CN209457484U - A kind of stone matter saves land coffin chamber - Google Patents

A kind of stone matter saves land coffin chamber Download PDF

Info

Publication number
CN209457484U
CN209457484U CN201820004834.3U CN201820004834U CN209457484U CN 209457484 U CN209457484 U CN 209457484U CN 201820004834 U CN201820004834 U CN 201820004834U CN 209457484 U CN209457484 U CN 209457484U
Authority
CN
China
Prior art keywords
coffin chamber
coffin
chamber
gravestone
stone matter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820004834.3U
Other languages
Chinese (zh)
Inventor
陈建峰
李忠玉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Coastal Ancient Garden
Original Assignee
Shanghai Coastal Ancient Garden
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Coastal Ancient Garden filed Critical Shanghai Coastal Ancient Garden
Priority to CN201820004834.3U priority Critical patent/CN209457484U/en
Application granted granted Critical
Publication of CN209457484U publication Critical patent/CN209457484U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Fencing (AREA)

Abstract

It saves land coffin chamber the utility model discloses a kind of stone matter, including coffin chamber, the coffin chamber is upper opening structure, the vertical view of coffin chamber is in " day " word shape, the gravestone pedestal for installing gravestone is provided on rear side of coffin chamber, coffin chamber is connect with gravestone pedestal by a terrace, and the groove matched with coffin chamber is offered on the downside of the terrace, can insert partition in two cavitys of coffin chamber.The utility model promotes the processing quality of coffin chamber, is allowed to be adapted with industry development demand;Positional relationship between two coffin chamber of adjustment standard family tomb and gravestone pedestal, to reach the purpose of Economization on land;The size of combined standard cinerary casket and standard cinerary urn is precisely calculated, and realizes that coffin chamber becomes " the big function of small volume " from " the big small function of the scale of construction ".

Description

A kind of stone matter saves land coffin chamber
Technical field
It saves land coffin chamber the utility model relates to a kind of stone matter.
Background technique
The nine ministries and commissions such as national Ministry of Civil Affairs call Funeral Reform, vigorously advocate save land, ecology, small-sized tomb, with land resource It is increasingly in short supply, the behave that saves land of funeral profession has become national strategy.Traditional grave form in China is over a period to come A possibility that will not also withering away, but further saving soil on the basis of meeting public's tradition burial culture psychology, also deposits so far ?.
The implementation of traditional tomb standard family tomb (as illustrated in fig. 1 and 2) manufacturing technology is as follows: one cave of a Room, i.e. a tomb A standard cinerary casket is buried in room, and a standard family tomb needs two coffin chambers;Coffin chamber and gravestone pedestal point column, that is to say, that remove two Outside a coffin chamber land occupation, gravestone pedestal also wants land occupation;Real 1.65 square metres of ground of consumption;Tomb body: 1000 millimeters of (width) × 0.85 millimeter=0.85 square metre of (depth);Road before tomb: 1000 millimeters=0.8 square metre of 800 millimeters of (width) × (length);Bury function Can: meet two standard cinerary caskets of burial.
The shortcomings that existing common grave: the limit, such as later period, client wish that increasing acupuncture point (increases peace for the land occupation in double caves Bury relatives' bone ash), such as original double caves are changed to three caves or four caves, it is necessary to carry out coffin pit reconstruction, cost is larger, with current Reconstruction expense, 2017 years, double cave reconstructions were 40,000 or more.
In conclusion existing coffin chamber is the structure process before 30 years, it is not able to satisfy the development that funeral profession grows with each passing hour Demand, (standard) family two coffin chambers of tomb and gravestone pedestal distinguish land occupation, and the big scale of construction is small, and limitation is larger.
Utility model content
It saves land coffin chamber the purpose of this utility model is to provide a kind of stone matter, to solve mentioned above in the background art ask Topic.
To achieve the above object, the utility model provides the following technical solutions:
A kind of stone matter saves land coffin chamber, including coffin chamber, and the coffin chamber is upper opening structure, and the vertical view of coffin chamber is in " day " font Shape is provided with the gravestone pedestal for installing gravestone on rear side of the coffin chamber, and coffin chamber is connect with gravestone pedestal by a terrace, The groove matched with coffin chamber is offered on the downside of the terrace, can insert partition in two cavitys of the coffin chamber.
As a further solution of the present invention: two cavity volumes of the coffin chamber are identical.
As a further solution of the present invention: the partition is aluminium-plastic panel.
As a further solution of the present invention: the top center of the partition offers circular through hole, through-hole it is straight Diameter is 30mm.
As a further solution of the present invention: the material of the coffin chamber is lithotome, regrown material, plastic material Or metal material.
As a further solution of the present invention: the depth of the groove is 15mm.
The coffin chamber compared with prior art, the utility model has the beneficial effects that the stone matter saves land promotes (traditional tomb) coffin chamber Processing quality, be allowed to industry development demand be adapted;It closes position between two coffin chamber of adjustment standard family tomb and gravestone pedestal System, to reach the purpose of Economization on land;The size (volume) of combined standard cinerary casket and standard cinerary urn is precisely calculated, and realizes Coffin chamber becomes " the big function of small volume " from " the big small function of the scale of construction ".
Detailed description of the invention
Fig. 1 is the double cave tomb plan views of traditional standard.
Fig. 2 is the double cave tomb side elevational views of traditional standard.
Fig. 3 is the plan view of coffin chamber in the utility model.
Fig. 4 is the elevation of coffin chamber in the utility model.
Fig. 5 is the plan view of terrace in the utility model.
Fig. 6 is the side elevational view of terrace in the utility model.
Fig. 7 is the front elevation view of terrace in the utility model.
Fig. 8 is the elevation of partition in the utility model.
Fig. 9 is the seating side figure of partition in the utility model.
In figure: 1- sarcophagi, 2- cinerary casket, 3- grave blanket, 4- terrace, 5- concrete, 6- inner cover, 7- partition, 8- groove, 9- tomb Upright stone tablet, 10- cinerary urn, 11- through-hole, 12- coffin chamber.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
Please refer to Fig. 1~9, in the utility model embodiment, a kind of stone matter saves land coffin chamber, including coffin chamber 12 and terrace 4, institute Stating coffin chamber 12 is upper opening structure, and the vertical view of coffin chamber 12 is in " day " word shape, and two cavity volumes of coffin chamber 12 are identical, by family tomb Two coffin chambers be integrated into a coffin chamber, to reduce the occupied soil in gap that coffin chamber wall surface and two coffin chambers point column generate, institute The rear side for stating coffin chamber 12 is provided with gravestone pedestal, and coffin chamber 12 is connect with gravestone pedestal by a terrace 4, eliminates gravestone pedestal The soil of occupancy is equipped with gravestone 9 on gravestone pedestal, and gravestone pedestal overlaps coffin chamber rear end, also i.e. by gravestone pedestal frame in tomb The upper rear of room, not independent land occupation, the downside of the terrace 4 offer the groove 8 matched with coffin chamber 12, groove 8 Depth is 15mm, and partition 7 can be inserted in two cavitys of the coffin chamber 12, and partition 7 is aluminium-plastic panel, the top center of partition 7 Circular through hole 11 is offered, the diameter of through-hole 11 is 30mm, facilitates the inserting of partition 7, passes through accurate calculation and movable mode clapboard 7 Design makes a coffin chamber be able to satisfy two standard cinerary caskets 2 of burial or four standard cinerary urns 10, if selecting cinerary urn 10 Make vessel, then can bury four tool the deceased's bone ashes, burial function doubles.
In the present embodiment, the material of the coffin chamber 12 can also be regrown material, plastic material, gold in addition to lithotome Belong to material etc. (metal material relatively more saves ground because wall is thin);Real consumption soil is 1.16 square metres;Tomb body: 840 millimeters of (width) 575 millimeters=0.483 square metre of × (depth);Road before tomb: 0.84 millimeter=0.672 square metre of 800 millimeters of (width) × (length).
Use partition 7, so that it may four cave cinerary urns 10 be become by original double caves cinerary casket 2, the present invention is the same as a tomb type In the case that structure is constant, most four tools bone ashes can be buried, can satisfy different clients demand.In general, customer demand Based on double caves, it is desirable in the form of the burial of cinerary casket 2 (because current cinerary casket 2 or grave mainstream).After several years, second For old friend (children), bone ash can be with parent in a place, as long as changing cinerary urn 10 into.
The utility model, it is ingenious to separate coffin chamber 12 using partition 7 by 12 volume of accurate calculation coffin chamber, flexibly dispose family The present position of each component of tomb increases the purpose of burial function 100% to reach Economization on land 30%.On the one hand this measure meets The demand of public's tradition burial culture psychology, meanwhile, and reduce the thing expenditure of burying of the common people at double, effective execution and actively rings The call of " about the ecological instruction buried that saves land is carried out " of having answered the nine ministries and commissions such as national Ministry of Civil Affairs to propose.
The stone matter saves land coffin chamber, promotes the processing quality of (traditional tomb) coffin chamber, is allowed to be adapted with industry development demand;It adjusts Positional relationship between two coffin chamber of whole standard family tomb and gravestone pedestal, to reach the purpose of Economization on land;Combined standard cinerary casket With the size (volume) of standard cinerary urn, precisely calculate, realizes that coffin chamber becomes " the big function of small volume " from " the big small function of the scale of construction ".
The above are merely preferred embodiments of the present invention, it is noted that for those skilled in the art, Without departing from the concept of the premise utility, several modifications and improvements can also be made, these also should be considered as practical Novel protection scope, these all will not influence the effect and patent practicability of the utility model implementation.

Claims (6)

  1. Coffin chamber, including coffin chamber 1. a kind of stone matter saves land, which is characterized in that the coffin chamber is upper opening structure, and the vertical view of coffin chamber is in " day " word shape, the gravestone pedestal for installing gravestone is provided on rear side of the coffin chamber, and coffin chamber and gravestone pedestal pass through one Terrace connects, and offers the groove matched with coffin chamber on the downside of the terrace, can insert in two cavitys of the coffin chamber Partition.
  2. The coffin chamber 2. stone matter according to claim 1 saves land, which is characterized in that two cavity volumes of the coffin chamber are identical.
  3. The coffin chamber 3. stone matter according to claim 1 saves land, which is characterized in that the partition is aluminium-plastic panel.
  4. The coffin chamber 4. stone matter according to claim 1 or 3 saves land, which is characterized in that the top center of the partition offers Circular through hole, the diameter of through-hole are 30mm.
  5. The coffin chamber 5. stone matter according to claim 1 or 2 saves land, which is characterized in that the material of the coffin chamber be lithotome, Regrown material, plastic material or metal material.
  6. The coffin chamber 6. stone matter according to claim 1 saves land, which is characterized in that the depth of the groove is 15mm.
CN201820004834.3U 2018-01-02 2018-01-02 A kind of stone matter saves land coffin chamber Expired - Fee Related CN209457484U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820004834.3U CN209457484U (en) 2018-01-02 2018-01-02 A kind of stone matter saves land coffin chamber

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820004834.3U CN209457484U (en) 2018-01-02 2018-01-02 A kind of stone matter saves land coffin chamber

Publications (1)

Publication Number Publication Date
CN209457484U true CN209457484U (en) 2019-10-01

Family

ID=68034912

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820004834.3U Expired - Fee Related CN209457484U (en) 2018-01-02 2018-01-02 A kind of stone matter saves land coffin chamber

Country Status (1)

Country Link
CN (1) CN209457484U (en)

Similar Documents

Publication Publication Date Title
Alexandridou Funerary variability in late eighth-century BCE Attica (Late Geometric II)
Insoll First Footsteps in the Archaeology of Harar, Ethiopia.
CN106142962A (en) A kind of bone-ash statue and preparation method thereof and the religious building with bone-ash statue
Ahrens “WHETHER BY DECAY OR FIRE CONSUMED…”
Ji A Moabite sanctuary at Khirbat Ataruz, Jordan: Stratigraphy, findings, and archaeological implications
CN209457484U (en) A kind of stone matter saves land coffin chamber
Al-Salameen et al. Two new Nabataean inscriptions from Wādī Mūsā, with discussion of Gaia and the marzēaḥ
Graham The quick and the dead in the extra-urban landscape: the Roman cemetery at Ostia/Portus as a lived environment
CN2789367Y (en) Tower stone tablet type multifunction memorial bablet
Malone Secularisation, anticlericalism and cremation within Italian cemeteries of the nineteenth century
Tagesson The Human Body as Material Culture‒Linköping Cathedral Churchyard in the Early Modern Period
CN201406866Y (en) Concealed type combined grave
CN205502716U (en) Commemorative tombstone
Tendler et al. Typical and atypical burial from the late Hellenistic-early Roman period at Horvat Ashun-Modi’in hills
CN204435995U (en) Novel cemetery building
CN207609240U (en) A kind of bodhi Holy Ghost arbor burial ceremony park
CN209339717U (en) A kind of case tomb coffin chamber hardware
CN201714134U (en) Family cemetery graveyard
CN110821270A (en) Palace formula memorial park
Bunker Berrima general cemetery: Changes in sentiment towards death and dying
CN201420416Y (en) Family type combination gravestone
CN102191875A (en) Integer integrated from gravestone and grave
CN206337889U (en) A kind of raised gravestone
CN2728467Y (en) Cinerary casket made of metal and stone material
CN2764346Y (en) Bottom board convex ceramic crematory urn

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191001

Termination date: 20220102