratio bridging switch controller
CN109406908A (en) One kind repairing the integrated test platform of examination
CN207072716U (en) A kind of online synchronous manipulation device of tensioner multimachine
CN203720597U (en) Intelligent high voltage switch cabinet compartment measurement and control apparatus
CN106501634A (en) A kind of three-phase voltage Self-resetting module detecting device
CN209387756U (en) One kind repairing the integrated test platform of examination
CN208314145U (en) A kind of combination switch intelligent detection device
CN204945279U (en) A kind of mixing console for Electrical Power Line Parameter test
CN206906464U (en) It is a kind of can wirelessly transmitting data ammeter
CN202649415U (en) AC/DC low capacity switch element test device
CN107121619B (en) A kind of electric substation's route protection service without power-off device and repair method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant