CN209472398U - A kind of device that quickly resumes production of AC/AC (alternating current) variable-frequency rolling line jettisoning SVC - Google Patents

A kind of device that quickly resumes production of AC/AC (alternating current) variable-frequency rolling line jettisoning SVC Download PDF

Info

Publication number
CN209472398U
CN209472398U CN201920286868.0U CN201920286868U CN209472398U CN 209472398 U CN209472398 U CN 209472398U CN 201920286868 U CN201920286868 U CN 201920286868U CN 209472398 U CN209472398 U CN 209472398U
Authority
CN
China
Prior art keywords
unit
svc
variable
internal calculation
calculation unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920286868.0U
Other languages
Chinese (zh)
Inventor
杨传龙
郭红玲
李修强
李明悦
杨蕙欣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Rizhao Steel Holding Group Co Ltd
Original Assignee
Rizhao Steel Holding Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Rizhao Steel Holding Group Co Ltd filed Critical Rizhao Steel Holding Group Co Ltd
Priority to CN201920286868.0U priority Critical patent/CN209472398U/en
Application granted granted Critical
Publication of CN209472398U publication Critical patent/CN209472398U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/30Reactive power compensation

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The utility model discloses the devices that quickly resumes production of AC/AC (alternating current) variable-frequency rolling line jettisoning SVC a kind of, including power supply unit and the display unit connected with device internal calculation unit, input unit, control output unit;The power supply unit to the present apparatus to be powered;The display unit data derive from device internal calculation unit;The input unit will input or the data of acquisition are transferred to the device internal calculation unit;The device internal calculation unit combines the data of acquisition input, calculates the reactive compensation Qc that should be put into after AC/AC (alternating current) variable-frequency rolling line SVC damage;The model that the device internal calculation unit exports is reached external device controller by the control output unit.The characteristics of compared with prior art with no investment, Rolling production recovery is fast, does not influence the power system reactive power factor and quality of voltage.

Description

A kind of device that quickly resumes production of AC/AC (alternating current) variable-frequency rolling line jettisoning SVC
Technical field
The utility model relates to power supply and distribution field, especially a kind of AC/AC (alternating current) variable-frequency rolling line jettisoning static reactive power compensator The device quickly to resume production.
Background technique
Equipment of Hot Strip Mill AC-AC frequency conversion system power factor is low, and voltage drop is big, spread of voltage, needs mating static benefit It repays device SVC and carries out voltage compensation, power factor compensation, so that system voltage when steel rolling be kept to stablize.Due to existing SVC device Control system is complicated, and power electronic devices and live hardware are easily damaged, and since cost is high, general hot rolling mill will not be to SVC The important control device and current-limiting reactor of system carry out spare part preparation, lead to hot rolling mill after above controller part and hardware damage It stops production for a long time.General current-limiting reactor damage, can stop production more than ten days in the case where no spare part, brought economic loss Number is huge.
Static reactive power compensator (SVC) is the electric system for maintaining network voltage to ensure production, as shown in Figure 1, SVC connects Enter in rolling line network system, filter group (FC) provides fixed capacitive reactive power (QC), SVC control system acquire rolling line electric current and The electric current for flowing through compensation reactor after voltage by thyristor triggering device control, provides inductive reactive power Q for systemTCR.Work as QN= QV-QC+QTCR=constant is (in formula: QNFor System Reactive Power, QVFor reactive load), power factor of electric network=constant, network voltage is several It does not fluctuate.Once any damage occur in SVC control system and series compensation reactor, and production scene is without the deposit part Replacement, inductive reactive power QTCR=0, System Reactive Power Q when steel rollingN=QV-QC, i.e., in the capacitive reactive power Qc whole of filter group (FC) Net, network system voltage significantly increase, and seriously jeopardize the electrical equipments such as transformer, AC-AC frequency converter.
There is no guarantor's shipping unit of jettisoning static reactive power compensator in current above-mentioned rolling line electric system, when SVC accident, because No expensive SVC controller and reactor spare part will lead to stop production for a long time;And by searching for historical data and after theoretical calculation, then The system main transformer gear and filter group are manually adjusted, because national equipment of Hot Strip Mill proficiency is different, calculates and tests repeatedly Demonstrate,prove that difficulty is big, risk is high, AC/AC (alternating current) variable-frequency milling train time of temporarily resuming production is longer, or even the damage other user power utilization demands of power grid It contributes with electric network active is reduced.
Utility model content
The technical assignment of the utility model is to provide a kind of AC/AC (alternating current) variable-frequency rolling line jettisoning for the above the deficiencies in the prior art The device that quickly resumes production of SVC, control system of the AC/AC (alternating current) variable-frequency rolling line in the high static reactive power compensator of cost (SVC) Or after series compensation reactor (one group in general 6 groups) damage, transported by a kind of guarantor of jettisoning static reactive power compensator (SVC) Device ensures that equipment of Hot Strip Mill production restores in time in time, and does not influence the normal electricity consumption of the other electricity consumption departments of the bus-bar system, Network Voltage Stability is kept simultaneously.
The technical scheme in the invention for solving the technical problem is: a kind of AC/AC (alternating current) variable-frequency rolling line jettisoning SVC's is quick extensive Multiple process units, it is characterised in that: including power supply unit and the display unit connected with device internal calculation unit, input list Member, control output unit;The power supply unit to the present apparatus to be powered;The display unit data are from dress Set internal calculation unit;The input unit will input or the data of acquisition are transferred to the device internal calculation list Member;The device internal calculation unit combines the data of acquisition input, should put into after calculating AC/AC (alternating current) variable-frequency rolling line SVC damage Reactive compensation Qc;The model that the device internal calculation unit exports is reached external equipment control by the control output unit Device processed.
Above-mentioned display unit and input unit is liquid crystal control panels.
The signal that device internal calculation unit exports is reached external device controller by above-mentioned control output unit, packet It includes and each filter is put into/exited control signal exports to the control device of each group filter, and export the system main transformer Gear control signal is to control device for transformer.
It further include manual correction unit in prioritization scheme, for the setting modification of device intrinsic parameter.
Above-mentioned manual correction unit can be directly connected to the device internal calculation unit and carry out parameter modification.
Above-mentioned manual correction unit also can connect the input unit and then realize to device internal calculation unit Parameter modification.
Compared with prior art, the utility model have it is following prominent the utility model has the advantages that
1, in the AC/AC (alternating current) variable-frequency band steel rolled-wire electric system with static reactive power compensator (SVC), newly-increased one kind can Guarantor's shipping unit of jettisoning SVC, the device can acquire or input in advance the acquisition of SVC during normal production active/idle/highest and The parameters such as minimum voltage can automatically control filter FC group number after accident as needed and adjust fixed capacitive reactive power Qc, automatic to control Make the system transformer gear;
2, the utility model does not damage the other power consumer power demands of the power grid and reduces electric network active power output, protects simultaneously Hold Network Voltage Stability;Without investment, Rolling production restores fast, does not influence the power system reactive power factor and quality of voltage;
3, the utility model has small investment, and Rolling production restores fast, before damage spare part arrival restores completely, the power grid without Function power factor and quality of voltage influence small feature;
4, the steel rolling alternating-current-alternating-current frequency conversion system of the current several hundred sets of national equipment of Hot Strip Mill and outfit static reactive power compensator It can quickly be resumed production with utility model device, not the millions of control device of stand-by storage and reactor spare part, the whole nation Metallurgical system promotion potential is huge, can create huge economic benefit to enterprise.
Detailed description of the invention
Fig. 1 is prior art SVC system composition schematic diagram.
Fig. 2 is the system connection schematic diagram of the utility model.
Fig. 3 is the functional relationship block diagram of the utility model.
Fig. 4 is the functional relationship block diagram of the utility model embodiment 2.
Fig. 5 is transformer nameplate parameter reference picture in the utility model embodiment.
Fig. 6 is the utility model rolling line power supply system schematic diagram.
Fig. 7 is the flow chart of the utility model embodiment 2.
Specific embodiment
The present invention will be further described with specific embodiment with reference to the accompanying drawings of the specification.The utility model is one The device that quickly resumes production of kind AC/AC (alternating current) variable-frequency rolling line jettisoning SVC, is described below in detail the embodiments of the present invention, the reality The example for applying example is intended for explaining the utility model, and should not be understood as limiting the present invention.It is not infused in embodiment Bright particular technique or condition person, according to the literature in the art described technology or conditions or according to product description into Row.Production firm person is not specified in instrument, and being can be with conventional products that are commercially available, and application method and inherence are former Reason is not stated again tired.
Utility model device control function is shown according to rolling line minimax load and grid power parameter, is calculated The existing transformer gear and filter FC group number that SVC failure should be put into after stopping transport, can either manually or automatically control transformation Device gear and filter FC group number.
The utility model quickly resumes production, and device is mountable on filter FC high-voltage switch cabinet door panel, and outside connects Relationship is connect as shown in Fig. 2, acquiring grid line voltage and phase voltage from main transformer T low-pressure side 35kV PT cabinet;From main transformer T low-pressure side 35kV outlet switch cabinet current transformer acquires electric current.Each filter (FC), which is exported, by control output unit puts into/exit control Signal processed to each group filter control device, and export the system main transformer gear control signal to transformer control fill It sets.When the TCR device failure such as SVC control system or bidirectional thyristor, it can in emergency circumstances pass through this device manual confirmation Or automatic calculating, complete the output action of filter FC group number and transformer gear selection investment.
Utility model device composition: including power supply unit and the display unit connected with device internal calculation unit, Input unit, control output unit.
The power supply unit, its object is to which 220V alternating current is converted into low pressure 24 or 12V power supply, to this dress It sets and is powered, specific element can be transformer.Because the specific implementation of this Elementary Function is numerous, this field Technical staff can be according to its function unrestricted choice to be achieved corresponding hardware in the prior art, therefore hardware components do not do and have Body description and restriction, each functional unit narrating mode is similar below.
The display unit can show the numerical value such as input, the numerical value of output or parameter by display unit, display Data source is in device internal calculation unit.Liquid crystal control panels can be used, it can be using conventional display board card module, wiring Terminal etc., hardware components are not specifically described and are limited.
The input unit: its object is to be required by the requirement of system voltage stability bandwidth, reactive factor and now The requirement of alternating-current-alternating-current frequency conversion system to voltage, in advance input or automatic collection during normal production SVC acquisition it is active/idle/ The real time datas such as highest and lowest voltage, and the data of input or acquisition are transferred to the device internal calculation unit. Can be using conventional input analog input card module, connecting terminal etc., hardware components are not specifically described and are limited.Prioritization scheme In, the display unit and input unit are using the liquid crystal control panels for showing that input function is integrated.
The device internal calculation unit: by the example, in hardware including CPU element, in conjunction with the input unit The parameters such as rolling line main transformer and the network transformer route of input are acquired, should be put into after calculating AC/AC (alternating current) variable-frequency rolling line SVC damage Reactive compensation Qc.Input data and calculation method include: main transformer high pressure in the case of two kinds of the highest and lowest load of rolling line Side voltage drop;According to main transformer high side voltage when minimum load and the requirement of rolling line ceiling voltage, transformer voltage ratio is calculated;According to most Main transformer high side voltage and the requirement of rolling line minimum voltage, are calculated the filter Qc that should be put into when big load;Choose close Qc Filter after verify, and according to the fine-tuning transformer voltage ratio such as voltage ripple of power network.The device internal calculation unit In calculate the method being related in detail, process is seen below, but this method and process are only a kind of way of realization, and others may be implemented The method for the reactive compensation Qc function that this unit acquisition parameter, calculating should be put into can be used.Can use can be realized Chip modules, the hardware components such as the conventional single-chip microcontroller of function are stated not specifically describe and limit.
The control output unit: the signal that the device internal calculation unit exports is reached into peripheral equipment control Device exports to the control device of each group filter including putting into/exiting control signal for each filter (FC), and exports this and be Main transformer gear control signal unite to control device for transformer.To realize adjustment main shift and filter group number (scene Main shift 0,1-17 grades, tetra- groups of filter group number H3/H5/H7/H11).It can be using conventional output module, connecting terminal Deng hardware components are not specifically described and limited.
It can also include manual correction unit in prioritization scheme, function is modified in the setting of realization device intrinsic parameter, such as can It is manually entered active/idle/highest and lowest voltage of SVC acquisition during normal production, power network equipment electricity can be manually entered Force parameter.It can be after voltage ripple of power network situation when actually looking at Rolling production and power factor change situation according to practical feelings Condition is to main transformer gear and can correct manually in device panel.Specific data connection relationship, can be as shown in figure 3, for hand Dynamic amending unit is directly connected to the device internal calculation unit and carries out parameter modification, can also be as shown in figure 4, manual correction The parameter modification of the unit connection input unit and then realization to device internal calculation unit.
When the power electronic control system of hot rolling mill SVC system and series compensation reactor failure, TCR and reactor stop Fortune, rolling line milling train are forced tripping grinder, produce new equipment using the guarantor in the application at this time, automatically control filter FC group number tune Capacitive reactive power Qc is determined in solidating, and automatically controlling the system transformer gear, (when non-on-load regulator transformer, need to show should adjust shelves Position).After electric system matches again, AC/AC (alternating current) variable-frequency milling train can put into operation, and the fast quick-recovery of rolling line temporarily produces.
Calculation method, process involved in device internal calculation unit described in the utility model, specially hot-strip are raw By the method for theoretical calculation jettisoning static reactive power compensator SVC in producing line milling train alternating-current-alternating-current frequency conversion system urgency situation, specifically by Following steps are constituted:
S1: minimum voltage and ceiling voltage when determining the alternating-current-alternating-current frequency conversion system steel rolling of the side 35kV: alternating-current-alternating-current frequency conversion system requires to roll Minimum voltage when steel produces under peak load is not less than 0.95 times of voltage rating 35kV, and ceiling voltage when minimum load is not More than 1.1 times of voltage rating 35kV.It acts as basic conditions.In the present embodiment, voltage rating 35KV, then according to transformation Device no-load voltage ratio calculates high side voltage, and minimum voltage is not less than 33.25KV, and ceiling voltage is no more than 38.5KV.
S2: maximum voltage when 110kV bus whole load zero load is determined: by the comprehensive 110kV for protecting background query of high pressure Ceiling voltage is 117kV in the historical record of side.It acts as basic calculation conditions.
S3: it calculates the voltage value determined in the minimum and maximum situation of 110kV bus institute's on-load: calculating steel rolling maximum most Voltage value when Smaller load.It acts as basic calculation conditions, calculate step to be crucial.
(1) Qmax, Qmin and Uk% are determined
As shown in fig. 6, according to 35KV original Design cooling load (the automatically controlled charter content that designing institute is given when Hot Line is built) Directly acquire maximum active Pmax, minimum idle Qmax, by the minimum active Pmin of historical experience value, minimum idle Qmin, and Uk%, and the design of rolling line load system apparent energy Smax and Smin is calculated.
(2) power supply system line resistance R is calculatedT
RT: substation's GIS switch outlet to the sum of the line and transformer resistance for loading high-voltage switch gear.Line is ignored in this calculating Road resistance value;
Δ Ps: kW is lost in three-phase shortcircuit;Being looked into transformer nameplate parameter list (Fig. 5) is 234.1kW;
UN: transformer rated line voltage kV;
SN: Three-Phase Transformer rated capacity kVA, data source is transformer nameplate parameter list.
(3) power supply system line reactance X is calculatedT:
Us%: the short-circuit voltage percentage value of transformer (takes Us%=Uk%, 11.9) being looked into transformer nameplate parameter list is;
Transformer impedance X=R is released by (1) (2)T+jXT
(4) when calculating minimum and maximum load, low-pressure side bus reduction to the minimum and maximum voltage value in high-pressure side
U1: main transformer high-side system voltage passes through ceiling voltage in the comprehensive side the 110kV historical record for protecting background query of high pressure For 117kV;
△ Umax: pressure drop of the busy hour reduction to main transformer high-pressure side route and main transformer;
△ Umin: pressure drop of the reduction to main transformer high-pressure side route and main transformer when minimum load;
Pmax and Pmin is minimum and maximum bearing power;
Qmax and Qmin is that minimum and maximum load is idle, and numerical value is shown in step S3 (1);
R=R in formulaT, X=XT
S4: the equipment minimum safe voltages such as the main transformer low-pressure side bus institute band rectifier transformer and highest safety electricity are determined Pressure: it is shown in the case where SVC investment according to background monitoring acquisition and recording, determines bus ceiling voltage and minimum voltage;It is made With for basic design conditions, it is necessary to meet the requirement of step S1.In the present embodiment, 35KV bus ceiling voltage is when minimum load 37.79KV, busy hour minimum voltage are 33.98KV.
S5: calculating the reasonable gear for determining upper level main transformer: being required according to pressure regulation, when by the inside S1 minimum load Ceiling voltage U2NCalculate gained.
Low-pressure side bus voltage (U when pressing minimum load2Nmin, 35KV bus ceiling voltage 37.79kV is taken by S4 step), really Determine tap voltage U1T.Formula is as follows:
Immediate tap (looked into transformer nameplate parameter list, calculated value close to 2 grades of voltage values of transformer) is selected, really Determine high voltage side of transformer voltage UT, as 2 grades of voltage value 119625V, the practical no-load voltage ratio of transformer after selection:
After gear selection, according to above-mentioned no-load voltage ratio formula, U ' is recalculated1min, verify whether that meeting voltage ripple of power network wants It asks.
In the present embodiment, according to transformer nameplate parameter, the final gear that calculates is 2 grades (former specified gear is 6 grades), is made Prepared with to need the S6 of compensation capacity to do calculating for Rolling production busy hour.
S6: it calculates and determines the capacitive reactive power Qc for needing the fixation compensated: according in the minimum voltage requirement and S5 inside S1 The gear and no-load voltage ratio K in faceT, calculate and go out in conjunction with the active and idle data inside S3;By busy hour pressure regulation requirement, determine Condenser capacity.
No-load voltage ratio KTTo timing, QcFilter compensation capacity formula are as follows:
U2max: it is chosen according to S4 step after compensating preceding busy hour low-pressure side voltage value 33.98kV, is become multiplied by transformer Than voltage of the reduction to the on high-tension side side 110kV;
Xε: route and transformer induction reactance (after ignoring line impedance, transformer impedance X=Xε);
U′2max: 35kV voltage side requires the voltage kept after compensation, takes 35kV;Busy hour high voltage side of transformer electricity Pressure value;
KT: transformer voltage ratio.
It acts as the capacity for determining capacitive reactive power fixed inside the SVC static compensator for needing to put into and group number are (existing There are tetra- groups of fixations of H3, H5, H7, H11 to make compensation capacitor).
S7: it determines the filter FC group number of investment: being determined according to the capacitive reactive power Qc of S6 fixation calculated in such spy Very in emergency circumstances, specific selection determines the filter for needing specifically to put into according to live practical filter configuring condition FC group number and title.22.08- is filtered according to the practical reactive compensation capacity configuration of filter apparatus, such as H3 when selection 10.42MVar takes 10.42MVar to be calculated.
S8: whether effect investment filter FC group number and capacity Q meet network voltage requirement: counter to push away effect with formula in S6 Test the voltage in the case of the capacitive reactive power Qc of fixation input by S7 whether meet inside S4 listed by voltage requirement (be more than or equal to 33.98, it is less than or equal to 33.79kV, worst condition does not allow more than voltage limit in S1 step).It is such as unsatisfactory for, then returns to S3 Step is confirmed and is calculated to supplemental characteristics such as power supply system Qmax, Qmin and Uk% again.
Pass through above-mentioned S1~S8 step and calculation process, the power electronic control system in SVC system of the utility model Above equipment is cast aside in time after there is any damage with 6 series compensation reactors, utilizes fixed capacitive reactive power Qc and upper one Grade main shift, the requirement of system voltage stability bandwidth, reactive factor requires and live alternating-current-alternating-current frequency conversion system wants voltage It asks;Reactive power matching (the switching group number and capacity of fixed capacitive reactive power Qc) is carried out after COMPREHENSIVE CALCULATING, transformer gear To match, the matching of system power factor and steel rolling alternating-current-alternating-current frequency conversion system voltage matches are not raised and lowered to both meet network voltage, Power system reactive power factor does not reduce, the requirement of alternating-current-alternating-current frequency conversion system voltage, and not damaging the other power consumer electricity consumptions of the power grid need to Summation reduces electric network active power output.
In actual production because there is the transformer gear design comparison of individual models narrow, there can also be Optimization Steps, The calculated results for being exactly above-mentioned S1~S8 from practice carry out further correcting fine tuning in actual needs, most Meet live Rolling production requirement eventually.In such a case, it is possible to using the method for embodiment 2.As shown in fig. 7, embodiment 2 In, further include S9~S11 other than above-mentioned S1~S8 step:
S9: scene whole load restoration power transmission production;
S10: voltage ripple of power network situation and power factor change situation when actually looking at Rolling production: pass through background monitoring Real-time display, sees whether voltage fluctuation meets the busbar voltage fluctuation section having in the case of SVC investment in S4 step, power factor Whether situation of change is in 0~1.
S11: situation is fluctuated according to S10 virtual voltage, adjustment is modified to upper level main transformer gear: and then realize The normal Rolling production of alternating-current-alternating-current frequency conversion system.Concrete operations are as follows: if voltage fluctuation is unsatisfactory in the case of having SVC to put into S4 step Busbar voltage fluctuation section, then the adjustment of virtual voltage gear meets high toward low-key, it is low toward it is high fall principle carry out, such as: it is real It is on the contrary by gear tune if border ceiling voltage needs to turn down upper level transformer gear beyond the 37.79KV in S4 step It is high.
The utility model calculation method effectively passes through in hot-rolled strip production line milling train alternating-current-alternating-current frequency conversion system urgency situation Theoretical calculation jettisoning static reactive power compensator SVC.In production operation, after hot-strip rolling line SVC damage, pass through above method After calculating, selecting transformer gear is 2 grades, selects filter H3, H5. smoothly to put into production, does not cause non-programmed halt.
It should be noted that the specific embodiment of the utility model is described in detail the utility model, For those skilled in the art, it is carried out without departing substantially from the spirit and scope of the utility model various Obvious change is within the protection scope of the utility model.

Claims (6)

1. a kind of AC/AC (alternating current) variable-frequency rolling line jettisoning SVC's quickly resumes production device, it is characterised in that: including power supply unit and and Display unit, input unit, the control output unit of device internal calculation unit connection;The power supply unit is to this dress It sets and is powered;The display unit data derive from device internal calculation unit;The input unit will input or The data of acquisition are transferred to the device internal calculation unit;The device internal calculation unit combines the number of acquisition input According to the reactive compensation Qc that should be put into after calculating AC/AC (alternating current) variable-frequency rolling line SVC damage;The control output unit is by the device The model of internal calculation unit output reaches external device controller.
2. the device that quickly resumes production of AC/AC (alternating current) variable-frequency rolling line jettisoning SVC according to claim 1, it is characterised in that: institute The display unit and input unit stated are liquid crystal control panels.
3. the device that quickly resumes production of AC/AC (alternating current) variable-frequency rolling line jettisoning SVC according to claim 1, it is characterised in that: institute The signal that device internal calculation unit exports is reached external device controller by the control output unit stated, including by each filtering Device puts into/exits control signal and exports to the control device of each group filter, and exports system main transformer gear control letter Number arrive control device for transformer.
4. the device that quickly resumes production of AC/AC (alternating current) variable-frequency rolling line jettisoning SVC according to claim 1, it is characterised in that: also Including manual correction unit, for the setting modification of device intrinsic parameter.
5. the device that quickly resumes production of AC/AC (alternating current) variable-frequency rolling line jettisoning SVC according to claim 4, it is characterised in that: institute The manual correction unit stated is directly connected to the device internal calculation unit and carries out parameter modification.
6. the device that quickly resumes production of AC/AC (alternating current) variable-frequency rolling line jettisoning SVC according to claim 4, it is characterised in that: institute The parameter modification of the manual correction unit connection the stated input unit and then realization to device internal calculation unit.
CN201920286868.0U 2019-03-07 2019-03-07 A kind of device that quickly resumes production of AC/AC (alternating current) variable-frequency rolling line jettisoning SVC Expired - Fee Related CN209472398U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920286868.0U CN209472398U (en) 2019-03-07 2019-03-07 A kind of device that quickly resumes production of AC/AC (alternating current) variable-frequency rolling line jettisoning SVC

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920286868.0U CN209472398U (en) 2019-03-07 2019-03-07 A kind of device that quickly resumes production of AC/AC (alternating current) variable-frequency rolling line jettisoning SVC

Publications (1)

Publication Number Publication Date
CN209472398U true CN209472398U (en) 2019-10-08

Family

ID=68094621

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920286868.0U Expired - Fee Related CN209472398U (en) 2019-03-07 2019-03-07 A kind of device that quickly resumes production of AC/AC (alternating current) variable-frequency rolling line jettisoning SVC

Country Status (1)

Country Link
CN (1) CN209472398U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110176774A (en) * 2019-03-07 2019-08-27 日照钢铁控股集团有限公司 A kind of device that quickly resumes production of AC/AC (alternating current) variable-frequency rolling line jettisoning SVC

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110176774A (en) * 2019-03-07 2019-08-27 日照钢铁控股集团有限公司 A kind of device that quickly resumes production of AC/AC (alternating current) variable-frequency rolling line jettisoning SVC

Similar Documents

Publication Publication Date Title
CN106887856A (en) Three-phase imbalance adjustment control method, device and three-phase imbalance regulating system
CN102130461B (en) Transformer-isolated static Var generator and control method thereof
CN103606932B (en) The low voltage dynamic reactive-power compensation capacitor autocontrol method that load is relevant
CN108321815A (en) A kind of low-voltage network utility power quality control system and method
CN103457270A (en) Central dynamic reactive compensation device for transformers
CN106816883A (en) Three-phase imbalance regulating system parallel connection input coefficient, control method and device
CN108667025A (en) A kind of medium voltage side power quality multiple target comprehensive processing method and system
CN106936140B (en) Reactive power adjusting device and method based on cooperation of flexible direct current and high-voltage parallel capacitor
CN106451487A (en) 220kV urban power grid reactive power compensation method
CN201937279U (en) Isolated static var generator of transformer
CN209472398U (en) A kind of device that quickly resumes production of AC/AC (alternating current) variable-frequency rolling line jettisoning SVC
CN201887482U (en) Dynamic reactive compensation device for transformer substation-type voltage reactive integrated control
CN208386154U (en) A kind of medium voltage side power quality multiple target comprehensive treatment system
CN101257213A (en) Reactive-load compensation method for high capacity high electric impedance distributing transformator attrition experiment
Go et al. Development and test of conservation voltage reduction application for Korean Smart Distribution Management System
CN207442725U (en) A kind of drive electric appliance with adjusting zero point type isolating transformer
CN101286642A (en) Reactive power compensation device of capacitor for 10kV bus in transforming plant with voltage gradation over 35kV
CN107465213B (en) A kind of power station AVC system and its idle real-time regulated quantity calculation method
Cooper et al. A systematic approach for medium-voltage power factor correction design
CN110176774A (en) A kind of device that quickly resumes production of AC/AC (alternating current) variable-frequency rolling line jettisoning SVC
CN109301846A (en) Uneven low-voltage controlling device and method
CN101699737A (en) Controlled reactor-based series voltage control device of circuit
Blazic et al. Analysis of flicker mitigation in a utility distribution network
Fedyczak et al. Modeling and analysis of three-phase hybrid transformer using matrix converter
CN110176773A (en) A method of in emergency circumstances by calculating jettisoning static reactive power compensator

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191008

CF01 Termination of patent right due to non-payment of annual fee