CN209511266U - A kind of assisted drainage pipeline connection construction to drawing device - Google Patents
A kind of assisted drainage pipeline connection construction to drawing device Download PDFInfo
- Publication number
- CN209511266U CN209511266U CN201821691929.3U CN201821691929U CN209511266U CN 209511266 U CN209511266 U CN 209511266U CN 201821691929 U CN201821691929 U CN 201821691929U CN 209511266 U CN209511266 U CN 209511266U
- Authority
- CN
- China
- Prior art keywords
- pipe
- drawing device
- locating part
- drainage pipeline
- assisted drainage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model provide a kind of assisted drainage pipeline connection construction to drawing device, it is made improvements in reinforced concrete sewer pipe connecting link, for difficult point present in construction research and development a kind of reinforced concrete drainage pipe to drawing device, the connection equipment greatly overcomes environmental condition to limit, artificial, pipeline merging precision in connection procedure easier to control is saved in the use for reducing lifting equipment.The reinforced concrete sewer pipe adjusts drawing device without repeatedly lifting, it is only necessary to lift on the basis of drainpipe, then be adjusted by the utility model to drawing, so that it may save the artificial guidance operation of subsequent lifting adjustment and part.Described device structure is simple, easy for construction, is able to cooperate the connection of the reinforced concrete sewer pipe of various models.
Description
Technical field
The utility model belong to building implement technical field more particularly to a kind of assisted drainage pipeline connection construction to drawing
Device.
Background technique
With the fast development of urban construction, being laid in construction for municipal pipeline is widely used.Prefabricated reinforced concrete
Native drainpipe figure is big, and quality is big, needs frequently to use the mechanical equipments such as loop wheel machine in pipeline docking work progress, repeatedly be adjusted
Whole ability accurate positioning, it is time-consuming and laborious.
It is, therefore, desirable to provide a kind of structure is simple, easy for construction, the reinforced concrete sewer pipe of various models can be cooperated to connect
Connect to drawing device.
Utility model content
The purpose of this utility model is to provide a kind of assisted drainage pipeline connection constructions to drawing device, existing for solving
There is reinforced concrete sewer pipe figure prefabricated in technology big, quality is big, needs frequently to use in pipeline docking work progress
The mechanical equipments such as loop wheel machine, repeatedly adjusted could accurate positioning, it is time-consuming and laborious the problems such as.
To solve the above-mentioned problems, the utility model provide a kind of assisted drainage pipeline connection construction to drawing device, packet
Include the first locating part, the second locating part and hook structure;
One end of first locating part and the hook structure is detachably connected, and the other end of the hook structure is to apply
Power end;
First locating part is set to one end of the first pipe, and the other end of the first pipe is used for and described
One end of second pipe is collectively as connecting pin;
Second locating part is set to the other end of the second pipe, and for limiting the fixed second pipe
The other end;
The force side sequentially passes through inside the first pipe, inside second pipe and second locating part;
When applying pulling force to the force side, the hook structure applies tractive force to first locating part, and described the
One locating part applies thrust identical with the direction of pull to the first pipe, and the thrust leans on the first pipe edge
The direction of the nearly second pipe is mobile, and the first pipe is connect with the second pipe.
Optionally, first limit includes a gusseted plate, and the gusseted plate includes a connecting component, described
Connecting component is connect with one end of the hook structure.
Optionally, the gusseted plate further includes three the first fixed frames, and three first fixed frames have a public affairs
End, three first fixed frames are linked together by the common end altogether, and three first fixed frames are in same plane
Interior, the angle between every two adjacent first fixed frame is 120 °;
The connector is arranged on the common end.
Optionally, three first fixed frames one end opposite with common end is respectively provided with one first expansion bracket for adapting to
One first fixing bolt is arranged for fixing first expansion bracket in various sizes of pipeline on first expansion bracket.
Optionally, second locating part include a hollow support plate, the hollow support plate include an annulus and
Three the second fixed frames;
Three second fixed frames include a connecting pin, and three second fixed frames are uniform by the connecting pin
It is arranged on the annulus, and three second fixed frames and the annulus are in the same plane, the force side passes through institute
State annulus.
Optionally, the opposite one end in the connecting pin of three second fixed frames is respectively provided with one second expansion bracket for adapting to
Various sizes of pipeline, one second fixing bolt of setting is for fixing second expansion bracket on second expansion bracket.
Optionally, second locating part further includes a support frame, and support frame as described above includes that hollow ring and both ends are equal
The even connection structure being arranged on the hollow ring, the connection structure is perpendicular to the plane where the hollow ring;
The hollow support plate and support frame as described above cooperate the other end to realize the fixed second pipe of limit.
Optionally, the hook structure includes the first drag hook and the second drag hook;
First drag hook and second drag hook include an annulus end and a latch closure end, the circle of first drag hook
Ring end connects the latch closure end of second drag hook;
The latch closure end of first drag hook is detachably connected with first locating part, and the annulus end of second drag hook is made
For the force side.
It optionally, further include a force application part, the force application part acts on the force side.
Optionally, the force application part includes a chain block, and the chain block connects and acts on the force side.
The utility model proposes a kind of assisted drainage pipeline connection constructions to drawing device, connects in reinforced concrete sewer pipe
Link is connect to make improvements, for difficult point present in construction research and development a kind of reinforced concrete drainage pipe to drawing device, the company
Connecing equipment greatly overcomes environmental condition to limit, and the use for reducing lifting equipment is saved manually, manages in connection procedure easier to control
Road merging precision.The reinforced concrete sewer pipe is to drawing device without repeatedly lifting adjustment, it is only necessary to lift drainpipe
It adjusts on the basis of, then through the utility model to drawing, so that it may save subsequent lifting adjustment and operation is manually taught in part.Institute
It states that apparatus structure is simple, easy for construction, is able to cooperate the connection of the reinforced concrete sewer pipe of various models.
Detailed description of the invention
Fig. 1 is a kind of showing the overall structure of drawing device for assisted drainage pipeline connection construction provided in an embodiment of the present invention
It is intended to;
Fig. 2 is that a kind of assisted drainage pipeline connection construction provided in an embodiment of the present invention faces signal to drawing device
Figure;
Fig. 3 is the structural schematic diagram of hook structure;
Fig. 4 is the structural schematic diagram of hollow support plate;
Fig. 5 is the structural schematic diagram of gusseted plate;
Fig. 6 is the structural schematic diagram of support frame;
10- hollow support plate, 101- annulus, the second expansion bracket of 102-, the second fixed frame of 103-, the fixed spiral shell of 104- second
Bolt, 20- gusseted plate, 201- steel ball, the first expansion bracket of 202-, the first fixed frame of 203-, the first fixing bolt of 204-, 30-
Chain block, 40- support frame, 50- hook structure, the first drag hook of 501-, the second drag hook of 502-.
Specific embodiment
Below in conjunction with the drawings and specific embodiments to the utility model proposes a kind of assisted drainage pipeline connection construction
Drawing device is described in further detail.According to following explanation and claims, the advantages of the utility model and feature will more
It is clear.It should be noted that attached drawing is all made of very simplified form and using non-accurate ratio, only to convenient, apparent
Ground aids in illustrating the purpose of the utility model embodiment.
In the description of the present invention, it should be understood that term " center ", "upper", "lower", "left", "right" etc. refer to
The orientation or positional relationship shown is to be based on the orientation or positional relationship shown in the drawings, and is merely for convenience of description the utility model
It is described with simplifying, rather than the device or element of indication or suggestion meaning must have a particular orientation, with specific orientation structure
It makes and operates, therefore should not be understood as limiting the present invention.
In addition, term " first ", " second " are used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance
Or implicitly indicate the quantity of indicated technical characteristic.Define " first " as a result, the feature of " second " can be expressed or
Implicitly include one or more of the features.In the description of the present invention, the meaning of " plurality " is at least two, example
Such as two, three etc., unless otherwise specifically defined.
As shown in Figures 1 to 6, the present embodiment provides a kind of assisted drainage pipeline connection constructions to drawing device, including
One end of one locating part, the second locating part and hook structure 50, first locating part and the hook structure 50 is detachable
Connection, the other end of the hook structure 50 are force side.First locating part is set to one end of the first pipe a,
The other end of the first pipe a is used for and one end of the second pipe b is collectively as connecting pin.Second locating part is set
It is placed in the other end of the second pipe b, and the other end for limiting the fixed second pipe b.The force side is successively
Inside the first pipe a, inside second pipe b and second locating part.
When applying pulling force to the force side, the hook structure 50 applies tractive force to first locating part, described
First locating part applies thrust identical with the direction of pull to the first pipe a, and the thrust makes the first pipe a
It is moved along the direction close to the second pipe b, and the first pipe a is connect with the second pipe b.
Optionally, first limit may include a gusseted plate 20, and the gusseted plate 20 includes an interconnecting piece
Part, the connecting component are connect with one end of the hook structure 50.
Optionally, the gusseted plate 20 further includes three the first fixed frames 203, three first fixed frames 203
There is a common end, three first fixed frames 203 are linked together by the common end, three first fixed frames
203 in the same plane, and the angle between every two adjacent first fixed frame 203 is 120 °, at this point, the connector
It is arranged on the common end.It should be noted that in the present embodiment, the gusseted plate 20 can also also comprise a steel
Ball, the steel ball are connected on the common end, are provided with connector on the steel ball.
Further, by practical application, the size of each pipeline be it is different, in order to adapt to various sizes
Pipeline, inventor discovery can three first fixed frames 203 one end opposite with common end be respectively provided with one first stretch
One first fixing bolt 204 is arranged for solid for adapting to various sizes of pipeline in frame 202 on first expansion bracket 202
Fixed first expansion bracket 202.The size of gusseted plate is adjusted by expansion bracket to adapt to various sizes of pipeline, such as Fig. 5
It is shown.
It should be noted that the gusseted plate can be welded using steel plate in the present embodiment, other materials can also be used
The material of matter makes gusseted plate, but the performance of material should meet the needs of gusseted plate, can be according to the actual needs
It selects, herein with no restrictions, and the quantity of the first fixed frame is also with no restrictions, and still, the quantity of the first fixing bolt is answered
It is equal with the quantity of the first expansion bracket.
Optionally, as shown in figure 4, the second locating part described in the present embodiment may include a hollow support plate 10, the sky
Heart support plate 10 includes an annulus 101 and three the second fixed frames 103.Three second fixed frames 103 include one
Connecting pin, three second fixed frames 103 are evenly arranged on the annulus 101 by the connecting pin, and described three
In the same plane with the annulus 101, the force side passes through the annulus 101 to second fixed frame 103.The annulus at center is
There are spaces for posterior drawing operation.
Further, by practical application, the size of each pipeline be it is different, in order to adapt to various sizes
Pipeline, it is flexible that one end that inventor's discovery can be opposite in the connecting pin of three second fixed frames 103 is respectively provided with one second
Frame 102 is for adapting to various sizes of pipeline, and one second fixing bolt 104 of setting is for fixing on second expansion bracket 102
Second expansion bracket 102.
It should be noted that the hollow support plate can be welded using steel plate in the present embodiment, other materials can also be used
The material of matter makes hollow support plate, but the performance of material should meet the needs of hollow support plate, can be according to the actual needs
It selects, herein with no restrictions, and the quantity of the second fixed frame is also with no restrictions, but the quantity of the second fixing bolt should be with
The quantity of second expansion bracket is equal.
Further, second locating part further includes a support frame 40, support frame as described above 40 include hollow ring with
And both ends are uniformly arranged on the connection structure on the hollow ring, the connection structure is perpendicular to where the hollow ring
Plane.The hollow support plate 10 cooperates the other end to realize the fixed second pipe b of limit with support frame as described above 40.Such as
Shown in Fig. 6, hollow ring is set in the left end of support frame, pipeline can be accepted by hollow support plate.In the present embodiment, institute
Stating support frame can be welded using steel plate, and other materials can also be used to make, herein with no restrictions.
Specifically, the hook structure 50 includes the first drag hook 501 and the second drag hook 502, first drag hook 501 with
Second drag hook 502 includes an annulus end and a latch closure end, the annulus end connection described second of first drag hook 501
The latch closure end of drag hook 502.
The latch closure end of first drag hook 501 is detachably connected with first locating part, the circle of second drag hook 502
Ring end is as the force side.In the present embodiment, the length L of hook structure is duct segments length, needs root in practical application
According to selecting the case where specific pipeline, hook structure one end is annulus, and the other end increases latch closure, be can avoid sliding during drawing high
It falls.Also note that pipeline one shares two sections in the present embodiment, it is therefore desirable to have two section drag hooks, if applied in more piece pipe
When the case where road, needs more piece drag hook at this time to be used cooperatively, different one illustrate herein.
It optionally, further include a force application part, the force application part acts on the force side.The force application part can be
Chain block 30, the chain block 30 connect and act on the force side.
In lifting, gusseted plate is placed on the one end pipeline a, is connected by hook structure, passes through pipeline a and pipeline
B is connected with chain block, and the chain block other end is connected with support frame, passes through hollow support plate between support frame and drainpipe b
The transmitting of power is carried out, thus there are spaces can operate the connection that chain block pulls pipeline a and pipeline b in support frame.
In conclusion the utility model proposes a kind of assisted drainage pipeline connection constructions to drawing device, in reinforced concrete
Native drainpipe connecting link makes improvements, for difficult point present in construction research and development a kind of reinforced concrete drainage pipe to drawing
Device, the connection equipment greatly overcome environmental condition to limit, and artificial, connection easier to control is saved in the use for reducing lifting equipment
Pipeline merging precision in the process.The reinforced concrete sewer pipe is to drawing device without repeatedly lifting adjustment, it is only necessary to will arrange
Water pipe lifts on the basis of, then is adjusted by the utility model to drawing, so that it may save subsequent lifting adjustment and part is artificial auxiliary
Lead operation.Described device structure is simple, easy for construction, is able to cooperate the connection of the reinforced concrete sewer pipe of various models.
In the description of this specification, reference term " one embodiment ", " some embodiments ", " example " or " specifically show
It is practical that the description of example " etc. means that particular features, structures, materials, or characteristics described in conjunction with this embodiment or example are contained in
In at least one novel embodiment or example.In the present specification, schematic expression of the above terms are necessarily directed to
It is identical embodiment or example.And particular features, structures, materials, or characteristics described can be at any one or more
It can be combined in any suitable manner in a embodiment.In addition, those skilled in the art can will be described in this specification different real
It applies example or example is engaged and combined.
It should be noted last that above embodiments are merely intended for describing the technical solutions of the present application, but not for limiting the present application, to the greatest extent
Pipe is described in detail the utility model referring to preferred embodiment, those skilled in the art should understand that, it can be with
The technical solution of the present invention is modified or equivalently replaced, without departing from technical solutions of the utility model spirit and
Range.
Claims (10)
1. a kind of assisted drainage pipeline connection construction to drawing device, for the docking between first pipe and second pipe,
It is characterized in that, including the first locating part, the second locating part and hook structure;
One end of first locating part and the hook structure is detachably connected, and the other end of the hook structure is force
End;
First locating part is set to one end of the first pipe, and the other end of the first pipe is used for and described second
One end of pipeline is collectively as connecting pin;
Second locating part is set to the other end of the second pipe, and for limiting the another of the fixed second pipe
End;
The force side sequentially passes through inside the first pipe, inside second pipe and second locating part;
When applying pulling force to the force side, the hook structure applies tractive force, first limit to first locating part
Position part applies thrust identical with the direction of pull to the first pipe, and the thrust makes the first pipe along close to institute
The direction for stating second pipe is mobile, and the first pipe is connect with the second pipe.
2. a kind of assisted drainage pipeline connection construction as described in claim 1 to drawing device, which is characterized in that described first
Limit includes a gusseted plate, and the gusseted plate includes a connecting component, the connecting component and the hook structure
One end connection.
3. a kind of assisted drainage pipeline connection construction as claimed in claim 2 to drawing device, which is characterized in that the triangle
Support plate further includes three the first fixed frames, and three first fixed frames have a common end, three first fixed frames
Linked together by the common end, three first fixed frames in the same plane, every two adjacent described first
Angle between fixed frame is 120 °;
The connecting component is arranged on the common end.
4. a kind of assisted drainage pipeline connection construction as claimed in claim 3 to drawing device, which is characterized in that described three
First fixed frame one end opposite with common end is respectively provided with one first expansion bracket for adapting to various sizes of pipeline, described the
One first fixing bolt is set on one expansion bracket for fixing first expansion bracket.
5. a kind of assisted drainage pipeline connection construction as claimed in claim 4 to drawing device, which is characterized in that described second
Locating part includes a hollow support plate, and the hollow support plate includes an annulus and three the second fixed frames;
Three second fixed frames include a connecting pin, and three second fixed frames are evenly arranged by the connecting pin
On the annulus, and three second fixed frames and the annulus are in the same plane, and the force side passes through the circle
Ring.
6. a kind of assisted drainage pipeline connection construction as claimed in claim 5 to drawing device, which is characterized in that described three
The opposite one end in the connecting pin of second fixed frame is respectively provided with one second expansion bracket for adapting to various sizes of pipeline, and described second
One second fixing bolt is set on expansion bracket for fixing second expansion bracket.
7. a kind of assisted drainage pipeline connection construction as claimed in claim 5 to drawing device, which is characterized in that described second
Locating part further includes a support frame, and support frame as described above includes that hollow ring and both ends are uniformly arranged on the hollow ring
Connection structure, the connection structure is perpendicular to the plane where the hollow ring;
The hollow support plate and support frame as described above cooperate the other end to realize the fixed second pipe of limit.
8. a kind of assisted drainage pipeline connection construction as described in claim 1 to drawing device, which is characterized in that the drag hook
Structure includes the first drag hook and the second drag hook;
First drag hook and second drag hook include an annulus end and a latch closure end, the annulus end of first drag hook
Connect the latch closure end of second drag hook;
The latch closure end of first drag hook is detachably connected with first locating part, and the annulus end of second drag hook is as institute
State force side.
9. a kind of assisted drainage pipeline connection construction as described in claim 1 to drawing device, which is characterized in that further include one
Force application part, the force application part act on the force side.
10. a kind of assisted drainage pipeline connection construction as claimed in claim 9 to drawing device, which is characterized in that it is described to apply
Power component includes a chain block, and the chain block connects and acts on the force side.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821691929.3U CN209511266U (en) | 2018-10-18 | 2018-10-18 | A kind of assisted drainage pipeline connection construction to drawing device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821691929.3U CN209511266U (en) | 2018-10-18 | 2018-10-18 | A kind of assisted drainage pipeline connection construction to drawing device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209511266U true CN209511266U (en) | 2019-10-18 |
Family
ID=68192689
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821691929.3U Active CN209511266U (en) | 2018-10-18 | 2018-10-18 | A kind of assisted drainage pipeline connection construction to drawing device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209511266U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109296050A (en) * | 2018-10-18 | 2019-02-01 | 中交上海航道局有限公司 | A kind of pair of drawing device |
CN112627850A (en) * | 2020-12-18 | 2021-04-09 | 中国二十冶集团有限公司 | A auxiliary device for installation of major diameter concrete pipe |
CN113108125A (en) * | 2021-03-12 | 2021-07-13 | 长江生态环保集团有限公司 | Auxiliary tool capable of enabling pipe joints to be tightly attached during drainage pipeline construction and using method |
CN113251211A (en) * | 2021-04-22 | 2021-08-13 | 中国一冶集团有限公司 | Pipeline socket butt joint device |
-
2018
- 2018-10-18 CN CN201821691929.3U patent/CN209511266U/en active Active
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109296050A (en) * | 2018-10-18 | 2019-02-01 | 中交上海航道局有限公司 | A kind of pair of drawing device |
CN112627850A (en) * | 2020-12-18 | 2021-04-09 | 中国二十冶集团有限公司 | A auxiliary device for installation of major diameter concrete pipe |
CN113108125A (en) * | 2021-03-12 | 2021-07-13 | 长江生态环保集团有限公司 | Auxiliary tool capable of enabling pipe joints to be tightly attached during drainage pipeline construction and using method |
CN113251211A (en) * | 2021-04-22 | 2021-08-13 | 中国一冶集团有限公司 | Pipeline socket butt joint device |
CN113251211B (en) * | 2021-04-22 | 2022-08-19 | 中国一冶集团有限公司 | Pipeline socket joint interfacing apparatus |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209511266U (en) | A kind of assisted drainage pipeline connection construction to drawing device | |
US4218158A (en) | Pipe handling method and apparatus | |
CN206466916U (en) | A kind of pipe burying device of hydraulic engineering | |
CN109296051A (en) | A kind of orbit movable retractable chute | |
CN211054059U (en) | Prefabricated cement pipe die | |
CN217500477U (en) | Large-pipe-diameter concrete pipeline splicing device | |
CN107697833A (en) | Can be born a heavy burden double rotating shaft combine rope control jack of translation | |
CN107606307B (en) | A kind of transport of pipeline section, contra-aperture device and method | |
CN109114304A (en) | A kind of drainage pipe fitting, which quickly connects, uses top removal device | |
US4268190A (en) | Pipe handling method and apparatus | |
CN208440205U (en) | A kind of piping lane prefabricated component lifting crane | |
CN109296050A (en) | A kind of pair of drawing device | |
CN110029714A (en) | Engineering drainage pipeline mounting device | |
CN206329348U (en) | A kind of minitunnel lining trolley | |
CN208701668U (en) | Reinforcing bar soil nailing | |
CN207862786U (en) | A kind of steel arch-shelf closing device | |
CN203392733U (en) | Pipeline hanging tool and engineering machinery | |
CN113915411B (en) | Auxiliary structure for underwater pipe burying | |
CN109185558A (en) | The method that a kind of major diameter GRP tube road is installed under water | |
CN113108125B (en) | Auxiliary tool capable of enabling pipe joints to be tightly attached during drainage pipeline construction and using method | |
CN204867188U (en) | Crooked bar straightener of portable many function high tensile reinforcements at most | |
CN209760877U (en) | Building wall reinforcing and supporting structure | |
CN111853417A (en) | Repairing device and repairing method for drainage pipeline | |
CN206220956U (en) | A kind of inspection aperture apparatus for different pile foundation hole footpaths | |
CN110629760A (en) | Building template for reservoir dam |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |