CN209481062U - A kind of tongs of balance-adjustable - Google Patents
A kind of tongs of balance-adjustable Download PDFInfo
- Publication number
- CN209481062U CN209481062U CN201920112541.1U CN201920112541U CN209481062U CN 209481062 U CN209481062 U CN 209481062U CN 201920112541 U CN201920112541 U CN 201920112541U CN 209481062 U CN209481062 U CN 209481062U
- Authority
- CN
- China
- Prior art keywords
- hanging ring
- tongs
- mounting
- screw rod
- boom body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
A kind of tongs of balance-adjustable of the utility model, including clamp handle, and it is mounted on the pincers portion of clamp handle front end;It is characterized in that, a vertically arranged boom body is hinged in the clamp handle, the lower section of the boom body and clamp handle are hinged, and are equipped with tongs anterior-posterior horizontal regulating mechanism, the top of the boom body is equipped with lifting portion, and the lifting portion is provided with tongs left and right horizontal regulating mechanism.Screw, the anterior-posterior horizontal posture of adjustable tongs ontology are adjusted by the anterior-posterior horizontal adjusted on anterior-posterior horizontal regulating mechanism;Adjust the hanging ring adjusting screw rod of left and right horizontal regulating mechanism, the left-right position of adjustable hanging ring, and then adjust the left and right horizontal posture of tongs ontology, directly the horizontal attitude of tongs can be adjusted under lifting state to realize, it is convenient and efficient, and position can lock after adjusting, and subsequent operation is facilitated to use.
Description
Technical field
The tongs that the utility model relates to need to use during industrial gas oil drilling well or well workover, it is especially a kind of
The tongs of its own equilibrium state is adjusted.
Background technique
Tongs is industrial gas oil drilling well or well workover in the process to the commonly used equipment of drilling rod maintenance, generally requires symbol
It closes People's Republic of China's standard GB/T17744-2015 " industrial gas oil drilling well and workover rig ", and the Chinese people are total
With state oil and gas industry standard SY/T5035-2004 " hanging ring, elevator, tongs ".
Tongs before use, need to lift it, makes vice body holding as far as possible horizontal, but tongs was lifting at present
It is all to lift by crane to fall repeatedly by worker in journey, then according to the state after lifting, the position of fine tuning hook, hanging ring is adjusted
Whole, worker rule of thumb, adjusts suitable position, then from now in use, empirically prejudge link position, reduce
Hang the number of judgement adjustment.
This respect problem existing for tongs affects manufacturing schedule to a certain extent, therefore it is necessary to improve part knot
Structure improves the adjustment speed of tongs balance.
Utility model content
The purpose of the utility model is to overcome defects in the prior art, provide a kind of tongs of balance-adjustable, packet
Clamp handle is included, and is mounted on the pincers portion of clamp handle front end;Specifically being improved to for the utility model, it is perpendicular to be hinged with one in the clamp handle
To the boom body of setting, the lower section of the boom body and clamp handle are hinged, and are equipped with tongs anterior-posterior horizontal regulating mechanism, the sunpender
The top of body is equipped with lifting portion, and the lifting portion is provided with tongs left and right horizontal regulating mechanism.
As the further improvement of the utility model above-mentioned technical proposal, the tongs anterior-posterior horizontal regulating mechanism is,
The front of the clamp handle is equipped with boom body mounting base, and the boom body mounting base is corresponding to be respectively equipped in the two sides of clamp handle
Pin shaft hole is installed, is equipped with mounting portion in the bottom of the boom body, the mounting portion is equipped with bearing pin mounting hole, the mounting portion
It is installed in the boom body mounting base, the pin shaft hole in the boom body mounting base is passed through by the first installation pin shaft, and wear
The bearing pin mounting hole is crossed, the boom body is hinged in the clamp handle by the first installation pin shaft;The boom body
Mounting portion to the tail portion of clamp handle extend, the perspective plane beyond the boom body, so be equipped with an anterior-posterior horizontal adjust screw hole, institute
It states and is fixed with anterior-posterior horizontal adjusting screw in anterior-posterior horizontal adjusting screw hole;The anterior-posterior horizontal adjusts screw tip and the institute of screw
Clamp handle is stated to be in contact.
As the further improvement of the utility model above-mentioned technical proposal, the first mounting pin the tip of the axis is equipped with spiral shell
Line screws on the first stop nut at its end on screw thread.
Further, first stop nut is slotted nut, is additionally provided in the first mounting pin the tip of the axis
Cotter-pin hold, the first split pin are inserted into the cotter-pin hold of the first installation pin shaft, and are opened and first stop nut
Fluting phase clamping.
As the further improvement of the utility model above-mentioned technical proposal, the tongs left and right horizontal regulating mechanism is institute
The top for stating boom body is bent to pincers portion direction, and level is equipped with a left and right adjusting mounting base, the left and right adjusting mounting base
Top is equipped with mounting groove, and the two sides of the mounting groove are equipped with mounting ear, and hanging ring adjusting screw rod is mounted on by the second installation pin shaft
In the mounting groove, the mounting ear that the second installation pin shaft passes through the mounting groove two sides is fixed;The hanging ring is adjusted
Screw rod is equipped with even arc-shaped hanging ring installation groove, and hanging ring is mounted in the installation groove of the hanging ring adjusting screw rod.
Further, the second mounting pin the tip of the axis is equipped with screw thread, and is screwed with the second stop nut;Described second
Stop nut is slotted nut, and the second installation pin shaft corresponds to nut on pin shaft body after the second stop nut is fixed
Slotting position is equipped with cotter-pin hold, and second split pin is inserted into the hole, and opens and be caught in opening for second stop nut
In slot.
As the further improvement of the utility model above-mentioned technical proposal, the hanging ring on hanging ring adjusting screw rod surface is installed
Groove is coherent spiral shape arc groove, and the hanging ring adjusting screw rod bottommost outer surface is away between the mounting groove upper surface
Spacing be less than the diameter of section of the hanging ring, and the top of the downside arc groove of the hanging ring adjusting screw rod is away from the installation
Spacing between slot upper surface is greater than the diameter of section of the hanging ring, and the hanging ring has been stuck in the circle of the hanging ring adjusting screw rod
In arc fluting.
Further, one end of the hanging ring adjusting screw rod is equipped with cylindrical external thread section, i.e. screw thread adjustable side, thereon
It is screwed with adjusting nut, the length of the hanging ring adjusting screw rod is slightly shorter than the inboard width of the mounting groove, by rotating the tune
Nut is saved, withstands on one end of the adjusting nut on the side wall of the mounting groove, and the other end of the hanging ring adjusting screw rod
It withstands on another side wall of the mounting groove, is locked in the hanging ring adjusting screw rod in the mounting groove.
Further, in the hanging ring adjusting screw rod and the installation groove sidewall contact surface and the adjusting nut and
The installation groove sidewall contact surface is coarse rubbing surface.
Clamp handle (vice body) is independently arranged, and in boom body by a kind of tongs of balance-adjustable of the utility model with boom body
Lower part be equipped with tongs anterior-posterior horizontal regulating mechanism, the top of boom body be equipped with tongs left and right horizontal regulating mechanism, pass through tune
Corresponding mechanism is saved, is realized to the separately adjustable, easy to operate and simple and reliable for structure of the horizontal attitude of tongs, it is easy to accomplish
And popularization.
Detailed description of the invention
Fig. 1 is a kind of tongs overall structure diagram of balance-adjustable of the utility model;
Fig. 2 is the sunpender position components perspective view of the explosion of the utility model;
Fig. 3 is the sunpender position overall mechanism schematic diagram of the utility model;
Fig. 4 is the sunpender positive view of the utility model;
Fig. 5 is the sunpender left and right horizontal regulating mechanism partial schematic diagram of the utility model;
Fig. 6 is the sunpender left and right horizontal regulating mechanism cross-sectional view of the utility model.
Specific embodiment
Below in conjunction with the drawings and specific embodiments, the utility model is described further.
A kind of tongs of balance-adjustable of the utility model, overall structure is as shown in Figure 1, include clamp handle 1, and be mounted on
The pincers portion 2 of 1 front end of clamp handle;Specifically being improved to for the utility model, is hinged with a vertically arranged boom body in the clamp handle 1
3, the lower section of the boom body 3 and clamp handle 1 are hinged, and are equipped with tongs anterior-posterior horizontal regulating mechanism 31, the top of the boom body 3
Equipped with lifting portion, for playing hanging rope, the lifting portion is provided with tongs left and right horizontal regulating mechanism 32.Pincers portion 2 is used to be pressed from both sides
Hold drilling rod, and tongs anterior-posterior horizontal regulating mechanism 31, tongs left and right horizontal regulating mechanism 32 be then used to respectively to tongs lifting after
Horizontality be adjusted, make tongs basic horizontal, facilitate operation.
It is illustrated in figure 2 the sunpender position components perspective view of the explosion of tongs, Fig. 3 show the whole knot of hanger rod part assembling
Structure schematic diagram.Specifically, the front of the clamp handle 1 is equipped with the boom body mounting base of boom body 3 to technical solutions of the utility model
11, the boom body mounting base 11 is to be respectively equipped with corresponding installation pin shaft hole in the two sides of clamp handle 1, in the boom body 3
Bottom be equipped with mounting portion 301, the mounting portion 301 is equipped with bearing pin mounting hole 302, and the mounting portion 301 is installed to described
In boom body mounting base 11, the pin shaft hole in the boom body mounting base 11 is passed through by the first installation pin shaft 12, and pass through institute
Bearing pin mounting hole 302 is stated, the boom body 3 is hinged in the clamp handle 1 by the first installation pin shaft 12;The sunpender
The mounting portion 301 of body 3 extends to the tail portion of clamp handle 1, the perspective plane beyond the boom body 3, and then is equipped with an anterior-posterior horizontal tune
Screw hole 303 is saved, the anterior-posterior horizontal, which is adjusted, is fixed with anterior-posterior horizontal adjusting screw 304 in screw hole 303;As shown in figure 4, passing through rotation
Turning described has anterior-posterior horizontal to adjust screw 304, its is made to adjust the position in screw hole 303 in the anterior-posterior horizontal, and the front and back
The screw head of horizontal adjustment screw 304 is withstood in the clamp handle 1, and then has adjusted bowing for the boom body 3 and the clamp handle 1
Angle α is faced upward, by adjusting the size of the angle α, to realize that the anterior-posterior horizontal state to entire tongs is adjusted.
Further, the end of the first installation pin shaft 12 is equipped with screw thread, and the first installation pin shaft 12 is installed in place
Afterwards, the first stop nut 13 is screwed on screw thread at its end, prevents the first installation pin shaft 12 from falling off.Further, institute
Stating the first stop nut 13 is slotted nut, is additionally provided with cotter-pin hold, the first opening in the end of the first installation pin shaft 12
Pin 14 is inserted into the cotter-pin hold of the first installation pin shaft 12, and opens the fluting phase clamping with first stop nut 13,
It further prevents the first installation pin shaft 12 to get loose in use, causes accident.
As shown in figure 5, the top of the boom body 3 is tongs left and right horizontal regulating mechanism 32, specifically boom body 3
Top is bent to 2 direction of pincers portion, and horizontal equipped with a left and right adjusting mounting base 310, the top of the left and right adjusting mounting base 310
Equipped with mounting groove 311, the two sides of the mounting groove 311 are equipped with mounting ear, and hanging ring adjusting screw rod 312 passes through the second installation pin shaft
313 are mounted in the mounting groove 311, and the mounting ear that the second installation pin shaft 313 passes through 311 two sides of mounting groove carries out
It is fixed;The hanging ring adjusting screw rod 312 is equipped with the installation groove of coherent spiral, and a hanging ring 316 is mounted on the hanging ring and adjusts
In the installation groove of screw rod 312.
Further, in order to locking, the end of the second installation pin shaft 313 is again provided with screw thread, and it is anti-to be screwed with second
Loose nut 314;Second stop nut 314 is similarly slotted nut, and the second installation pin shaft 313 is through the second stop nut
After 314 is fixed, the slotting position that nut is corresponded on pin shaft body is equipped with cotter-pin hold, and the hole is inserted into second split pin 315
It is interior, and open and be caught in the fluting of second stop nut 314, it carries out sufficiently locking.
It is described in the tongs left and right horizontal regulating mechanism 32 as shown in fig. 6, the important improvement as the utility model
Hanging ring adjusting screw rod 312 is round bar of the surface with coherent helicla flute, described to hang after being installed in the mounting groove 311
312 bottommost outer surface of ring adjusting screw rod is less than cutting for the hanging ring 316 away from the spacing h1 between 311 upper surface of mounting groove
Face diameter d, and the top of the downside arc groove of the hanging ring adjusting screw rod 312 is away between 311 upper surface of mounting groove
Spacing h2 is greater than the diameter of section d of the hanging ring 316, i.e., the described hanging ring 316 has been stuck in the circle of the hanging ring adjusting screw rod 312
In arc fluting, cannot the axial direction freely along the hanging ring adjusting screw rod 312 moved;When the rotation hanging ring adjusting screw rod
When 312, the hanging ring 316 could be displaced along the axial direction of the hanging ring adjusting screw rod 312, and this displacement is continuous;
One end of the hanging ring adjusting screw rod 312 is equipped with cylindrical external thread section, i.e. screw thread adjustable side 318, is screwed with adjusting nut thereon
317, the length of the hanging ring adjusting screw rod 312 is slightly shorter than the width of the mounting groove 311, by rotating the adjusting nut
317, withstand on one end of the adjusting nut 317 on the side wall of the mounting groove 311, and the hanging ring adjusting screw rod 312
The other end is withstood on another side wall of the mounting groove 311, and the hanging ring adjusting screw rod 312 is made to be locked in the mounting groove 311
Interior, position of the hanging ring 316 described in this way in the mounting groove 311 just secures;When the horizontal appearance for needing to adjust the tongs
When state, the adjusting nut 317 is unclamped by tool, then turn hanging ring adjusting screw rod 312, adjusts hanging ring 316 in hanging ring
It is moved on screw rod 312, and then adjusts the left and right horizontal posture of tongs;After adjusting in place, then reversely rotate the adjusting nut
317, eliminate the gap between the hanging ring adjusting screw rod 312 and mounting groove 311.Due on the hanging ring adjusting screw rod 312
316 holding tank of hanging ring is coherent spiral shape arc groove, therefore after lifting utensil is sling entire tongs by hanging ring 316, into
When row balance adjustment, it can directly rotate the hanging ring adjusting screw rod 312 and the position of hanging ring 316 is adjusted, without repeatedly
Entire tongs is lifted by crane, the time of adjustment is greatly saved;And once regulated, it can pass through adjusting nut 317
The position is locked, is retained, subsequent use is facilitated.
Further, in the hanging ring adjusting screw rod 312 and the 311 side wall contact surface of mounting groove and the adjusting spiral shell
Mother 317 and the 311 side wall contact surface of mounting groove, are coarse rubbing surface 319, are realized by the frictional force of two contact surfaces
It is locking.
Further, spanner operation portion is equipped on the hanging ring adjusting screw rod 312, conveniently by spanner come to hanging ring tune
The rotation of section screw rod 312 is operated, and when also conveniently tightening the adjusting nut 317, is preferably locked.In general, this is pulled
Hand operation portion can be set on the body of rod of hanging ring adjusting screw rod 312 and 311 side wall of mounting groove contact side, and spanner operation portion can
To be designed to square, it is also possible to hexagon, as long as convenient wrench blocks, is operated, thus it is not enterprising in schematic diagram
Row is shown.
The preferred embodiment created to the utility model above is illustrated, but the utility model is created not
It is only limitted to the embodiment, those skilled in the art go back under the premise of without prejudice to the utility model creative spirit
Various equivalent variation or replacement can be made, these equivalent modifications or replacement are all contained in the claim of this application and are limited
In the range of.
Claims (9)
1. a kind of tongs of balance-adjustable, including clamp handle, and it is mounted on the pincers portion of clamp handle front end;It is characterized in that, described
A vertically arranged boom body is hinged in clamp handle, the lower section of the boom body and clamp handle are hinged, and are equipped with tongs anterior-posterior horizontal
The top of regulating mechanism, the boom body is equipped with lifting portion, and the lifting portion is provided with tongs left and right horizontal regulating mechanism.
2. according to a kind of tongs of balance-adjustable described in claim 1, which is characterized in that the tongs anterior-posterior horizontal regulating mechanism
To be equipped with boom body mounting base in the front of the clamp handle, the boom body mounting base is to be respectively equipped with phase in the two sides of clamp handle
Corresponding installation pin shaft hole is equipped with mounting portion in the bottom of the boom body, and the mounting portion is equipped with bearing pin mounting hole, described
Mounting portion is installed in the boom body mounting base, passes through the pin shaft in the boom body mounting base by the first installation pin shaft
Hole, and the bearing pin mounting hole is passed through, the boom body is hinged in the clamp handle by the first installation pin shaft;It is described
The mounting portion of boom body extends to the tail portion of clamp handle, the perspective plane beyond the boom body, and then is equipped with an anterior-posterior horizontal and adjusts
Screw hole, the anterior-posterior horizontal, which is adjusted, is fixed with anterior-posterior horizontal adjusting screw in screw hole;The anterior-posterior horizontal adjusts the screw rod of screw
Top is in contact with the clamp handle.
3. according to a kind of tongs of balance-adjustable as claimed in claim 2, which is characterized in that the first mounting pin the tip of the axis is set
There is screw thread, screws on the first stop nut on screw thread at its end.
4. according to a kind of tongs of balance-adjustable as claimed in claim 3, which is characterized in that first stop nut is fluting spiral shell
Mother is additionally provided with cotter-pin hold in the first mounting pin the tip of the axis, and the first split pin is inserted into the opening of the first installation pin shaft
In pin hole, and open the fluting phase clamping with first stop nut.
5. according to a kind of tongs of balance-adjustable described in claim 1, which is characterized in that the tongs left and right horizontal regulating mechanism
For the top of the boom body is bent to pincers portion direction, and horizontal equipped with a left and right adjusting mounting base, the left and right adjusting installation
The top of seat is equipped with mounting groove, and the two sides of the mounting groove are equipped with mounting ear, and hanging ring adjusting screw rod passes through the second installation pin shaft peace
In the mounting groove, the mounting ear that the second installation pin shaft passes through the mounting groove two sides is fixed;The hanging ring
Adjusting screw rod is equipped with even arc-shaped hanging ring installation groove, and hanging ring is mounted in the installation groove of the hanging ring adjusting screw rod.
6. according to a kind of tongs of balance-adjustable described in claim 5, which is characterized in that the second mounting pin the tip of the axis is set
There is screw thread, and is screwed with the second stop nut;Second stop nut is slotted nut, and the second installation pin shaft is anti-through second
After loose nut is fixed, the slotting position that nut is corresponded on pin shaft body is equipped with cotter-pin hold, and the second split pin is inserted into the hole, and
Opening is caught in the fluting of second stop nut.
7. according to a kind of tongs of balance-adjustable as claimed in claim 6, which is characterized in that hang on hanging ring adjusting screw rod surface
Ring installation groove is coherent spiral shape arc groove, and the hanging ring adjusting screw rod bottommost outer surface is away from table on the mounting groove
Spacing between face is less than the diameter of section of the hanging ring, and the top of the downside arc groove of the hanging ring adjusting screw rod is away from institute
The diameter of section that the spacing between mounting groove upper surface is greater than the hanging ring is stated, the hanging ring has been stuck in the hanging ring and has adjusted spiral shell
In the arc groove of bar.
8. according to a kind of tongs of balance-adjustable as claimed in claim 7, which is characterized in that one end of the hanging ring adjusting screw rod is set
There are cylindrical external thread section, i.e. screw thread adjustable side, be screwed with adjusting nut thereon, the length of the hanging ring adjusting screw rod is slightly shorter than institute
The inboard width for stating mounting groove makes one end of the adjusting nut withstand on the mounting groove by rotating the adjusting nut
On side wall, and the other end of the hanging ring adjusting screw rod is withstood on another side wall of the mounting groove, and the hanging ring is made to adjust spiral shell
Rod lock is in the mounting groove.
9. according to a kind of tongs of balance-adjustable according to any one of claims 8, which is characterized in that the hanging ring adjusting screw rod with it is described
Groove sidewall contact surface and the adjusting nut and the installation groove sidewall contact surface are installed, are coarse rubbing surface.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920112541.1U CN209481062U (en) | 2019-01-23 | 2019-01-23 | A kind of tongs of balance-adjustable |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920112541.1U CN209481062U (en) | 2019-01-23 | 2019-01-23 | A kind of tongs of balance-adjustable |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209481062U true CN209481062U (en) | 2019-10-11 |
Family
ID=68132210
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920112541.1U Active CN209481062U (en) | 2019-01-23 | 2019-01-23 | A kind of tongs of balance-adjustable |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209481062U (en) |
-
2019
- 2019-01-23 CN CN201920112541.1U patent/CN209481062U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204617423U (en) | Mechanical type table lifting mechanism | |
CN103025388A (en) | Adjustable exercise bars | |
CN209481062U (en) | A kind of tongs of balance-adjustable | |
CN209431873U (en) | A kind of graphitic carbonaceous silica crucible fixture | |
CN219489365U (en) | Self-unhooking lifting appliance convenient for lifting reinforcement cage | |
US2568263A (en) | Combination wrench and elevator | |
JP2009012936A (en) | Lifting tool | |
CN111335835B (en) | Well testing stop fork | |
WO2013056625A1 (en) | Telescopic tool for fuel oil precipitate discharge | |
CN216711368U (en) | Tower hoisting sling with high stability | |
CN111137780B (en) | Hoist and mount mousing-hook device | |
CN201013836Y (en) | Locking apparatus of small pot-hook spring | |
CN209364493U (en) | A kind of monkey wrench with activity adjustment plurality of specifications | |
CN210795512U (en) | Hang in midair stable steel band book suspension device | |
CN211623369U (en) | Movable well testing stop fork | |
CN215946497U (en) | Lifting hook device with protective structure for bridge crane | |
CN112027896A (en) | Lifting appliance capable of being adjusted to adapt to different gravity centers | |
CN201520597U (en) | Crank shaft hoisting tool | |
CN205572354U (en) | Structure of rotatable and locking instrument head | |
CN217889434U (en) | Chain maintenance device | |
CN209940319U (en) | Novel adjustable hanging head | |
CN220056008U (en) | Rail top air duct template lifting appliance | |
CN209856206U (en) | Double-nut adjusting device | |
CN116281575B (en) | Self-unhooking lifting appliance suitable for turning over and lifting reinforcement cage | |
CN219144874U (en) | Insulator chain R-shaped locking pin pulling tool |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |