CN209492013U - One kind being exclusively used in brick positioning intercept unit for building - Google Patents
One kind being exclusively used in brick positioning intercept unit for building Download PDFInfo
- Publication number
- CN209492013U CN209492013U CN201821549640.8U CN201821549640U CN209492013U CN 209492013 U CN209492013 U CN 209492013U CN 201821549640 U CN201821549640 U CN 201821549640U CN 209492013 U CN209492013 U CN 209492013U
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- screw rod
- bracket
- support
- nut
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Processing Of Stones Or Stones Resemblance Materials (AREA)
Abstract
The utility model relates to a kind of intercept units more particularly to one kind to be exclusively used in brick positioning intercept unit for building.Technical problems to be solved: a kind of time saving and energy saving, truncation is provided and is accurately exclusively used in brick positioning intercept unit for building.Technical solution is as follows: one kind being exclusively used in brick positioning intercept unit for building, includes pedestal, first support, first bearing, the first screw rod, the first nut, first baffle, Oscillating handle, second support etc.;It is fixedly connected with first support in the upper left of pedestal, first bearing is embedded in first support, interference is connected with the first screw rod in first bearing, and the first nut is combined on the first screw rod.The utility model realizes the function that brick is truncated, not only realize the function that positioning truncation is quickly carried out to brick, and also achieve the function that the brick of different length can be truncated, the utility model have the characteristics that it is easy to use, using safe, easy to operate, manufacturing cost is low.
Description
Technical field
The utility model relates to a kind of intercept units more particularly to one kind to be exclusively used in brick positioning intercept unit for building.
Background technique
It when building house corner, needs that brick is truncated, existing truncation mode is all manually
Brick is truncated using tool, manually contraction is truncated brick using tool not only time-consuming and laborious, but also is truncated
Not precisely, brick is caused to waste.
Summary of the invention
In order to overcome it is artificial shrink brick is truncated using tool it is not only time-consuming and laborious, but also be truncated it is not accurate,
To the wasting disadvantage of brick, technical problems to be solved: provide a kind of time saving and energy saving, truncation be accurately exclusively used in it is for building
Brick positions intercept unit.
Technical solution is as follows: one kind being exclusively used in brick for building positioning intercept unit, includes pedestal, first support, the
One bearing, the first screw rod, the first nut, first baffle, Oscillating handle, second support, sliding rail, sliding block, guide rod, conehead, spring and
Second baffle is fixedly connected with first support in the upper left of pedestal, first bearing is embedded in first support, in first axle
It holds interior interference and is connected with the first screw rod, the first nut is combined on the first screw rod, be fixedly connected in the bottom end of the first nut
First baffle determines Lian Jie You Oscillating handle in the left end Gu of the first screw rod, second support is fixedly connected on the right side of first support,
The bottom of second support is fixedly connected with sliding rail, and slidingtype is connected with sliding block, the bottom end of sliding block and the first nut on the slide rail
Top is fixedly connected, and is provided with pilot hole in the right part of second support, guide rod is connected in pilot hole inner sliding type, in guide rod
Bottom end be fixedly connected with conehead, be fixedly connected with second baffle on the top of guide rod, connect the bottom end of second baffle is fixed
It is connected to spring, the bottom end of spring is fixedly connected with the upper right of second support.
Preferably, further including having third bracket, the second nut, the second screw rod, the first slide bar, the first sliding sleeve and the first electricity
Machine is fixedly connected with third bracket above the right side of first support, is fixedly connected with the second nut in the right end of third bracket,
The second screw rod, the bottom end of the second screw rod and the tip contact of second baffle are combined in the second nut, in the upper of third bracket
Side right side is fixedly connected with the first slide bar, and slidingtype is connected with the first sliding sleeve on the first slide bar, solid in the right end of the first sliding sleeve
Surely it is connected with first motor, the output shaft of first motor is fixedly connected with the top of the second screw rod.
Preferably, further including having the 4th bracket, the second slide bar, the second sliding sleeve and third baffle, under second support
Side right side is fixedly connected with the 4th bracket, the second slide bar is fixedly connected in the lower right-hand side of the 4th bracket, on the second slide bar
Slidingtype is connected with the second sliding sleeve, is fixedly connected with third baffle in the bottom end of the second sliding sleeve.
Preferably, further include having the 5th bracket, the second motor, strut, second bearing, third screw rod and third nut,
The 5th bracket can be had by being fixedly connected above the right side of the 4th bracket, be fixedly connected with the second electricity in the lower right of the 5th bracket
Machine is fixed with strut below the 5th bracket, and strut is located at the left side of the second motor, and second bearing is embedded on strut,
Interference is connected with third screw rod in second bearing, and the right end of third screw rod is fixedly connected with the output shaft of the second motor,
Third nut is combined on three screw rods, the bottom end of third nut is fixedly connected with the top of the second sliding sleeve.
Preferably, further including having third motor, first pulley, the second belt wheel and belt, under the left side of first support
Side is fixedly connected with third motor, and third motor is located at the lower section of first bearing, is fixedly connected on the output shaft of third motor
There is first pulley, is fixedly connected with the second belt wheel in the left part of the first screw rod, the second belt wheel is connect by belt with first pulley.
When user needs to carry out brick positioning truncation, the brick that needs are truncated first is placed into the through-hole of pedestal
On, brick is then pushed to the left, contacts brick with first baffle, is then manually firmly pressed second baffle, is made second
Baffle moves down, and second baffle, which moves down, compresses spring, and second baffle, which moves down, drives guide rod to moving down
Dynamic, guide rod, which moves down, drives conehead to move down, and conehead, which moves down, strikes off brick, when artificial stopping is pressed downward
Second baffle, second baffle is since the elastic force of spring moves up, to reach the function of making conehead keep in the center, when need to
When left adjusting point of cut-off, manually Yao Dong Oscillating handle rotates forward , Oscillating handle and rotates forward drive the first screw rod rotating forward, because sliding rail and sliding block are sliding
Dynamic formula connection, so the first screw rod rotate forward drive the first nut be moved to the left, the first nut be moved to the left drive first baffle to
It moves left, to reach the function that point of cut-off is adjusted, after being moved to designated position, stops Yao Dong Oscillating handle, when
When needing to adjust to the right, the reversion of Yao Dong Oscillating handle.
Because further including having third bracket, the second nut, the second screw rod, the first slide bar, the first sliding sleeve and first motor,
It is fixedly connected with third bracket above the right side of first support, is fixedly connected with the second nut in the right end of third bracket, the
The second screw rod, the bottom end of the second screw rod and the tip contact of second baffle are combined in two nuts, it is right in the top of third bracket
Side is fixedly connected with the first slide bar, and slidingtype is connected with the first sliding sleeve on the first slide bar, in the fixed company of the right end of the first sliding sleeve
It is connected to first motor, the output shaft of first motor is fixedly connected with the bottom end of the second screw rod.So when needing to cut brick
When disconnected, starting first motor first is rotated forward, and first motor, which rotates forward, drives the second screw rod to rotate forward, because of the first slide bar and the first sliding sleeve
Slidingtype connection, so the second screw rod rotate forward, the second screw rod can be made to move down, the second screw rod move down to second baffle into
Row is pressed downward, to reach the function that brick is truncated, after truncation, starting first motor reversion returns the second screw rod
Return original position, after keeping in the center, closes first motor.
Because further including having the 4th bracket, the second slide bar, the second sliding sleeve and third baffle, in the lower right of second support
It is fixedly connected with the 4th bracket, is fixedly connected with the second slide bar in the lower right-hand side of the 4th bracket, the slidingtype on the second slide bar
It is connected with the second sliding sleeve, is fixedly connected with third baffle in the bottom end of the second sliding sleeve.So before brick is truncated, first
Manually push the second sliding sleeve to be moved to the left, the second sliding sleeve be moved to the left drive third baffle be moved to the left, third baffle to
It moves left and brick is pushed away to the left, contact brick with first baffle, make that brick is truncated more accurate.
Because further including having the 5th bracket, the second motor, strut, second bearing, third screw rod and third nut, the 4th
The 5th bracket can be had by being fixedly connected above the right side of bracket, be fixedly connected with the second motor in the lower right of the 5th bracket,
Strut is fixed with below 5th bracket, strut is located at the left side of the second motor, second bearing is embedded on strut, second
Interference is connected with third screw rod in bearing, and the right end of third screw rod is fixedly connected with the output shaft of the second motor, in third screw rod
On be combined with third nut, the bottom end of third nut is fixedly connected with the top of the second sliding sleeve.So when needing to push brick to the left
When block, start the rotating forward of the second motor first, the second motor, which rotates forward, drives third screw rod to rotate forward, and third screw rod, which rotates forward, drives third spiral shell
Mother is moved to the left, because the bottom end of third nut is fixedly connected with the top of the second sliding sleeve, third nut is moved to the left band
Dynamic second sliding sleeve is moved to the left, and when third baffle pushes brick and first baffle to contact, is started the second motor reversal, is made third
Baffle is kept in the center.
It is fixed below the left side of first support because further including having third motor, first pulley, the second belt wheel and belt
It is connected with third motor, third motor is located at the lower section of first bearing, is fixedly connected with first on the output shaft of third motor
Belt wheel is fixedly connected with the second belt wheel in the left part of the first screw rod, and the second belt wheel is connect by belt with first pulley.So working as
When needing to shake the rotating forward of the first screw rod, starting third motor first is rotated forward, and third motor, which is rotated forward, drives first band by output shaft
Wheel rotates forward, and first pulley is rotated forward to be rotated forward by the second belt wheel of drive of belt, and the second belt wheel, which rotates forward, drives the first screw rod to rotate forward, when
When needing that the first screw rod is driven to invert, start third motor reversal.
The utility model has the advantages that the utility model realizes the function that brick is truncated, not only realize quickly to brick into
The function of row positioning truncation, and the function that the brick of different length can be truncated is also achieved, the utility model tool
Have it is easy to use, use the features such as safe, easy to operate, manufacturing cost is low.
Detailed description of the invention
Fig. 1 is the first schematic view of the front view of the utility model.
The schematic view of the front view that Fig. 2 is second of the utility model.
Fig. 3 is the third schematic view of the front view of the utility model.
The schematic view of the front view that Fig. 4 is the 4th kind of the utility model.
The schematic view of the front view that Fig. 5 is the 5th kind of the utility model.
Drawing reference numeral: 1 pedestal, 2 through-holes, 3 first supports, 4 first bearings, 5 first screw rods, 6 first nuts, 7 first gear
Plate, 8 Oscillating handles, 9 second supports, 10 sliding rails, 11 sliding blocks, 12 pilot holes, 13 guide rods, 14 coneheads, 15 springs, 16 second baffles,
17 third brackets, 18 second nuts, 19 second screw rods, 20 first slide bars, 21 first sliding sleeves, 22 first motors, 23 the 4th brackets,
24 second slide bars, 25 second sliding sleeves, 26 third baffles, 27 the 5th brackets, 28 second motors, 29 struts, 30 second bearings, 31
Three screw rods, 32 third nuts, 33 third motors, 34 first pulleys, 35 second belt wheels, 36 belts.
Specific embodiment
The utility model is described in further detail below in conjunction with the drawings and specific embodiments, but is not limited practical
Novel protection scope and application range.
Embodiment 1
One kind being exclusively used in brick for building positioning intercept unit, includes pedestal 1, first support 3, the as shown in Figs. 1-5
One bearing 4, the first screw rod 5, the first nut 6,7, Oscillating handle 8 of first baffle, second support 9, sliding rail 10, sliding block 11, guide rod 13,
Conehead 14, spring 15 and second baffle 16 are fixedly connected with first support 3 in the upper left of pedestal 1, in first support 3
Embedded with first bearing 4, interference is connected with the first screw rod 5 in first bearing 4, and the first nut 6 is combined on the first screw rod 5,
It is fixedly connected with first baffle 7 in the bottom end of the first nut 6, Lian Jie You Oscillating handle 8 is determined in the left end Gu of the first screw rod 5, first
The right side of bracket 3 is fixedly connected with second support 9, is fixedly connected with sliding rail 10 in the bottom of second support 9, sliding on sliding rail 10
Dynamic formula is connected with sliding block 11, and the bottom end of sliding block 11 is fixedly connected with the top of the first nut 6, is provided in the right part of second support 9
Pilot hole 12 is connected with guide rod 13 in 12 inner sliding type of pilot hole, is fixedly connected with conehead 14 in the bottom end of guide rod 13,
The top of guide rod 13 is fixedly connected with second baffle 16, is fixedly connected with spring 15, spring 15 in the bottom end of second baffle 16
Bottom end be fixedly connected with the upper right of second support 9.
Embodiment 2
One kind being exclusively used in brick for building positioning intercept unit, includes pedestal 1, first support 3, the as shown in Figs. 1-5
One bearing 4, the first screw rod 5, the first nut 6,7, Oscillating handle 8 of first baffle, second support 9, sliding rail 10, sliding block 11, guide rod 13,
Conehead 14, spring 15 and second baffle 16 are fixedly connected with first support 3 in the upper left of pedestal 1, in first support 3
Embedded with first bearing 4, interference is connected with the first screw rod 5 in first bearing 4, and the first nut 6 is combined on the first screw rod 5,
It is fixedly connected with first baffle 7 in the bottom end of the first nut 6, Lian Jie You Oscillating handle 8 is determined in the left end Gu of the first screw rod 5, first
The right side of bracket 3 is fixedly connected with second support 9, is fixedly connected with sliding rail 10 in the bottom of second support 9, sliding on sliding rail 10
Dynamic formula is connected with sliding block 11, and the bottom end of sliding block 11 is fixedly connected with the top of the first nut 6, is provided in the right part of second support 9
Pilot hole 12 is connected with guide rod 13 in 12 inner sliding type of pilot hole, is fixedly connected with conehead 14 in the bottom end of guide rod 13,
The top of guide rod 13 is fixedly connected with second baffle 16, is fixedly connected with spring 15, spring 15 in the bottom end of second baffle 16
Bottom end be fixedly connected with the upper right of second support 9.
It further include having third bracket 17, the second nut 18, the second screw rod 19, the first slide bar 20, the first sliding sleeve 21 and first
Motor 22 is fixedly connected with third bracket 17 above the right side of first support 3, is fixedly connected in the right end of third bracket 17
Second nut 18 is combined with the second screw rod 19, the bottom end of the second screw rod 19 and the top of second baffle 16 in the second nut 18
Contact, is fixedly connected with the first slide bar 20 in the upper right of third bracket 17, and slidingtype is connected with the on the first slide bar 20
One sliding sleeve 21 is fixedly connected with first motor 22, the output shaft of first motor 22 and the second screw rod in the right end of the first sliding sleeve 21
19 top is fixedly connected.
Embodiment 3
One kind being exclusively used in brick for building positioning intercept unit, includes pedestal 1, first support 3, the as shown in Figs. 1-5
One bearing 4, the first screw rod 5, the first nut 6,7, Oscillating handle 8 of first baffle, second support 9, sliding rail 10, sliding block 11, guide rod 13,
Conehead 14, spring 15 and second baffle 16 are fixedly connected with first support 3 in the upper left of pedestal 1, in first support 3
Embedded with first bearing 4, interference is connected with the first screw rod 5 in first bearing 4, and the first nut 6 is combined on the first screw rod 5,
It is fixedly connected with first baffle 7 in the bottom end of the first nut 6, Lian Jie You Oscillating handle 8 is determined in the left end Gu of the first screw rod 5, first
The right side of bracket 3 is fixedly connected with second support 9, is fixedly connected with sliding rail 10 in the bottom of second support 9, sliding on sliding rail 10
Dynamic formula is connected with sliding block 11, and the bottom end of sliding block 11 is fixedly connected with the top of the first nut 6, is provided in the right part of second support 9
Pilot hole 12 is connected with guide rod 13 in 12 inner sliding type of pilot hole, is fixedly connected with conehead 14 in the bottom end of guide rod 13,
The top of guide rod 13 is fixedly connected with second baffle 16, is fixedly connected with spring 15, spring 15 in the bottom end of second baffle 16
Bottom end be fixedly connected with the upper right of second support 9.
It further include having third bracket 17, the second nut 18, the second screw rod 19, the first slide bar 20, the first sliding sleeve 21 and first
Motor 22 is fixedly connected with third bracket 17 above the right side of first support 3, is fixedly connected in the right end of third bracket 17
Second nut 18 is combined with the second screw rod 19, the bottom end of the second screw rod 19 and the top of second baffle 16 in the second nut 18
Contact, is fixedly connected with the first slide bar 20 in the upper right of third bracket 17, and slidingtype is connected with the on the first slide bar 20
One sliding sleeve 21 is fixedly connected with first motor 22, the output shaft of first motor 22 and the second screw rod in the right end of the first sliding sleeve 21
19 top is fixedly connected.
It further include having the 4th bracket 23, the second slide bar 24, the second sliding sleeve 25 and third baffle 26, under second support 9
Side right side is fixedly connected with the 4th bracket 23, the second slide bar 24 is fixedly connected in the lower right-hand side of the 4th bracket 23, second
Slidingtype is connected with the second sliding sleeve 25 on slide bar 24, is fixedly connected with third baffle 26 in the bottom end of the second sliding sleeve 25.
Embodiment 4
One kind being exclusively used in brick for building positioning intercept unit, includes pedestal 1, first support 3, the as shown in Figs. 1-5
One bearing 4, the first screw rod 5, the first nut 6,7, Oscillating handle 8 of first baffle, second support 9, sliding rail 10, sliding block 11, guide rod 13,
Conehead 14, spring 15 and second baffle 16 are fixedly connected with first support 3 in the upper left of pedestal 1, in first support 3
Embedded with first bearing 4, interference is connected with the first screw rod 5 in first bearing 4, and the first nut 6 is combined on the first screw rod 5,
It is fixedly connected with first baffle 7 in the bottom end of the first nut 6, Lian Jie You Oscillating handle 8 is determined in the left end Gu of the first screw rod 5, first
The right side of bracket 3 is fixedly connected with second support 9, is fixedly connected with sliding rail 10 in the bottom of second support 9, sliding on sliding rail 10
Dynamic formula is connected with sliding block 11, and the bottom end of sliding block 11 is fixedly connected with the top of the first nut 6, is provided in the right part of second support 9
Pilot hole 12 is connected with guide rod 13 in 12 inner sliding type of pilot hole, is fixedly connected with conehead 14 in the bottom end of guide rod 13,
The top of guide rod 13 is fixedly connected with second baffle 16, is fixedly connected with spring 15, spring 15 in the bottom end of second baffle 16
Bottom end be fixedly connected with the upper right of second support 9.
It further include having third bracket 17, the second nut 18, the second screw rod 19, the first slide bar 20, the first sliding sleeve 21 and first
Motor 22 is fixedly connected with third bracket 17 above the right side of first support 3, is fixedly connected in the right end of third bracket 17
Second nut 18 is combined with the second screw rod 19, the bottom end of the second screw rod 19 and the top of second baffle 16 in the second nut 18
Contact, is fixedly connected with the first slide bar 20 in the upper right of third bracket 17, and slidingtype is connected with the on the first slide bar 20
One sliding sleeve 21 is fixedly connected with first motor 22, the output shaft of first motor 22 and the second screw rod in the right end of the first sliding sleeve 21
19 top is fixedly connected.
It further include having the 4th bracket 23, the second slide bar 24, the second sliding sleeve 25 and third baffle 26, under second support 9
Side right side is fixedly connected with the 4th bracket 23, the second slide bar 24 is fixedly connected in the lower right-hand side of the 4th bracket 23, second
Slidingtype is connected with the second sliding sleeve 25 on slide bar 24, is fixedly connected with third baffle 26 in the bottom end of the second sliding sleeve 25.
It further include having the 5th bracket 27, the second motor 28, strut 29, second bearing 30, third screw rod 31 and third nut
32, the 5th bracket 27 can be had by being fixedly connected above the right side of the 4th bracket 23, in the fixed company of the lower right of the 5th bracket 27
It is connected to the second motor 28, is fixed with strut 29 in the lower section of the 5th bracket 27, strut 29 is located at the left side of the second motor 28,
Second bearing 30 is embedded on strut 29, interference is connected with third screw rod 31 in second bearing 30, the right end of third screw rod 31 with
The output shaft of second motor 28 is fixedly connected, and is combined with third nut 32 on third screw rod 31, the bottom end of third nut 32 with
The top of second sliding sleeve 25 is fixedly connected.
Embodiment 5
One kind being exclusively used in brick for building positioning intercept unit, includes pedestal 1, first support 3, the as shown in Figs. 1-5
One bearing 4, the first screw rod 5, the first nut 6,7, Oscillating handle 8 of first baffle, second support 9, sliding rail 10, sliding block 11, guide rod 13,
Conehead 14, spring 15 and second baffle 16 are fixedly connected with first support 3 in the upper left of pedestal 1, in first support 3
Embedded with first bearing 4, interference is connected with the first screw rod 5 in first bearing 4, and the first nut 6 is combined on the first screw rod 5,
It is fixedly connected with first baffle 7 in the bottom end of the first nut 6, Lian Jie You Oscillating handle 8 is determined in the left end Gu of the first screw rod 5, first
The right side of bracket 3 is fixedly connected with second support 9, is fixedly connected with sliding rail 10 in the bottom of second support 9, sliding on sliding rail 10
Dynamic formula is connected with sliding block 11, and the bottom end of sliding block 11 is fixedly connected with the top of the first nut 6, is provided in the right part of second support 9
Pilot hole 12 is connected with guide rod 13 in 12 inner sliding type of pilot hole, is fixedly connected with conehead 14 in the bottom end of guide rod 13,
The top of guide rod 13 is fixedly connected with second baffle 16, is fixedly connected with spring 15, spring 15 in the bottom end of second baffle 16
Bottom end be fixedly connected with the upper right of second support 9.
It further include having third bracket 17, the second nut 18, the second screw rod 19, the first slide bar 20, the first sliding sleeve 21 and first
Motor 22 is fixedly connected with third bracket 17 above the right side of first support 3, is fixedly connected in the right end of third bracket 17
Second nut 18 is combined with the second screw rod 19, the bottom end of the second screw rod 19 and the top of second baffle 16 in the second nut 18
Contact, is fixedly connected with the first slide bar 20 in the upper right of third bracket 17, and slidingtype is connected with the on the first slide bar 20
One sliding sleeve 21 is fixedly connected with first motor 22, the output shaft of first motor 22 and the second screw rod in the right end of the first sliding sleeve 21
19 top is fixedly connected.
It further include having the 4th bracket 23, the second slide bar 24, the second sliding sleeve 25 and third baffle 26, under second support 9
Side right side is fixedly connected with the 4th bracket 23, the second slide bar 24 is fixedly connected in the lower right-hand side of the 4th bracket 23, second
Slidingtype is connected with the second sliding sleeve 25 on slide bar 24, is fixedly connected with third baffle 26 in the bottom end of the second sliding sleeve 25.
It further include having the 5th bracket 27, the second motor 28, strut 29, second bearing 30, third screw rod 31 and third nut
32, the 5th bracket 27 can be had by being fixedly connected above the right side of the 4th bracket 23, in the fixed company of the lower right of the 5th bracket 27
It is connected to the second motor 28, is fixed with strut 29 in the lower section of the 5th bracket 27, strut 29 is located at the left side of the second motor 28,
Second bearing 30 is embedded on strut 29, interference is connected with third screw rod 31 in second bearing 30, the right end of third screw rod 31 with
The output shaft of second motor 28 is fixedly connected, and is combined with third nut 32 on third screw rod 31, the bottom end of third nut 32 with
The top of second sliding sleeve 25 is fixedly connected.
It further include having third motor 33, first pulley 34, the second belt wheel 35 and belt 36, under the left side of first support 3
Side is fixedly connected with third motor 33, and third motor 33 is located at the lower section of first bearing 4, solid on the output shaft of third motor 33
Surely it is connected with first pulley 34, is fixedly connected with the second belt wheel 35 in the left part of the first screw rod 5, the second belt wheel 35 passes through belt 36
It is connect with first pulley 34.
When user needs to carry out brick positioning truncation, the brick that needs are truncated first is placed into the logical of pedestal 1
On hole 2, brick is then pushed to the left, contacts brick with first baffle 7, then manually firmly presses second baffle 16,
Move down second baffle 16, second baffle 16, which moves down, compresses spring 15, and second baffle 16 moves down band
Action-oriented bar 13 moves down, guide rod 13 move down drive conehead 14 move down, conehead 14 move down to brick into
Row strikes off, and when artificial stopping is pressed downward second baffle 16, second baffle 16 is since the elastic force of spring 15 moves up, to reach
The function of making conehead 14 keep in the center, when needing to adjust point of cut-off to the left, manually Yao Dong Oscillating handle 8 rotates forward , Oscillating handle 8 and rotates forward
The first screw rod 5 is driven to rotate forward, because sliding rail 10 is connect with 11 slidingtype of sliding block, the first screw rod 5, which rotates forward, drives the first nut 6
It is moved to the left, the first nut 6, which is moved to the left, drives first baffle 7 to be moved to the left, to reach the function that point of cut-off is adjusted
Can, after being moved to designated position, stop Yao Dong Oscillating handle 8, when needing to adjust to the right, Yao Dong Oscillating handle 8 is inverted.
Because further including having third bracket 17, the second nut 18, the second screw rod 19, the first slide bar 20,21 and of the first sliding sleeve
First motor 22 is fixedly connected with third bracket 17 above the right side of first support 3, in the fixed company of the right end of third bracket 17
It is connected to the second nut 18, the second screw rod 19, bottom end and the second baffle 16 of the second screw rod 19 are combined in the second nut 18
Tip contact is fixedly connected with the first slide bar 20 in the upper right of third bracket 17, and slidingtype connects on the first slide bar 20
There is the first sliding sleeve 21, is fixedly connected with first motor 22, the output shaft of first motor 22 and second in the right end of the first sliding sleeve 21
The bottom end of screw rod 19 is fixedly connected.So starting first motor 22 first rotates forward when needing that brick is truncated, the first electricity
Machine 22, which rotates forward, drives the second screw rod 19 to rotate forward, because the first slide bar 20 is connect with 21 slidingtype of the first sliding sleeve, the second screw rod
19 rotate forward, and the second screw rod 19 can be made to move down, the second screw rod 19, which moves down, is pressed downward second baffle 16, to reach
To the function that brick is truncated, after truncation, starting first motor 22 invert, so that the second screw rod 19 is kept in the center, when return
After returning original position, first motor 22 is closed.
Because further including having the 4th bracket 23, the second slide bar 24, the second sliding sleeve 25 and third baffle 26, in second support 9
Lower right be fixedly connected with the 4th bracket 23, be fixedly connected with the second slide bar 24 in the lower right-hand side of the 4th bracket 23,
Slidingtype is connected with the second sliding sleeve 25 on second slide bar 24, is fixedly connected with third baffle 26 in the bottom end of the second sliding sleeve 25.Institute
Manually to push the second sliding sleeve 25 to be moved to the left first, the second sliding sleeve 25 is moved to the left band before brick is truncated
Dynamic third baffle 26 is moved to the left, and third baffle 26 is moved to the left pushes away brick to the left, contacts brick with first baffle 7, makes
Brick is truncated more accurate.
Because further including having the 5th bracket 27, the second motor 28, strut 29, second bearing 30, third screw rod 31 and third
Nut 32, the 5th bracket 27 can be had by being fixedly connected above the right side of the 4th bracket 23, solid in the lower right of the 5th bracket 27
Surely it is connected with the second motor 28, is fixed with strut 29 in the lower section of the 5th bracket 27, strut 29 is located at a left side for the second motor 28
Side is embedded with second bearing 30 on strut 29, and interference is connected with third screw rod 31, the right side of third screw rod 31 in second bearing 30
End is fixedly connected with the output shaft of the second motor 28, and third nut 32, the bottom of third nut 32 are combined on third screw rod 31
End is fixedly connected with the top of the second sliding sleeve 25.So start the rotating forward of the second motor 28 first when needing to push brick to the left,
Second motor 28, which rotates forward, drives third screw rod 31 to rotate forward, and third screw rod 31, which rotates forward, drives third nut 32 to be moved to the left, because the
The bottom end of three nuts 32 is fixedly connected with the top of the second sliding sleeve 25, so third nut 32, which is moved to the left, drives the second sliding sleeve 25
It is moved to the left, when third baffle 26 pushes brick and first baffle 7 to contact, starting the second motor 28 reversion makes third baffle
26 keep in the center.
Because further including having third motor 33, first pulley 34, the second belt wheel 35 and belt 36, on a left side for first support 3
Side-lower is fixedly connected with third motor 33, and third motor 33 is located at the lower section of first bearing 4, in the output shaft of third motor 33
On be fixedly connected with first pulley 34, be fixedly connected with the second belt wheel 35 in the left part of the first screw rod 5, the second belt wheel 35 passes through skin
Band 36 is connect with first pulley 34.So starting third motor 33 first rotates forward when needing to shake the rotating forward of the first screw rod 5, the
Three motors 33 are rotated forward drives first pulley 34 to rotate forward by output shaft, and first pulley 34 rotates forward the second band of drive for passing through belt 36
Wheel 35 rotates forward, and the second belt wheel 35, which rotates forward, drives the first screw rod 5 to rotate forward, when needing that the first screw rod 5 is driven to invert, starting third electricity
Machine 33 inverts.
The above embodiments are only for explaining the technical ideas and features of the present invention, and its object is to allow be familiar with technique
Personage can understand the content of the utility model and implement accordingly, do not limit the protection scope of the present invention.
All equivalent change or modifications according to made by the spirit of the present invention essence, should all cover the protection scope of the utility model it
It is interior.
Claims (5)
1. one kind is exclusively used in brick for building positioning intercept unit, which is characterized in that include pedestal (1), first support (3),
First bearing (4), the first screw rod (5), the first nut (6), first baffle (7), Oscillating handles (8), second support (9), sliding rail (10),
Sliding block (11), guide rod (13), conehead (14), spring (15) and second baffle (16), in the fixed company of the upper left of pedestal (1)
First support (3) are connected to, are embedded with first bearing (4) on first support (3), interior interference is connected with first in first bearing (4)
Screw rod (5) is combined with the first nut (6) on the first screw rod (5), is fixedly connected with first gear in the bottom end of the first nut (6)
Plate (7) determines Lian Jie You Oscillating handle (8) in the left end Gu of the first screw rod (5), is fixedly connected with second on the right side of first support (3)
Bracket (9) is fixedly connected with sliding rail (10) in the bottom of second support (9), and slidingtype is connected with sliding block on sliding rail (10)
(11), the bottom end of sliding block (11) is fixedly connected with the top of the first nut (6), is provided with pilot hole in the right part of second support (9)
(12), in pilot hole (12), inner sliding type is connected with guide rod (13), is fixedly connected with conehead in the bottom end of guide rod (13)
(14), second baffle (16) are fixedly connected on the top of guide rod (13), are fixedly connected in the bottom end of second baffle (16)
The bottom end of spring (15), spring (15) is fixedly connected with the upper right of second support (9).
2. one kind according to claim 1 is exclusively used in brick positioning intercept unit for building, which is characterized in that further include having
Third bracket (17), the second nut (18), the second screw rod (19), the first slide bar (20), the first sliding sleeve (21) and first motor
(22), third bracket (17) are fixedly connected with above the right side of first support (3), in the fixed company of the right end of third bracket (17)
The second nut (18) are connected to, are combined with the second screw rod (19) in the second nut (18), the bottom end and second of the second screw rod (19)
The tip contact of baffle (16) is fixedly connected with the first slide bar (20) in the upper right of third bracket (17), in the first slide bar
(20) slidingtype is connected with the first sliding sleeve (21) on, is fixedly connected with first motor (22) in the right end of the first sliding sleeve (21), the
The output shaft of one motor (22) is fixedly connected with the top of the second screw rod (19).
3. one kind according to claim 2 is exclusively used in brick positioning intercept unit for building, which is characterized in that further include having
4th bracket (23), the second slide bar (24), the second sliding sleeve (25) and third baffle (26), the lower right in second support (9)
It is fixedly connected with the 4th bracket (23), the second slide bar (24) are fixedly connected in the lower right-hand side of the 4th bracket (23), second
Slidingtype is connected with the second sliding sleeve (25) on slide bar (24), is fixedly connected with third baffle in the bottom end of the second sliding sleeve (25)
(26).
4. one kind according to claim 3 is exclusively used in brick positioning intercept unit for building, which is characterized in that further include having
5th bracket (27), the second motor (28), strut (29), second bearing (30), third screw rod (31) and third nut (32),
The 5th bracket (27) can be had by being fixedly connected above the right side of 4th bracket (23), in the fixed company of the lower right of the 5th bracket (27)
The second motor (28) are connected to, are fixed with strut (29) below the 5th bracket (27), strut (29) is located at the second motor
(28) left side is embedded with second bearing (30) on strut (29), and in second bearing (30), interior interference is connected with third screw rod
(31), the right end of third screw rod (31) is fixedly connected with the output shaft of the second motor (28), is combined on third screw rod (31)
The bottom end of third nut (32), third nut (32) is fixedly connected with the top of the second sliding sleeve (25).
5. one kind according to claim 4 is exclusively used in brick positioning intercept unit for building, which is characterized in that further include having
Third motor (33), first pulley (34), the second belt wheel (35) and belt (36), it is fixed below the left side of first support (3)
It is connected with third motor (33), third motor (33) is located at the lower section of first bearing (4), on the output shaft of third motor (33)
First pulley (34) are fixedly connected with, are fixedly connected with the second belt wheel (35) in the left part of the first screw rod (5), the second belt wheel (35)
It is connect by belt (36) with first pulley (34).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821549640.8U CN209492013U (en) | 2018-09-21 | 2018-09-21 | One kind being exclusively used in brick positioning intercept unit for building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821549640.8U CN209492013U (en) | 2018-09-21 | 2018-09-21 | One kind being exclusively used in brick positioning intercept unit for building |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209492013U true CN209492013U (en) | 2019-10-15 |
Family
ID=68150914
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821549640.8U Active CN209492013U (en) | 2018-09-21 | 2018-09-21 | One kind being exclusively used in brick positioning intercept unit for building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209492013U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110815607A (en) * | 2019-11-27 | 2020-02-21 | 鄢胜 | Intermittent manual mushroom stone piece knocking machine |
-
2018
- 2018-09-21 CN CN201821549640.8U patent/CN209492013U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110815607A (en) * | 2019-11-27 | 2020-02-21 | 鄢胜 | Intermittent manual mushroom stone piece knocking machine |
CN110815607B (en) * | 2019-11-27 | 2021-06-15 | 鄢胜 | Intermittent manual mushroom stone piece knocking machine |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207422029U (en) | A kind of novel garden lamp convenient for adjusting lighting angle | |
CN207565013U (en) | A kind of solar energy power generating edges of boards frame stamping equipment | |
CN204618110U (en) | Effort-saving is without dead angle cleaner | |
CN209492013U (en) | One kind being exclusively used in brick positioning intercept unit for building | |
CN104723194A (en) | Automatic edge polishing device for iron pan | |
CN108098935A (en) | A kind of tool structure for timber cutting | |
CN204505655U (en) | A kind of edge-neatening apparatus based on chain pitch wheel | |
CN207495749U (en) | A kind of trimming machine mechanism repaired for ceramics | |
CN204714002U (en) | A kind of full-automatic inverting machine being applicable to motor vehicle engine cylinder body | |
CN219684896U (en) | Brick preparation is with equipment of polishing | |
CN208197028U (en) | A kind of automatic cutting device | |
CN108972581A (en) | A kind of bio-robot Steerring in situ device | |
CN108575127A (en) | A kind of orchard weeder | |
CN208989234U (en) | A kind of veterinary treatment station | |
CN208234906U (en) | A kind of full-automatic primary cell separator | |
CN204074397U (en) | A kind of automatic glue spreading device of sleeve outer circle part | |
CN203762159U (en) | Noodle slicing machine | |
CN112808433A (en) | Grinding device for vitamin C sodium phosphate and using method thereof | |
CN207772735U (en) | A kind of automatic clamping device for digital-controlled carving machine | |
CN212196039U (en) | Rubber band snatchs distraction device | |
CN211161667U (en) | Conveniently adjust production facility for spring that cuts length | |
CN211411906U (en) | Horizontal stirring bean pot | |
CN204508233U (en) | A kind of plastic tub moving-out device | |
CN209271978U (en) | A kind of device for fast cleaning of shaft coupling | |
CN208392131U (en) | A kind of cutter device for board house plate |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 253000 Dejian building, Sanba East Road, De Zhou City, Shandong Province Patentee after: Shandong Expressway Dejian Group Co.,Ltd. Address before: 253000 Dejian building, Sanba East Road, De Zhou City, Shandong Province Patentee before: SHANDONG DEJIAN GROUP Co.,Ltd. |
|
CP01 | Change in the name or title of a patent holder |