CN209509188U - A kind of construction connects with steel tube part - Google Patents

A kind of construction connects with steel tube part Download PDF

Info

Publication number
CN209509188U
CN209509188U CN201822129339.8U CN201822129339U CN209509188U CN 209509188 U CN209509188 U CN 209509188U CN 201822129339 U CN201822129339 U CN 201822129339U CN 209509188 U CN209509188 U CN 209509188U
Authority
CN
China
Prior art keywords
fixing sleeve
spacer
steel tube
connects
tube part
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201822129339.8U
Other languages
Chinese (zh)
Inventor
李英文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201822129339.8U priority Critical patent/CN209509188U/en
Application granted granted Critical
Publication of CN209509188U publication Critical patent/CN209509188U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses a kind of construction to connect with steel tube part, including the first fixing sleeve and the second fixing sleeve, first fixing sleeve and the second fixing sleeve are rotatablely connected by connecting shaft, and first the inside of fixing sleeve and the second fixing sleeve locating rod is connected with by connecting shaft, the movable side of second fixing sleeve, which is run through, is connected with fixing bolt, it is through-hole structure inside the movable side of first fixing sleeve, the fixing bolt is connect through the first fixing sleeve interior bone with fixture nut spiral, first fixing sleeve connect the spacer of promising arcuate structure with the inner wall of the second fixing sleeve gluing, arcuately the equidistant gluing in direction is connected with adjustment spring inside the spacer, the radian of spacer is less than degree.The construction, which connects with steel tube part and is located at the inside of fixing sleeve, is provided with flexible spacer, and in the fixed steel pipe of connector, spacer can prevent the fixed tension damage steel pipe of connector, and steel pipe is caused to deform.

Description

A kind of construction connects with steel tube part
Technical field
The utility model relates to technical field of building construction, specially a kind of construction connects with steel tube part.
Background technique
Construction refers to the production activity of engineering construction implementation phase, is the building course of all kinds of buildings, can also be with It says it is various lines on design drawing, in specified place, becomes process in kind, it includes basic engineering construction, master Body structure construction, roof construction, decorative engineering construction etc., the place of construction operation is known as " construction site " or cries " construction site " is also named building site, and construction site needs a large amount of scaffold to carry out less important work, and steel pipe scaffold refers to that construction site is Worker operation and solving vertically and horizontally is transported and the various steel pipe scaffold brackets set up.
Existing construction connects with steel tube the fixed tension of part and is easy that steel pipe is made to deform, and causes steel pipe stress not ?.
Utility model content
The purpose of this utility model is to provide a kind of construction to connect with steel tube part, is mentioned with solving above-mentioned background technique Steel pipe existing currently on the market out fixes tension with connector and is easy the problem of making steel pipe deform.
To achieve the above object, the utility model provides the following technical solutions: a kind of construction connects with steel tube part, wraps The first fixing sleeve and the second fixing sleeve are included, first fixing sleeve and the second fixing sleeve are rotatablely connected by connecting shaft, and first The inside of fixing sleeve and the second fixing sleeve is connected with locating rod by connecting shaft, and the movable side of the second fixing sleeve is through company It is connected to fixing bolt, is through-hole structure inside the movable side of the first fixing sleeve, the fixing bolt is fixed through first Set interior bone is connect with fixture nut spiral, and the first fixing sleeve connect promising arc knot with the inner wall of the second fixing sleeve gluing The spacer of structure, arcuately the equidistant gluing in direction is connected with adjustment spring inside the spacer, and the radian of spacer is less than Degree.
Preferably, the locating rod includes mounting hole, connecting rod and positioning column, and positioning column side is located at the centre of positioning column Position is welded and connected with connecting rod, and the mounting hole that diameter is greater than connecting shaft outer dia is offered inside connecting rod, and fixed Position column is cylindrical structure.
Preferably, the outer wall gluing of the positioning column is connected with rubber pad, and the inside of rubber pad offers 2 layers of bubble.
Preferably, the spacer uses rubber material, and spacer axis along the vertical direction and the first fixing sleeve position It is overlapped in the axis of vertical direction.
Preferably, the bubble be ellipsoidal structure, and bubble along the circumferential direction equidistantly distributed in the inside of rubber pad.
Compared with prior art, the utility model has the beneficial effects that the construction, which connects with steel tube part, is located at fixation The inside of set is provided with flexible spacer, and in the fixed steel pipe of connector, spacer can prevent the fixed tension of connector Steel pipe is damaged, steel pipe is caused to deform.The construction, which connects with steel tube part and is located at the inside gluing of fixing sleeve, is connected with rubber The spacer of glue material matter, in the fixed steel pipe of connector, the first fixing sleeve and the second fixing sleeve can inwardly squeeze steel pipe simultaneously, adjust Section pad can prevent the first fixing sleeve and the fixed tension of the second fixing sleeve from steel pipe junction being caused to deform, and itself is adjusted in spacer It is stronger that thickness fixes steel pipe, and the construction connects with steel tube part and is equipped with cylindrical positioning column, can will position In the steel pipe that column insertion is connected, steel pipe inner wall is made to have outside support force, can further make steel pipe fixation more stable.
Detailed description of the invention
Fig. 1 is that a kind of construction of the utility model connects with steel tube part side view;
Fig. 2 is that a kind of construction of the utility model connects with steel tube part top view;
Fig. 3 is that a kind of construction of the utility model connects with steel tube in part Fig. 2 enlarged structure schematic diagram at A;
Fig. 4 is that a kind of construction of the utility model connects with steel tube in part Fig. 2 enlarged structure schematic diagram at B;
Fig. 5 is that a kind of construction of the utility model connects with steel tube part positioning column top view.
In figure: 1, locating rod, 101, mounting hole, 102, connecting rod, 103, positioning column, 2, rubber pad, 3, fixing bolt, 4, First fixing sleeve, 5, connecting shaft, 6, spacer, 7, fixture nut, 8, adjustment spring, 9, bubble, the 10, second fixing sleeve.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
Please refer to Fig. 1-5, the utility model provides a kind of technical solution: a kind of construction connects with steel tube part, including First fixing sleeve 4 and the second fixing sleeve 10, the first fixing sleeve 4 are rotatablely connected with the second fixing sleeve 10 by connecting shaft 5, and first The inside of fixing sleeve 4 and the second fixing sleeve 10 is connected with locating rod 1 by connecting shaft 5, and locating rod 1 includes mounting hole 101, connection Bar 102 and positioning column 103, the middle position that 103 side of positioning column is located at positioning column 103 are welded and connected with connecting rod 102, and even The mounting hole 101 that diameter is greater than 5 outer dia of connecting shaft is offered inside extension bar 102, and positioning column 103 is cylindrical knot Structure, this structure can be such that positioning column 103 is inserted into the interior bone of steel pipe interconnected, keep positioning column 103 outside The junction for supporting steel pipe prevents the junction of steel pipe from deforming because stress is excessive, and the outer wall gluing of positioning column 103 connects It is connected to rubber pad 2, and the inside of rubber pad 2 offers 2 layers of bubble 9, this structure enables positioning column 103 to be fastened on the interior of steel pipe Preferably steel pipe is supported outward in portion's through-hole, and positioning column 103 can make the stronger of steel pipe connection interconnected, second The movable side of fixing sleeve 10 is connected with fixing bolt 3, and the first fixing sleeve 4 is through-hole structure inside movable side, fixed spiral shell Bolt 3 is connect through 4 interior bone of the first fixing sleeve with 7 spiral of fixture nut, the inner wall of the first fixing sleeve 4 and the second fixing sleeve 10 The glued spacer 6 for connecting promising arcuate structure, the outer wall gluing of positioning column 103 are connected with rubber pad 2, and rubber pad 2 Inside offers 2 layers of bubble 9, this structure enables positioning column 103 to be fastened in the interior bone of steel pipe preferably to outer support Firmly steel pipe, and positioning column 103 can make the stronger of steel pipe interconnected connection, bubble 9 are ellipsoidal structure, and bubble 9 Along the circumferential direction for equidistantly distributed in the inside of rubber pad 2, this structure can be such that the compressible range of rubber pad 2 increases, and adjust Arcuately the equidistant gluing in direction is connected with adjustment spring 8 inside pad 6, and less than 120 degree, this structure can make the radian of spacer 6 When first fixing sleeve 4 and the second fixing sleeve 10 inwardly squeeze steel pipe, tune that the first fixing sleeve 4 is bonded with 10 inner wall of the second fixing sleeve Section pad 6 can play buffer function, prevent the first fixing sleeve 4 from so that steel pipe is deformed with the fixed tension of the second fixing sleeve 10.
Working principle: when connecting with steel tube part using the construction, first by the first fixing sleeve 4 and the second fixing sleeve 10 are rotated to both sides respectively by connecting shaft 5, are greater than the angle between the first fixing sleeve 4 and the second fixing sleeve 10 180 °, then the lower half portion of positioning column 103 is downwardly into the steel duct through-hole for needing to be attached, positioning column 103 External rubber pad 2 can be rebounded outward by the extruding of steel duct through-hole, so as to be fastened on positioning column 103 in steel pipe In portion's through-hole, and positioning column 103 can outside supporting steel pipe, another steel pipe is then inserted downwardly into the upper of positioning column 103 Half part, followed by by the first fixing sleeve 4 and the second fixing sleeve 10 by connecting shaft 5 to central rotational, make the first fixing sleeve 4 with In the steel pipe being connected is wrapped in by the second fixing sleeve 10, fixing bolt 3 is then run through into the first fixing sleeve 4 and the second fixing sleeve 10 are fixed by fixture nut 7, and the steel pipe being connected can be bonded outwardly against the first fixing sleeve 4 with 10 inner wall of the second fixing sleeve Spacer 6, spacer 6 can inwardly squeeze the steel pipe being connected with 8 stress of adjustment spring in spacer 6, so as to make steel Pipe is fixed more stable, and spacer 6 can prevent steel pipe stress is excessive to deform, and here it is the construction to connect with steel tube The course of work of part.
Although the utility model is described in detail with reference to the foregoing embodiments, come for those skilled in the art Say, it is still possible to modify the technical solutions described in the foregoing embodiments, or to part of technical characteristic into Row equivalent replacement, within the spirit and principle of the utility model, any modification, equivalent replacement, improvement and so on should all It is included within the scope of protection of this utility model.

Claims (5)

1. a kind of construction connects with steel tube part, including the first fixing sleeve (4) and the second fixing sleeve (10), described first is fixed It covers (4) and the second fixing sleeve (10) to be rotatablely connected by connecting shaft (5), and the first fixing sleeve (4) and the second fixing sleeve (10) Inside is connected with locating rod (1) by connecting shaft (5), it is characterised in that: the movable side of second fixing sleeve (10) is run through It is connected with fixing bolt (3), is through-hole structure inside the movable side of the first fixing sleeve (4), the fixing bolt (3) is passed through It wears the first fixing sleeve (4) interior bone to connect with fixture nut (7) spiral, the first fixing sleeve (4) and the second fixing sleeve (10) Inner wall gluing connects the spacer (6) of promising arcuate structure, and the internal arcuately direction of the spacer (6) is equidistantly glued to be connected It is connected to adjustment spring (8), the radian of spacer (6) is less than 120 degree.
2. a kind of construction according to claim 1 connects with steel tube part, it is characterised in that: locating rod (1) packet Mounting hole (101), connecting rod (102) and positioning column (103) are included, positioning column (103) side is located at the interposition of positioning column (103) It sets and is welded and connected with connecting rod (102), and offer the peace that diameter is greater than connecting shaft (5) outer dia inside connecting rod (102) It fills hole (101), and positioning column (103) is cylindrical structure.
3. a kind of construction according to claim 2 connects with steel tube part, it is characterised in that: the positioning column (103) Outer wall gluing be connected with rubber pad (2), and the inside of rubber pad (2) offers 2 layers of bubble (9).
4. a kind of construction according to claim 1 connects with steel tube part, it is characterised in that: the spacer (6) is adopted With rubber material, and the axis of spacer (6) along the vertical direction is overlapped with the axis that the first fixing sleeve (4) is located at vertical direction.
5. a kind of construction according to claim 3 connects with steel tube part, it is characterised in that: the bubble (9) is ellipse Circular configuration, and bubble (9) along the circumferential direction inside of the equidistantly distributed in rubber pad (2).
CN201822129339.8U 2018-12-19 2018-12-19 A kind of construction connects with steel tube part Expired - Fee Related CN209509188U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822129339.8U CN209509188U (en) 2018-12-19 2018-12-19 A kind of construction connects with steel tube part

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822129339.8U CN209509188U (en) 2018-12-19 2018-12-19 A kind of construction connects with steel tube part

Publications (1)

Publication Number Publication Date
CN209509188U true CN209509188U (en) 2019-10-18

Family

ID=68195544

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822129339.8U Expired - Fee Related CN209509188U (en) 2018-12-19 2018-12-19 A kind of construction connects with steel tube part

Country Status (1)

Country Link
CN (1) CN209509188U (en)

Similar Documents

Publication Publication Date Title
US7466286B2 (en) Folding frame for mounting an antenna
CN209509188U (en) A kind of construction connects with steel tube part
CN109638753B (en) Spacing damping device for split conductors of overhead line
CN211693845U (en) Polyethylene winding pipe with external adjustable stable support seat
CN208310713U (en) A kind of petroleum high pressure pipe joint damping device
CN206708558U (en) A kind of unstressed installation high-pressure oil pipe combination fastener
CN206289748U (en) A kind of high strength steel attachment structure
CN112856081B (en) Double-layer corrugated pipe butt joint
CN211423725U (en) Shock absorption support for compressor
CN208634627U (en) A kind of bellows expansion joint
CN209229142U (en) A kind of clamping hoop type pipeline rotary fixing device
CN203421109U (en) Flexible supporting structure for ultrasonic transducer
CN208670272U (en) Para-seismic support
CN209164759U (en) A kind of building pipe suspended fixing component
CN207321185U (en) The girder and girder and bearing assembly of novel photovoltaic tracker
CN207864520U (en) A kind of damping noise reduction base unit of auto sound cotton pressing machine
CN205618823U (en) Double bracing formula elastic supporting tube card mechanism
CN204805064U (en) Compressor bearing structure
CN210372343U (en) Suspension type comprehensive support and hanger
CN204343505U (en) External wall of high-rise building installs detent mechanism
CN205823827U (en) A kind of attachment means of expansion link
TW201349655A (en) Outdoor unit system and holder for outdoor unit
CN212268831U (en) Nano calcium pneumatic conveying pipeline
CN209479747U (en) A kind of mounting device of facilities for transport and communication steering structure
CN217151035U (en) Prefabricated externally-hung wallboard of shock-proof type

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191018

Termination date: 20191219

CF01 Termination of patent right due to non-payment of annual fee