CN209491970U - Concrete batching dust removal system for workshop - Google Patents

Concrete batching dust removal system for workshop Download PDF

Info

Publication number
CN209491970U
CN209491970U CN201822035416.3U CN201822035416U CN209491970U CN 209491970 U CN209491970 U CN 209491970U CN 201822035416 U CN201822035416 U CN 201822035416U CN 209491970 U CN209491970 U CN 209491970U
Authority
CN
China
Prior art keywords
water
dust removal
removal system
concrete batching
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201822035416.3U
Other languages
Chinese (zh)
Inventor
袁启涛
姜耿
丁路静
李微
蒋新峰
高鹏
白润鹏
兰鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China West Construction Tianjin Co Ltd
Original Assignee
China West Construction Tianjin Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China West Construction Tianjin Co Ltd filed Critical China West Construction Tianjin Co Ltd
Priority to CN201822035416.3U priority Critical patent/CN209491970U/en
Application granted granted Critical
Publication of CN209491970U publication Critical patent/CN209491970U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model relates to concrete batching dust removal system for workshop, belong to the technical field of construction, its key points of the technical solution are that including water tank, water tank is communicated with water pipe, water pipe includes main flow pipe, and water pump is provided between water tank and main flow pipe, multiple isocons are provided on main flow pipe, multiple water jets are offered on each isocon, are provided with atomizer in water jet.The utility model has the effect of reducing concrete batching workshop Dust Capacity.

Description

Concrete batching dust removal system for workshop
Technical field
The utility model relates to the technical fields of construction, more particularly, to concrete batching dust removal system for workshop.
Background technique
Concrete, which refers to, makees cementitious material, sand, masonry aggregate with cement;With water (additive and admixture can be contained) by certain Ratio cooperation, it is agitated obtained by cement concrete, be usually used in the technical fields such as construction.
Then concrete is stirred by agitating device again before use, firstly the need of ingredient is carried out, when ingredient needs Each raw material is subjected to the operation such as weigh, is poured into apparatus for placing, when pouring out raw material, a large amount of powder of thick air Dirt, meanwhile, it in whipping process, and needs to mix the raw material weighed, which can also generate a large amount of dust, make It is severe to obtain concrete batching workshop condition, will seriously affect the physical and mental health of operator.
Therefore, it is necessary to improve the working environment in concrete batching workshop, to reduce Dust Capacity, to protect the body and mind of worker Health.
Utility model content
The purpose of the utility model is to provide concrete batching dust removal system for workshop, reaching reduces concrete batching workshop powder The effect of dust quantity.
The above-mentioned purpose of utility model of the utility model has the technical scheme that
Concrete batching dust removal system for workshop, including water tank, water tank are communicated with water pipe, and water pipe includes main flow pipe, storage It is provided with water pump between water pot and main flow pipe, multiple isocons are provided on main flow pipe, multiple sprays are offered on each isocon The mouth of a river is provided with atomizer in water jet.
By using above-mentioned technical proposal, water pump drives the water in water tank to be flowed out by main flow pipe, then shunts through isocon, When water flow passes through water jet, water mist is sprayed by atomizer, water mist can capture the dust in air and be allowed to settle, to reach To the effect for reducing concrete batching workshop Dust Capacity.
The utility model is further arranged to: being provided with surge tank between the water pump and main flow pipe.
By using above-mentioned technical proposal, for surge tank between water pump and main flow pipe, surge tank plays buffer function, keeps away Exempt under the drive of water pump, water flow flows directly into main flow pipe and causes flow rate of water flow is too fast to be not easy to the phenomenon that adjusting.
The utility model is further arranged to: being communicated with air pump, snorkel and pressure gauge at the top of the surge tank, is ventilated Pressure-regulating valve is provided on pipe.
By using above-mentioned technical proposal, surge tank has buffer function, reduces the flow velocity of water, air pump can apply surge tank Pressure accelerates the speed that the water in surge tank flow to main flow pipe;Pressure gauge can be used for detecting the air pressure in surge tank simultaneously;Pressure tune Section valve can be used for adjusting the pressure in surge tank, easy to operate and use.
The utility model is further arranged to: the isocon includes multiple splicing tubes, between every two contiguous concatenation pipe To be detachably fixed connection.
By using above-mentioned technical proposal, when the length in workshop is too long or too short, can continue to spell splicing tubes It connects to extend the length of isocon, or is dismantled to shorten the overall length of isocon, convenient for being applicable in different size of vehicle Between, it is easy to use and installs.
The utility model is further arranged to: described be detachably fixed is connected as being threadedly coupled.
By using above-mentioned technical proposal, every two splicing tubes, which are connected through a screw thread, is spliced, the connection of threaded connection Mode is relatively firm, is easy to use.
The utility model is further arranged to: the threaded connection place of the adjacent splicing tubes of every two is provided with sealing Item.
By using above-mentioned technical proposal, the setting of sealing strip can avoid water flow and be showed by what the connecting sewing of two connecting tubes flowed out As achieving the effect that avoid waste water resource.
The utility model is further arranged to: the sealing strip is the sealing strip of rubber material.
The advantages of by using above-mentioned technical proposal, rubber material has high resiliency, wear-resisting, good combination property top, just In use, the leakproofness of junction is improved.
The utility model is further arranged to: being provided with by-pass valve in each splicing tubes.
By using above-mentioned technical proposal, concrete batching workshop is generally large, and only carries out at the one of workshop sometimes Ingredient, the setting of by-pass valve is so that the flow direction of water flow is more targeted, by flow cavitation result in the position for needing dedusting, then Water flow is sprayed onto corresponding region by atomizer again, avoids the phenomenon that being dusted to entire workshop and lead to waste of resource.
The utility model is further arranged to: insulating layer is arranged with outside the splicing tubes.
By using above-mentioned technical proposal, the temperature that the setting of insulating layer can reduce splicing in-pipe flow as far as possible becomes Change, the phenomenon that splicing in-pipe flow freezes occurs in reduction winter as far as possible.
The utility model is further arranged to: the insulating layer is the insulating layer of sponge material.
By using above-mentioned technical proposal, sponge has many advantages, such as heat preservation, heat-insulated, sound-absorbing, damping, the insulation of sponge Function can reduce the temperature change for shunting in-pipe flow, be easy to use.
In conclusion the advantageous effects of the utility model are as follows:
1. water pump drives the water in water tank to flow to isocon by main flow pipe, water mist, water mist are then sprayed by atomizer The dust in air can be captured and be allowed to settle, to achieve the effect that reduce concrete batching workshop Dust Capacity;
2. isocon is spliced by multiple splicing tubes, it is applicable to the workshop of different length, is easy to use.
Detailed description of the invention
Fig. 1 is the overall structure diagram of the utility model;
Fig. 2 is the structural schematic diagram that the utility model embodies water tank and surge tank;
Fig. 3 is the structural schematic diagram that the utility model embodies isocon stitching portion;
Fig. 4 is the partial enlargement diagram of part A in Fig. 3.
In figure, 1, water tank;11, connecting tube;2, surge tank;21, air inlet pipe;22, pressure gauge;23, snorkel;231, it presses Force regulating valve;3, water pump;4, air pump;5, water pipe;51, main flow pipe;52, isocon;521, splicing tubes;5211, sealing strip; 5212, water jet;52121, atomizer;5213, by-pass valve;5214, insulating layer.
Specific embodiment
The utility model is described in further detail below in conjunction with attached drawing.
It referring to Fig.1, is concrete batching dust removal system for workshop disclosed by the utility model, including water tank 1, water tank 1 Be communicated with surge tank 2, surge tank 2 is communicated with main flow pipe 51, be provided with multiple isocons 52 on main flow pipe 51, main flow pipe 51 it is another One end is connected to water tank 1.
Referring to Fig. 2, water tank 1 is the tank body that cylinder stands on ground, for containing water for dust removal, the side of water tank 1 It is provided with water pump 3.Water pump 3 is placed in ground, and the side of water pump 3 is provided with surge tank 2, and surge tank 2 is the tank body placed vertically, Surge tank 2 is provided with air pump 4 far from the side of water tank 1.The lower part of 1 circumference side of water tank and water pump 3, water pump 3 and buffering It is connected with connecting tube 11 between the lower part of 2 circumference side of tank, is connected with air inlet pipe 21 between the top and air pump 4 of surge tank 2.
The top of surge tank 2 is provided with pressure gauge 22, and pressure gauge 22 is used to monitor the air pressure in surge tank 2, pressure gauge 22 Side be provided with snorkel 23.One end of snorkel 23 is connected to surge tank 2, and the other end extends in water tank 1, snorkel Pressure-regulating valve 231 is provided on 23, for adjusting the air pressure in surge tank 2.
The bottom of 2 circumference side of surge tank is communicated with main flow pipe 51.Water pump 3 drives water flow to flow to surge tank by water tank 1 2, air pump 4 drives water flow to be flowed out by main flow pipe 51.
Fig. 1 is reviewed, main flow pipe 51 extends upwardly at the ceiling in workshop, and is surrounded by U-shaped structure, far from surge tank 2 one end is connected to water tank 1, and top is fixedly connected with ceiling, and main flow pipe 51 is communicated with multiple isocons 52.
In conjunction with Fig. 3, isocon 52 includes multiple splicing tubes 521.Splicing tubes 521 are tubular structure, every two contiguous concatenation To be threadedly coupled between pipe 521, so that multiple splicing tubes 521 are spliced into longer isocon 52, multiple isocons 52 are parallel simultaneously Row's setting, top are fixedly connected with ceiling, and both ends are connected to main flow pipe 51 respectively, referring to Fig. 4, the stitching portion of splicing tubes 521 It is provided with sealing strip 5211.Sealing strip 5211 is cyclic structure, and annular inner wall is bonded with the outer wall of splicing tubes 521, sealing strip 5211 be rubber material, and the spliced leakproofness of two splicing tubes 521 can be improved, exposed to avoid water flow by stitching portion.
The bottom of splicing tubes 521 offers multiple water jets 5212, is provided with atomizer 52121 in water jet 5212. For the water flowed out by main flow pipe 51 by that will spray water mist by atomizer 52121 when water jet 5212, water mist can capture air In dust and be allowed to settle, thus achieve the effect that reduce concrete batching workshop Dust Capacity.
Referring to Fig. 3, it is provided with by-pass valve 5213 in each splicing tubes 521, the setting of by-pass valve 5213 is so that water flow Flow direction it is more targeted, flow cavitation result is needed to the position of dedusting in workshop, then again by water flow by atomizer 52121 are sprayed onto corresponding region, avoid the phenomenon that being dusted to entire workshop and lead to waste of resource.The outer wall of splicing tubes 521 It is provided with insulating layer 5214, insulating layer 5214 is sponge material, and the inner wall of insulating layer 5214 is bonded with the outer wall of splicing tubes 521, Consequently facilitating maintaining the temperature of water flow in splicing tubes 521.
The implementation principle of the present embodiment are as follows: water pump 3 drives water flow to flow to surge tank 2 by water tank 1, and air pump 4 drives water again Stream flow to main flow pipe 51 by surge tank 2, after then being shunted by isocon 52, passes through atomizer by water jet 5212 52121 spray water mist, and water mist will capture the dust in workshop, to achieve the effect that reduce concrete batching workshop Dust Capacity; Then part water flow is flow in water tank 1 by main flow pipe 51 again, realizes water circulation.
The embodiment of present embodiment is the preferred embodiment of the utility model, and not limitation is originally practical new according to this The protection scope of type, therefore: the equivalence changes that all structures, shape, principle according to the utility model are done should all be covered by practical Within novel protection scope.

Claims (10)

1. concrete batching dust removal system for workshop, including water tank (1), water tank (1) are communicated with water pipe (5), water pipe (5) includes Main flow pipe (51) is provided with water pump (3) between water tank (1) and main flow pipe (51), and main flow pipe is provided with multiple shuntings on (51) It manages (52), is offered multiple water jets (5212) on each isocon (52), be provided with atomizer in water jet (5212) (52121)。
2. concrete batching dust removal system for workshop according to claim 1, it is characterised in that: the water pump (3) and mainstream Surge tank (2) are provided between pipe (51).
3. concrete batching dust removal system for workshop according to claim 2, it is characterised in that: the top of the surge tank (2) Portion is communicated with air pump (4), snorkel (23) and pressure gauge (22), is provided with pressure-regulating valve (231) on snorkel (23).
4. concrete batching dust removal system for workshop according to claim 1, it is characterised in that: the isocon (52) includes Multiple splicing tubes (521) are detachably fixed connection between every two contiguous concatenation pipe (521).
5. concrete batching dust removal system for workshop according to claim 4, it is characterised in that: described to be detachably fixed connection To be threadedly coupled.
6. concrete batching dust removal system for workshop according to claim 5, it is characterised in that: the adjacent splicing of every two The threaded connection place of pipe (521) is provided with sealing strip (5211).
7. concrete batching dust removal system for workshop according to claim 6, it is characterised in that: the sealing strip (5211) is The sealing strip (5211) of rubber material.
8. concrete batching dust removal system for workshop according to claim 4, it is characterised in that: each splicing tubes (521) by-pass valve (5213) are provided on.
9. concrete batching dust removal system for workshop according to claim 8, it is characterised in that: the splicing tubes (521) are outside It is arranged with insulating layer (5214).
10. concrete batching dust removal system for workshop according to claim 9, it is characterised in that: the insulating layer (5214) For the insulating layer (5214) of sponge material.
CN201822035416.3U 2018-12-04 2018-12-04 Concrete batching dust removal system for workshop Active CN209491970U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822035416.3U CN209491970U (en) 2018-12-04 2018-12-04 Concrete batching dust removal system for workshop

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822035416.3U CN209491970U (en) 2018-12-04 2018-12-04 Concrete batching dust removal system for workshop

Publications (1)

Publication Number Publication Date
CN209491970U true CN209491970U (en) 2019-10-15

Family

ID=68152577

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822035416.3U Active CN209491970U (en) 2018-12-04 2018-12-04 Concrete batching dust removal system for workshop

Country Status (1)

Country Link
CN (1) CN209491970U (en)

Similar Documents

Publication Publication Date Title
CN107029909A (en) A kind of construction site ground device for reducing dust
CN103643740B (en) A kind of steel pipe column concrete lifting construction method
CN206598384U (en) A kind of concrete casting equipment
CN204386612U (en) A kind of concrete for mines refractory gunning equipment
CN209551991U (en) A kind of autoclave aerated concrete building block molding machine
CN108049637A (en) A kind of construction concrete powring apptss
CN209491970U (en) Concrete batching dust removal system for workshop
CN210384873U (en) Drying device for polycarboxylate superplasticizer
CN207495794U (en) A kind of mortar mixer for building
CN107598699A (en) One kind white washed wall pours integrated device with Horizontal concrete
CN217621177U (en) Cement balancing weight
CN205190995U (en) PCCP steel wire tube core cement paste spraying device
CN204098931U (en) For the quantitative output device of the liquid accelerating agent of dry shotcreting injection apparatus
CN205561960U (en) Flowmeter shows belt cleaning device
CN211736409U (en) Novel spray nozzle structure of concrete spraying device
CN208639219U (en) A kind of water-fertilizer integral equipment easy to remove
CN204626899U (en) A kind of new type mortar flush coater
CN208757848U (en) The injection apparatus of wool opener
CN205046821U (en) Nozzle mechanism for mortar coating machine and mortar coating machine
CN207109618U (en) A kind of small aggregate self-compacting concrete conveying device
CN205466722U (en) Fountain building concrete mixing arrangement
CN204662985U (en) A kind of device utilizing the anti-airborne dust of tower crane, cooling, maintenance
CN210339027U (en) Concrete powder storage tank
CN108355442A (en) A kind of quick lime dust-extraction unit
CN204493101U (en) A kind of pouring-in concrete pumping equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant