- CN209500843U CN209500843U CN201822105683.3U CN201822105683U CN209500843U CN 209500843 U CN209500843 U CN 209500843U CN 201822105683 U CN201822105683 U CN 201822105683U CN 209500843 U CN209500843 U CN 209500843U
- Authority
- CN
- China
- Prior art keywords
- room
- reboiler
- heating
- main body
- gas
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Vaporization, Distillation, Condensation, Sublimation, And Cold Traps (AREA)
Abstract
The utility model discloses a kind of reboilers, including reboiler main body, the top of the reboiler main body, which is run through, gas outlet, the inner upper of the reboiler main body is provided with boils room again, it is described boil room again be internally provided with helix tube, the helix tube is internally provided with baffle, the lower inside of the reboiler main body is provided with the second heating room, the inner upper of second heating room is provided with the second heating layer, this kind of reboiler is provided with air entraining pipe and the second heating layer, air entraining pipe can be entered by the gas of helix tube, since air entraining pipe is located at the lower section of the second heating layer, so that gas is when by air entraining pipe, second heating layer can heat gas, so that the heat of gas increases, and the gas after heating enters the first heating room, then helix tube is entered by the first heating room again, can be in this way gas repeatedly It carries out heat exchange and improves the thermal utilization effect of the reboiler so that the heat in gas will not waste.
Description
Technical field
The utility model relates to reboiler technical field, specially a kind of reboiler.
Background technique
Reboiler is very widely used in chemical plant, and it is one that reboiler (also referred to as reboiler), which can be such that liquid vaporizes again,
It is a to exchange heat, while a kind of special heat exchanger of gasifying liquid;Mostly shared with fractionating column;Material is heated swollen in reboiler
Swollen or even vaporization, density becomes smaller, to leave vaporization space, smoothly returns in tower.
Existing reboiler often exchanges that heat effect is poor, since the flow velocity of gas is very fast, gas and material is caused to contact
Time it is shorter it is existing simultaneously to influence the efficient heat transfer of reboiler so that the heat effect that material absorbs in gas is poor
Some reboiler heat utilization effects are poor, will be discharged after carrying out heat exchange due to gas, but such gas still contains
A large amount of heat, so as to cause heat waste.
Utility model content
The purpose of this utility model is to provide a kind of reboilers, to solve to propose exchange heat effect in above-mentioned background technique
The problem of fruit difference and heat utilization effect difference.
To achieve the above object, the utility model provides the following technical solutions: a kind of reboiler, including reboiler main body,
Through there is gas outlet, the inner upper of the reboiler main body is provided with boils room again at the top of the reboiler main body, it is described again
Boiling room is internally provided with helix tube, and the helix tube is internally provided with baffle, and the lower inside of the reboiler main body is set
It is equipped with the second heating room, the inner upper of second heating room is provided with the second heating layer, and second heating room is interior
Portion is provided with air entraining pipe, and the other side of the reboiler main body is provided with the first heating room, and described first heats on the inside of room
Side be connected by aspirator with helix tube, and it is described first heat ceiling portion run through have water inlet, the side of the water inlet
It is provided with inlet valve, first heating room is internally provided with the first heating layer, first heating layer and the second heating layer
Inside be provided with electric heating wire, the outer surface of the reboiler main body is provided with observation window.
Preferably, be provided with operation panel above the other side of the reboiler main body, the operation panel respectively with electricity
Heater strip and aspirator are electrically connected.
Preferably, one end of the helix tube is connected by air entraining pipe with the first heating room, and the air entraining pipe is close
One end of first heating room is tilted down along the direction of the first heating room.
Preferably, the baffle plate setting has multiple, and multiple equal equidistant arrangements of the baffle.
Preferably, the upper side for boiling room again is provided with feed pipe, is provided with inlet valve at the top of the feed pipe.
Preferably, the side-lower for boiling room again is provided with discharge nozzle, and described boil again is provided with discharging at the top of room
Valve.
Compared with prior art, the utility model has the beneficial effects that this kind of reboiler is provided with helix tube and baffle, spiral shell
Coil can increase gas and pass through the distance for boiling room again, to increase gas in the time for boiling indoor moving again, and baffle can subtract
The slow gas flow rate into helix tube can increase gas to further increase gas in the time for boiling indoor moving again in this way
The time of indoor moving is being boiled again, to increase the time of gas and material heat exchange, improves the heat exchange for boiling room again effect
Fruit, while this kind of reboiler is provided with air entraining pipe and the second heating layer, can enter air entraining pipe by the gas of helix tube, due to drawing
Tracheae is located at the lower section of the second heating layer, so that gas is when by air entraining pipe, the second heating layer can add gas
Heat, so that the heat of gas increases, and the gas after heating enters the first heating room, then enters spiral shell by the first heating room again
Coil can be that the carry out heat exchange of gas repeatedly improves the reboiler so that the heat in gas will not waste in this way
Thermal utilization effect.
Detailed description of the invention
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is the utility model helix tube the schematic diagram of the section structure;
Fig. 3 is the utility model reboiler main body overlooking structure diagram;
Fig. 4 is the utility model reboiler main body positive structure diagram.
In figure: 1, reboiler main body;2, the first heating room;3, electric heating wire;4, the first heating layer;5, water inlet;6, into
Water valve;7, aspirator;8, operation panel;9, helix tube;10, gas outlet;11, feed pipe;12, inlet valve;13, discharge nozzle;14,
Outlet valve;15, air entraining pipe;16, the second heating layer;17, room is boiled again;18, the second heating room;19, baffle;20, observation window.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
In the utility model: the model HZWJ of aspirator.
Fig. 1-4 is please referred to, the utility model provides a kind of technical solution: a kind of reboiler, including reboiler main body, first
Heat room 2, electric heating wire 3, the first heating layer 4, water inlet 5, inlet valve 6, aspirator 7, operation panel 8, helix tube 9, outlet
Mouth 10, inlet valve 12, discharge nozzle 13, outlet valve 14, air entraining pipe 15, the second heating layer 16, boils room 17, second at feed pipe 11 again
Room 18, baffle 19 and observation window 20 are heated, the top of the reboiler main body 1, which is run through, gas outlet 10, the reboiler main body 1
Inner upper be provided with and boil room 17 again, it is described boil room 17 again be internally provided with helix tube 9, the inside of the helix tube 9 is set
It is equipped with baffle 19, the baffle 19 is provided with multiple, and the equal equidistant arrangement of multiple baffles 19, can slow down in this way into spiral
The flow velocity of the gas of pipe 9, so that the time of material and air heat exchange is improved, the lower inside setting of the reboiler main body 1
There is the second heating room 18, the inner upper of second heating room 18 is provided with the second heating layer 16, and second heating room
18 are internally provided with air entraining pipe 15, and the other side of the reboiler main body 1 is provided with the first heating room 2, first heating
The inner upper of room 2 is connected by aspirator 7 with helix tube 9, and runs through at the top of first heating room 2 and have water inlet 5, institute
The side for stating water inlet 5 is provided with inlet valve 6, and first heating room 2 is internally provided with the first heating layer 4, and described first
The inside of heating layer 4 and the second heating layer 16 is provided with electric heating wire 3, and the outer surface of the reboiler main body 1 is provided with sight
Examine window 20.
Fig. 1, Fig. 3 and Fig. 4 are please referred to, is provided with operation panel 8, the behaviour above the other side of the reboiler main body 1
Make panel 8 to be electrically connected with electric heating wire 3 and aspirator 7 respectively, such staff can start electric heating by operation panel 8
Silk 3 and aspirator 7.
Referring to Fig. 1, one end of the helix tube 9 is connected by air entraining pipe 15 with the first heating room 2, and the bleed
Pipe 15 is tilted down close to one end of the first heating room 2 along the direction of the first heating room 2, can make the gas by helix tube 9 in this way
Body enters the first heating room 2 by air entraining pipe 15, and reduces the volume that the water in the first heating room 2 flows into air entraining pipe 15.
Fig. 1, Fig. 3 and Fig. 4 are please referred to, the upper side for boiling room 17 again is provided with feed pipe 11, the feed pipe 11
Top be provided with inlet valve 12, make in this way staff turn on inlet valve 12 by material by feed pipe 11 importing boil room 17 again
Interior, the side-lower for boiling room 17 again is provided with discharge nozzle 13, and the top for boiling room 17 again is provided with outlet valve 14, this
Sample makes staff turn on outlet valve 14 and will boil in room 17 remaining material again to be discharged by discharge nozzle 13.
Working principle: firstly, the reboiler is mounted on job site by staff, powering on, and proceed with one's work personnel
Inlet valve 6 is turned on, water is poured into the first heating room 2 by water inlet 5, the personnel that proceed with one's work close inlet valve 6 and turn on charging
Valve 12 boils material in room 17 by the feeding of feed pipe 11 again, and the personnel that proceed with one's work close inlet valve 12, then pass through operation panel
Start electric heating wire 3 and aspirator 7, the starting of electric heating wire 3 the first heating layer 4 of heating and the second heating layer 16, the first heating layer 4
With the first heating room 2 of the second heating layer 16 heating and the second heating room 18, the second heating room 18 transfers heat to boils room 17 again
The material boiled in room 17 again is heated, after the water in the first heating room 2 is heated into water vapour, after water vapour is extracted by aspirator 7
Into in helix tube 9, the vapor of helix tube 9 can further heat the material boiled in room 17 again, when material is heated to certain temperature
After degree evaporation, the gas of material evaporation can enter fractionating column by gas outlet 10, and can enter by the water vapour of helix tube 9
Air entraining pipe 15, since air entraining pipe 15 is located at the lower section of the second heating layer 16, so that water vapour is when by air entraining pipe 15, the
Electric heating wire 3 in two heating layers 16 can heat water vapour, so that the heat of vapor increases, and the water after heating
Steam is moved back into the first heating room 2, then enters helix tube 9 by the first heating room 2, so that vapor is anti-in helix tube 9
Multiple circulation turns on outlet valve 14, remaining material can be from discharge nozzle 13 finally, staff disconnects power supply after the completion of ought boiling again
Discharge, staff collect the material of discharge.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art,
It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired
Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.
Claims (6)
1. a kind of reboiler, including reboiler main body (1), it is characterised in that: the top of the reboiler main body (1), which is run through, to be had out
Port (10), the inner upper of the reboiler main body (1) is provided with boils room (17) again, the inside setting for boiling room (17) again
Have helix tube (9), the helix tube (9) is internally provided with baffle (19), the lower inside setting of the reboiler main body (1)
There is the second heating room (18), the inner upper of second heating room (18) is provided with the second heating layer (16), and described second
Heating room (18) is internally provided with air entraining pipe (15), and the other side of the reboiler main body (1) is provided with the first heating room
(2), the inner upper of first heating room (2) is connected by aspirator (7) with helix tube (9), and first heating
Through having water inlet (5) at the top of room (2), the side of the water inlet (5) is provided with inlet valve (6), first heating room (2)
Be internally provided with the first heating layer (4), the inside of first heating layer (4) and the second heating layer (16) be provided with electricity plus
The outer surface of heated filament (3), the reboiler main body (1) is provided with observation window (20).
2. a kind of reboiler according to claim 1, it is characterised in that: above the other side of the reboiler main body (1)
It is provided with operation panel (8), the operation panel (8) is electrically connected with electric heating wire (3) and aspirator (7) respectively.
3. a kind of reboiler according to claim 1, it is characterised in that: one end of the helix tube (9) passes through air entraining pipe
(15) it is connected with the first heating room (2), and the air entraining pipe (15) heats room along first close to one end of the first heating room (2)
(2) direction tilts down.
4. a kind of reboiler according to claim 1, it is characterised in that: the baffle (19) is provided with multiple and multiple
The equal equidistant arrangement of the baffle (19).
5. a kind of reboiler according to claim 1, it is characterised in that: the upper side for boiling room (17) again is provided with
Feed pipe (11) is provided with inlet valve (12) at the top of the feed pipe (11).
6. a kind of reboiler according to claim 1, it is characterised in that: the side-lower for boiling room (17) again is provided with
Discharge nozzle (13), and described boil again is provided with outlet valve (14) at the top of room (17).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822105683.3U CN209500843U (en) | 2018-12-14 | 2018-12-14 | A kind of reboiler |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822105683.3U CN209500843U (en) | 2018-12-14 | 2018-12-14 | A kind of reboiler |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209500843U true CN209500843U (en) | 2019-10-18 |
Family
ID=68194941
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201822105683.3U Active CN209500843U (en) | 2018-12-14 | 2018-12-14 | A kind of reboiler |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209500843U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112843752A (en) * | 2020-12-18 | 2021-05-28 | 苏州市腾中钛设备制造有限公司 | Reboiler capable of utilizing waste heat |
-
2018
- 2018-12-14 CN CN201822105683.3U patent/CN209500843U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112843752A (en) * | 2020-12-18 | 2021-05-28 | 苏州市腾中钛设备制造有限公司 | Reboiler capable of utilizing waste heat |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104495966B (en) | The seawater desalination system that a kind of bubbling humidification is coupled with heat pump cycle and processing method | |
CN107362560A (en) | Falling film evaporator in the two phase countercurrent flow vertical tube of surrounding tangential admission | |
CN104922921B (en) | A kind of self-loopa MVR thermo-compression evaporation systems | |
CN107374336A (en) | A kind of rice steaming box of steam heat recovery | |
CN209500843U (en) | A kind of reboiler | |
CN209567829U (en) | A kind of thermal sensitivity waste liquid circulation vaporising device | |
CN207371123U (en) | A kind of soda manufacture MVR vaporising devices | |
CN208725484U (en) | A kind of rice steaming box of steam heat recycling | |
CN106108673A (en) | A kind of hot water container of drinking machine structure | |
CN106287641A (en) | Accumulation of energy steam generator | |
CN205461070U (en) | Spout membrane vaporization system | |
CN110081596A (en) | A kind of bittern bromine heat-exchanger rig | |
CN216571566U (en) | Falling film evaporator | |
CN106267872B (en) | A kind of air energy energy-saving distilling device | |
CN205973864U (en) | Distilled water machine | |
CN101653664B (en) | Plate-type falling film evaporator | |
CN206191552U (en) | Conduction oil evaporimeter | |
CN211885430U (en) | Multi-effect evaporation tower | |
CN211836369U (en) | Waste heat utilization's distillation plant of waste heat utilization | |
CN208711074U (en) | A kind of climbing film evaporator based on MVR | |
CN208660387U (en) | Falling film evaporator | |
CN207822756U (en) | A kind of methanol distillation column | |
CN207153134U (en) | A kind of falling film evaporation tower | |
CN207515489U (en) | Drying tower exhaust treatment system | |
CN207061909U (en) | A kind of new type of safe water still for improving water outlet efficiency and scale-deposit-preventing generation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |