CN209494013U - A kind of construction of hydro project drainage arrangement - Google Patents
A kind of construction of hydro project drainage arrangement Download PDFInfo
- Publication number
- CN209494013U CN209494013U CN201920130063.7U CN201920130063U CN209494013U CN 209494013 U CN209494013 U CN 209494013U CN 201920130063 U CN201920130063 U CN 201920130063U CN 209494013 U CN209494013 U CN 209494013U
- Authority
- CN
- China
- Prior art keywords
- fixedly installed
- suction pump
- water
- bevel gear
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model discloses a kind of construction of hydro project drainage arrangements, including movable plate, the top center of the movable plate is fixedly installed with riser, one lateral roof of the riser is fixedly installed with transverse slat, the bottom of the transverse slat is fixedly installed with vertical bar, and the side of vertical bar is fixedly installed with servo motor, and fixing sleeve is equipped with the first bevel gear on the output shaft of servo motor, the lower rotation of transverse slat is equipped with vertical pivot, and fixing sleeve is equipped with the second bevel gear on vertical pivot.The utility model structure is simple, it is convenient to operate, and during draining, suction pump ponding of getting along well always is in contact, suction pump will not there is a situation where corrode because drawing water, the service life of suction pump is extended, steel mesh and filter screen can remove impurities in water, and the impurity in water will not enter in suction pump via drinking-water pipe, the inside of suction pump will not accumulate impurity, therefore it will not damage easily, further extend the service life of suction pump, reduce economic investment.
Description
Technical field
The utility model relates to hydraulic engineering technical field more particularly to a kind of construction of hydro project drainage arrangements.
Background technique
Hydraulic engineering is in the construction process, it is often necessary to and there is the place of ponding to carry out draining construction site, to prevent
Only ponding impacts construction.
When carrying out draining to ponding position, drawn water using suction pump being placed on underwater connecting drinking-water pipe
Work, hand water pump, easily there is a situation where corroding, shorten the service life of suction pump, increase often and positioned at the lower section of the water surface
Economic input and ponding position is more, existing drainage arrangement is typically mounted on somewhere, it has not been convenient to and it is mobile, lead to drainage efficiency
It is not high, so we have proposed a kind of construction of hydro project drainage arrangement, it is set forth above to solve the problems, such as.
Summary of the invention
Purpose of the utility model is to solve disadvantages existing in the prior art, and a kind of hydraulic engineering proposed is applied
Work drainage arrangement.
To achieve the goals above, the utility model adopts the technical scheme that
A kind of construction of hydro project drainage arrangement, including movable plate, the fixed peace of the top center of the movable plate
Equipped with riser, a lateral roof of the riser is fixedly installed with transverse slat, and the bottom of the transverse slat is fixedly installed with vertical bar, and vertical bar
Side be fixedly installed with servo motor, on the output shaft of the servo motor fixing sleeve be equipped with the first bevel gear, the transverse slat
Lower rotation vertical pivot is installed, and on vertical pivot fixing sleeve be equipped with the second bevel gear, second bevel gear and the first bevel gear
It is meshed, external screw thread is offered on the vertical pivot, and be threaded with threaded block on vertical pivot, the threaded block is located at the second umbrella tooth
The lower section of wheel, the bottom of the transverse slat are fixedly installed with block set, and the basal sliding of the block set is equipped with mobile bar, the movement
It is fixedly connected at the top of the bottom of bar and threaded block, the side of the threaded block is fixedly installed with mounting plate, the mounting plate
Bottom is fixedly installed with suction pump, and suction pump is equipped with pump mouth and water outlet, and the bottom of the suction pump is fixedly installed with
Horizontal stripe, and through-hole is offered on horizontal stripe, guide pad is fixedly installed in the through-hole of the horizontal stripe, and guiding is offered on guide pad
Hole, the pilot hole rice are equipped with drinking-water pipe, the top of the drinking-water pipe through through-hole and pilot hole and and suction pump pump mouth
Sealing is threadedly coupled, and the bottom of the drinking-water pipe extends to the lower section of guide pad and sealing is threaded with draw water hair, the pumping
The bottom of head is provided with opening, and the draw water hair is equipped with chamber, be fixed on the two sides inner wall of the chamber it is same with
Its compatible filter screen.
Preferably, there are four brake wheels for the bottom fixed installation of the movable plate, and four brake wheels are symmetrical arranged two-by-two.
Preferably, the bottom of the block set is opened in groove, and horizontal block, and horizontal block are fixedly installed at the top of the mobile bar
Top extend in groove and be slidably connected with groove, be fixedly installed with limited block on the two sides inner wall of institute's Hu groove.
Preferably, the water outlet sealing of the suction pump is threaded with outlet pipe, and drinking-water pipe extends to external storage
The top in pond.
Preferably, the opening of the chamber is fixedly installed with matched steel mesh.
Compared with prior art, the utility model has the beneficial effects that needing to carry out the product of construction site using the device
When draining at water, push movable plate to ponding side, draw water hair is located at the surface of ponding, restarts servo motor, make
Threaded block is moved downwards, and then draw water hair is made to be moved downward to the bosom of ponding, at this point, suction pump is located at the upper of the water surface
Side, using suction pump carry out ponding draining, during draining, can according to the case where liquid level adjust draw water hair to
The distance of lower insertion is convenient for better draining, and the steel mesh and filter screen being arranged on draw water hair can be effectively by water accumulation parts
Contaminant filter, will not enter in suction pump via drinking-water pipe.
The utility model structure is simple, and it is convenient to operate, and during draining, suction pump ponding of getting along well always is in contact,
Suction pump will not extend the service life of suction pump because drawing water there is a situation where corroding, and steel mesh and filter screen can will be in water
Impurity removes, and the impurity in water will not enter in suction pump via drinking-water pipe, and the inside of suction pump will not accumulate impurity, therefore not
It can damage easily, further extend the service life of suction pump, reduce economic investment.
Detailed description of the invention
Fig. 1 be the utility model proposes a kind of construction of hydro project drainage arrangement structural schematic diagram;
Fig. 2 be the utility model proposes a kind of construction of hydro project drainage arrangement A schematic enlarged-scale view;
Fig. 3 be the utility model proposes a kind of construction of hydro project drainage arrangement B structure enlarged drawing.
In figure: 1 movable plate, 2 brake wheels, 3 risers, 4 transverse slats, 5 servo motors, 6 vertical pivots, 7 second bevel gears, 8 threaded blocks,
9 block sets, 10 grooves, 11 mobile bars, 12 mounting plates, 13 suction pumps, 14 outlet pipes, 15 horizontal stripes, 16 guide pads, 17 pilot holes, 18
Drinking-water pipe, 19 draw water hairs, 20 chambers, 21 steel meshes, 22 filter screens, 23 first bevel gears.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.
Referring to Fig.1-3, a kind of construction of hydro project drainage arrangement, including movable plate 1, the top center position of movable plate 1
It sets and is fixedly installed with riser 3, a lateral roof of riser 3 is fixedly installed with transverse slat 4, and the bottom of transverse slat 4 is fixedly installed with vertical bar, and
The side of vertical bar is fixedly installed with servo motor 5, and fixing sleeve is equipped with the first bevel gear 23, transverse slat 4 on the output shaft of servo motor 5
Lower rotation vertical pivot 6 is installed, and on vertical pivot 6 fixing sleeve be equipped with the second bevel gear 7, the second bevel gear 7 and the first bevel gear
23 are meshed, and external screw thread are offered on vertical pivot 6, and threaded block 8 is threaded on vertical pivot 6, and threaded block 8 is located at the second bevel gear
7 lower section, the bottom of transverse slat 4 are fixedly installed with block set 9, and the basal sliding of block set 9 is equipped with mobile bar 11, the bottom of mobile bar 11
Portion is fixedly connected with the top of threaded block 8, and the side of threaded block 8 is fixedly installed with mounting plate 12, and the bottom of mounting plate 12 is fixed
Suction pump 13 being installed, and suction pump 13 is equipped with pump mouth and water outlet, the bottom of suction pump 13 is fixedly installed with horizontal stripe 15,
And through-hole is offered on horizontal stripe 15, guide pad 16 is fixedly installed in the through-hole of horizontal stripe 15, and guiding is offered on guide pad 16
Hole 17,17 meters of pilot hole are equipped with drinking-water pipe 18, the top of drinking-water pipe 18 through through-hole and pilot hole 17 and and suction pump 13 pumping
Mouth of a river sealing is threadedly coupled, and the bottom of drinking-water pipe 18 extends to the lower section of guide pad 16 and sealing is threaded with draw water hair 19,
The bottom of draw water hair 19 is provided with opening, and draw water hair 19 is equipped with chamber 20, is fixed on the two sides inner wall of chamber 20 same
Matched filter screen 22 pushes movement when needing the draining using the water accumulation part of device progress construction site
Plate 1 to ponding side, draw water hair 19 is located at the surface of ponding, restarts servo motor 5, moves threaded block 8 downwards, into
And so that draw water hair 19 is moved downward to the bosom of ponding, at this point, suction pump 13 is located at the top of the water surface, using suction pump 19 into
The draining of row ponding, during draining, the distance that can be downwardly into according to draw water hair 19 is adjusted the case where liquid level,
Convenient for better draining, the steel mesh 21 and filter screen 22 being arranged on draw water hair 19 can be effectively by the impurity mistakes of water accumulation part
Filter will not enter in suction pump 13 via drinking-water pipe 18, and the utility model structure is simple, and it is convenient to operate, during draining,
The ponding of getting along well always of suction pump 13 is in contact, and suction pump 13 will not extend suction pump 13 because drawing water there is a situation where corroding
Service life, steel mesh 21 and filter screen 22 can remove impurities in water, and the impurity in water will not enter via drinking-water pipe 18 to be taken out
In water pump 13, the inside of suction pump 13 will not accumulate impurity, therefore will not damage easily, further extend making for suction pump 13
With the service life, reduce economic investment, wherein the model 110SG-M02030 of servo motor 5.
In the utility model, there are four brake wheels 2 for the bottom fixed installation of movable plate 1, and four brake wheels 2 are symmetrical two-by-two
Setting, the bottom of block set 9 are opened in groove 10, and the top of mobile bar 11 is fixedly installed with horizontal block, and extends at the top of horizontal block
It is slidably connected in groove 10 and with groove 10, limited block, suction pump 13 is fixedly installed on the two sides inner wall of institute's Hu groove 10
Water outlet sealing be threaded with outlet pipe 14, and drinking-water pipe 18 extends to the top of external reservoir, and chamber 20 is opened
It is fixedly installed with matched steel mesh 21 at mouthful, needs to carry out the draining of the water accumulation part of construction site using the device
When, push movable plate 1 to ponding side, draw water hair 19 is located at the surface of ponding, restarts servo motor 5, keeps threaded block 8 downward
It is moved, and then draw water hair 19 is made to be moved downward to the bosom of ponding, at this point, suction pump 13 is located at the top of the water surface, benefit
The draining that ponding is carried out with suction pump 19, during draining, can according to the case where liquid level adjust draw water hair 19 to
The distance of lower insertion, is convenient for better draining, the steel mesh 21 and filter screen 22 being arranged on draw water hair 19 can effectively by
The contaminant filter of water accumulation part will not enter in suction pump 13 via drinking-water pipe 18, and the utility model structure is simple, and it is convenient to operate,
During draining, the ponding of getting along well always of suction pump 13 is in contact, and suction pump 13 will not prolong because drawing water there is a situation where corroding
The service life of suction pump 13 is grown, steel mesh 21 and filter screen 22 can remove impurities in water, and the impurity in water will not be via
Drinking-water pipe 18 enters in suction pump 13, and the inside of suction pump 13 will not accumulate impurity, therefore will not damage easily, further extends
The service life of suction pump 13 reduces economic investment.
Working principle: need using the device carry out construction site water accumulation part draining when, push movable plate 1 to
Ponding side, draw water hair 19 are located at the surface of ponding, restart servo motor 5, and the output shaft rotation of servo motor 5 makes the first umbrella
Gear 23 is rotated, since the first bevel gear 23 and the second bevel gear 7 are meshed, so that the second bevel gear 7 and vertical pivot 6 can be into
Row rotation, the rotation of vertical pivot 6 move threaded block 8 downwards, and threaded block 8, which moves down, keeps guide pad 16 and draw water hair 19 downward
It is moved, draw water hair 19 can be moved to the bosom of ponding, at this point, suction pump 13 is located at the top of the water surface, using drawing water
Pump 19 carries out the draining of ponding, during draining, can be downwardly into according to draw water hair 19 is adjusted the case where liquid level
Distance, be convenient for better draining, the steel mesh 21 and filter screen 22 being arranged on draw water hair 19 can be effectively by water accumulation parts
Contaminant filter, impurity will not enter in suction pump 13 via drinking-water pipe 18, therefore the inside of suction pump 13 will not accumulate impurity,
Suction pump 13 will not damage easily, extend the service life of suction pump 13, and the brake wheel 2 of setting can make whole device ontology
Movement it is more convenient, improve the drainage efficiency of the multiple ponding positions in construction site, the ponding of getting along well always of suction pump 13 connects
Touching, suction pump 13 will not further extend the service life of suction pump 13 because drawing water there is a situation where corroding.
The preferable specific embodiment of the above, only the utility model, but the protection scope of the utility model is not
It is confined to this, anyone skilled in the art is within the technical scope disclosed by the utility model, practical according to this
Novel technical solution and its utility model design are subject to equivalent substitution or change, should all cover the protection model in the utility model
Within enclosing.
Claims (5)
1. a kind of construction of hydro project drainage arrangement, including movable plate (1), which is characterized in that the top of the movable plate (1)
Center is fixedly installed with riser (3), and a lateral roof of the riser (3) is fixedly installed with transverse slat (4), the transverse slat (4)
Bottom be fixedly installed with vertical bar, and the side of vertical bar is fixedly installed with servo motor (5), the output of the servo motor (5)
Fixing sleeve is equipped with the first bevel gear (23) on axis, and the lower rotation of the transverse slat (4) is equipped with vertical pivot (6), and solid on vertical pivot (6)
Surely it is arranged with the second bevel gear (7), second bevel gear (7) and the first bevel gear (23) are meshed, and open on the vertical pivot (6)
Equipped with external screw thread, and threaded block (8) are threaded on vertical pivot (6), the threaded block (8) is located under the second bevel gear (7)
Side, the bottom of the transverse slat (4) are fixedly installed with block set (9), and the basal sliding of the block set (9) is equipped with mobile bar (11),
It is fixedly connected at the top of the bottom of the mobile bar (11) and threaded block (8), the side of the threaded block (8) is fixedly installed with peace
The bottom of loading board (12), the mounting plate (12) is fixedly installed with suction pump (13), and suction pump (13) be equipped with pump mouth and
The bottom of water outlet, the suction pump (13) is fixedly installed with horizontal stripe (15), and through-hole, the horizontal stripe are offered on horizontal stripe (15)
(15) it is fixedly installed in through-hole guide pad (16), and offers pilot hole (17), the pilot hole on guide pad (16)
(17) rice is equipped with drinking-water pipe (18), and the top of the drinking-water pipe (18) is through through-hole and pilot hole (17) and and suction pump (13)
Pump mouth sealing is threadedly coupled, and the bottom of the drinking-water pipe (18) extends to the lower section of guide pad (16) and sealing is threaded with
Draw water hair (19), the bottom of the draw water hair (19) are provided with opening, and the draw water hair (19) is equipped with chamber (20), the chamber
The same matched filter screen (22) is fixed on the two sides inner wall of room (20).
2. a kind of construction of hydro project drainage arrangement according to claim 1, which is characterized in that the movable plate (1)
Bottom be fixedly mounted there are four brake wheel (2), and four brake wheels (2) are symmetrical arranged two-by-two.
3. a kind of construction of hydro project drainage arrangement according to claim 1, which is characterized in that the block set (9)
Bottom is opened in groove (10), is fixedly installed with horizontal block at the top of the mobile bar (11), and groove is extended at the top of horizontal block
(10) it is slidably connected in and with groove (10), is fixedly installed with limited block on the two sides inner wall of institute's Hu groove (10).
4. a kind of construction of hydro project drainage arrangement according to claim 1, which is characterized in that the suction pump (13)
Water outlet sealing be threaded with outlet pipe (14), and drinking-water pipe (18) extends to the top of external reservoir.
5. a kind of construction of hydro project drainage arrangement according to claim 1, which is characterized in that the chamber (20)
Opening is fixedly installed with matched steel mesh (21).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920130063.7U CN209494013U (en) | 2019-01-25 | 2019-01-25 | A kind of construction of hydro project drainage arrangement |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920130063.7U CN209494013U (en) | 2019-01-25 | 2019-01-25 | A kind of construction of hydro project drainage arrangement |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209494013U true CN209494013U (en) | 2019-10-15 |
Family
ID=68156004
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920130063.7U Active CN209494013U (en) | 2019-01-25 | 2019-01-25 | A kind of construction of hydro project drainage arrangement |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209494013U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111236550A (en) * | 2020-03-04 | 2020-06-05 | 诸暨新伏给排水设备有限公司 | Drainage device for drainage on roof of drainage house |
CN112302149A (en) * | 2020-10-26 | 2021-02-02 | 常德市俊德科技发展有限公司 | Be applicable to landfill gas recovery drainage facility |
-
2019
- 2019-01-25 CN CN201920130063.7U patent/CN209494013U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111236550A (en) * | 2020-03-04 | 2020-06-05 | 诸暨新伏给排水设备有限公司 | Drainage device for drainage on roof of drainage house |
CN112302149A (en) * | 2020-10-26 | 2021-02-02 | 常德市俊德科技发展有限公司 | Be applicable to landfill gas recovery drainage facility |
CN112302149B (en) * | 2020-10-26 | 2022-03-18 | 北京吉成环境能源科技有限公司 | Be applicable to landfill gas recovery drainage facility |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209494013U (en) | A kind of construction of hydro project drainage arrangement | |
CN209125558U (en) | A kind of burnishing device in glass cover-plate production process | |
CN201722667U (en) | Gate lifting device | |
CN211257253U (en) | Stifled pull throughs is prevented to high-lift pump station forebay water inlet | |
CN208697171U (en) | Cooling device is used in components polishing | |
CN208329031U (en) | A kind of water engineering facility | |
CN206008290U (en) | A kind of self-cleaning strainer | |
CN213626200U (en) | Glass curtain wall convenient to clean | |
CN204023659U (en) | Hydro-cushion groover | |
CN210252307U (en) | Ion exchange resin tower | |
CN211935912U (en) | Oil collecting device for novel intelligent equipment of chemical machinery | |
CN210185473U (en) | Window cleaning robot | |
CN210529810U (en) | Hydraulic engineering desilting device | |
CN209040062U (en) | A kind of drainage arrangement for hydraulic engineering | |
CN207392694U (en) | A kind of plastering machine convenient for adjusting | |
CN205908245U (en) | Translation door of supporting structure | |
CN220394825U (en) | Novel drainage device of hydraulic engineering channel | |
CN104999551A (en) | Automatic flushing device for rough surface of prefabricated panel | |
CN207987941U (en) | A kind of drainage arrangement of foundation pit | |
CN114197575B (en) | Underground and ground surface dual-purpose water taking device | |
CN220790064U (en) | Integrated pump station | |
CN208258415U (en) | A kind of lotus root digging harvester pedestal | |
CN217651970U (en) | Automatic precipitation device for water conservancy construction | |
CN215528263U (en) | Outdoor power cabinet with good protection effect | |
CN213756089U (en) | Hydraulic engineering uses multi-functional irrigation equipment |