CN209461866U - A kind of temporary electricity management equipment for construction site - Google Patents

A kind of temporary electricity management equipment for construction site Download PDF

Info

Publication number
CN209461866U
CN209461866U CN201920329958.3U CN201920329958U CN209461866U CN 209461866 U CN209461866 U CN 209461866U CN 201920329958 U CN201920329958 U CN 201920329958U CN 209461866 U CN209461866 U CN 209461866U
Authority
CN
China
Prior art keywords
support
bracket
power supply
switching power
construction site
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920329958.3U
Other languages
Chinese (zh)
Inventor
卜东晓
管基海
武争艳
李淑洁
代跃强
陈存卓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Sixth Engineering Division Co Ltd
China Construction Sixth Bureau Construction Development Co Ltd
Original Assignee
China Construction Sixth Engineering Division Co Ltd
China Construction Sixth Bureau Construction Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Sixth Engineering Division Co Ltd, China Construction Sixth Bureau Construction Development Co Ltd filed Critical China Construction Sixth Engineering Division Co Ltd
Priority to CN201920329958.3U priority Critical patent/CN209461866U/en
Application granted granted Critical
Publication of CN209461866U publication Critical patent/CN209461866U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Emergency Alarm Devices (AREA)

Abstract

The utility model proposes a kind of temporary electricity management equipments for construction site, including power alarm case, rail brackets, first support, second support, bracket and third bracket are successively arranged inside power alarm case from top to bottom, rail brackets are equipped with guide rail, guide rail is equipped with breaker, fuse and contactor, first support and second support are for fixing Switching Power Supply and warning signal, for fixing alarm host machine, contactor, Switching Power Supply, alarm host machine and warning signal are sequentially connected for second support, bracket and third bracket.Switching Power Supply is fixed in first support and second support by Switching Power Supply bracket.Switching Power Supply bracket includes limiting section, and the main body of limiting section is in rectangle, and the both ends of limiting section main body are circle.By the utility model proposes power alarm case apply at construction site, can timely and effectively reflect the outage problem that live electricity system occurs, avoid economic loss or security risk caused by breaking down as electricity system.

Description

A kind of temporary electricity management equipment for construction site
Technical field
The utility model belongs to controller switching equipment field, especially a kind of temporary electricity management equipment for construction site.
Background technique
In recent years, with the fast development of building trade, each construction site is more next to the stability requirement of power supply for construction It is higher.Temporary electricity usage in construction sites once breaks down, it will stops operation, under suspended state, electric administrative staff are faced at scene Awareness of safety weakens, and be easy to cause security risk and direct economic loss.The entire construction of temporary electricity usage in construction sites covering simultaneously Place, if when temporary electricity system when something goes wrong, construction site can not timely feedback failure generation region, professional electrician is not It can be in time.
Utility model content
The utility model proposes a kind of temporary electricity management equipments for construction site, the technical solution adopted is as follows:
A kind of temporary electricity management equipment for construction site, including power alarm case, from upper inside power alarm case Rail brackets, first support, second support, bracket and third bracket are successively arranged under and, rail brackets are equipped with guide rail, guide rail It is equipped with breaker, fuse and contactor, first support and second support are for fixing Switching Power Supply and warning signal, and second For fixing alarm host machine, contactor, Switching Power Supply, alarm host machine and warning signal are sequentially connected for frame, bracket and third bracket.
Further, the rail brackets, first support, second support and third bracket are integrally in concave, rail brackets, The both ends of first support, second support and third bracket are bolted on the two sides of power alarm case, rail brackets, first The bottom surface of bracket, second support and third bracket is in contact with the inner surface of power alarm case.
Further, Switching Power Supply is fixed in first support and second support by several Switching Power Supply brackets.
Further, the Switching Power Supply bracket includes limiting section, and the main body of limiting section is in rectangle, and the two of limiting section main body End is circle, is successively arranged cylindricality interconnecting piece and mounting part at the border circular areas of limiting section main body both ends.
Further, the limiting section is connected by interconnecting piece with fixed part, and fixed part is used for and first support, second Frame matches, and after installing Switching Power Supply, the surface of limiting section, interconnecting piece and Switching Power Supply fits.
Further, when Switching Power Supply bracket being fixed in first support and second support, power-off report is directed toward in mounting part The inner surface of alert case.
Further, inside the shell, shell is equipped with several for propagating the circular hole of sound for the warning signal setting.
Further, alarm host machine is placed in bracket, does further fastening, the both ends difference of fixed frame by fixed frame It is fixed in second support and third bracket.
It compared with prior art, can the utility model has the beneficial effects that: power alarm case is applied to construction site To reflect that fault position occurs in scene in time, professional electrician and constructing operation personnel are warned in time;By alarm host machine, During night vision is limited or suspension of works, power alarm case can also play the role of preventing on-site cable from losing, and avoid economy Loss.
Detailed description of the invention
Fig. 1 is powered off warning box external wiring diagram;
Fig. 2 is powered off warning box cut-away drawing;
Fig. 3 is powered off warning box internal structure chart;
Fig. 4 is Switching Power Supply supporting structure schematic diagram;
Fig. 5 is another viewing angle constructions schematic diagram of Switching Power Supply;
Fig. 6 is schematic diagram when Switching Power Supply bracket is mounted in Switching Power Supply;
Fig. 7 is wire casing structure schematic diagram;
Fig. 8 is power alarm case schematic diagram of internal structure in another embodiment.
Description of symbols:
Alarm box main body -1, rail brackets -11, guide rail -12, first support -13, second support -14, third bracket -15, Fixed frame -16, bracket -17, Switching Power Supply bracket -18, fixed part -1801, interconnecting piece -1802, limiting section -1803, mounting part - 1804, cylindricality interconnecting piece -1805, breaker -2, fuse -3, contactor -4, Switching Power Supply -5, warning signal -6, alarm host machine -7, Wire casing -8, aperture -81.
Specific embodiment
Embodiment 1:
In the present embodiment, the temporary electricity management equipment of proposition includes power alarm case, inside box main body 1 of alarming from upper and Under be successively arranged rail brackets 11, first support 13, second support 14, bracket 17 and third bracket 15, set on rail brackets 11 There is guide rail 12, guide rail 12 is equipped with breaker 2, fuse 3 and contactor 4, and first support 13 and second support 14 are for fixing Switching Power Supply 5 and warning signal 6, second support 14, bracket 17 and third bracket 15 are for fixing alarm host machine 7, contactor 4, switch Power supply 5, alarm host machine 7 and warning signal 7 are sequentially connected.
In the present embodiment, alarm host machine 7 is placed in bracket 17, does further fastening, fixed frame 16 by fixed frame 16 Both ends be separately fixed in second support 14 and third bracket 15.
It is in concave that rail brackets 11, first support 13, second support 14 and third bracket 15 be whole, rail brackets 11, the The both ends of one bracket 13, second support 14 and third bracket 15 are bolted on the two sides of alarm box main body 1, rail brackets 11, the bottom surface of first support 13, second support 14 and third bracket 15 is in contact with the inner surface of alarm box main body 1.
In the present embodiment, Switching Power Supply 5 is fixed on first support 13 by the fixed part 1801 on Switching Power Supply bracket 18 In second support 14.Wherein Switching Power Supply bracket 18 includes limiting section 1803, and the main body of limiting section 1803 is in rectangle, limiting section The both ends of 1803 main bodys are circle, and circular diameter is greater than the diameter of circular hole on 5 shell of Switching Power Supply, 1803 main body two of limiting section Cylindricality interconnecting piece 1805 and mounting part 1804 are successively arranged at the border circular areas of end.The diameter of cylindricality interconnecting piece 1805 is less than mounting part 1804 diameter.
In the present embodiment, when Switching Power Supply 5 is installed, a Switching Power Supply bracket 18 is fixed on first support 13 first On, mounting part 1804 is put into the circular hole on 5 shell of Switching Power Supply, switch electricity is made by the weight of Switching Power Supply 5 itself The shell in source 5 is caught in the annular groove formed between limiting section 1803 and mounting part 1804, then by another Switching Power Supply bracket 18 are put into the circular hole on 5 shell of Switching Power Supply, and tense downwards, so that 5 shell of Switching Power Supply is caught in limiting section 1803 and hangs In the annular groove formed between socket part 1804, then the Switching Power Supply bracket 18 is fixed in second support 14.After installing, limit Position portion 1803, interconnecting piece 1802 and the surface of Switching Power Supply 5 fit.
In the present embodiment, warning signal 6 is arranged inside the shell, and shell is equipped with several for propagating the circular hole of sound.
In the present embodiment, the model NXB-63 of breaker 2, the model RT18 of fuse 3, the model of contactor CJX2-1810, alarm host machine 7 are Security GSM Alarm System, and warning signal 6 is the accessory of alarm host machine 7.
As shown in Figure 1 and Figure 2, power alarm case is mounted on each electricity consumption circuit end, connects with monitored power circuit power supply It connects.If the failures such as power-off, phase shortage occur for cable, the contact of contactor 4 is disconnected, and alarm host machine 7 issues police by warning signal 6 at this time Report, and to the phone number dial alarm pre-set or short message is sent in 10 seconds, it wherein include each power-off in short message The number of warning box, after the personnel of receiving a crime report are connected to phone and short message, it may be determined that the number of power alarm case, to rush towards scene in time Processing avoids economic loss and security risk caused by breaking down as temporary electricity system.
Embodiment 2:
In the present embodiment, the inside of alarm box main body 1 is equipped with 3 wire casings 8, evenly spaced on each wire casing 8 to be equipped with shape Shape is the aperture 81 of round rectangle.Guide rail 12, Switching Power Supply 5, warning signal 6 and alarm host machine 7 are directly anchored to alarm box main body 1 On inner surface, breaker 2, fuse 3, contactor 4 is mounted on guide rail 12.When wiring, connect again after cable is passed through aperture 81 It receives the report for police service in box main body 1 on each corresponding contact of equipment, so that cable marshalling, rule.
Technical principle of the utility model has been described above with reference to specific embodiments, these descriptions are intended merely to explain this reality With novel technical principle, and it cannot be construed to the limitation to scope of protection of the utility model in any way.It is explained based on this, Those skilled in the art do not need to pay for creative labor other specific embodiment parties that can associate the utility model Formula all will fall within the protection scope of the utility model.

Claims (8)

1. a kind of temporary electricity management equipment for construction site, which is characterized in that including power alarm case, power alarm case Inside is successively arranged rail brackets, first support, second support, bracket and third bracket, rail brackets from top to bottom and is equipped with Guide rail, guide rail are equipped with breaker, fuse and contactor, and first support and second support are for fixing Switching Power Supply and police Number, second support, bracket and third bracket are for fixing alarm host machine, and contactor, Switching Power Supply, alarm host machine and warning signal are successively It is connected.
2. a kind of temporary electricity management equipment for construction site as described in claim 1, which is characterized in that the guide rail branch Frame, first support, second support and third bracket are integrally in concave, rail brackets, first support, second support and third bracket Both ends be bolted on the two sides of power alarm case, the bottom of rail brackets, first support, second support and third bracket Face is in contact with the inner surface of power alarm case.
3. a kind of temporary electricity management equipment for construction site as described in claim 1, which is characterized in that Switching Power Supply is logical Several Switching Power Supply brackets are crossed to be fixed in first support and second support.
4. a kind of temporary electricity management equipment for construction site as claimed in claim 3, which is characterized in that the switch electricity Source bracket includes limiting section, and the main body of limiting section is in rectangle, and the both ends of limiting section main body are circle, and limiting section main body both ends are round Cylindricality interconnecting piece and mounting part are successively arranged at region.
5. a kind of temporary electricity management equipment for construction site as claimed in claim 4, which is characterized in that the limiting section It is connected by interconnecting piece with fixed part, fixed part with first support, second support for matching, after installing Switching Power Supply, The surface of limiting section, interconnecting piece and Switching Power Supply fits.
6. a kind of temporary electricity management equipment for construction site as claimed in claim 5, which is characterized in that by Switching Power Supply When bracket is fixed in first support and second support, the inner surface of power alarm case is directed toward in mounting part.
7. a kind of temporary electricity management equipment for construction site as described in claim 1, which is characterized in that the warning signal is set It sets inside the shell, shell is equipped with several for propagating the circular hole of sound.
8. a kind of temporary electricity management equipment for construction site as described in claim 1, which is characterized in that alarm host machine is put It sets in bracket, further fastening is done by fixed frame, the both ends of fixed frame are separately fixed in second support and third bracket.
CN201920329958.3U 2019-03-15 2019-03-15 A kind of temporary electricity management equipment for construction site Active CN209461866U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920329958.3U CN209461866U (en) 2019-03-15 2019-03-15 A kind of temporary electricity management equipment for construction site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920329958.3U CN209461866U (en) 2019-03-15 2019-03-15 A kind of temporary electricity management equipment for construction site

Publications (1)

Publication Number Publication Date
CN209461866U true CN209461866U (en) 2019-10-01

Family

ID=68047321

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920329958.3U Active CN209461866U (en) 2019-03-15 2019-03-15 A kind of temporary electricity management equipment for construction site

Country Status (1)

Country Link
CN (1) CN209461866U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112652977A (en) * 2020-11-24 2021-04-13 温州职业技术学院 Intelligent comprehensive distribution box
CN115732280A (en) * 2022-12-15 2023-03-03 中国建筑第五工程局有限公司 Construction site temporary power utilization fault alarm system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112652977A (en) * 2020-11-24 2021-04-13 温州职业技术学院 Intelligent comprehensive distribution box
CN115732280A (en) * 2022-12-15 2023-03-03 中国建筑第五工程局有限公司 Construction site temporary power utilization fault alarm system
CN115732280B (en) * 2022-12-15 2024-03-08 中国建筑第五工程局有限公司 Temporary power failure alarm system for construction site

Similar Documents

Publication Publication Date Title
KR102057494B1 (en) Smart electrical accident prevention and energy management system
CN209461866U (en) A kind of temporary electricity management equipment for construction site
CN101692114A (en) Disconnection monitoring and alarm system for high voltage cable grounding system
CN104022576B (en) A kind of protection pressing plate status monitoring terminal and surveillance thereof
CN106841934A (en) Intelligent trouble indicator and instruction system
CN108550244A (en) A kind of safety ground monitoring alarm with multichannel
CN205375736U (en) Illuminating line electric fire detection system
CN215068533U (en) Multifunctional fire alarm
CN201821159U (en) Power line breakage protection and alarm system
CN207530357U (en) A kind of track circuit unit and its cabinet
CN215415713U (en) Distribution network fault detection device
CN109802410A (en) A kind of zero line break protection device and method
CN206039774U (en) Electric fire control system for prepackage type transformer substation
CN210072031U (en) Leakage protection device of valve actuator
CN209860577U (en) Electricity consumption facility leakage protection and electricity consumption safety monitoring system
CN209627054U (en) A kind of site interval measure and control device for substation
CN209401980U (en) A kind of transformer substation protection pressure plate real-time state monitoring device
JP6514068B2 (en) Gate operating device and gate operating method
CN105119150A (en) Fuse type isolation switch cabinet
CN106793356A (en) A kind of intelligent fire-fighting illumination and emergency evacuation indicate system
CN111307219A (en) Grounding circulation on-line monitoring system with active anti-theft and high-speed wireless transmission
CN202257840U (en) Sound and light alarm device for grounding wires
CN104868597A (en) Switchgear monitoring system
CN219497160U (en) Electrical fire monitoring and management system for cabinet of communication machine room
JPWO2021111652A1 (en) Digital Electric Multi-Safety Control System

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant