CN209510453U - A kind of energy conservation quickly cooling intercooler - Google Patents
A kind of energy conservation quickly cooling intercooler Download PDFInfo
- Publication number
- CN209510453U CN209510453U CN201822255048.3U CN201822255048U CN209510453U CN 209510453 U CN209510453 U CN 209510453U CN 201822255048 U CN201822255048 U CN 201822255048U CN 209510453 U CN209510453 U CN 209510453U
- Authority
- CN
- China
- Prior art keywords
- ice chest
- inner cavity
- middle ice
- intercooler
- fixedly installed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02T—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
- Y02T10/00—Road transport of goods or passengers
- Y02T10/10—Internal combustion engine [ICE] based vehicles
- Y02T10/12—Improving ICE efficiencies
Landscapes
- Production, Working, Storing, Or Distribution Of Ice (AREA)
Abstract
The utility model relates to energy-saving cooling device technical fields, and disclose a kind of energy saving quickly cooling intercooler, including middle ice chest, the side of middle ice chest is fixedly installed with rear blast pipe, the other end of blast pipe is fixedly connected with the first valve afterwards, the other end of first valve is fixedly connected with advance air hose, and middle ice chest is fixedly installed with discharge pipe far from the side of rear blast pipe, and the middle positive side of ice chest is fixedly installed with fixed case.The energy conservation quickly cooling intercooler, by the bottom in middle ice chest inner cavity, scraper plate is set, the water of ice chest intracavity bottom and oil are cleaned out in entering when using scraper plate by engine booster, middle ice chest intracavity bottom water and oil accumulation is avoided to influence the generation of intercooler behavior pattern, when intercooler work, by scraper plate be bonded in ice chest inner cavity guarantee in be not connected between ice chest and fixed case, at this time in the inner cavity of ice chest be absolutely sealed and heat is not transferred to electric putter and causes fire.
Description
Technical field
The utility model relates to energy-saving cooling device technical field, specially a kind of energy saving quickly cooling intercooler.
Background technique
Intercooler is turbo charged auxiliary equipment, its role is to reduce pressurized high temperature air temperature, to reduce hair
The thermic load of motivation improves air inflow, and then increases the power of engine, can be used for turbocharging automobile engine.
The structure of intercooler is the chamber of a sealing, and engine booster temperature rises, cools down by intercooler, work as hair
When motivation is pressurized, there is fraction of oil to enter the inner cavity of intercooler, meanwhile, temperature rising has least a portion of vapor to enter intercooler
Inner cavity, when intercooler cools down to it, Water vapor condensation is placed in the bottom of intercooler inner cavity at liquid water, accumulate over a long period, heap
Product will affect the performance of intercooler in the You Heshui of intercooler intracavity bottom, and air enters excessive velocities when inside intercooler,
Air flows unevenness in intercooler, reduces the efficiency of intercooler refrigeration.
Utility model content
In view of the deficiencies of the prior art, the utility model provides a kind of energy saving quickly cooling intercooler, has in intercooler
The water and oil in bottom of chamber portion are cleared up and are controlled air and enters the speed of intercooler and guarantee that air is equal in intercooler internal flow
Even advantage is solved when engine booster, has fraction of oil to enter the inner cavity of intercooler, meanwhile, temperature rising has few portion
The vapor divided enters the inner cavity of intercooler, and when intercooler cools down to it, Water vapor condensation is placed in intercooler at liquid water
The bottom of chamber, accumulates over a long period, and the You Heshui for being deposited in intercooler intracavity bottom will affect the performance of intercooler, and in air entrance
The problem of excessive velocities when inside cooler, air flows unevenness in intercooler, reduces intercooler refrigerating efficiency.
The utility model provides the following technical solutions: a kind of energy conservation quickly cooling intercooler, including middle ice chest, the middle ice chest
Side is fixedly installed with rear blast pipe, and the other end of the rear blast pipe is fixedly connected with the first valve, first valve
The other end is fixedly connected with advance air hose, and the middle ice chest is fixedly installed with discharge pipe far from the side of rear blast pipe, it is described in
The positive side of ice chest is fixedly installed with fixed case, and peace is fixed far from the both ends of middle ice chest side in the inner cavity of the fixed case respectively
Equipped with electric putter and telescopic rod, the electric putter is fixedly connected with the other end of telescopic rod by scraper plate, the bottom of the middle ice chest
Portion is fixedly installed with sewage draining exit far from the side of fixed case, and the other end of the sewage draining exit is fixedly mounted on by the first round tube
On two valves, the other end of second valve is fixedly installed with the second round tube, and the other end of second round tube is fixedly attached
Have an elastic tape, the external activity of the elastic tape is socketed with dirt storage box, the dirt storage box close to elastic tape side inner cavity slightly
Protrusion, and the prominence of dirt storage box inner cavity is fixedly installed with rubber pad.
Preferably, the middle ice chest is equipped with the through-hole being evenly distributed, the middle ice chest close to the inner cavity of rear blast pipe side
The through-hole being evenly distributed, and the through-hole that middle ice chest is equipped with close to rear blast pipe side inner cavity are equipped with close to the inner cavity of discharge pipe side
It is adapted with middle ice chest close to the through-hole that discharge pipe side inner cavity is equipped with.
Preferably, the sewage draining exit and the first round tube are respectively conical design and cylinder design, and the first round tube with
Second round tube it is equal in magnitude.
Preferably, the rubber pad and elastic tape are hollow cylinder design, and the width value of rubber pad is greater than rubber
The width value of apron.
Preferably, the advance air hose and rear blast pipe about the first valve central symmetry and are funnel-shaped design.
Preferably, the length value of the scraper plate is equal with the length value of middle ice chest inner cavity, and scraper plate and middle ice chest inner cavity
Basal sliding connection.
Be compared with the prior art, the utility model have it is following the utility model has the advantages that
1, the energy conservation quickly cooling intercooler is arranged scraper plate by the bottom in middle ice chest inner cavity, is increased engine using scraper plate
The water of ice chest intracavity bottom and oil are cleaned out in entering when pressure, and middle ice chest intracavity bottom water and oil accumulation is avoided to influence intercooler
The generation of behavior pattern, when intercooler work when, by scraper plate be bonded in ice chest inner cavity guarantee between ice chest and fixed case not
Connection, the inner cavity of middle ice chest is absolutely sealed at this time and heat is not transferred to electric putter and causes fire.
2, the energy conservation quickly cooling intercooler is adjusted in the control air entrance of the first valve in ice chest by the way that the first valve is arranged
The speed in portion, and the two sides of middle ice chest inner cavity are equipped with equally distributed through-hole, the setting of through-hole guarantees that air can be cold in
The internal flow of case is uniform, improves the effect of intercooler refrigeration.
Detailed description of the invention
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is the utility model structure fixed case top view;
Fig. 3 is the utility model structure dirt storage box schematic diagram.
In figure: 1, middle ice chest;2, discharge pipe;3, fixed case;4, sewage draining exit;5, the first round tube;6, the second valve;7, second
Round tube;8, dirt storage box;9, rubber pad;10, advance air hose;11, the first valve;12, rear blast pipe;13, scraper plate;14, elastic tape;
15, electric putter;16, telescopic rod.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
Fig. 1-3, a kind of energy conservation quickly cooling intercooler, including middle ice chest 1 are please referred to, after the side of middle ice chest 1 is fixedly installed with
Blast pipe 12, the other end of rear blast pipe 12 are fixedly connected with the first valve 11, when need to control air enter in inside ice chest 1
Speed and guarantee air when the internal flow of middle ice chest 1 is uniform, adjust the first valve 11 control air enter in ice chest 1
The speed in portion, and the two sides of 1 inner cavity of middle ice chest are equipped with equally distributed through-hole, the setting of through-hole guarantees that air can be cold in
The internal flow of case 1 is uniform, improves the effect of intercooler refrigeration, and the other end of the first valve 11 is fixedly connected with advance air hose
10, advance air hose 10 and rear blast pipe 12 about 11 central symmetry of the first valve and are funnel-shaped design, and middle ice chest 1 is far from after
The side of blast pipe 12 is fixedly installed with discharge pipe 2, and middle ice chest 1, which is equipped with close to the inner cavity of rear 12 side of blast pipe, to be evenly distributed
Through-hole, middle ice chest 1 is equipped with the through-hole being evenly distributed close to the inner cavity of 2 side of discharge pipe, and middle ice chest 1 is close to rear blast pipe 12 1
The through-hole that side inner cavity is equipped with is adapted with middle ice chest 1 close to the through-hole that 2 side inner cavity of discharge pipe is equipped with, middle ice chest 1 positive one
Side is fixedly installed with fixed case 3, and the inner cavity of fixed case 3 is fixedly installed with electric putter 15 far from the both ends of middle 1 side of ice chest respectively
With telescopic rod 16, electric putter 15 is fixedly connected with the other end of telescopic rod 16 by scraper plate 13, and the height value of fixed case 3, which is less than, to be scraped
The height value of plate 13 guarantees that scraper plate 13 can keep off the port between fixed case 3 and middle ice chest 1 completely when intercooler work
Firmly, so that not being connected between middle ice chest 1 and fixed case 3, scraper plate 13 is located at the bottom of middle 1 inner cavity of ice chest, the length value of scraper plate 13
Equal with the length value of middle 1 inner cavity of ice chest, the height value of scraper plate 13 is much smaller than the height value of middle 1 inner cavity of ice chest, and scraper plate 13 with
The basal sliding of middle 1 inner cavity of ice chest connects, and the bottom of middle ice chest 1 is fixedly installed with sewage draining exit 4 far from the side of fixed case 3, arranges
The other end of dirty mouth 4 is fixedly mounted on the second valve 6 by the first round tube 5, and the other end of the second valve 6 is fixedly installed with the
Two round tubes 7, the other end fixing sleeve of the second round tube 7 are connected to elastic tape 14, and sewage draining exit 4 and the first round tube 5 are respectively that cone is set
Meter and cylinder design, and the first round tube 5 and the second round tube 7 is equal in magnitude, the external activity of elastic tape 14 is socketed with storage dirt
Case 8, enter when needing engine booster in 1 intracavity bottom of ice chest water and oil when cleaning out, starting electric putter 15 pushes away
Dynamic scraper plate 13 cleans out the water of middle 1 intracavity bottom of ice chest and oil, and the oil scraped is discharged into dirt storage box 8 by sewage draining exit 4,
When intercooler work when, will scraper plate 13 fitting in ice chest 1 inner cavity guarantee in be not connected between ice chest 1 and fixed case 3, at this time in
The inner cavity of ice chest 1 is absolutely sealed and heat is not transferred to electric putter 15 and causes fire, and dirt storage box 8 is close to 14 side of elastic tape
Inner cavity slightly protrusion, and the prominence of 8 inner cavity of dirt storage box is fixedly installed with rubber pad 9, rubber pad 9 and elastic tape 14 are hollow
Cylinder design, and the width value of rubber pad 9 be greater than elastic tape 14 width value, when in dirt storage box 8 water and oil fill need
When pouring out, dirt storage box 8 need to only be extracted out from the bottom of the second round tube 7, when needing to install dirt storage box 8, by dirt storage box 8
It is inserted directly into the bottom of the second round tube 7, the mounting means of dirt storage box 8 is simple and convenient, and the setting of rubber pad 9 and elastic tape 14 guarantees
The inside of dirt storage box 8 is in sealing state.
Working principle makes the inner cavity of ice chest 1 in the fitting of scraper plate 13 firstly, closing the second valve 6 when engine booster
It is not connected between ice chest 1 and fixed case 3 in guarantee, the inner cavity of middle ice chest 1 is absolutely sealed at this time and heat is not transferred to electricity and pushes away
Bar 15 causes fire, open the first valve 11 allow air enter in ice chest 1 inner cavity, adjust the speed of the first valve 11 control air inlet
Degree, the two sides for being placed in middle 1 inner cavity of ice chest are equipped with equally distributed through-hole, and the setting of through-hole guarantees that air can be in middle ice chest 1
Internal flow is uniform, is freezed using intercooler to air, has the inner cavity of ice chest 1 in fraction of water and oil entrance at this time,
When engine stop pressurization, the second valve 6 is opened, starts electric putter 15, electric putter 15 pushes scraper plate 13 in middle 1 inner cavity of ice chest
Bottom move back and forth, the water for depositing to middle 1 intracavity bottom of ice chest and oil are cleaned out, telescopic rod 16 play to scraper plate 13 into
The effect of row support, the water scraped and oil are discharged into dirt storage box 8 by sewage draining exit 4, if the water and oil in dirt storage box 8 are filled
It needs to pour out, dirt storage box 8 need to only be extracted out from the bottom of the second round tube 7, when needing to install dirt storage box 8, by dirt storage box 8
It is inserted directly into the bottom of the second round tube 7, the mounting means of dirt storage box 8 is simple and convenient and the setting of rubber pad 9 and elastic tape 14 is protected
The inside of card dirt storage box 8 is in sealing state, and preventing the second valve 6 from not fastening causes the inner cavity of middle ice chest 1 to be connected to outside, shadow
Ring the effect of intercooler refrigeration.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality
Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation
In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to
Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those
Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment
Intrinsic element.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art,
It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired
Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.
Claims (6)
1. a kind of energy conservation quickly cooling intercooler, including middle ice chest (1), it is characterised in that: the side of the middle ice chest (1) is fixedly mounted
Have rear blast pipe (12), the other end of the rear blast pipe (12) is fixedly connected with the first valve (11), first valve
(11) the other end is fixedly connected with advance air hose (10), the fixed peace in side of the middle ice chest (1) far from rear blast pipe (12)
Equipped with discharge pipe (2), the positive side of the middle ice chest (1) is fixedly installed with fixed case (3), the inner cavity of the fixed case (3)
Both ends far from middle ice chest (1) side are fixedly installed with electric putter (15) and telescopic rod (16) respectively, the electric putter (15) and
The other end of telescopic rod (16) is fixedly connected by scraper plate (13), side of the bottom far from fixed case (3) of the middle ice chest (1)
It is fixedly installed with sewage draining exit (4), the other end of the sewage draining exit (4) is fixedly mounted on the second valve (6) by the first round tube (5)
On, the other end of second valve (6) is fixedly installed with the second round tube (7), the other end fixing sleeve of second round tube (7)
It is connected to elastic tape (14), the external activity of the elastic tape (14) is socketed with dirt storage box (8), and the dirt storage box (8) is close to rubber
The inner cavity slightly protrusion of (14) side is enclosed, and the prominence of dirt storage box (8) inner cavity is fixedly installed with rubber pad (9).
2. a kind of energy saving quickly cooling intercooler according to claim 1, it is characterised in that: the middle ice chest (1) is close to laggard
The inner cavity of air hose (12) side is equipped with the through-hole being evenly distributed, and the middle ice chest (1) is equipped with close to the inner cavity of discharge pipe (2) side
The through-hole being evenly distributed, and the through-hole that is equipped with close to rear blast pipe (12) side inner cavity of middle ice chest (1) and middle ice chest (1) are close to going out
The through-hole that air hose (2) side inner cavity is equipped with is adapted.
3. a kind of energy saving quickly cooling intercooler according to claim 1, it is characterised in that: the sewage draining exit (4) and the first circle
Pipe (5) is respectively conical design and cylinder design, and the first round tube (5) and the second round tube (7) is equal in magnitude.
4. a kind of energy saving quickly cooling intercooler according to claim 1, it is characterised in that: the rubber pad (9) and elastic tape
It (14) is hollow cylinder design, and the width value of rubber pad (9) is greater than the width value of elastic tape (14).
5. a kind of energy saving quickly cooling intercooler according to claim 1, it is characterised in that: the advance air hose (10) and laggard
Air hose (12) is about the first valve (11) central symmetry and is funnel-shaped design.
6. a kind of energy saving quickly cooling intercooler according to claim 1, it is characterised in that: the length value of the scraper plate (13) with
The length value of middle ice chest (1) inner cavity is equal, and scraper plate (13) is connect with the basal sliding of middle ice chest (1) inner cavity.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822255048.3U CN209510453U (en) | 2018-12-29 | 2018-12-29 | A kind of energy conservation quickly cooling intercooler |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822255048.3U CN209510453U (en) | 2018-12-29 | 2018-12-29 | A kind of energy conservation quickly cooling intercooler |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209510453U true CN209510453U (en) | 2019-10-18 |
Family
ID=68198511
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201822255048.3U Active CN209510453U (en) | 2018-12-29 | 2018-12-29 | A kind of energy conservation quickly cooling intercooler |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209510453U (en) |
-
2018
- 2018-12-29 CN CN201822255048.3U patent/CN209510453U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209510453U (en) | A kind of energy conservation quickly cooling intercooler | |
CN209052385U (en) | Filling apparatus is used in a kind of drip-proof anti-icing fluid production | |
CN207395221U (en) | A kind of Cool-water Machine for Industry | |
CN110671769B (en) | Control method of water-cooling integrated water chiller with variable-frequency hydraulic module | |
CN106197063B (en) | Centrifugal air blast crossing current closed cooling tower | |
CN213748070U (en) | High-low temperature supercharging air cooler structure | |
CN208419241U (en) | A kind of Demountable metallic flat plate collector | |
CN207921033U (en) | a kind of hydraulic oil cooler | |
CN207649425U (en) | High temperature coke powder cooling device | |
CN201439515U (en) | Dry quenching water-cooling sleeve cooler | |
CN209279710U (en) | A kind of cooler facilitating draining for cooling tower | |
CN206001975U (en) | A kind of air-cooled vibrating rod | |
CN110500913A (en) | Fin belt cleaning device, condenser and air conditioner | |
CN209279481U (en) | The energy-efficient aerial cooler of Two-way Cycle | |
CN107178848B (en) | Water pipe blows ice-storage system | |
CN207920799U (en) | Air-compressor set air compression plant | |
CN215571574U (en) | Portable small-sized refrigerator | |
CN220356180U (en) | Detachable air cooler water spreading disc | |
CN216448418U (en) | Anti-freezing air energy heat pump | |
CN215176181U (en) | C-shaped four-fan heat source tower | |
CN209326074U (en) | A kind of central air-conditioning after improvement surface air cooler | |
CN216159180U (en) | Adjustable cooler for air conditioner | |
CN201902303U (en) | Two-stage compressor with water melting and collection functions | |
CN213901451U (en) | Mounting structure of surface cooler binding off | |
CN216048490U (en) | Box structure for air source heat pump |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of utility model: An energy saving quick cooling intercooler Effective date of registration: 20210408 Granted publication date: 20191018 Pledgee: Bank of China Limited Weihai Wendeng sub branch Pledgor: WEIHAI JIAHE HEAT SYSTEM Co.,Ltd. Registration number: Y2021980002489 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right |