CN209444951U - A kind of pipeline banjo fixing butt jointing - Google Patents

A kind of pipeline banjo fixing butt jointing Download PDF

Info

Publication number
CN209444951U
CN209444951U CN201822173293.XU CN201822173293U CN209444951U CN 209444951 U CN209444951 U CN 209444951U CN 201822173293 U CN201822173293 U CN 201822173293U CN 209444951 U CN209444951 U CN 209444951U
Authority
CN
China
Prior art keywords
mounting blocks
bell
connection
peg
spigot joint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201822173293.XU
Other languages
Chinese (zh)
Inventor
乐宁建
骆焱
余江辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Feng Is Refrigeration Technology Co Ltd
Original Assignee
Hangzhou Feng Is Refrigeration Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Feng Is Refrigeration Technology Co Ltd filed Critical Hangzhou Feng Is Refrigeration Technology Co Ltd
Priority to CN201822173293.XU priority Critical patent/CN209444951U/en
Application granted granted Critical
Publication of CN209444951U publication Critical patent/CN209444951U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of pipeline banjo fixing butt jointing, for connecting two sections of pipelines being separated from each other, including mutually equipped socket part and plug division, wherein, the socket part includes bell and spigot joint, the first mounting blocks being slidably located in outside bell and spigot joint, the outside for being connected to the first spring between bell and spigot joint and the first mounting blocks in compressive state and being arranged in parallel in the first mounting blocks with the axis of bell and spigot joint buckles, the plug division includes connection-peg, the second mounting blocks being slidably located on connection-peg, the second spring between connection-peg and the second mounting blocks is connected in compressive state and is protruded from the second mounting blocks and is buckled mutually matched boss.The utility model is compact-sized, easy for installation, completes docking for pipeline with the connection of socket part by plug division, reduces installation difficulty, improve work efficiency.

Description

A kind of pipeline banjo fixing butt jointing
Technical field
The utility model relates to a kind of fluid or gas connection connectors, belong to pipe fitting or pipe fitting technical field.
Background technique
In production and life, it is often necessary to the pipeline of two-phase seperation be interconnected to realize the stream of fluid or gas It is dynamic.Two root canal roads are docked by the connection of pipeline frequently with a kind of mode of similar muff joint at present and are connected, the both ends of connector Be respectively adopted thread connecting mode by sealing surfaces force together connection two segment pipes;Or use quick coupling, this connector One side operating process is cumbersome, when installation site is inconvenient to operate, installation operation difficulty is increased, on the other hand also as hydraulic pressure The excessive accident that will cause fluid leakage.
Utility model content
The purpose of the utility model is to provide a kind of pipeline banjo fixing butt jointings compact-sized, easy for installation, reduce installation Difficulty improves work efficiency.
In order to achieve the above objectives, the utility model adopts the following technical solution:
A kind of pipeline banjo fixing butt jointing, for connecting two sections of pipelines being separated from each other, comprising:
Socket part is connected with a wherein segment pipe end;And
Plug division, one end are connected with another segment pipe end;The other end and socket part are mutually equipped,
Wherein, the socket part includes:
Bell and spigot joint is the tube-in-tube structure with centre bore, fixes on the outer wall of the tube-in-tube structure and be embedded with the first ball, cover One end of barrel structure is provided with flange sleeve, and the other end far from flange sleeve is connected with pipe end, and the centre bore is set as Stepped hole corresponding with shape;
First mounting blocks, are set in the periphery in the middle section of bell and spigot joint, and the inner wall of first mounting blocks is opened up along bell and spigot joint Axially extending spiral helicine first slot rolling, first slot rolling and the first ball engagement complete the first mounting blocks and bell and spigot joint Relative displacement;
First spring is sleeved on bell and spigot joint periphery, and is connected between flange sleeve and the first mounting blocks in compressive state;
Buckle, the outside of the first mounting blocks is arranged in parallel in the axis of bell and spigot joint,
The plug division includes:
Connection-peg is the cylinder with through-hole, fixed on the outer wall of the cylinder to be embedded with the second ball, one end of cylinder with Pipe end is connected;The grafting flange that the other end setting of cylinder is equipped with flange sleeve,
Second mounting blocks, are set in the periphery in the middle section of connection-peg, and the inner wall of second mounting blocks is opened up along connection-peg Axially extending spiral helicine second slot rolling, second slot rolling and the second ball engagement complete the second mounting blocks and connection-peg Relative displacement;
Second spring is sleeved on the periphery of connection-peg, and is connected to grafting flange and the second mounting blocks in compressive state Between;
Boss outwardly protrudes in the second mounting blocks, cooperates with buckle and fix the first mounting blocks.
Itself further improvement lies in that, the periphery of the grafting flange is arranged with sealing ring.With this, docks and complete in pipeline Afterwards, it prevents water flow from overflowing, guarantees sealing performance.
Itself further improvement lies in that, the middle part of the buckle and the first mounting blocks are hinged, buckle far from boss one end hang down Straight first mounting blocks are arranged outward holds out against spring in compressive state.By holding out against the restoring force of spring, by one end of buckle Outer top, so that the other end of buckle and boss locking fix.
Itself further improvement lies in that, between the bell and spigot joint and the first mounting blocks setting by the first circlip it is fixed first Bearing, the setting second bearing fixed by the second circlip between the connection-peg and the second mounting blocks.
Itself further improvement lies in that, second mounting blocks open up axially flat with connection-peg on the end face of grafting flange Capable pilot hole, the guide post that setting is equipped with pilot hole on first mounting blocks.With this, when carrying out pipeline connection, energy Enough make plug division and socket part two parts quick alignment, completes docking.
The beneficial effects of the utility model are:
The utility model is compact-sized, after socket part and plug division are connected with two segment pipes that needs are connected to respectively, leads to Cross the mutual equipped of connection-peg and bell and spigot joint, can quickly finish the connection between pipeline, and by buckle and boss it Between cooperation, two segment pipes are connected and are locked, easy to operate, installation is simple, improves work efficiency.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of banjo fixing butt jointing described in the utility model;
Fig. 2 is the structural schematic diagram of the utility model socket part;
Fig. 3 is schematic diagram of the utility model socket part after 90 ° of center axis rotation;
Fig. 4 is the structural schematic diagram of the utility model plug division;
Fig. 5 is schematic diagram of the utility model plug division after 90 ° of center axis rotation;
Fig. 6 is the schematic perspective view of the utility model off-state;
Fig. 7 is the schematic perspective view of the utility model connection status.
Each list of reference numerals in figure are as follows: 1, bell and spigot joint, 2, connection-peg, the 3, first mounting blocks, the 4, second mounting blocks, 5, buckle, 6, boss, 7, hold out against spring, the 8, first spring, 9, second spring, the 10, first ball, 11, grafting flange, 12, flange sleeve, 13, Sealing ring, the 14, first slot rolling, 15, second bearing, the 16, second circlip, 17, first bearing, the 18, first circlip, 19, guide post, 20, pilot hole, the 21, second ball, the 22, second slot rolling.
Specific embodiment
With reference to the accompanying drawing and specific embodiment the utility model is described in further detail.
Referring to Fig. 1, Fig. 6 and Fig. 7, the utility model provides a kind of pipeline banjo fixing butt jointing, and the pipeline banjo fixing butt jointing is used In connecting two sections of pipelines being separated from each other, main includes the socket part and plug division being mutually equipped with, the socket part and plug division The other end be connected respectively with two segment pipes.
The structure of the socket part mainly includes bell and spigot joint 1, the first mounting blocks 3,8 and of the first spring referring to Fig. 2 and Fig. 3 Buckle 5.Wherein, the sliding of bell and spigot joint 1 is inserted into the first mounting blocks 3, and 5 setting of buckle is in 3 outside of the first mounting blocks.
The bell and spigot joint 1 is the tube-in-tube structure with centre bore, and one end of the tube-in-tube structure is covered for being connected with pipeline The other end of barrel structure is matched with plug division, one end of plug division cooperation is provided with flange sleeve 12, so that 1 shape of bell and spigot joint It is similar to multi-diameter shaft.Its internal centre bore of tube-in-tube structure is arranged to stepped hole corresponding with shape.In addition, in tube-in-tube structure Outer wall middle section be provided with the first pit, be embedded in first pit and be fixed with the first ball 10, wherein the first ball 10 is convex For the outer wall of bell and spigot joint 1.
First mounting blocks 3 are set in the periphery in the middle section of bell and spigot joint 1, are arranged between bell and spigot joint 1 and the first mounting blocks 3 It is connected by first bearing 17, wherein first bearing 17 is embedded in by the fixation of the first circlip 18 into the first mounting blocks 3.First Offering the first slot rolling 14 on the inner wall of mounting blocks 3, first slot rolling 14 is in the shape of a spiral along the axially extending of bell and spigot joint 1, and One slot rolling 14 is corresponding with the first ball 10, when with bell and spigot joint 1 axial relative displacement occurs for the first mounting blocks 3, is embedded in solid The first ball 10 being scheduled on bell and spigot joint 1 can slide in the first slot rolling 14.
First spring 8 is sleeved on 1 periphery of bell and spigot joint, and is connected to flange sleeve 12 and the first installation in compressive state Between block 3.Described to buckle 5 as a strip square, the axis of buckle 5 and bell and spigot joint 1 is arranged in parallel in the outer of the first mounting blocks 3 Side.One end of the close flange sleeve 12 of the strip square is arranged to crotch to the bending of the first mounting blocks 3, strip square Middle part and the first mounting blocks 3 are hinged, and the other end of strip square, which is fixedly connected with, holds out against spring 7, institute in compressive state It states the one end for holding out against spring 7 and is connected with buckling 5, the other end for holding out against spring 7 is connected with the first mounting blocks 3.By holding out against spring 7 Restoring force, 5 one end Wai Ding will be buckled.
The structure of the plug division mainly includes connection-peg 2, the second mounting blocks 4,9 and of second spring referring to Fig. 4 and Fig. 5 Boss 6.The connection-peg 2 is actively plugged in the second mounting blocks 4, equipped with 1 phase of bell and spigot joint when use.The boss 6 is arranged In 4 outside of the second mounting blocks, matched with buckle 5.
The connection-peg 2 is the cylinder with through-hole, and one end of the cylinder is connected with pipe end;The other end of cylinder is set Set the grafting flange 11 being equipped with flange sleeve 12.The periphery of the grafting flange 11 is arranged with sealing ring 13, has docked in pipeline Cheng Hou, grafting flange 11 are wanted to cooperate with flange sleeve 12, can prevent water flow from overflowing by sealing ring 13, guarantee sealing performance.? The outer wall middle section of cylinder is provided with second dimple, is embedded in the second dimple and is fixed with the second ball 21, wherein the second ball 21 protrude from the outer wall of connection-peg 2.
Second mounting blocks 4 are set in the periphery in the middle section of connection-peg 2, are arranged between connection-peg 2 and the second mounting blocks 4 There is second bearing 15, the second bearing 15 is embedded in by the fixation of the second circlip 16 into the second mounting blocks 4.Second installation The inner wall of block 4 opens up axially extending spiral helicine second slot rolling 22 along connection-peg 2, second slot rolling 22 and the second ball 21 is corresponding, when with connection-peg 2 axial relative displacement occurs for the second mounting blocks 4, is embedded in second be fixed on connection-peg 2 Ball 21 can slide in the second slot rolling 22.
The second spring 9 is sleeved on the periphery of connection-peg 2, and is connected to grafting flange 11 and second in compressive state Between mounting blocks 4.The boss 6 is outwardly protruded in the second mounting blocks 4, is cooperated with buckle 5 and is fixed the first mounting blocks 3.When When socket part and plug division are in connection status, the crotch fastener for buckling 5 lives boss 6, as shown in Figure 1 and Figure 7.
In addition, as shown in Figure 3 and Figure 5, being opened up on the end face of grafting flange 11 and connection-peg 2 in the second mounting blocks 4 Axial parallel pilot hole 20, is arranged the guide post 19 being equipped with pilot hole 20 on the first mounting blocks 3.Carrying out pipeline connection When, plug division and socket part two parts quick alignment can be made, complete docking, improve working efficiency.

Claims (5)

1. a kind of pipeline banjo fixing butt jointing, for connecting two sections of pipelines being separated from each other, characterized in that include:
Socket part is connected with a wherein segment pipe end;And
Plug division, one end are connected with another segment pipe end;The other end and socket part are mutually equipped,
Wherein, the socket part includes:
Bell and spigot joint (1) is the tube-in-tube structure with centre bore, fixes on the outer wall of the tube-in-tube structure and be embedded with the first ball (10), one end of tube-in-tube structure is provided with flange sleeve (12), and the other end far from flange sleeve (12) is connected with pipe end, institute It states centre bore and is set as stepped hole corresponding with shape;
First mounting blocks (3), are set in the periphery in the middle section of bell and spigot joint (1), and the inner wall of first mounting blocks (3) is opened up along set Axially extending spiral helicine first slot rolling (14) of connector (1), first slot rolling (14) have cooperated with the first ball (10) At the relative displacement of the first mounting blocks (3) and bell and spigot joint (1);
First spring (8) is sleeved on bell and spigot joint (1) periphery, and is connected to flange sleeve (12) and the first installation in compressive state Between block (3);
It buckles (5), the outside of the first mounting blocks (3) is arranged in parallel in the axis of bell and spigot joint (1),
The plug division includes:
Connection-peg (2) is the cylinder with through-hole, and fixation is embedded with the second ball (21) on the outer wall of the cylinder, the one of cylinder End is connected with pipe end;The grafting flange (11) that the other end setting of cylinder is equipped with flange sleeve (12),
Second mounting blocks (4), are set in the periphery in the middle section of connection-peg (2), and the inner wall of second mounting blocks (4) is opened up along slotting Axially extending spiral helicine second slot rolling (22) of connector (2), second slot rolling (22) have cooperated with the second ball (21) At the relative displacement of the second mounting blocks (4) and connection-peg (2);
Second spring (9) is sleeved on the periphery of connection-peg (2), and is connected to grafting flange (11) and second in compressive state Between mounting blocks (4);
Boss (6) outwardly protrudes in the second mounting blocks (4), cooperates with buckle (5) and fix the first mounting blocks (3).
2. a kind of pipeline banjo fixing butt jointing according to claim 1, characterized in that the periphery of the grafting flange (11) is arranged There are sealing ring (13).
3. a kind of pipeline banjo fixing butt jointing according to claim 1, characterized in that the middle part of the buckle (5) and the first peace Fill block (3) hingedly, the top for being in compressive state is arranged in vertical first mounting blocks (3) in one end of the buckle (5) far from boss (6) outward Tight spring (7).
4. a kind of pipeline banjo fixing butt jointing according to claim 1, characterized in that the bell and spigot joint (1) and the first mounting blocks (3) setting first bearing (17) fixed by the first circlip (18) between, the connection-peg (2) and the second mounting blocks (4) it Between setting second bearing (15) fixed by the second circlip (16).
5. a kind of pipeline banjo fixing butt jointing according to claim 1, characterized in that the neighbouring grafting of second mounting blocks (4) Opened up on the end face of flange (11) with the axial parallel pilot hole (20) of connection-peg (2), on first mounting blocks (3) setting with The equipped guide post (19) of pilot hole (20).
CN201822173293.XU 2018-12-24 2018-12-24 A kind of pipeline banjo fixing butt jointing Active CN209444951U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822173293.XU CN209444951U (en) 2018-12-24 2018-12-24 A kind of pipeline banjo fixing butt jointing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822173293.XU CN209444951U (en) 2018-12-24 2018-12-24 A kind of pipeline banjo fixing butt jointing

Publications (1)

Publication Number Publication Date
CN209444951U true CN209444951U (en) 2019-09-27

Family

ID=68015096

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822173293.XU Active CN209444951U (en) 2018-12-24 2018-12-24 A kind of pipeline banjo fixing butt jointing

Country Status (1)

Country Link
CN (1) CN209444951U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113028179A (en) * 2019-12-24 2021-06-25 博西华电器(江苏)有限公司 Household appliance pipeline butt joint private-dismantling-prevention device, gas stove and pipeline butt joint dismantling method
CN114932398A (en) * 2022-06-06 2022-08-23 安徽杰蓝特新材料有限公司 Hinge locking type RTP pipe integrated connection process

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113028179A (en) * 2019-12-24 2021-06-25 博西华电器(江苏)有限公司 Household appliance pipeline butt joint private-dismantling-prevention device, gas stove and pipeline butt joint dismantling method
CN114932398A (en) * 2022-06-06 2022-08-23 安徽杰蓝特新材料有限公司 Hinge locking type RTP pipe integrated connection process
CN114932398B (en) * 2022-06-06 2024-02-02 安徽杰蓝特新材料有限公司 Hinge lock catch type RTP pipe integral type connection process

Similar Documents

Publication Publication Date Title
CN209444951U (en) A kind of pipeline banjo fixing butt jointing
ES2653697T3 (en) Pipe element with support surface, groove and flange and manufacturing procedures and devices
CA2494481A1 (en) Plug-in coupling for connecting a fluid line to a pipe
CN207094002U (en) Dismountable Quick Connect Kit
CN105972361B (en) A kind of liquid high-voltage quick joint
CN209781984U (en) Three-way pneumatic connector
KR101218352B1 (en) Conneting device for pipe
CN109595414A (en) Male contact and quick coupling
CN209444947U (en) Male contact and quick coupling
CN215410735U (en) Plastic conduit connection structure convenient to dismantle fast
CN205504267U (en) Novel pipeline joint
CN203363485U (en) Pipe fast connecting structure
CN210424085U (en) Pipeline connecting assembly and angle valve
CN208816930U (en) A kind of compressed air pipe sliding block lock tube coupling structure
CN211010337U (en) Pipe fitting joint
CN220851200U (en) Quick connector for resisting water pressure
CN206409771U (en) Conduit coupling
CN211821142U (en) Pipeline joint
CN107781556A (en) A kind of plane formula snap joint
CN212455835U (en) Joint assembly of connecting pipe
CN212868584U (en) Novel check valve joint
CN214579442U (en) Groove pipe joint snap ring
CN219734523U (en) Connecting joint
CN219013642U (en) Novel hose connector
CN215173078U (en) Pneumatic stop pipe joint

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant