CN209444894U - A kind of rail traffic indoor drainage pipe mounting device - Google Patents
A kind of rail traffic indoor drainage pipe mounting device Download PDFInfo
- Publication number
- CN209444894U CN209444894U CN201821859373.4U CN201821859373U CN209444894U CN 209444894 U CN209444894 U CN 209444894U CN 201821859373 U CN201821859373 U CN 201821859373U CN 209444894 U CN209444894 U CN 209444894U
- Authority
- CN
- China
- Prior art keywords
- fixed plate
- block
- fixedly connected
- rail traffic
- drainage pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Sink And Installation For Waste Water (AREA)
Abstract
The utility model discloses a kind of rail traffic indoor drainage pipe mounting devices, it is related to technical field of rail traffic, it includes mounting plate, connecting plate is fixedly connected at left and right sides of the mounting plate lower surface, the lower surface of the connecting plate is fixedly connected with the first fixed plate, the two sides overlap joint of the two sides of first fixed plate lower surface and the second fixed plate upper surface.Rail traffic indoor drainage pipe mounting device; pass through the mutual cooperation of the first fixed plate, the second fixed plate, slide bar, sliding sleeve, block, shaft, bearing, through-hole and protective device; people first pass through handle and block are rotated forward 90 degree; people move down the second fixed plate; separate the first fixed plate and the second fixed plate; pipeline is placed on protective device surface; the second fixed plate is moved up again; it avoids people from needing to use different mounting devices when to different Pipe installings, is brought convenience to people when being installed to drainage pipeline.
Description
Technical field
The utility model relates to technical field of rail traffic, specially a kind of rail traffic is installed with indoor drainage pipe and is filled
It sets.
Background technique
Rail traffic refers to a kind of vehicles or transportation system that vehicle in use needs to travel in certain tracks.Most allusion quotation
The rail traffic of type is exactly the railway system as composed by traditional train and standard railroad.It is polynary with train and railway technology
Change development, rail traffic shows more and more types, be not only dispersed throughout the land transport of long range, is also widely used in
In short-range urban public transport.
In urban rail transit construction, need that drainage pipeline is installed, and the model of drainage pipeline is different, pipeline it is thick
Carefully also different, existing drainage pipeline mounting device can only install a kind of pipeline of model, to different Pipe installings
When need to use different mounting devices, therefore while installing to people to drainage pipeline, makes troubles.
Utility model content
(1) the technical issues of solving
In view of the deficiencies of the prior art, the utility model provides a kind of rail traffic indoor drainage pipe installation dress
It sets, a kind of pipeline of model can only be installed by solving existing drainage pipeline mounting device, to different Pipe installings
When need the problem of using different mounting devices.
(2) technical solution
To achieve the above objectives, the technical scheme adopted by the utility model is that: a kind of rail traffic indoor drainage pipe
Mounting device, including mounting plate are fixedly connected to connecting plate at left and right sides of the mounting plate lower surface, the connecting plate
Lower surface is fixedly connected with the first fixed plate, the two sides of the two sides of first fixed plate lower surface and the second fixed plate upper surface
Overlap joint, the upper surface left side of first fixed plate are fixedly connected with the first fixed block, and the lower surface of first fixed block is solid
Surely it is connected with slide bar, the surface of the slide bar is socketed with sliding sleeve, and the lower surface of the sliding sleeve is connected to the upper table of the second fixed block
Face.
The right side of second fixed block is fixedly connected on the left side of the second fixed plate lower surface, the bottom end of the slide bar
It is fixedly connected with baffle, the lower surface of first fixed plate and the upper surface of the second fixed plate are fixedly connected to three bullets
Spring, the top of the spring are fixedly connected with protective device, and first fixed plate is fixedly connected with first on the right side of upper surface
The upper surface of link block, first link block offers through-hole.
The second link block, the upper surface of second link block are fixedly connected on the right side of second fixed plate lower surface
It is connected with bearing, the bearing inner sleeve is connected to shaft, and the top of the shaft, which passes through through-hole and fixes with the lower surface of block, to be connected
It connects, the upper surface of the lower surface of the block and the first link block overlaps, and the bottom end of the shaft is fixedly connected with handle.
Preferably, the protective device includes grip block, and the lower surface of the grip block is fixedly connected with the top of spring,
The upper surface of the grip block is fixedly connected with elastic cushion.
Preferably, the shape of the slide bar is rectangle, and the shape of the sliding sleeve is rectangle.
Preferably, the shape of the block and through-hole is rectangle, and the length of the block is greater than the length of through-hole, described
The length of block is less than the width of through-hole.
Preferably, the upper surface of the mounting plate is opened up there are four mounting hole, and four mounting holes are located at mounting plate
The four corners of upper surface.
Preferably, the shape of first fixed plate and the second fixed plate is arc, and the shape of the grip block is also arc
Shape.
(3) beneficial effect
The utility model has the beneficial effects that:
1, rail traffic indoor drainage pipe mounting device passes through the first fixed plate, the second fixed plate, slide bar, cunning
The mutual cooperation of set, block, shaft, bearing, through-hole and protective device, people first pass through handle and block are rotated forward 90 degree, people
Move down the second fixed plate, separate the first fixed plate and the second fixed plate, pipeline be placed on protective device surface, then to
Upper the second fixed plate of movement overlaps the second fixed plate and the first fixed plate, then so that block is stuck in the first connection rotating handles
The upper surface of plate just can install the drainage pipeline of different model, avoid people's needs when to different Pipe installings
Using different mounting devices is arrived, brought convenience to people when being installed to drainage pipeline.
, rail traffic indoor drainage pipe mounting device, the elastic cushion by the way that protective device is arranged, in protective device
The effect that protection can be played to drainage pipeline avoids grip block from causing drainage pipeline hair damaged the tension that drainage pipeline clamps
The phenomenon that, it is rectangle by the shape of setting slide bar and sliding sleeve, can be avoided and rotated when sliding over up and down motion, to keep away
Exempt from the case where the second fixed plate is rotated when moving up and down, keeps the second fixed plate more steady when moving up and down.
, rail traffic indoor drainage pipe mounting device, by be arranged block and through-hole length and width, can
Make block that can smoothly pass through through-hole after rotating forward 90 degree, by the way that baffle is arranged, baffle, which can be avoided, slides over downslide
Slide bar is detached from when dynamic, and baffle can also play the role of limit to the second fixed plate.
Detailed description of the invention
Fig. 1 is the schematic diagram of the section structure that the utility model is faced;
Fig. 2 is the structural schematic diagram of the utility model left view;
Fig. 3 is the structural schematic diagram of the utility model part A amplification.
In figure: 1 mounting plate, 2 mounting holes, 3 connecting plates, 4 first fixed plates, 5 first fixed blocks, 6 slide bars, 7 sliding sleeves, 8
Two fixed blocks, 9 baffles, 10 second fixed plates, 11 springs, 12 protective devices, 121 grip blocks, 122 elastic cushions, 13 first connections
Block, 14 through-holes, 15 blocks, 16 shafts, 17 bearings, 18 second link blocks, 19 handles.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
As shown in Figure 1-3, the utility model provides a kind of technical solution: a kind of rail traffic is installed with indoor drainage pipe
Device, including mounting plate 1, the upper surface of mounting plate 1 is opened up there are four mounting hole 2, and four mounting holes 2 are located at mounting plate
The four corners of 1 upper surface can facilitate people to install mounting plate 1 by setting mounting hole 2,1 lower surface of mounting plate
The left and right sides is fixedly connected to connecting plate 3, and the lower surface of connecting plate 3 is fixedly connected with the first fixed plate 4, the first fixed plate 4
Shape with the second fixed plate 10 is arc, and the shape of grip block 121 is also arc, and the shape by the way that grip block 121 is arranged is
Arc can be adapted with the shape of drainage pipeline, to facilitate people to install drainage pipeline, under the first fixed plate 4
The two sides of the two sides on surface and 10 upper surface of the second fixed plate overlap, and the is fixedly connected on the left of the upper surface of the first fixed plate 4
One fixed block 5, the lower surface of the first fixed block 5 are fixedly connected with slide bar 6, and the surface of slide bar 6 is socketed with sliding sleeve 7, the shape of slide bar 6
Shape is rectangle, and the shape of sliding sleeve 7 is rectangle, is rectangle by the shape of setting slide bar 6 and sliding sleeve 7, can be avoided sliding sleeve 7 upper
It is rotated when lower movement, so that the case where avoiding the second fixed plate 10 from rotating when moving up and down, makes the second fixed plate
10 is more steady when moving up and down, and the lower surface of sliding sleeve 7 is connected to the upper surface of the second fixed block 8.
The right side of second fixed block 8 is fixedly connected on the left side of 10 lower surface of the second fixed plate, and the bottom end of slide bar 6 is fixed
It is connected with baffle 9, by the way that baffle 9 is arranged, baffle 9 can be avoided sliding sleeve 7 and be detached from when moving up and down from the surface of slide bar 6, the
The lower surface of one fixed plate 4 and the upper surface of the second fixed plate 10 are fixedly connected to three springs 11, by the way that spring 11 is arranged,
After the first fixed plate 4 and the second fixed plate 10 are fixed, spring 11 due to the elastic force of itself can make respectively two grip blocks 121 to
A mutually close Fang Yundong fixes pipeline more stable, while spring 11 can also play the role of buffering, when pipeline occurs
When shaking, spring 11 plays the effect of buffering, the top of spring 11 since the elastic force of itself can be shunk in contraction process to pipeline
End is fixedly connected with protective device 12, and protective device 12 includes grip block 121, the lower surface of grip block 121 and the top of spring 11
End is fixedly connected, and the upper surface of grip block 121 is fixedly connected with elastic cushion 122, by the way that protective device 12, protective device 12 is arranged
Interior elastic cushion 122 can play the effect of protection to drainage pipeline, and grip block 121 is avoided to lead the tension that drainage pipeline clamps
The phenomenon of drainage pipeline hair breakage is caused, the first link block 13, the first connection are fixedly connected on the right side of 4 upper surface of the first fixed plate
The upper surface of block 13 offers through-hole 14.
The second link block 18, the upper surface card of the second link block 18 are fixedly connected on the right side of second fixed plate, 10 lower surface
It is connected to bearing 17, shaft 16 is socketed in bearing 17, by setting bearing 17 and shaft 16, block 15 can be made to be rotated,
To enable block 15 to be stuck in the upper surface of the first link block 13, the top of shaft 16 pass through through-hole 14 and under block 15
Surface is fixedly connected, and the shape of block 15 and through-hole 14 is rectangle, and the length of block 15 is greater than the length of through-hole 14, block 15
Length be less than through-hole 14 width, by be arranged block 15 and through-hole 14 length and width, block 15 can be made to rotate forward
Through-hole 14, the upper surface overlap joint of the lower surface of block 15 and the first link block 13, shaft 16 can be smoothly passed through after 90 degree
Bottom end be fixedly connected with handle 19, by be arranged handle 19, people's rotating shaft 16 can be facilitated, so that people be facilitated to rotate
Block 15.
The operating procedure of the utility model are as follows:
S1, firstly, people first by handle 19 rotate forward 90 degree, handle 19 drive shaft 16 rotate, shaft 16 drive block
15 rotations, after 15 rotated ninety degrees of block, block 15 just can pass through through-hole 14, and people move the second fixed plate still further below
10, separate the second fixed plate 10 with the first fixed plate 4;
S2, then drainage pipeline is placed on the top of elastic cushion 122 by people, then moves up the second fixed plate 10, makes the
Two fixed plates 10 and the first fixed plate 4 overlap, and when block 15 passes through through-hole 14, handle 19 are inverted 90 degree, 19 band of handle
Turn axis 16 rotates, and shaft 16 drives block 15 to rotate, and block 15 is made to be stuck in the upper surface of the first link block 13;
S3, simultaneously, spring 11 in the first fixed plate 4 and the second fixed plate 10 can make two due to the elastic force of itself respectively
Grip block 121 fixes pipeline more stable to a mutually close Fang Yundong.
Above-described specific embodiment, to the purpose of this utility model, technical scheme and beneficial effects carried out into
One step is described in detail, it should be understood that being not used to limit the foregoing is merely specific embodiment of the present utility model
The utility model processed, within the spirit and principle of the utility model, any modification, equivalent substitution, improvement and etc. done,
It should be included within the scope of protection of this utility model.
Claims (6)
1. a kind of rail traffic indoor drainage pipe mounting device, including mounting plate (1), it is characterised in that: the mounting plate
(1) it is fixedly connected at left and right sides of lower surface connecting plate (3), the lower surface of the connecting plate (3) is fixedly connected with first
Fixed plate (4), the two sides of the first fixed plate (4) lower surface and the two sides of the second fixed plate (10) upper surface overlap, described
It is fixedly connected with the first fixed block (5) on the left of the upper surface of first fixed plate (4), the lower surface of first fixed block (5) is solid
Surely it is connected with slide bar (6), the surface of the slide bar (6) is socketed with sliding sleeve (7), and the lower surface of the sliding sleeve (7) is connected to second
The upper surface of fixed block (8);
The right side of second fixed block (8) is fixedly connected on the left side of the second fixed plate (10) lower surface, the slide bar (6)
Bottom end be fixedly connected with baffle (9), the lower surface of first fixed plate (4) and the upper surface of the second fixed plate (10) are solid
Fixed connection is there are three spring (11), and the top of the spring (11) is fixedly connected with protective device (12), first fixed plate
(4) it is fixedly connected on the right side of upper surface the first link block (13), the upper surface of first link block (13) offers through-hole
(14);
It is fixedly connected with the second link block (18) on the right side of second fixed plate (10) lower surface, second link block (18)
Upper surface be connected with bearing (17), is socketed with shaft (16) in the bearing (17), the top of the shaft (16) passes through logical
Hole (14) is simultaneously fixedly connected with the lower surface of block (15), the lower surface of the block (15) and the upper table of the first link block (13)
Face overlap joint, the bottom end of the shaft (16) is fixedly connected with handle (19).
2. a kind of rail traffic indoor drainage pipe mounting device according to claim 1, it is characterised in that: the guarantor
Protection unit (12) includes grip block (121), and the lower surface of the grip block (121) is fixedly connected with the top of spring (11), institute
The upper surface for stating grip block (121) is fixedly connected with elastic cushion (122).
3. a kind of rail traffic indoor drainage pipe mounting device according to claim 1, it is characterised in that: the cunning
The shape of bar (6) is rectangle, and the shape of the sliding sleeve (7) is rectangle.
4. a kind of rail traffic indoor drainage pipe mounting device according to claim 1, it is characterised in that: the gear
The shape of block (15) and through-hole (14) is rectangle, and the length of the block (15) is greater than the length of through-hole (14), the block
(15) length is less than the width of through-hole (14).
5. a kind of rail traffic indoor drainage pipe mounting device according to claim 1, it is characterised in that: the peace
The upper surface of loading board (1) is opened up there are four mounting hole (2), and four mounting holes (2) are located at the four of mounting plate (1) upper surface
At angle.
6. a kind of rail traffic indoor drainage pipe mounting device according to claim 2, it is characterised in that: described
The shape of one fixed plate (4) and the second fixed plate (10) is arc, and the shape of the grip block (121) is also arc.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821859373.4U CN209444894U (en) | 2018-11-13 | 2018-11-13 | A kind of rail traffic indoor drainage pipe mounting device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821859373.4U CN209444894U (en) | 2018-11-13 | 2018-11-13 | A kind of rail traffic indoor drainage pipe mounting device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209444894U true CN209444894U (en) | 2019-09-27 |
Family
ID=68011033
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821859373.4U Active CN209444894U (en) | 2018-11-13 | 2018-11-13 | A kind of rail traffic indoor drainage pipe mounting device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209444894U (en) |
-
2018
- 2018-11-13 CN CN201821859373.4U patent/CN209444894U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106971677B (en) | A kind of culture medium information propagating equipment | |
US20100184524A1 (en) | Motion simulator | |
CN103244801B (en) | Four-degree-of-freedom movement means | |
CN101049838A (en) | Alcula type wall climbing robot | |
CN107127740B (en) | Floating system based on pneumatic muscles Yu cylinder mixed connection | |
CN106948287A (en) | A kind of traffic safety instruction equipment | |
CN206869873U (en) | A kind of 3-dof parallel robot | |
CN209444894U (en) | A kind of rail traffic indoor drainage pipe mounting device | |
CN202577139U (en) | Zipper-type road and bridge deformation joint device | |
CN206038414U (en) | Fastener fatigue test loading frame who adapts to multiple loading angle | |
CN104278771B (en) | A kind of triangular steel plate antivibrator | |
CN107512541B (en) | A kind of track pacifically dual-purpose transport vehicle | |
CN205915333U (en) | Three degrees of freedom of overconstraint self -balancing platform that connects in parallel | |
CN102635065A (en) | Zipper type deformation joint device for roads and bridges | |
CN211044566U (en) | Multimedia teaching is with show stand in kind | |
CN104913935A (en) | Adjustable variable-section air duct connector for internal combustion engine ventilation experiment | |
FR2884210B1 (en) | DEVICE FOR SUSPENDING AN ENGINE ON A BOGIE CHASSIS | |
CN205211368U (en) | Folding bill -board | |
CN210133123U (en) | Suspension type air rail and vehicle end connecting device thereof | |
CN206752350U (en) | A kind of traffic safety instruction equipment | |
CN209261918U (en) | A kind of rail traffic fan mounting device | |
CN107817120B (en) | A kind of vehicle static strength test device for simulating bogie shock loading | |
CN203095097U (en) | Impending wire steering mechanism | |
CN214116112U (en) | Subway rail laying steel spring corrects device | |
CN207200031U (en) | A kind of top side detachable switch cubicle |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20230904 Address after: No. 01, 3rd Floor, Building 9, No. 46 Shuxi Road, Jinniu High tech Industrial Park, Chengdu, Sichuan, 610037 Patentee after: Sichuan xinchengneng Engineering Design Co.,Ltd. Address before: No. 1102, 11th floor, building 4, No. 46, Shuxi Road, Jinniu hi tech Industrial Park, Chengdu, Sichuan 610000 Patentee before: Sichuan Xinhui Feng Industrial Co.,Ltd. |
|