CN209502085U - Finishing coat room - Google Patents

Finishing coat room Download PDF

Info

Publication number
CN209502085U
CN209502085U CN201822223778.5U CN201822223778U CN209502085U CN 209502085 U CN209502085 U CN 209502085U CN 201822223778 U CN201822223778 U CN 201822223778U CN 209502085 U CN209502085 U CN 209502085U
Authority
CN
China
Prior art keywords
finishing coat
room
box body
water
water tank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201822223778.5U
Other languages
Chinese (zh)
Inventor
周平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Red Eagle Furniture Co Ltd
Original Assignee
Chengdu Red Eagle Furniture Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Red Eagle Furniture Co Ltd filed Critical Chengdu Red Eagle Furniture Co Ltd
Priority to CN201822223778.5U priority Critical patent/CN209502085U/en
Application granted granted Critical
Publication of CN209502085U publication Critical patent/CN209502085U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a kind of finishing coat rooms, including room body, blow vent is provided on the side wall of room body, the exhaust fan for the intracorporal air in room to be discharged is provided in blow vent, on the outer wall of room body and it is located at the snorkel being provided at blow vent for covering blow vent, suction ventilator is provided on the outer roof of room body, the other end of snorkel is connected to the air inlet of suction ventilator, box body is additionally provided on the outer roof of room body, the air opening end of suction ventilator is provided with the discharge pipe being connected to box body, the sedimentation component for settling the finishing coat gas for entering box body is provided on box body, the utility model has the advantages that reduce the finishing coat gas drifted in finishing coat room and finishing coat gas is prevented to be discharged in external environment.

Description

Finishing coat room
Technical field
The utility model relates to furniture processing technology fields, more particularly, to a kind of finishing coat room.
Background technique
Finishing coat room is one of paint booth, and so-called finishing coat room refers to room equipped with coating equipment, carrying out painting operation. Finishing coat room is to specialize in spraying liquid coating, structure and equip most complicated paint booth, is the key equipment of Painting Shop indispensability. It is combined with various spraying methods (such as aerial spraying, without gas high pressure painting, electrostatic spraying), and adapts to multifarious coated article Variation.Last procedure of furniture processing is to carry out finishing coat spraying, this is also one of the critical process for guaranteeing furniture quality. And when carrying out finishing coat spraying, it is necessary to be sprayed in finishing coat room.
In the prior art, when being sprayed on furniture due to finishing coat, strong sharp aroma is had, therefore operator is in face When carrying out spray coating operations in japanning room, operator is needed to wear mask, but wears mask only preliminary protection, it is closed in finishing coat room Space the finishing coat gas of volatilization is in finishing coat room for a long time, even if wearing mask also will receive its influence, therefore have Meeting build exhaust outlet on the wall in finishing coat room, but finishing coat enter the external world from exhaust outlet after will affect extraneous air ring Border, and then tremendous influence is caused to the resident on periphery.
Utility model content
The purpose of this utility model is to provide a kind of finishing coat room, have reduce the finishing coat gas drifted in finishing coat room and Finishing coat gas is prevented to be discharged to the advantage in external environment.
The above-mentioned purpose of the utility model has the technical scheme that
A kind of finishing coat room, including room body are provided with blow vent on the side wall of the room body, and setting is useful in the blow vent In by the exhaust fan of the intracorporal gas in room discharge, on the outer wall of the room body and it is located at blow vent and is provided with for by blow vent The snorkel covered, is provided with suction ventilator on the outer roof of the room body, the other end of the snorkel and the suction ventilator Air inlet is connected to, and is additionally provided with box body on the outer roof of the room body, the air opening end of the suction ventilator is provided with and the box The discharge pipe of body connection, the sedimentation component for settling the finishing coat gas for entering box body is provided on the box body.
Implement above-mentioned technical proposal, start exhaust fan, the intracorporal finishing coat gas in room will be drawn into snorkel by exhaust fan It is interior, restart suction ventilator immediately, allows the finishing coat gas being in snorkel to be inhaled into box body by discharge pipe, pass through sedimentation Component settles the finishing coat gas of sucking, so that finishing coat gas no longer floats, makes the intracorporal finishing coat in room after being arranged in this way Gas is reduced, and will not spread to the external world, is impacted to the environment on periphery.
Further, room body is arranged on the inner sidewall at top in the blow vent, inside of the room body close to bottom It is additionally provided with ventilation opening on wall, blower fan is provided in the ventilation opening, is covered on the ventilation opening and connects with the snorkel Logical exhaust pipe.
Implement above-mentioned technical proposal, the exhaust fan in blow vent carries out adsorption operations to the upper half area inside room body, and Blower fan in ventilation opening adsorbs the finishing coat gas in the lower half region being in inside room body, so that in absorption room body Finishing coat gas effect it is more preferable.
Further, the sedimentation component include water tank at the top of box body is set, first drawing water of being connected to water tank Pump, outlet pipe and atomizer, one end of the outlet pipe is connected to the water outlet end of the first suction pump, the other end passes through box Body roof, the atomizer, which is arranged, is located at the intracorporal one end of box in outlet pipe.
Implement above-mentioned technical proposal, after finishing coat gas enters in box body, starts the first suction pump, it will be in water tank Water is evacuated in outlet pipe, and water is sprayed from atomizer, and since finishing coat gas is included, there are many finishing coat particles, so that face The intracorporal particle of paint gas is deposited to the bottom of storage tank after meeting water, to reach sedimentation finishing coat gas conveniently effect.
Further, the outlet pipe is located at the intracorporal one end of box and is provided with and communicated with hard straight tube, and the atomizer is described It has been uniformly arranged on hard straight tube multiple.
Implement above-mentioned technical proposal, sprays water by multiple atomizers on hard straight tube, enable in water tank The fog that finishing coat gas is atomized spray head ejection largely covers, and allows the better effect of sedimentation.
Further, be additionally provided with the second suction pump on the outer roof of the room body, the water inlet of second suction pump with Box body is provided with and communicated with drinking-water pipe, water outlet end and the water tank of second suction pump between the side wall of bottom wall Flow pipe is provided with and communicated between roof.
Implement above-mentioned technical proposal, start the second suction pump, by drinking-water pipe and flow pipe by the intracorporal water of box again It is evacuated in water tank, is recycled, to achieve the effect that water conservation.
Further, it is located in the box body above the water surface and is provided with web plate below hard straight tube, is placed on the web plate There are several active carbons.
Implement above-mentioned technical proposal, adsorbent of the active carbon as a kind of function admirable, mainly since it has uniqueness Absorption surface architectural characteristic and surface chemistry determined.The chemical property of absorbent charcoal material is stablized, high mechanical strength, Acidproof, alkaline-resisting, heat-resisting, not soluble in water and organic solvent can regenerate use, have been widely used for chemical industry, environmental protection, food The every field such as processing, metallurgy, drug purification, military chemistry protection.Currently, modified active Carbon Materials are widely used at sewage The fields such as reason, prevention and control of air pollution, therefore can also be used to the pernicious gas in absorption finishing coat gas, when finishing coat gas and water are fallen After on to active carbon, active carbon can fall the intracorporal most of chemical gas absorption of finishing coat gas, so that after web plate Water energy it is enough more clean utilized again so that the water energy of recycling is enough after filtering.
Further, the water tank is provided with the fire hose for the water in water tank to be discharged on the side wall of bottom wall Head is provided on the roof of the water tank and changes the mouth of a river, described to change threaded cap on the mouth of a river and be equipped with nut cap.
Implement above-mentioned technical proposal, after long-time service, it is also desirable to manually replace the water in water tank, beat at this time It turns on the tap, first used water is bled off, then turns on nut cap again, new tap water is circulated into water storage by changing the mouth of a river again In case, to reach the water conveniently effect in replacement water tank.
Further, the articulated slab for replacing active carbon is hingedly provided on the side wall of the box body, the articulated slab Sealing ring is provided on edges of boards.
Implement above-mentioned technical proposal, after long-time service, active carbon is also required to replace, and at this time opens articulated slab, directly Manually used active carbon is taken out, then new active carbon is placed on web plate, the replacement of active carbon is just able to achieve, reaches To replacement active carbon conveniently effect;And the setting of sealing ring is so that articulated slab when covering box side wall, is not easy to produce Raw leakage.
In conclusion the utility model has the following beneficial effects:
One, start exhaust fan, the intracorporal finishing coat gas in room will be drawn into snorkel by exhaust fan, restart suction immediately Blower allows the finishing coat gas being in discharge pipe to be again sucked into box body by discharge pipe, will be sucked by sedimentation component Finishing coat gas settled so that finishing coat gas no longer floats, reduce the intracorporal finishing coat gas in room, and And the external world will not be spread to, the environment on periphery is impacted;
Two, after being used for a long time, active carbon is also required to replace, and at this time opens articulated slab, and direct labor manually will be used Active carbon take out, then new active carbon is placed on web plate, is just able to achieve the replacement of active carbon, reach replacement active carbon compared with Effect for convenience;And the setting of sealing ring is so that articulated slab when covering box side wall, is not likely to produce leakage.
Detailed description of the invention
Fig. 1 is first diagrammatic cross-section of the utility model embodiment;
Fig. 2 is second diagrammatic cross-section of the utility model embodiment;
Fig. 3 is the third diagrammatic cross-section of the utility model embodiment;
Fig. 4 is the portion the A enlarged drawing in Fig. 3.
Appended drawing reference: 1, room body;11, blow vent;12, exhaust fan;13, ventilation opening;14, blower fan;15, snorkel;16, Exhaust pipe;2, suction ventilator;21, discharge pipe;3, box body;4, component is settled;41, water tank;42, the first suction pump;43, it is discharged Pipe;44, atomizer;45, hard straight tube;5, the second suction pump;51, drinking-water pipe;52, flow pipe;6, web plate;61, active carbon;7, Tap;8, the mouth of a river is changed;81, nut cap;9, articulated slab.
Specific embodiment
Below in conjunction with attached drawing, the technical solution of the utility model embodiment is described.
As shown in Figure 1, a kind of finishing coat room, including room body 1, it is provided with blow vent 11 on the side wall of room body 1, in blow vent 11 It is provided with the exhaust fan 12 for the gas in room body 1 to be discharged;Room body 1 is arranged in close to the inner sidewall at top in blow vent 11 On, room body 1 is additionally provided with ventilation opening 13 on the inner sidewall of bottom, and blower fan 14, ventilation opening 13 are provided in ventilation opening 13 On be covered with the exhaust pipe 16 being connected to snorkel 15.
Exhaust fan 12 in blow vent 11 carries out adsorption operations to the upper half area inside room body 1, and in ventilation opening 13 Blower fan 14 adsorbs the finishing coat gas in the lower half region being in inside room body 1, so that the finishing coat in absorption room body 1 The effect of gas is more preferable.
As shown in Figure 1, 2, it is provided on the outer wall of room body 1 and at blow vent 11 logical for covering blow vent 11 Tracheae 15 is provided with suction ventilator 2 on the outer roof of room body 1, and the other end of snorkel 15 is connected to the air inlet of suction ventilator 2, room Box body 3 is additionally provided on the outer roof of body 1, the air opening end of suction ventilator 2 is provided with the discharge pipe 21 being connected to box body 3, box body 3 On be provided with sedimentation component 4 for settling the finishing coat gas for entering box body 3.
As shown in Fig. 1,4, sedimentation component 4 includes the water tank 41 that the top of box body 3 is arranged in, the be connected to water tank 41 One suction pump 42, outlet pipe 43 and atomizer 44, one end of outlet pipe 43 is connected to the water outlet end of the first suction pump 42, The other end passes through 3 roof of box body, and one end that outlet pipe 43 is located in box body 3 is arranged in atomizer 44;And outlet pipe 43 is located at One end in box body 3 is provided with and communicated with hard straight tube 45, and atomizer 44 has been uniformly arranged multiple on hard straight tube 45.
After the finishing coat gas in room body 1 is discharged by exhaust fan 12, it can enter in snorkel 15, and by 14 row of blower fan Finishing coat gas out can enter in exhaust pipe 16, and start suction ventilator 2 at this time, allow and be in snorkel 15 and exhaust pipe 16 Finishing coat gas be inhaled into box body 3 by discharge pipe 21;After finishing coat gas enters in box body 3, starting first is drawn water Pump 42, the water in water tank 41 is evacuated in outlet pipe 43, sprays water by multiple atomizers 44 on hard straight tube 45, can So that the fog that the finishing coat gas in water tank 41 is atomized the ejection of spray head 44 largely covers, due to containing in finishing coat gas Many finishing coat particles, so that the intracorporal particle of finishing coat gas is deposited to 41 bottom of water tank after meeting water, to reach sedimentation face Paint gas conveniently effect.
As shown in Figure 3,4, be additionally provided with the second suction pump 5 on the outer roof of room body 1, the water inlet of the second suction pump 5 with Box body 3 is provided with and communicated with drinking-water pipe 51, the water outlet end of the second suction pump 5 and the top of water tank 41 between the side wall of bottom wall Flow pipe 52 is provided with and communicated between wall;Water tank 41 is provided with for arranging the water in water tank 41 on the side wall of bottom wall Tap 7 out is provided on the roof of water tank 41 and changes the mouth of a river 8, changes threaded cap on the mouth of a river 8 and is equipped with nut cap 81.
Start the second suction pump 5, the water in box body 3 is evacuated to by water tank 41 by drinking-water pipe 51 and flow pipe 52 again It is interior, it is recycled, to achieve the effect that water conservation;And after being used for a long time, it is also desirable to manually will be in water tank 41 Water replaced, at this time open tap 7, first used water is bled off, then turns on nut cap 81 again, new tap water is led to It crosses and changes the mouth of a river 8 and be circulated into water tank 41 again, to reach water in replacement water tank 41 conveniently effect.
As shown in Figure 3,4, the lower section in box body 3 positioned at water surface top and hard straight tube 45 is provided with web plate 6, puts on web plate 6 It is equipped with several active carbons 61;The articulated slab 9 for replacing active carbon 61, the plate of articulated slab 9 are hingedly provided on the side wall of box body 3 Sealing ring is provided on side.After finishing coat gas and water are fallen on active carbon 61, active carbon 61 can be intracorporal big by finishing coat gas Chemical gas absorption in part is fallen, so that the water energy after web plate 6 is enough more clean, so that the water energy of recycling It is enough to be utilized again after filtering;After long-time service, active carbon 61 is also required to replace, and at this time opens articulated slab 9, directly It connects and manually takes out used active carbon 61, then new active carbon 61 is placed on web plate 6, be just able to achieve active carbon 61 Replacement, reach replacement active carbon 61 conveniently effect;And the setting of sealing ring is so that articulated slab 9 is covering box body 3 When side wall, it is not likely to produce leakage.
Specific work process: starting exhaust fan 12, blower fan 14 and suction ventilator 2, the finishing coat gas that will be in room body 1 It is drawn into box body 3, then starts the first suction pump 42 and water is extracted into hard straight tube 45 out of water tank 41, then from hard straight tube 45 On atomizer 44 spray, then start the second suction pump 5, the water in box body 3 drawn back again in water tank 41.

Claims (8)

1. a kind of finishing coat room, including room body (1), it is characterised in that: blow vent (11) are provided on the side wall of the room body (1), The exhaust fan (12) for the gas in room body (1) to be discharged, the outer wall of the room body (1) are provided in the blow vent (11) Above and it is located at the snorkel (15) being provided at blow vent (11) for covering blow vent (11), the outer top of the room body (1) It is provided on wall suction ventilator (2), the other end of the snorkel (15) is connected to the air inlet of the suction ventilator (2), the room It is additionally provided on the outer roof of body (1) box body (3), the air opening end of the suction ventilator (2) is provided with to be connected to the box body (3) Discharge pipe (21), the sedimentation component for settling the finishing coat gas for entering box body (3) is provided on the box body (3) (4)。
2. finishing coat room according to claim 1, it is characterised in that: blow vent (11) setting is in room body (1) close to top On the inner sidewall in portion, the room body (1) is additionally provided with ventilation opening (13) on the inner sidewall of bottom, in the ventilation opening (13) It is provided with blower fan (14), the exhaust pipe (16) being connected to the snorkel (15) is covered on the ventilation opening (13).
3. finishing coat room according to claim 2, it is characterised in that: the sedimentation component (4) includes that setting is pushed up in box body (3) The water tank (41) in portion, the first suction pump (42) being connected to water tank (41), outlet pipe (43) and atomizer (44), institute The one end for stating outlet pipe (43) is connected to the water outlet end of the first suction pump (42), the other end passes through box body (3) roof, the mist Change spray head (44) setting and is located at one end in box body (3) in outlet pipe (43).
4. finishing coat room according to claim 3, it is characterised in that: the outlet pipe (43) is located at one end in box body (3) It is provided with and communicated with hard straight tube (45), the atomizer (44) has been uniformly arranged multiple on the hard straight tube (45).
5. finishing coat room according to claim 4, it is characterised in that: be additionally provided with second on the outer roof of the room body (1) Suction pump (5), the water inlet and box body (3) of second suction pump (5) are provided with and communicated between the side wall of bottom wall to draw water It manages (51), is provided with and communicated with flow pipe between the water outlet end of second suction pump (5) and the roof of the water tank (41) (52)。
6. finishing coat room according to claim 5, it is characterised in that: be located at water surface top and hard straight tube in the box body (3) (45) it is provided with below web plate (6), is placed with several active carbons (61) on the web plate (6).
7. finishing coat room according to claim 3, it is characterised in that: the water tank (41) is arranged on the side wall of bottom wall There is the tap (7) for the water in water tank (41) to be discharged, is provided on the roof of the water tank (41) and changes the mouth of a river (8), the threaded cap that changes on the mouth of a river (8) is equipped with nut cap (81).
8. finishing coat room according to claim 6, it is characterised in that: be hingedly provided with and be used on the side wall of the box body (3) The articulated slab (9) of active carbon (61) is replaced, is provided with sealing ring on the edges of boards of the articulated slab (9).
CN201822223778.5U 2018-12-27 2018-12-27 Finishing coat room Active CN209502085U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822223778.5U CN209502085U (en) 2018-12-27 2018-12-27 Finishing coat room

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822223778.5U CN209502085U (en) 2018-12-27 2018-12-27 Finishing coat room

Publications (1)

Publication Number Publication Date
CN209502085U true CN209502085U (en) 2019-10-18

Family

ID=68197863

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822223778.5U Active CN209502085U (en) 2018-12-27 2018-12-27 Finishing coat room

Country Status (1)

Country Link
CN (1) CN209502085U (en)

Similar Documents

Publication Publication Date Title
CN101966499B (en) Apparatus integrating surface vacuum spraying of workpiece, paint solidifying and waste paint and solvent recycling, and process thereof
CN207343049U (en) A kind of closed spray painting aerosol retracting device
CN204620303U (en) A kind of guipure atomization oiler
CN101125319A (en) Multi-layer type water curtain spraying chamber
CN202270607U (en) Negative-pressure spray paint recycling device
CN201102006Y (en) Multi-layer water screen spray house
KR20120008849A (en) Internal coating device for steel pipe
CN209286872U (en) A kind of last time air drying type carton coating cloud filtration system
CN209379276U (en) A kind of automatic reciprocating type flush coater
CN203342599U (en) Movable type composite dust removal machine
CN209502085U (en) Finishing coat room
CN208427247U (en) A kind of glue spraying isolation watering can
CN214487518U (en) Steel structure coating machine with waste gas treatment system
CN107583798A (en) A kind of efficient and environment-friendly type spray painting room
CN206701582U (en) A kind of open spray painting aerosol retracting device
CN105999956B (en) Gas recovery system on spraying process
CN105944881A (en) Method for lowering paint mist pollution in paint spraying process
CN208116060U (en) A kind of automatic spray booth of floor rail type spraying coating line
CN108296060B (en) Spraying machine capable of reducing air pollution
CN207126723U (en) A kind of furniture spray paint room of low stain
CN208695328U (en) A kind of effectively drip-proof flush coater
CN208960227U (en) A kind of water curtain paint spray booth
CN208712042U (en) A kind of plastic-spraying equipment dust-extraction unit
CN207307477U (en) Paint mist purification treatment device for spray room
CN208583133U (en) A kind of processing colored finish concrete dust-extraction unit

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant