CN209485364U - A kind of project cost plotting board - Google Patents
A kind of project cost plotting board Download PDFInfo
- Publication number
- CN209485364U CN209485364U CN201920322748.1U CN201920322748U CN209485364U CN 209485364 U CN209485364 U CN 209485364U CN 201920322748 U CN201920322748 U CN 201920322748U CN 209485364 U CN209485364 U CN 209485364U
- Authority
- CN
- China
- Prior art keywords
- fixedly installed
- plate
- project cost
- rod
- plotting board
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
Purpose of the utility model is to solve the problems that existing inconvenience measures engineering construction material, disclose a kind of project cost plotting board, including bottom plate, the bottom plate bottom surface is uniformly equipped with roller devices, fixed link is fixedly installed on the left of the plate upper surface, handle is fixedly installed in the middle part of the fixed link left side, fixed link left side upper end is fixedly installed with support plate, it is fixedly installed with mounting rod on the upside of the support plate, the mounting rod upper end is fixedly installed with clipboard.The utility model passes through the control to sliding block, consequently facilitating the position to laser lamp is adjusted, so that laser lamp convenient to use measures the scantling of engineering construction in remote situation, the time is more saved, facilitate and carry out one man operation, meets social demand.
Description
Technical field
The utility model relates to Project Cost Field more particularly to a kind of project cost plotting boards.
Background technique
The straight meaning of project cost is exactly the construction price of engineering.The three elements of engineering valuation: amount, is taken valence.Broadly engineering
Cost covers construction engineering cost (Civil Specialities and installation profession), and highway engineering cost, marine traffic engineering cost, railway engineering are made
Valence, total construction cost of water project, Cost for Electric Power Engineering, communication engineering cost, Aerospace Engineering cost etc..Project cost refers to progress
The full payment that a certain engineering construction is spent, core content are that investment estimate, estimation per design, amendment budgetary estimate, construction drawing are pre-
Calculation, Engineering Settlement, budget needed for the completion of projects etc..The main task of project cost: according to drawing, quota andInventorySpecification, calculates
Flat cost included in engineering (artificial, material and equipment, construction equipment use), enterprise administration expense, measure expense, set-fee, benefit
Profit and tax etc..
It is wherein particularly important to the measurement of engineering material therefor, since more construction material can be put in construction site
Material, is generally required when measuring to the size of these materials and is measured using tape measure, when measurement, needs one
People holds wherein one end of tape measure, and in addition a people pulls tape measure, to measure to plate, in measurement when ratio
It is cumbersome, rapid survey is carried out for the size inconvenience of plate, and existing after being measured, needs to remember data
Inconvenience is recorded when record, and therefore, it is necessary to design a kind of project cost plotting board to solve the deficiencies in the prior art.
Utility model content
Purpose of the utility model is to solve the deficiencies in the prior art, provide a kind of project cost plotting board.
The utility model is achieved through the following technical solutions:
A kind of project cost plotting board, including bottom plate, the bottom plate bottom surface are uniformly equipped with roller devices, the bottom plate
It is fixedly installed with fixed link on the left of upper surface, handle, the fixed link left side are fixedly installed in the middle part of the fixed link left side
Face upper end is fixedly installed with support plate, and mounting rod is fixedly installed on the upside of the support plate, and the mounting rod upper end is fixedly mounted
There is clipboard, support rod is fixedly installed on the right side of the plate upper surface, is arranged with nut on the downside of the support rod surface, it is described
It is fixedly installed with the second helical spring on the upside of nut, second helical spring upper end is fixedly installed with casing, described sleeve pipe table
Face is fixedly installed with connecting rod, is equipped with screw rod on the right side of described sleeve pipe, the screw rod right end is fixedly installed with positioning plate, described fixed
Position plate right side is fixedly installed with guide housing, and the guide housing surface is symmetrically arranged with the first helical spring, first spiral
Spring inner end is fixedly installed with sliding block, and the sliding block side is fixedly installed with holding rod, and the sliding block right side is fixedly installed with company
Fishplate bar, the connection plate surface outer end are fixedly installed with laser lamp.
As the optimal technical scheme of the utility model, described sleeve pipe is slidably matched with support rod.
As the optimal technical scheme of the utility model, the screw rod and casing threads cooperate.
As the optimal technical scheme of the utility model, the sliding block is slidably matched with guide housing.
As the optimal technical scheme of the utility model, scale is respectively marked on the guide housing and connecting plate.
As the optimal technical scheme of the utility model, the nut is threadedly engaged with support rod.
Compared with prior art, the utility model has the beneficial effects that
The utility model is by the control to sliding block, consequently facilitating the position to laser lamp is adjusted, to conveniently make
The scantling of engineering construction is measured in remote situation with laser lamp, more the saving time, facilitates progress single
People's operation, while measuring far from construction site safer, by the setting of clipboard, preferably allowing makes
User places writing book, consequently facilitating the data after measurement are recorded, it is convenient to the device by roller devices
Position moved, the construction material of different location is measured thus convenient, by being threadedly engaged for screw rod and casing,
Positioning plate is rotated to convenient, so as to the different side lengths of the plate so that laser lamp measurement is constructed, preferably to engineering
Cost, and reasonable design, easy operation are carried out, meets social demand, is worth being promoted to Project Cost Field.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model.
In figure: 1, laser lamp, 2, connecting plate, the 3, first helical spring, 4, sliding block, 5, holding rod, 6, guide housing, the 7, second spiral shell
Revolve spring, 8, nut, 9, support rod, 10, bottom plate, 11, roller devices, 12, fixed link, 13, handle, 14, support plate, 15, peace
Fill bar, 16, clipboard, 17, connecting rod, 18, casing, 19, screw rod, 20, positioning plate.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
Referring to Fig. 1, the utility model provides a kind of technical solution:
A kind of project cost plotting board, including bottom plate 10,10 bottom surface of bottom plate are uniformly equipped with roller devices 11, institute
It states and is fixedly installed with fixed link 12 on the left of 10 upper surface of bottom plate, be fixedly installed with handle 13 in the middle part of 12 left side of fixed link,
The 12 left side upper end of fixed link is fixedly installed with support plate 14, is fixedly installed with mounting rod 15 on the upside of the support plate 14,
15 upper end of mounting rod is fixedly installed with clipboard 16, is fixedly installed with support rod 9 on the right side of 10 upper surface of bottom plate, described
It is arranged with nut 8 on the downside of 9 surface of support rod, the second helical spring 7, second spiral are fixedly installed on the upside of the nut 8
7 upper end of spring is fixedly installed with casing 18, and 18 surface of described sleeve pipe is fixedly installed with connecting rod 17, pacifies on the right side of described sleeve pipe 18
Equipped with screw rod 19,19 right end of screw rod is fixedly installed with positioning plate 20, and 20 right side of positioning plate is fixedly installed with guiding
Frame 6,6 surface of guide housing are symmetrically arranged with the first helical spring 3, and 3 inner end of the first helical spring is fixedly installed with cunning
Block 4,4 side of sliding block are fixedly installed with holding rod 5, and 4 right side of sliding block is fixedly installed with connecting plate 2, the connecting plate 2
Surface outer end is fixedly installed with laser lamp 1.
Described sleeve pipe 18 is slidably matched with support rod 9.
The screw rod 19 is threadedly engaged with casing 18.
The sliding block 4 is slidably matched with guide housing 6.
Scale is respectively marked on the guide housing 6 and connecting plate 2.
The nut 8 is threadedly engaged with support rod 9.
Working principle: by the measurement to construction site surplus material, remaining material is subtracted using the amount of total material
Size, the amount of the material exactly used, so as to complete the cost to engineering, to the remaining plate in construction site carry out
When measurement, user holds handle 13 first, the device is pushed near construction site by roller devices 11, then
User's both hands hold holding rod 5 respectively, and the switch of laser lamp 1 is opened, and then user slides sliding block 4, and then will
The position of laser lamp 1 can be adjusted, laser lamp 1 is made to be irradiated to two sides of plate, observed the scale on guide housing 6, make
The length that two connecting plates 2 are added with the scale on guide housing 6 is exactly the length of measured plate, then carries out to screw rod 19
Positioning plate 20 is rotated 90 degree, connecting plate 2 will be made to turn to horizontality at this time, using same method by laser by rotation
Lamp 1 is irradiated on other two side, to just complete the measurement to strip width, after being measured, minute book is placed on
On clipboard 16, then the size of measurement is recorded, then user pushes the device, surveys to different plate
Amount, the statistics for finally carrying out data just complete project cost then multiplied by the unit price of material.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art,
It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired
Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.
Claims (6)
1. a kind of project cost plotting board, including bottom plate (10), it is characterised in that: bottom plate (10) bottom surface is uniformly equipped with
Roller devices (11), bottom plate (10) the upper surface left side are fixedly installed with fixed link (12), fixed link (12) left side
Middle part is fixedly installed with handle (13), and fixed link (12) the left side upper end is fixedly installed with support plate (14), the support
It is fixedly installed with mounting rod (15) on the upside of plate (14), mounting rod (15) upper end is fixedly installed with clipboard (16), the bottom
It is fixedly installed with support rod (9) on the right side of plate (10) upper surface, is arranged with nut (8), the spiral shell on the downside of support rod (9) surface
It being fixedly installed with the second helical spring (7) on the upside of cap (8), the second helical spring (7) upper end is fixedly installed with casing (18),
Described sleeve pipe (18) surface is fixedly installed with connecting rod (17), is equipped with screw rod (19), the screw rod on the right side of described sleeve pipe (18)
(19) right end is fixedly installed with positioning plate (20), and positioning plate (20) right side is fixedly installed with guide housing (6), the guiding
Frame (6) surface is symmetrically arranged with the first helical spring (3), and the first helical spring (3) inner end is fixedly installed with sliding block (4),
Sliding block (4) side is fixedly installed with holding rod (5), and sliding block (4) right side is fixedly installed with connecting plate (2), the company
Fishplate bar (2) surface outer end is fixedly installed with laser lamp (1).
2. a kind of project cost plotting board according to claim 1, it is characterised in that: described sleeve pipe (18) and support rod
(9) it is slidably matched.
3. a kind of project cost plotting board according to claim 1, it is characterised in that: the screw rod (19) and casing
(18) it is threadedly engaged.
4. a kind of project cost plotting board according to claim 1, it is characterised in that: the sliding block (4) and guide housing
(6) it is slidably matched.
5. a kind of project cost plotting board according to claim 1, it is characterised in that: the guide housing (6) and connection
Plate is respectively marked with scale on (2).
6. a kind of project cost plotting board according to claim 1, it is characterised in that: the nut (8) and support rod
(9) it is threadedly engaged.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920322748.1U CN209485364U (en) | 2019-03-14 | 2019-03-14 | A kind of project cost plotting board |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920322748.1U CN209485364U (en) | 2019-03-14 | 2019-03-14 | A kind of project cost plotting board |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209485364U true CN209485364U (en) | 2019-10-11 |
Family
ID=68134408
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920322748.1U Expired - Fee Related CN209485364U (en) | 2019-03-14 | 2019-03-14 | A kind of project cost plotting board |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209485364U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111323000A (en) * | 2020-04-08 | 2020-06-23 | 衡水衡源电力建设有限责任公司 | Laser positioning system |
-
2019
- 2019-03-14 CN CN201920322748.1U patent/CN209485364U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111323000A (en) * | 2020-04-08 | 2020-06-23 | 衡水衡源电力建设有限责任公司 | Laser positioning system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209485364U (en) | A kind of project cost plotting board | |
CN202281571U (en) | Electronic measuring tape | |
CN207515671U (en) | A kind of architectural design survey tool | |
CN209726968U (en) | A kind of project cost drawing measuring scale | |
CN216364130U (en) | Building engineering cost platform based on BIM technique | |
CN206314712U (en) | A kind of multifunctional engineering account valuation tool box | |
CN213422019U (en) | A drawing measuring device for engineering cost | |
CN212005031U (en) | Measuring scale for project cost budget | |
CN205068481U (en) | Constructional engineering cost budget rehearsal device | |
CN205426136U (en) | Be fit for building site measuring device | |
CN205537425U (en) | Measuring device for engineering cost | |
CN210551159U (en) | Workpiece scribing device for mechanical teaching | |
CN210513112U (en) | Measuring device for municipal works | |
CN208350086U (en) | A kind of portable measuring scale of project cost | |
CN208075848U (en) | Project cost field measurement apparatus | |
CN207982504U (en) | Data cutting machine | |
CN206321197U (en) | A kind of full-automatic three meters of ruler measuring instruments | |
CN206866815U (en) | A kind of construction costs budget tool box | |
CN212458158U (en) | Dipperstick for engineering cost | |
CN219248223U (en) | Wireless liquid level acquisition terminal | |
CN205826715U (en) | A kind of dust-proof detachable electric energy meter | |
CN210952830U (en) | Measuring instrument for building engineering | |
CN205897982U (en) | Multi -functional engineering management dipperstick | |
CN220446453U (en) | Automatic scribing device for ship building | |
CN218847106U (en) | Road planning is with turning angle measuring device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20191011 Termination date: 20200314 |
|
CF01 | Termination of patent right due to non-payment of annual fee |