CN209457262U - Crossbeam is adjusted for prefabricated buildings steel skeleton in one kind - Google Patents

Crossbeam is adjusted for prefabricated buildings steel skeleton in one kind Download PDF

Info

Publication number
CN209457262U
CN209457262U CN201920149044.9U CN201920149044U CN209457262U CN 209457262 U CN209457262 U CN 209457262U CN 201920149044 U CN201920149044 U CN 201920149044U CN 209457262 U CN209457262 U CN 209457262U
Authority
CN
China
Prior art keywords
fixed
fixed beam
crossbeam
sleeve
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920149044.9U
Other languages
Chinese (zh)
Inventor
郗猛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Xinhuayou Construction Group Co Ltd
Original Assignee
Qingdao Xinhuayou Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Xinhuayou Construction Group Co Ltd filed Critical Qingdao Xinhuayou Construction Group Co Ltd
Priority to CN201920149044.9U priority Critical patent/CN209457262U/en
Application granted granted Critical
Publication of CN209457262U publication Critical patent/CN209457262U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses one kind to be adjusted crossbeam for prefabricated buildings steel skeleton, including walking beam, fixed beam one and fixed beam two, the both ends of walking beam are respectively interposed in the inside of fixed beam one and fixed beam two, fixed beam one and fixed beam two are fixedly connected to mounting plate far from one end of walking beam, the top middle position of fixed beam one and fixed beam two is provided with sliding mouth one, the side middle position of fixed beam one and fixed beam two is provided with sliding mouth two, walking beam is provided with several fixation holes close to the side of sliding mouth two, fixed beam one and fixed beam two are equipped with fixed bin close to the top of walking beam, the inside of fixed bin is provided with groove, the bosom position of groove is provided with fixed cylinder, symmetrically there is slide bar on two tops of walking beam.The utility model has the advantages that effectively making to be fixed between walking beam and fixed beam one and walking beam and fixed beam two, the stability of crossbeam is effectively raised, brings convenience for the installation and removal of crossbeam.

Description

Crossbeam is adjusted for prefabricated buildings steel skeleton in one kind
Technical field
The utility model relates to technical field of buildings, it particularly relates to a kind of adjustable for prefabricated buildings steel skeleton Save crossbeam.
Background technique
In recent years, in the driving of " green building action " and " building industrialization, housing industrialization " policy and economic development Under, assembled architecture has become the hot spot of studies in China and exploration.Prefabricated buildings are because its assembly and disassembly is convenient, is convenient for The characteristics such as mobile and transport, are more and more utilized in multiple fields, however the length of most of assembled crossbeam is It is changeless, lead to the crossbeam that different length is needed for different size of house, therefore cause to need to prepare in assembly The crossbeam of plurality of specifications, causes handling time to extend, while increasing the occupied area of crossbeam, and staff is caused to waste screening The time of the crossbeam of equal length, and then job schedule is seriously affected, reduce working efficiency.
For the problems in the relevant technologies, currently no effective solution has been proposed.
Utility model content
For the problems in the relevant technologies, the utility model proposes one kind for the adjustable cross of prefabricated buildings steel skeleton Beam, to overcome above-mentioned technical problem present in existing the relevant technologies.
For this purpose, the specific technical solution that the utility model uses is as follows:
Crossbeam, including walking beam, fixed beam one and fixed beam two is adjusted for prefabricated buildings steel skeleton in one kind, described The both ends of walking beam are respectively interposed in the inside of the fixed beam one and the fixed beam two, the fixed beam one and the fixation Beam two is fixedly connected to mounting plate far from one end of the walking beam, in the top of the fixed beam one and the fixed beam two Between position be provided with sliding mouth one, the side middle position of the fixed beam one and the fixed beam two is provided with sliding mouth two, the activity Beam is provided with several fixation holes close to the side of the sliding mouth two, and the fixed beam one and the fixed beam two are close to the activity The top of beam is equipped with fixed bin, and the inside of the fixed bin is provided with groove, and the bosom position of the groove is provided with fixation Symmetrically there is slide bar on cylinder, two tops of the walking beam, and the top of the slide bar through the sliding mouth one and extends to the fixation The inside of cylinder is connected between the fixed cylinder and the slide bar by fixed mechanism, and the bottom end of the fixed bin is symmetrically installed There is a rolling pearl, the fixed bin is fixedly connected with fixed link close to the side middle position of the sliding mouth two, in the fixed link It is connected with catch bar, and the fixed link is fixedly connected with baffle plate, the catch bar far from one end of the fixed bin One end close to the fixed bin is fixedly connected with kelly compatible with the fixation hole.
Further, several limit holes are provided in the fixed link.
Further, connected between the catch bar and the fixed link by anchorage bar compatible with the limit hole It connects.
Further, it is provided with sliding slot compatible with the rolling pearl in the fixed beam one and the fixed beam two, and The sliding slot is located at the two sides of the sliding mouth one.
Further, the fixed mechanism includes being located at the sleeve one of the inside grooves and being connected with the sleeve one Sleeve two, the inside of the sleeve one is interspersed with mobile bar one, and one end of the mobile bar one is fixedly connected with joining rod, institute It states and is provided with bayonet on joining rod, the spring one that is cased with inside the sleeve one in the mobile bar one and be located at the sleeve Spring two outside one.
Further, the inside of the sleeve two is interspersed with mobile bar two, and one end of the mobile bar two is fixedly connected with Connector rod compatible with the bayonet, the spring three being cased in the mobile bar two inside the sleeve two, the shifting One end of lever one and the mobile bar two is fixedly connected to push plate.
The utility model has the following beneficial effects: by the way that fixing barrel casing to be located on slide bar, and cooperate the setting of fixed mechanism, The inside of walking beam, fixed beam one and fixed beam two is effectively made to carry out interspersed movement, so that slide bar drives fixed bin It is slided in fixed beam one and fixed beam two, by rolling the setting of pearl, effectively reduces fixed bin and fixed beam one Friction between fixed beam two, while the stability between walking beam, fixed beam one and fixed beam two is improved, realize cross Beam length adjustability, by the fixed link of setting, catch bar, kelly and fixation hole, effectively make walking beam and fixed beam one with And be fixed between walking beam and fixed beam two, the stability of crossbeam is effectively raised, is the installation and removal band of crossbeam Convenience is carried out.
Detailed description of the invention
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment Needed in attached drawing be briefly described, it should be apparent that, the accompanying drawings in the following description is only the utility model Some embodiments for those of ordinary skill in the art without creative efforts, can also be according to this A little attached drawings obtain other attached drawings.
Fig. 1 is shown according to a kind of structure that crossbeam is adjusted for prefabricated buildings steel skeleton of the utility model embodiment It is intended to;
Fig. 2 is that crossbeam fixed bin side is adjusted for prefabricated buildings steel skeleton according to one kind of the utility model embodiment One of view;
Fig. 3 is that crossbeam fixed bin side is adjusted for prefabricated buildings steel skeleton according to one kind of the utility model embodiment The two of view;
Fig. 4 is that crossbeam fixed mechanism is adjusted for prefabricated buildings steel skeleton according to one kind of the utility model embodiment Structural schematic diagram.
In figure:
1, walking beam;2, fixed beam one;3, fixed beam two;4, mounting plate;5, sliding mouth one;6, sliding mouth two;7, fixation hole;8, Fixed bin;9, groove;10, fixed cylinder;11, slide bar;12, fixed mechanism;13, pearl is rolled;14, fixed link;15, baffle plate;16, Catch bar;17, kelly;18, anchorage bar;19, limit hole;20, sliding slot;21, sleeve one;22, sleeve two;23, mobile bar one; 24, joining rod;25, spring three;26, mobile bar two;27, connector rod;28, bayonet;29, push plate;30, spring two;31, spring One.
Specific embodiment
To further illustrate each embodiment, the utility model is provided with attached drawing, these attached drawings are in the utility model discloses A part of appearance mainly to illustrate embodiment, and can cooperate the associated description of specification former come the running for explaining embodiment Reason, cooperation refer to these contents, and those of ordinary skill in the art will be understood that other possible embodiments and this is practical new The advantages of type, the component in figure is not necessarily to scale, and similar component symbol is conventionally used to indicate similar component.
Embodiment according to the present utility model provides a kind of for the adjustable crossbeam of prefabricated buildings steel skeleton.
Embodiment one:
As shown in Figs 1-4, crossbeam is adjusted for prefabricated buildings steel skeleton according to the utility model embodiment, including Walking beam 1, fixed beam 1 and fixed beam 23, the both ends of the walking beam 1 are respectively interposed in the fixed beam 1 and described solid Determine the inside of beam 23, the fixed beam 1 and the fixed beam 23 are fixedly connected to peace far from one end of the walking beam 1 The top middle position of loading board 4, the fixed beam 1 and the fixed beam 23 is provided with sliding mouth 1, the fixed beam 1 and institute The side middle position for stating fixed beam 23 is provided with sliding mouth 26, and the walking beam 1 is provided with several close to the side of the sliding mouth 26 A fixation hole 7, the fixed beam 1 and the fixed beam 23 are equipped with fixed bin 8 close to the top of the walking beam 1, described The inside of fixed bin 8 is provided with groove 9, and the bosom position of the groove 9 is provided with fixed cylinder 10, two tops of the walking beam 1 Symmetrically there is slide bar 11 at end, and the top of the slide bar 11 runs through the sliding mouth 1 and extends to the inside of the fixed cylinder 10, described It is connected between fixed cylinder 10 and the slide bar 11 by fixed mechanism 12, and the bottom end of the fixed bin 8 is symmetrically installed with rolling Pearl 13, the fixed bin 8 are fixedly connected with fixed link 14, the fixed link 14 close to the side middle position of the sliding mouth 26 On be connected with catch bar 16, and the fixed link 14 is fixedly connected with baffle plate 15, institute far from one end of the fixed bin 8 It states catch bar 16 and is fixedly connected with kelly 17 compatible with the fixation hole 7 close to one end of the fixed bin 8.
With the aid of the technical scheme, by the way that fixed cylinder 10 to be set on slide bar 11, and cooperate setting for fixed mechanism 12 It sets, effectively makes the inside of walking beam 1, fixed beam 1 and fixed beam 23 carry out interspersed movement, so that 11 band of slide bar Dynamic fixed bin 8 is slided in fixed beam 1 and fixed beam 23, by rolling the setting of pearl 13, effectively reduces fixation Friction between box 8 and fixed beam 1 and fixed beam 23, at the same improve walking beam 1, fixed beam 1 and fixed beam 23 it Between stability, realize crossbeam length adjustability, by the fixed link 14 of setting, catch bar 16, kelly 17 and fixation hole 7, Effectively make to be fixed between walking beam 1 and fixed beam 1 and walking beam 1 and fixed beam 23, effectively raises crossbeam Stability, bring convenience for the installation and removal of crossbeam.
Embodiment two:
As shown in Fig. 2, being provided with several limit holes 19 in the fixed link 14.By the limit hole 19 of setting, convenient for adjusting Position of the catch bar 16 in fixed link 14 is saved, and then controls the fixation between kelly 17 and fixation hole 7.
As shown in Figure 1, 2, by compatible with the limit hole 19 between the catch bar 16 and the fixed link 14 Anchorage bar 18 connects.By the anchorage bar 18 of setting, convenient for fixed link 14 and catch bar 16 are fixed.
As shown in Figure 1,3, it is provided in the fixed beam 1 and the fixed beam 23 compatible with the rolling pearl 13 Sliding slot 20, and the sliding slot 20 is located at the two sides of the sliding mouth 1.It is so effective that reduce fixed bin 8 by the sliding slot 20 of setting With the friction between fixed beam 1 and fixed beam 23.
Embodiment three:
As shown in figure 4, the fixed mechanism 12 include sleeve 1 inside the groove 9 and with the sleeve one 21 sleeves 2 22 being connected, the inside of the sleeve 1 are interspersed with mobile bar 1, and one end of the mobile bar 1 is solid Surely it is connected with joining rod 24, bayonet 28 is provided on the joining rod 24, is cased in the mobile bar 1 positioned at the sleeve one Spring 1 inside 21 and the spring 2 30 outside the sleeve 1.The inside of the sleeve 2 22 is interspersed with movement Bar 2 26, one end of the mobile bar 2 26 are fixedly connected with connector rod 27 compatible with the bayonet 28, the mobile bar The spring 3 25 being arranged on 2 26 inside the sleeve 2 22, the one of the mobile bar 1 and the mobile bar 2 26 End is fixedly connected to push plate 29.
Using the design scheme of fixed mechanism 12, by pushing push plate 29, so that push plate 29 drives mobile bar 1 in turn It is mobile to drive joining rod 24, while mobile bar 2 26 being made to drive connector rod 27 mobile, so that connector rod 27 and joining rod Bayonet 28 on 24 is clamped so that fixed between joining rod 24 and connector rod 27 so that joining rod 24 by fixed cylinder 10 with Slide bar 11 is fixed, so that fixed bin 8 slides in fixed beam 1 and fixed beam 23, effectively makes walking beam 1 It will be attached between fixed beam 1 and fixed beam 23.
Working principle: in use, the both ends of walking beam 1 are passed through fixed beam 1 and fixed beam 23, so that movable Slide bar 11 on beam 1 passes through sliding mouth 1 and enters in the groove 9 on fixed bin 8, while by 19 sets of limit hole in the outer of slide bar 11 Portion, and then push plate 29 is pushed, so that push plate 29 drives mobile bar 1 and then drives the movement of joining rod 24, while making mobile bar 2 26 drive connector rods 27 mobile so that the bayonet 28 on connector rod 27 and joining rod 24 is clamped so that joining rod 24 with It is fixed between connector rod 27, so that fixed cylinder 10 and slide bar 11 are fixed joining rod 24, and then change fixed beam one 2, the length between walking beam 1 and fixed beam 23, and then change the length of crossbeam, and then movable sleeving pushing away in fixed link 14 Lever 16, while kelly 17 is passed through in fixation hole 7, and anchorage bar 18 is fixed by fixed link 14 and catch bar 16, Walking beam 1 effectively is fixed with fixed beam 1 and fixed beam 23 respectively.
In conclusion by means of the above-mentioned technical proposal of the utility model, by the way that fixed cylinder 10 is set on slide bar 11, And cooperate the setting of fixed mechanism 12, effectively make the inside of walking beam 1, fixed beam 1 and fixed beam 23 carry out interspersed shifting It is dynamic, so that slide bar 11 drives fixed bin 8 to be slided in fixed beam 1 and fixed beam 23, by rolling setting for pearl 13 It sets, effectively reduces the friction between fixed bin 8 and fixed beam 1 and fixed beam 23, while improving walking beam 1, fixing Stability between beam 1 and fixed beam 23 realizes crossbeam length adjustability, passes through the fixed link 14 of setting, catch bar 16, kelly 17 and fixation hole 7 effectively make to be consolidated between walking beam 1 and fixed beam 1 and walking beam 1 and fixed beam 23 It is fixed, the stability of crossbeam is effectively raised, brings convenience for the installation and removal of crossbeam.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this Within the spirit and principle of utility model, any modification, equivalent replacement, improvement and so on should be included in the utility model Protection scope within.

Claims (6)

1. crossbeam is adjusted for prefabricated buildings steel skeleton in one kind, which is characterized in that including walking beam (1), fixed beam one (2) With fixed beam two (3), the both ends of the walking beam (1) are respectively interposed in the fixed beam one (2) and the fixed beam two (3) Inside, the fixed beam one (2) and the fixed beam two (3) are fixedly connected to installation far from the one end of the walking beam (1) The top middle position of plate (4), the fixed beam one (2) and the fixed beam two (3) is provided with sliding mouth one (5), the fixed beam One (2) and the side middle position of the fixed beam two (3) are provided with sliding mouth two (6), and the walking beam (1) is close to the sliding mouth two (6) side is provided with several fixation holes (7), the fixed beam one (2) and the fixed beam two (3) close to the walking beam (1) top is equipped with fixed bin (8), and the inside of the fixed bin (8) is provided with groove (9), the bosom of the groove (9) Position is provided with fixed cylinder (10), and two tops of the walking beam (1) symmetrically have slide bar (11), and the top of the slide bar (11) is run through The cunning mouth one (5) and the inside for extending to the fixed cylinder (10), lead between the fixed cylinder (10) and the slide bar (11) Fixed mechanism (12) connection is crossed, and the bottom end of the fixed bin (8) is symmetrically installed with and rolls pearl (13), the fixed bin (8) is leaned on The side middle position of the nearly sliding mouth two (6) is fixedly connected with fixed link (14), is connected on the fixed link (14) Catch bar (16), and the fixed link (14) is fixedly connected with baffle plate (15) far from the one end of the fixed bin (8), it is described to push away Lever (16) is fixedly connected with the compatible kelly (17) with the fixation hole (7) close to the one end of the fixed bin (8).
2. according to claim 1 a kind of for the adjustable crossbeam of prefabricated buildings steel skeleton, which is characterized in that described solid Several limit holes (19) are provided in fixed pole (14).
3. according to claim 2 a kind of for the adjustable crossbeam of prefabricated buildings steel skeleton, which is characterized in that described to push away It is connect between lever (16) and the fixed link (14) by anchorage bar (18) compatible with the limit hole (19).
4. according to claim 1 a kind of for the adjustable crossbeam of prefabricated buildings steel skeleton, which is characterized in that described solid Determine to be provided with the rolling pearl (13) compatible sliding slot (20), and the sliding slot in beam one (2) and the fixed beam two (3) (20) it is located at the two sides of the sliding mouth one (5).
5. according to claim 1 a kind of for the adjustable crossbeam of prefabricated buildings steel skeleton, which is characterized in that described solid Determining mechanism (12) includes positioned at the sleeve two groove (9) internal sleeve one (21) and be connected with the sleeve one (21) (22), the inside of the sleeve one (21) is interspersed with mobile bar one (23), and one end of the mobile bar one (23) is fixedly connected with Joining rod (24) is provided with bayonet (28) on the joining rod (24), is cased on the mobile bar one (23) positioned at the sleeve one (21) internal spring one (31) and the spring two (30) external positioned at the sleeve one (21).
6. according to claim 5 a kind of for the adjustable crossbeam of prefabricated buildings steel skeleton, which is characterized in that the set The inside of two (22) of cylinder is interspersed with mobile bar two (26), and one end of the mobile bar two (26) is fixedly connected with and the bayonet (28) compatible connector rod (27) is cased with the spring three internal positioned at the sleeve two (22) on the mobile bar two (26) (25), one end of the mobile bar one (23) and the mobile bar two (26) is fixedly connected to push plate (29).
CN201920149044.9U 2019-01-29 2019-01-29 Crossbeam is adjusted for prefabricated buildings steel skeleton in one kind Expired - Fee Related CN209457262U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920149044.9U CN209457262U (en) 2019-01-29 2019-01-29 Crossbeam is adjusted for prefabricated buildings steel skeleton in one kind

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920149044.9U CN209457262U (en) 2019-01-29 2019-01-29 Crossbeam is adjusted for prefabricated buildings steel skeleton in one kind

Publications (1)

Publication Number Publication Date
CN209457262U true CN209457262U (en) 2019-10-01

Family

ID=68046112

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920149044.9U Expired - Fee Related CN209457262U (en) 2019-01-29 2019-01-29 Crossbeam is adjusted for prefabricated buildings steel skeleton in one kind

Country Status (1)

Country Link
CN (1) CN209457262U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112942677A (en) * 2021-01-26 2021-06-11 上海绿地建设(集团)有限公司 Assembled double-side-plate all-bolt steel connecting beam
CN115012555A (en) * 2022-07-05 2022-09-06 苏邑设计集团有限公司 Prefabricated assembled wall truss structure

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112942677A (en) * 2021-01-26 2021-06-11 上海绿地建设(集团)有限公司 Assembled double-side-plate all-bolt steel connecting beam
CN115012555A (en) * 2022-07-05 2022-09-06 苏邑设计集团有限公司 Prefabricated assembled wall truss structure
CN115012555B (en) * 2022-07-05 2023-10-20 苏邑设计集团有限公司 Prefabricated wall truss structure

Similar Documents

Publication Publication Date Title
CN209457262U (en) Crossbeam is adjusted for prefabricated buildings steel skeleton in one kind
CN108193993B (en) A kind of high-strength aluminum alloy heat-insulating bridge-cut-off passive type door and window
CN209140736U (en) It is a kind of to be easily installed fixed mechanism
CN209009996U (en) A kind of concrete prefabricated element hanging frame component
CN209066740U (en) A kind of aluminium sheet roofing installation node component structure
CN208907527U (en) A kind of electromechanical equipment damping device
CN207460844U (en) A kind of cotton acquisition frame and cotton picker
CN210838802U (en) Groove type bridge
CN209654928U (en) A kind of railway tunnel construction safety monitoring device
CN205822584U (en) Adjustable high strength I-beam structure
CN209140424U (en) It is a kind of for producing the steady type machine table of steel construction
CN208486527U (en) A kind of ground flattening-out idler wheel being easily installed disassembly
CN209313253U (en) A kind of distribution box connection component and its link structure
CN210688760U (en) Installation mechanism of wall regenerative furnace
CN204738184U (en) Low power bullet strip of withholding
CN209065191U (en) A kind of zinc-coated wire collecting drum convenient for transfer
CN208518077U (en) A kind of steel structure connection structure of adjustable clearance
CN208023771U (en) A kind of assembled architecture shock-damping structure
CN207211722U (en) A kind of wall form system with back cord
CN216751155U (en) Assembled outer wall lightning protection sleeve pipe
CN208918091U (en) A kind of building decoration curtain wall
CN214075424U (en) Filter cover easy to assemble and disassemble for atomizer
CN209281995U (en) Modular network transformer
CN110067327A (en) A kind of exhibition room multifunctional usage partition wall mounting structure
CN208175155U (en) A kind of waterproof and dampproof type outdoor wireless communication apparatus

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191001

Termination date: 20210129

CF01 Termination of patent right due to non-payment of annual fee