CN209457484U - A kind of stone matter saves land coffin chamber - Google Patents
A kind of stone matter saves land coffin chamber Download PDFInfo
- Publication number
- CN209457484U CN209457484U CN201820004834.3U CN201820004834U CN209457484U CN 209457484 U CN209457484 U CN 209457484U CN 201820004834 U CN201820004834 U CN 201820004834U CN 209457484 U CN209457484 U CN 209457484U
- Authority
- CN
- China
- Prior art keywords
- coffin chamber
- coffin
- chamber
- gravestone
- stone matter
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Fencing (AREA)
Abstract
It saves land coffin chamber the utility model discloses a kind of stone matter, including coffin chamber, the coffin chamber is upper opening structure, the vertical view of coffin chamber is in " day " word shape, the gravestone pedestal for installing gravestone is provided on rear side of coffin chamber, coffin chamber is connect with gravestone pedestal by a terrace, and the groove matched with coffin chamber is offered on the downside of the terrace, can insert partition in two cavitys of coffin chamber.The utility model promotes the processing quality of coffin chamber, is allowed to be adapted with industry development demand;Positional relationship between two coffin chamber of adjustment standard family tomb and gravestone pedestal, to reach the purpose of Economization on land;The size of combined standard cinerary casket and standard cinerary urn is precisely calculated, and realizes that coffin chamber becomes " the big function of small volume " from " the big small function of the scale of construction ".
Description
Technical field
It saves land coffin chamber the utility model relates to a kind of stone matter.
Background technique
The nine ministries and commissions such as national Ministry of Civil Affairs call Funeral Reform, vigorously advocate save land, ecology, small-sized tomb, with land resource
It is increasingly in short supply, the behave that saves land of funeral profession has become national strategy.Traditional grave form in China is over a period to come
A possibility that will not also withering away, but further saving soil on the basis of meeting public's tradition burial culture psychology, also deposits so far
?.
The implementation of traditional tomb standard family tomb (as illustrated in fig. 1 and 2) manufacturing technology is as follows: one cave of a Room, i.e. a tomb
A standard cinerary casket is buried in room, and a standard family tomb needs two coffin chambers;Coffin chamber and gravestone pedestal point column, that is to say, that remove two
Outside a coffin chamber land occupation, gravestone pedestal also wants land occupation;Real 1.65 square metres of ground of consumption;Tomb body: 1000 millimeters of (width) ×
0.85 millimeter=0.85 square metre of (depth);Road before tomb: 1000 millimeters=0.8 square metre of 800 millimeters of (width) × (length);Bury function
Can: meet two standard cinerary caskets of burial.
The shortcomings that existing common grave: the limit, such as later period, client wish that increasing acupuncture point (increases peace for the land occupation in double caves
Bury relatives' bone ash), such as original double caves are changed to three caves or four caves, it is necessary to carry out coffin pit reconstruction, cost is larger, with current
Reconstruction expense, 2017 years, double cave reconstructions were 40,000 or more.
In conclusion existing coffin chamber is the structure process before 30 years, it is not able to satisfy the development that funeral profession grows with each passing hour
Demand, (standard) family two coffin chambers of tomb and gravestone pedestal distinguish land occupation, and the big scale of construction is small, and limitation is larger.
Utility model content
It saves land coffin chamber the purpose of this utility model is to provide a kind of stone matter, to solve mentioned above in the background art ask
Topic.
To achieve the above object, the utility model provides the following technical solutions:
A kind of stone matter saves land coffin chamber, including coffin chamber, and the coffin chamber is upper opening structure, and the vertical view of coffin chamber is in " day " font
Shape is provided with the gravestone pedestal for installing gravestone on rear side of the coffin chamber, and coffin chamber is connect with gravestone pedestal by a terrace,
The groove matched with coffin chamber is offered on the downside of the terrace, can insert partition in two cavitys of the coffin chamber.
As a further solution of the present invention: two cavity volumes of the coffin chamber are identical.
As a further solution of the present invention: the partition is aluminium-plastic panel.
As a further solution of the present invention: the top center of the partition offers circular through hole, through-hole it is straight
Diameter is 30mm.
As a further solution of the present invention: the material of the coffin chamber is lithotome, regrown material, plastic material
Or metal material.
As a further solution of the present invention: the depth of the groove is 15mm.
The coffin chamber compared with prior art, the utility model has the beneficial effects that the stone matter saves land promotes (traditional tomb) coffin chamber
Processing quality, be allowed to industry development demand be adapted;It closes position between two coffin chamber of adjustment standard family tomb and gravestone pedestal
System, to reach the purpose of Economization on land;The size (volume) of combined standard cinerary casket and standard cinerary urn is precisely calculated, and realizes
Coffin chamber becomes " the big function of small volume " from " the big small function of the scale of construction ".
Detailed description of the invention
Fig. 1 is the double cave tomb plan views of traditional standard.
Fig. 2 is the double cave tomb side elevational views of traditional standard.
Fig. 3 is the plan view of coffin chamber in the utility model.
Fig. 4 is the elevation of coffin chamber in the utility model.
Fig. 5 is the plan view of terrace in the utility model.
Fig. 6 is the side elevational view of terrace in the utility model.
Fig. 7 is the front elevation view of terrace in the utility model.
Fig. 8 is the elevation of partition in the utility model.
Fig. 9 is the seating side figure of partition in the utility model.
In figure: 1- sarcophagi, 2- cinerary casket, 3- grave blanket, 4- terrace, 5- concrete, 6- inner cover, 7- partition, 8- groove, 9- tomb
Upright stone tablet, 10- cinerary urn, 11- through-hole, 12- coffin chamber.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
Please refer to Fig. 1~9, in the utility model embodiment, a kind of stone matter saves land coffin chamber, including coffin chamber 12 and terrace 4, institute
Stating coffin chamber 12 is upper opening structure, and the vertical view of coffin chamber 12 is in " day " word shape, and two cavity volumes of coffin chamber 12 are identical, by family tomb
Two coffin chambers be integrated into a coffin chamber, to reduce the occupied soil in gap that coffin chamber wall surface and two coffin chambers point column generate, institute
The rear side for stating coffin chamber 12 is provided with gravestone pedestal, and coffin chamber 12 is connect with gravestone pedestal by a terrace 4, eliminates gravestone pedestal
The soil of occupancy is equipped with gravestone 9 on gravestone pedestal, and gravestone pedestal overlaps coffin chamber rear end, also i.e. by gravestone pedestal frame in tomb
The upper rear of room, not independent land occupation, the downside of the terrace 4 offer the groove 8 matched with coffin chamber 12, groove 8
Depth is 15mm, and partition 7 can be inserted in two cavitys of the coffin chamber 12, and partition 7 is aluminium-plastic panel, the top center of partition 7
Circular through hole 11 is offered, the diameter of through-hole 11 is 30mm, facilitates the inserting of partition 7, passes through accurate calculation and movable mode clapboard 7
Design makes a coffin chamber be able to satisfy two standard cinerary caskets 2 of burial or four standard cinerary urns 10, if selecting cinerary urn 10
Make vessel, then can bury four tool the deceased's bone ashes, burial function doubles.
In the present embodiment, the material of the coffin chamber 12 can also be regrown material, plastic material, gold in addition to lithotome
Belong to material etc. (metal material relatively more saves ground because wall is thin);Real consumption soil is 1.16 square metres;Tomb body: 840 millimeters of (width)
575 millimeters=0.483 square metre of × (depth);Road before tomb: 0.84 millimeter=0.672 square metre of 800 millimeters of (width) × (length).
Use partition 7, so that it may four cave cinerary urns 10 be become by original double caves cinerary casket 2, the present invention is the same as a tomb type
In the case that structure is constant, most four tools bone ashes can be buried, can satisfy different clients demand.In general, customer demand
Based on double caves, it is desirable in the form of the burial of cinerary casket 2 (because current cinerary casket 2 or grave mainstream).After several years, second
For old friend (children), bone ash can be with parent in a place, as long as changing cinerary urn 10 into.
The utility model, it is ingenious to separate coffin chamber 12 using partition 7 by 12 volume of accurate calculation coffin chamber, flexibly dispose family
The present position of each component of tomb increases the purpose of burial function 100% to reach Economization on land 30%.On the one hand this measure meets
The demand of public's tradition burial culture psychology, meanwhile, and reduce the thing expenditure of burying of the common people at double, effective execution and actively rings
The call of " about the ecological instruction buried that saves land is carried out " of having answered the nine ministries and commissions such as national Ministry of Civil Affairs to propose.
The stone matter saves land coffin chamber, promotes the processing quality of (traditional tomb) coffin chamber, is allowed to be adapted with industry development demand;It adjusts
Positional relationship between two coffin chamber of whole standard family tomb and gravestone pedestal, to reach the purpose of Economization on land;Combined standard cinerary casket
With the size (volume) of standard cinerary urn, precisely calculate, realizes that coffin chamber becomes " the big function of small volume " from " the big small function of the scale of construction ".
The above are merely preferred embodiments of the present invention, it is noted that for those skilled in the art,
Without departing from the concept of the premise utility, several modifications and improvements can also be made, these also should be considered as practical
Novel protection scope, these all will not influence the effect and patent practicability of the utility model implementation.
Claims (6)
- Coffin chamber, including coffin chamber 1. a kind of stone matter saves land, which is characterized in that the coffin chamber is upper opening structure, and the vertical view of coffin chamber is in " day " word shape, the gravestone pedestal for installing gravestone is provided on rear side of the coffin chamber, and coffin chamber and gravestone pedestal pass through one Terrace connects, and offers the groove matched with coffin chamber on the downside of the terrace, can insert in two cavitys of the coffin chamber Partition.
- The coffin chamber 2. stone matter according to claim 1 saves land, which is characterized in that two cavity volumes of the coffin chamber are identical.
- The coffin chamber 3. stone matter according to claim 1 saves land, which is characterized in that the partition is aluminium-plastic panel.
- The coffin chamber 4. stone matter according to claim 1 or 3 saves land, which is characterized in that the top center of the partition offers Circular through hole, the diameter of through-hole are 30mm.
- The coffin chamber 5. stone matter according to claim 1 or 2 saves land, which is characterized in that the material of the coffin chamber be lithotome, Regrown material, plastic material or metal material.
- The coffin chamber 6. stone matter according to claim 1 saves land, which is characterized in that the depth of the groove is 15mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820004834.3U CN209457484U (en) | 2018-01-02 | 2018-01-02 | A kind of stone matter saves land coffin chamber |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820004834.3U CN209457484U (en) | 2018-01-02 | 2018-01-02 | A kind of stone matter saves land coffin chamber |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209457484U true CN209457484U (en) | 2019-10-01 |
Family
ID=68034912
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820004834.3U Expired - Fee Related CN209457484U (en) | 2018-01-02 | 2018-01-02 | A kind of stone matter saves land coffin chamber |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209457484U (en) |
-
2018
- 2018-01-02 CN CN201820004834.3U patent/CN209457484U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Alexandridou | Funerary variability in late eighth-century BCE Attica (Late Geometric II) | |
Insoll | First Footsteps in the Archaeology of Harar, Ethiopia. | |
CN106142962A (en) | A kind of bone-ash statue and preparation method thereof and the religious building with bone-ash statue | |
Ahrens | “WHETHER BY DECAY OR FIRE CONSUMED…” | |
Ji | A Moabite sanctuary at Khirbat Ataruz, Jordan: Stratigraphy, findings, and archaeological implications | |
CN209457484U (en) | A kind of stone matter saves land coffin chamber | |
Al-Salameen et al. | Two new Nabataean inscriptions from Wādī Mūsā, with discussion of Gaia and the marzēaḥ | |
Graham | The quick and the dead in the extra-urban landscape: the Roman cemetery at Ostia/Portus as a lived environment | |
CN2789367Y (en) | Tower stone tablet type multifunction memorial bablet | |
Malone | Secularisation, anticlericalism and cremation within Italian cemeteries of the nineteenth century | |
Tagesson | The Human Body as Material Culture‒Linköping Cathedral Churchyard in the Early Modern Period | |
CN201406866Y (en) | Concealed type combined grave | |
CN205502716U (en) | Commemorative tombstone | |
Tendler et al. | Typical and atypical burial from the late Hellenistic-early Roman period at Horvat Ashun-Modi’in hills | |
CN204435995U (en) | Novel cemetery building | |
CN207609240U (en) | A kind of bodhi Holy Ghost arbor burial ceremony park | |
CN209339717U (en) | A kind of case tomb coffin chamber hardware | |
CN201714134U (en) | Family cemetery graveyard | |
CN110821270A (en) | Palace formula memorial park | |
Bunker | Berrima general cemetery: Changes in sentiment towards death and dying | |
CN201420416Y (en) | Family type combination gravestone | |
CN102191875A (en) | Integer integrated from gravestone and grave | |
CN206337889U (en) | A kind of raised gravestone | |
CN2728467Y (en) | Cinerary casket made of metal and stone material | |
CN2764346Y (en) | Bottom board convex ceramic crematory urn |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20191001 Termination date: 20220102 |