CN209482304U - A kind of road construction pile pulling device - Google Patents

A kind of road construction pile pulling device Download PDF

Info

Publication number
CN209482304U
CN209482304U CN201821899498.XU CN201821899498U CN209482304U CN 209482304 U CN209482304 U CN 209482304U CN 201821899498 U CN201821899498 U CN 201821899498U CN 209482304 U CN209482304 U CN 209482304U
Authority
CN
China
Prior art keywords
threaded rod
pile pulling
gear bar
support frame
bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821899498.XU
Other languages
Chinese (zh)
Inventor
郭红敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinchang Chengtan Town Chengshe Machinery Factory
Original Assignee
Xinchang Chengtan Town Chengshe Machinery Factory
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinchang Chengtan Town Chengshe Machinery Factory filed Critical Xinchang Chengtan Town Chengshe Machinery Factory
Priority to CN201821899498.XU priority Critical patent/CN209482304U/en
Application granted granted Critical
Publication of CN209482304U publication Critical patent/CN209482304U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to technical field of road construction, and disclose a kind of road construction pile pulling device, including pedestal, the bottom of the pedestal is fixedly installed with idler wheel, the side of the base top is fixedly installed with supporting leg, the support frame positioned at supporting leg side is fixedly installed at the top of the pedestal, the side movable sleeve of the pedestal is connected to the first threaded rod positioned at support frame side, one end of first threaded rod and the bottom pivot bush unit of fixed plate, fixed plate are fixedly mounted on the top of support frame inner wall.The road construction pile pulling device, pass through being used cooperatively for the first threaded rod, the second threaded rod, first gear bar, second gear bar and driving gear bar, so that equipment can be adapted for some small-sized pile bodies, it avoids because the specification of pile pulling device is larger, it is not suitable for small-sized pile body, needs the problem of carrying out artificial pile pulling, leading to pile pulling low efficiency, to reduce labor intensity, the working efficiency of pile pulling is improved.

Description

A kind of road construction pile pulling device
Technical field
The utility model relates to technical field of road construction, specially a kind of road construction pile pulling device.
Background technique
Pile-drawing machine is the piling machinery that stake is extracted to stratum using vibration, static(al) or hammer action, is pulled out in construction with vibration Stake is more universal, when operation, vibrating extractor is installed in pile crown, is hung under suspension hook, is started by spring bump leveller and rigging Pile-drawing machine, the vibration that vibrator generates cause stake and soil resonance, and soil structures are destroyed, and frictional force reduces between pile body and the soil body, Rigging is tightened simultaneously, stake is gradually extracted.
Current pile pulling device is typically all to be suitable for the biggish pile body of some specifications, pile body lesser for some specifications For, artificial mode pile pulling is usually used, pile pulling efficiency is lower, if carrying out pile pulling using existing pile pulling device, not only Be easy to cause pile pulling work inconvenient and extremely waste, in addition, pile pulling device when carrying out pile pulling, need according to the size of pile body come Clamping mechanism is adjusted, so that pile body is clamped, it is complicated for operation, while increasing the time of pile pulling work.
Utility model content
In view of the deficiencies of the prior art, the utility model provides a kind of road construction pile pulling device, and it is small to have adaptation The advantages of pile pulling of type pile body, Automatic-clamping, solves because pile pulling device specification is larger, is not suitable for small-sized pile body, needs Artificial pile pulling increases pile pulling work so that pile pulling low efficiency and needs adjust clamping mechanism according to the specification of different pile bodies The problem of time.
The utility model provides the following technical solutions: a kind of road construction pile pulling device, including pedestal, the pedestal Bottom is fixedly installed with idler wheel, and the side of the base top is fixedly installed with supporting leg, and the top of the pedestal is fixedly mounted There is the support frame positioned at supporting leg side, the side movable sleeve of the pedestal is connected to the first threaded rod positioned at support frame side, One end of first threaded rod and the bottom pivot bush unit of fixed plate, the fixed plate are fixedly mounted on the top of support frame inner wall End, one end of first threaded rod are fixedly connected with one end of the first gear bar at the top of fixed plate, the first gear bar The other end through the top of support frame and ratcheting with the driving gear bar at the top of support frame, one end of the driving gear bar with The output shaft pivot bush unit of motor, the motor are fixedly mounted on the fixed frame of one lateral roof of support frame, the base bottom Other side movable sleeve be connected to the second threaded rod, one end of second threaded rod and the second gear bar at the top of fixed plate are fixed Connection, the threaded one end of second threaded rod are socketed with sliding block, and the side movable sleeve of the sliding block is connected to mounting plate, the peace The side of loading board is fixedly installed with curved splint, and the side of the mounting plate inner cavity is fixedly connected with one end of spring, the bullet The other end of spring is fixedly connected with the side of fixture block, and the other side of the fixture block is fixedly connected with one end of guide rod, the fixture block The top of side is flexibly connected with one end of motion bar, and the other end of the motion bar is through mounting plate and solid with one end of push rod Fixed connection, the other end of the push rod are fixedly connected with the side of curved splint, and the side of the sliding block, which is fixedly installed with, to be located at Hydraulic stem above mounting plate, one end of the hydraulic stem are fixedly connected with the side of curved splint.
Preferably, the both ends of the driving gear bar are fixedly installed with driving gear, and the master at driving gear bar both ends Moving gear is ratcheting with one end of first gear bar and second gear bar respectively.
Preferably, one end of the second gear bar is run through the bottom of fixed plate and is fixed with one end of the second threaded rod and connects It connects, and the other end of second gear bar is through the top of support frame and ratcheting with one end of driving gear.
Preferably, the quantity of the sliding block is two, and screw thread is socketed in the first threaded rod and second to two sliding blocks respectively One end of threaded rod.
Preferably, one end of the guide rod through the inner cavity of mounting plate and the side of curved splint and extends to curved splint The other side, and the size of guide rod is adapted with the through slot of curved splint side.
Preferably, the quantity of the motion bar is two groups, and two groups of motion bars are respectively and fixedly installed on two mounting plates, The groove pivot bush unit that the middle part of the motion bar is opened up by removable pin and mounting plate side.
Be compared with the prior art, the utility model have it is following the utility model has the advantages that
1, the road construction pile pulling device passes through the first threaded rod, the second threaded rod, first gear bar, second gear Being used cooperatively for bar and driving gear bar, so that equipment can be adapted for some small-sized pile bodies, avoids because of pile pulling device Specification is larger, is not suitable for small-sized pile body, needs the problem of carrying out artificial pile pulling, leading to pile pulling low efficiency, to reduce Labor intensity improves the working efficiency of pile pulling.
2, the road construction pile pulling device makes to press from both sides by being used cooperatively for guide rod, spring, fixture block, motion bar and push rod The mechanism of holding can automatically clamp pile body, avoid because need clamping mechanism is adjusted according to the specification of different pile bodies, from And the problem of increasing the pile pulling working time, thus reduce the time of pile pulling work, the efficiency for enabling pile pulling to work It is promoted.
Detailed description of the invention
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is the utility model structure mounting plate schematic diagram;
Fig. 3 is enlarged diagram at the A of the utility model structure.
In figure: 1, pedestal;2, idler wheel;3, supporting leg;4, support frame;5, the first threaded rod;6, fixed plate;7, first gear Bar;8, driving gear bar;9, motor;10, fixed frame;11, the second threaded rod;12, second gear bar;13, sliding block;14, it installs Plate;15, curved splint;16, spring;17, fixture block;18, guide rod;19, motion bar;20, push rod;21, hydraulic stem.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
It please refers to Fig. 1-3, a kind of road construction pile pulling device, including pedestal 1, the bottom of pedestal 1 and is fixedly installed with rolling The side of wheel 2,1 top of pedestal is fixedly installed with supporting leg 3, and the top of pedestal 1 is fixedly installed with the branch positioned at 3 side of supporting leg Support 4, the side movable sleeve of pedestal 1 are connected to the first threaded rod 5 positioned at 4 side of support frame, one end of the first threaded rod 5 and solid The bottom pivot bush unit of fixed board 6, fixed plate 6 are fixedly mounted on the top of 4 inner wall of support frame, one end of the first threaded rod 5 and solid One end of the first gear bar 7 at the top of fixed board 6 is fixedly connected, the other end of first gear bar 7 through support frame 4 top and with The driving gear bar 8 at 4 top of support frame is ratcheting, and the both ends of driving gear bar 8 are fixedly installed with driving gear, and driving gear The driving gear at 8 both ends of bar is ratcheting with one end of first gear bar 7 and second gear bar 12 respectively, passes through driving gear bar 8 The power of motor 9 is transmitted to first gear bar 7 and second gear bar 12 by transmission effect, to make first gear bar 7 and second The rotation direction of rack 12 is consistent, one end of driving gear bar 8 and the output shaft pivot bush unit of motor 9, the type of motor 9 It number is Y112M-2, motor 9 is fixedly mounted on the fixed frame 10 of 4 one lateral roof of support frame, the other side activity of 1 bottom of pedestal It is socketed with the second threaded rod 11, one end of the second threaded rod 11 is fixedly connected with the second gear bar 12 at 6 top of fixed plate, and second One end of rack 12 is run through the bottom of fixed plate 6 and is fixedly connected with one end of the second threaded rod 11, and second gear bar 12 The other end through the top of support frame 4 and ratcheting with one end of driving gear, by the transmission of second gear bar 12, make second Threaded rod 11 and second gear bar 12 keep identical rotation direction, so that sliding block 13 be made preferably to move, ensure that equipment Reasonability, the threaded one end of the second threaded rod 11 are socketed with sliding block 13, and the quantity of sliding block 13 is two, and two sliding blocks 13 are distinguished Screw thread is socketed in one end of the first threaded rod 5 and the second threaded rod 11, by the gag lever post between two sliding blocks 13, makes two arcs The horizontal direction of clevis plate 15 is consistent, and guarantee is not in the unstable generation of clamping, so that curved splint 15 can be with Pile body is preferably clamped, the side movable sleeve of sliding block 13 is connected to mounting plate 14, and the side of mounting plate 14 is fixedly installed with arc folder The side of plate 15,14 inner cavity of mounting plate is fixedly connected with one end of spring 16, and the other end of spring 16 and the side of fixture block 17 are solid Fixed connection, the other side of fixture block 17 are fixedly connected with one end of guide rod 18, one end of guide rod 18 through mounting plate 14 inner cavity with The side of curved splint 15 and the other side for extending to curved splint 15, and the size of guide rod 18 and 15 side of curved splint is logical Slot is adapted, and by guide rod 18, when contacting curved splint 15 and pile body, guide rod 18 is mobile to the inside of mounting plate 14, is driven One end of motion bar 19 is mobile, and then drives the movement of push rod 20, ensure that curved splint 15 can clamp pile body, fixture block automatically The top of 17 sides is flexibly connected with one end of motion bar 19, and the quantity of motion bar 19 is two groups, and two groups of motion bars 19 are distinguished It is fixedly mounted on two mounting plates 14, the groove activity that the middle part of motion bar 19 is opened up by removable pin and 14 side of mounting plate Socket, by two groups of motion bars 19, so that the two sides of curved splint 15 are inwardly bonded, to clamp pile body, utilizes motion bar The removable pin at 19 middle parts, is driven motion bar 19 more reasonably, the other end of motion bar 19 through mounting plate 14 and with One end of push rod 20 is fixedly connected, and the other end of push rod 20 is fixedly connected with the side of curved splint 15, and the side of sliding block 13 is solid Dingan County is equipped with the hydraulic stem 21 for being located at 14 top of mounting plate, and one end of hydraulic stem 21 is fixedly connected with the side of curved splint 15.
Working principle is first turned on motor 9, and driving gear bar 8 is driven to rotate, and then drives first gear bar 7 and second Rack 12 rotates, so that the first threaded rod 5 and the rotation of the second threaded rod 11 pass through hydraulic stem 21 to keep sliding block 13 mobile Mounting plate 14 is pushed, curved splint 15 is made to fit with pile body, so that guide rod 18 is mobile to 14 inner cavity of mounting plate, drives motion bar 19 one end is mobile, so that the other end of motion bar 19 is mobile to the side of curved splint 15, carries out driving push rod 20 mobile, make It obtains curved splint 15 and clamps pile body.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality Body, which is perhaps operated, to be distinguished and not necessarily requires or dark and deposit between these entities or operation with another entity or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (6)

1. a kind of road construction pile pulling device, including pedestal (1), it is characterised in that: the bottom of the pedestal (1) is fixedly mounted Have idler wheel (2), the side at the top of the pedestal (1) is fixedly installed with supporting leg (3), and the top of the pedestal (1) is fixedly mounted There is the support frame (4) positioned at supporting leg (3) side, the side movable sleeve of the pedestal (1) is connected to positioned at support frame (4) side First threaded rod (5), one end of first threaded rod (5) and the bottom pivot bush unit of fixed plate (6), the fixed plate (6) It is fixedly mounted on the top of support frame (4) inner wall, one end of first threaded rod (5) and the first tooth at the top of fixed plate (6) One end of wheel bar (7) is fixedly connected, top and and support frame of the other end of the first gear bar (7) through support frame (4) (4) the driving gear bar (8) at the top of is ratcheting, one end of the driving gear bar (8) and the output shaft pivot bush unit of motor (9), The motor (9) is fixedly mounted on the fixed frame (10) of (4) one lateral roof of support frame, the other side of pedestal (1) bottom Movable sleeve is connected to the second threaded rod (11), one end of second threaded rod (11) and the second gear bar at the top of fixed plate (6) (12) it is fixedly connected, the threaded one end of second threaded rod (11) is socketed with sliding block (13), and the side of the sliding block (13) is living Dynamic to be socketed with mounting plate (14), the side of the mounting plate (14) is fixedly installed with curved splint (15), the mounting plate (14) The side of inner cavity is fixedly connected with the one end of spring (16), the fixed company of the other end of the spring (16) and the side of fixture block (17) It connects, the other side of the fixture block (17) is fixedly connected with one end of guide rod (18), the top of fixture block (17) side and activity One end of bar (19) is flexibly connected, and the other end of the motion bar (19) is through mounting plate (14) and solid with one end of push rod (20) Fixed connection, the other end of the push rod (20) are fixedly connected with the side of curved splint (15), and the side of the sliding block (13) is solid Dingan County is equipped with the hydraulic stem (21) being located above mounting plate (14), and the one of one end of the hydraulic stem (21) and curved splint (15) Side is fixedly connected.
2. a kind of road construction pile pulling device according to claim 1, it is characterised in that: the driving gear bar (8) Both ends be fixedly installed with driving gear, and the driving gear at driving gear bar (8) both ends respectively with first gear bar (7) and One end of second gear bar (12) is ratcheting.
3. a kind of road construction pile pulling device according to claim 1, it is characterised in that: the second gear bar (12) One end through fixed plate (6) bottom and be fixedly connected with one end of the second threaded rod (11), and second gear bar (12) The other end is through the top of support frame (4) and ratcheting with one end of driving gear.
4. a kind of road construction pile pulling device according to claim 1, it is characterised in that: the quantity of the sliding block (13) It is two, and screw thread is socketed in one end of the first threaded rod (5) and the second threaded rod (11) to two sliding blocks (13) respectively.
5. a kind of road construction pile pulling device according to claim 1, it is characterised in that: one end of the guide rod (18) Through the inner cavity of mounting plate (14) and the side of curved splint (15) and the other side for extending to curved splint (15), and guide rod (18) size is adapted with the through slot of curved splint (15) side.
6. a kind of road construction pile pulling device according to claim 1, it is characterised in that: the number of the motion bar (19) Amount is two groups, and two groups of motion bars (19) are respectively and fixedly installed on two mounting plates (14), the middle part of the motion bar (19) The groove pivot bush unit opened up by removable pin and mounting plate (14) side.
CN201821899498.XU 2018-11-19 2018-11-19 A kind of road construction pile pulling device Expired - Fee Related CN209482304U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821899498.XU CN209482304U (en) 2018-11-19 2018-11-19 A kind of road construction pile pulling device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821899498.XU CN209482304U (en) 2018-11-19 2018-11-19 A kind of road construction pile pulling device

Publications (1)

Publication Number Publication Date
CN209482304U true CN209482304U (en) 2019-10-11

Family

ID=68116031

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821899498.XU Expired - Fee Related CN209482304U (en) 2018-11-19 2018-11-19 A kind of road construction pile pulling device

Country Status (1)

Country Link
CN (1) CN209482304U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111733814A (en) * 2020-07-06 2020-10-02 段满红 Working method of multistage pile pulling device with one-way locking effect
CN111733815A (en) * 2020-07-06 2020-10-02 段满红 Multistage pile pulling device with one-way locking effect
CN112832242A (en) * 2021-01-28 2021-05-25 浙江中垚建设有限公司 Building green construction is with high-efficient clearing device of old and useless basis
CN114215063A (en) * 2021-12-03 2022-03-22 天津一冶建设工程有限公司 Pile pulling equipment for pulling piles of steel pipe columns of door opening frames

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111733814A (en) * 2020-07-06 2020-10-02 段满红 Working method of multistage pile pulling device with one-way locking effect
CN111733815A (en) * 2020-07-06 2020-10-02 段满红 Multistage pile pulling device with one-way locking effect
CN112832242A (en) * 2021-01-28 2021-05-25 浙江中垚建设有限公司 Building green construction is with high-efficient clearing device of old and useless basis
CN112832242B (en) * 2021-01-28 2022-11-08 浙江昆仑园林工程有限公司 Building green construction is with high-efficient clearing device of old and useless basis
CN114215063A (en) * 2021-12-03 2022-03-22 天津一冶建设工程有限公司 Pile pulling equipment for pulling piles of steel pipe columns of door opening frames
CN114215063B (en) * 2021-12-03 2024-03-22 天津一冶建设工程有限公司 Pile pulling equipment for pulling pile of steel pipe column of door opening frame

Similar Documents

Publication Publication Date Title
CN209482304U (en) A kind of road construction pile pulling device
CN205571981U (en) Liftable clamping device
CN207401941U (en) Bending mechanism when crane span structure Steel material is processed
CN208310225U (en) A kind of civil engineering multi-purpose type template pours fixture
CN102837202A (en) Reinforced lockable device
CN204800239U (en) Cover machine is pressed to swing arm
CN210588230U (en) Positioning device convenient to adjust for spring processing
CN208907318U (en) A kind of Construction of Civil Engineering support device
CN109590425B (en) Full-automatic integrated device for gold foil forging
CN107142939B (en) A kind of pile-drawing machine of hydraulic engineering
CN208363095U (en) A kind of Static pressure pile driver
CN202825306U (en) Reinforcement locking device
CN208276475U (en) A kind of assembly device of balance shaft support assembly
CN109877738A (en) Turnover device is used in a kind of encapsulation of hydraulic press
CN214839648U (en) Electromechanical device mounting structure
CN201296939Y (en) Hydraulic pressure digging machine grabbing clamping device
CN211681829U (en) Crane part installation auxiliary device convenient to accurate butt joint
CN211285651U (en) Road slope reinforcing apparatus for civil engineering
CN208391581U (en) A kind of processing tool of automobile turbocharger component
CN220579986U (en) Vibrating hammer device
CN106926188B (en) Shake slot rocker arm adhesive tape mounting tool
CN216664124U (en) Arm is embraced to multi-functional hammer of adjustable
CN2670443Y (en) Prestressed concrete tubular pile clipper
CN215884913U (en) Lifting, overturning and dumping device for garbage can
CN220184015U (en) Vibrating pile hammer

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191011

Termination date: 20211119