CN209440650U - A kind of molding equipment of absorbing material - Google Patents
A kind of molding equipment of absorbing material Download PDFInfo
- Publication number
- CN209440650U CN209440650U CN201821929210.9U CN201821929210U CN209440650U CN 209440650 U CN209440650 U CN 209440650U CN 201821929210 U CN201821929210 U CN 201821929210U CN 209440650 U CN209440650 U CN 209440650U
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- absorbing material
- baking oven
- heating
- molding equipment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Casting Or Compression Moulding Of Plastics Or The Like (AREA)
Abstract
The utility model discloses a kind of molding equipments of absorbing material, the baking oven is fixedly connected with the workbench, the output end of the hydraulic cylinder is fixedly connected with the top board, the heating mechanism is fixedly connected on the top of the top board, the pedestal is fixedly connected on the lower end of the inside of the baking oven, the lower platen is fixedly connected on the top of the base, the cooler is located at the inside of the baking oven, two layers or more of first adsorption layer is provided with above the water storage tank, the spraying mechanism is provided between the two neighboring first adsorption layer, one end of the flow pipe is connected to the water storage tank, the other end of the flow pipe runs through the purifying box, the nozzle is fixedly connected with the flow pipe, reach the exhaust gas that can be generated in absorption cleaning autoclaving process, so that worker possesses good building ring Border avoids the physically and mentally healthy purpose being damaged.
Description
Technical field
The utility model relates to absorbing material manufacturing technology field more particularly to a kind of molding equipments of absorbing material.
Background technique
Absorbing material is concerned due to can be thermal energy by the electromagnetic energy of electromagnetic wave, and electromagnetic wave can be effectively prevented in it
The interference to electronic equipment is radiated, injury of the electromagnetic wave to human body health is further mitigated.
But during preparing absorbing material, the base band after needing to dry carries out hot-pressing processing, hot-pressing processing, heat
Large quantity of exhaust gas can be generated in pressure treatment process, exhaust gas is unprocessed to be caused seriously to pollute to the working environment of worker, endanger body
Body health.
Utility model content
The purpose of this utility model is to provide a kind of molding equipments of absorbing material, it is intended to solve heat in the prior art
Large quantity of exhaust gas can be generated in pressure treatment process, exhaust gas is unprocessed to be caused seriously to pollute to the working environment of worker, endanger body
The technical problem of heart health.
To achieve the above object, a kind of molding equipment for absorbing material that the utility model uses, the absorbing material
Molding equipment includes conveying device, reactor tank, heating squeegee apparatus, hot-press arrangement and waste gas purification apparatus, the conveying device
Including workbench and conveyer belt, the conveyer belt and the workbench are rotatablely connected, and the reactor tank is fixed with the workbench
Connection, and it is located at the top of the conveyer belt, the heating squeegee apparatus is fixedly connected with the workbench, and is located at described defeated
The top of band is sent, the hot-press arrangement includes baking oven, hydraulic cylinder, top board, heating mechanism, pedestal and lower platen, the baking
Case is fixedly connected with the workbench, and the conveyer belt runs through the baking oven, the hydraulic cylinder and the fixed company of the baking oven
It connects, and is located at the top of the inside of the baking oven, the output end of the hydraulic cylinder is fixedly connected with the top board, described to add
Heat engine structure is fixedly connected with the top board, and is located at the top of the top board, and the pedestal is fixedly connected with the baking oven,
And it is located at the lower end of the inside of the baking oven, the lower platen is fixedly connected with the base, and is located at the top of the pedestal,
The waste gas purification apparatus includes cooler bin, cooler, purifying box and spraying mechanism, and the cooler bin passes through conduit
It is connected to the baking oven, the cooler is located at the inside of the baking oven, and the purifying box is connected by conduit and the cooler bin
Logical, the bottom of the purifying box has water storage tank, and two layers or more of first adsorption layer is provided with above the water storage tank, adjacent
It is provided with the spraying mechanism between two first adsorption layers, the spraying mechanism includes flow pipe and nozzle, described to send
One end of water pipe is connected to the water storage tank, and the other end of the flow pipe runs through the purifying box, and is located at two neighboring institute
It states between first adsorption layer, the nozzle is fixedly connected with the flow pipe, and is located at the lower section of the flow pipe, and is located at phase
Between adjacent two first adsorption layers.
Wherein, the heating squeegee apparatus includes cabinet, heater, knife rest and cutter hub, the cabinet and the workbench
It is fixedly connected, and the conveyer belt runs through the cabinet, the heater is fixedly connected with the cabinet, and is located at the cabinet
Inside, the knife rest is fixedly connected with the workbench, and is located at the top of the conveyer belt, the cutter hub and the knife rest
It is fixedly connected, and is located at the top of the conveyer belt.
Wherein, the waste gas purification apparatus further includes air-introduced machine and cyclone separator, and the air-introduced machine and the whirlwind divide
It is connected to, and is respectively positioned between the cooler bin and the purifying box by conduit from device.
Wherein, the waste gas purification apparatus further includes water collection device and the second adsorption layer, the water collection device and the purifying box
It is fixedly connected, and is located at the inside of the purifying box, second adsorption layer is fixedly connected with the purifying box, and is located at described
The top of water collection device.
Wherein, the quantity of the nozzle is multiple, and multiple nozzles are evenly distributed on the flow pipe.
Wherein, the heating mechanism includes heating shell, heat-conducting plate and adding thermal resistance, and the heating shell and the top board are solid
Fixed connection, and it is located at the top of the top board, the heating shell has heating chamber, and the heat-conducting plate is fixed with the heating shell
Connection, and it is located at the bottom end of the inside of the heating chamber, the adding thermal resistance is fixedly connected with the heat-conducting plate, and is located at described
The lower section of heat-conducting plate.
Wherein, the heating mechanism further includes insulating layer, and the insulating layer is linked in the appearance wall of the heating shell.
Wherein, the hot-press arrangement further includes air pressure telescopic link, and one end of the air pressure telescopic link is fixed with the pedestal
Connection, the other end of the air pressure telescopic link are fixedly connected with the lower platen.
Wherein, the hot-press arrangement further includes range sensor, and the range sensor is fixedly connected with the lower platen,
And it is located at the inside of the lower platen.
Wherein, the hot-press arrangement further includes cushion, and the cushion is fixedly connected with the base, and is located at described
The lower section of pedestal.
A kind of molding equipment of absorbing material of the utility model is connected by the conveyer belt and workbench rotation
It connects, the reactor tank is fixedly connected with the workbench, and is located at the top of the conveyer belt, the heating squeegee apparatus and institute
It states workbench to be fixedly connected, and is located at the top of the conveyer belt, the baking oven is fixedly connected with the workbench, and described defeated
Send band through the baking oven, the hydraulic cylinder is fixedly connected on the top of the inside of the baking oven, the hydraulic cylinder it is defeated
Outlet is fixedly connected with the top board, and the heating mechanism is fixedly connected on the top of the top board, and the pedestal is fixed
It is connected to the lower end of the inside of the baking oven, the lower platen is fixedly connected on the top of the base, and the cooler bin passes through
Conduit is connected to the baking oven, and the cooler is located at the inside of the baking oven, and the purifying box passes through conduit and the cooling
Case connection, the bottom of the purifying box have water storage tank, two layers or more of first adsorption layer are provided with above the water storage tank,
The spraying mechanism is provided between the two neighboring first adsorption layer, the spraying mechanism includes flow pipe and nozzle, institute
The one end for stating flow pipe is connected to the water storage tank, and the other end of the flow pipe runs through the purifying box, and is located at adjacent two
Between a first adsorption layer, the nozzle is fixedly connected with the flow pipe, and is located at the lower section of the flow pipe, and position
Between the two neighboring first adsorption layer.The exhaust gas that the waste gas purification apparatus can generate hot pressing, passes through institute
First adsorption layer, the spraying mechanism and the second adsorption layer collective effect are stated, and then absorption cleaning exhaust gas, acquisition can inhale
The exhaust gas generated in purification autoclaving process is received, so that worker possesses good working environment, avoids physically and mentally healthy damaged
Harmful effect.
Detailed description of the invention
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment
Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is only
It is some embodiments of the utility model, for those of ordinary skill in the art, in the premise not made the creative labor
Under, it is also possible to obtain other drawings based on these drawings.
Fig. 1 is the front view of the molding equipment of the absorbing material of the utility model.
Fig. 2 is the overall structure diagram of the molding equipment of the absorbing material of the utility model.
Fig. 3 is the top view of the molding equipment of the absorbing material of the utility model.
Fig. 4 is the schematic diagram of internal structure of the hot-press arrangement of the utility model.
Molding equipment, 10- conveying device, 20- reactor tank, the 30- of 100- absorbing material heat squeegee apparatus, 40- hot pressing
Device, 50- waste gas purification apparatus, 11- workbench, 12- conveyer belt, 31- cabinet, 32- heater, 33- knife rest, 34- cutter hub,
41- baking oven, 42- hydraulic cylinder, 43- top board, 44- heating mechanism, 441- heating shell, 442- heating chamber, 443- heat-conducting plate,
444- adding thermal resistance, 445- insulating layer, 45- pedestal, 46- lower platen, 47- air pressure telescopic link, 48- range sensor, 49- buffering
Pad, 51- cooler bin, 52- cooler, 53- purifying box, 54- spraying mechanism, 541- flow pipe, 542- nozzle, 55- water storage tank,
56- first adsorption layer, 57- air-introduced machine, 58- cyclone separator, 59- water collection device, the second adsorption layer of 591-.
Specific embodiment
The embodiments of the present invention are described below in detail, examples of the embodiments are shown in the accompanying drawings, wherein from beginning
Same or similar element or element with the same or similar functions are indicated to same or similar label eventually.Below by ginseng
The embodiment for examining attached drawing description is exemplary, it is intended to for explaining the utility model, and should not be understood as to the utility model
Limitation.
In the description of the present invention, it should be understood that term " length ", " width ", "upper", "lower", " preceding ",
The orientation or positional relationship of the instructions such as " rear ", "left", "right", "vertical", "horizontal", "top", "bottom" "inner", "outside" is based on attached
Orientation or positional relationship shown in figure, is merely for convenience of describing the present invention and simplifying the description, rather than indication or suggestion
Signified device or element must have a particular orientation, be constructed and operated in a specific orientation, therefore should not be understood as to this
The limitation of utility model.In addition, the meaning of " plurality " is two or more in the description of the present invention, unless separately
There is clearly specific restriction.
The utility model provides a kind of molding equipment 100 of absorbing material, the absorbing material referring to FIG. 1 to FIG. 4,
Molding equipment 100 include conveying device 10, reactor tank 20, heating squeegee apparatus 30, hot-press arrangement 40 and waste gas purification apparatus
50, the conveying device 10 includes workbench 11 and conveyer belt 12, and the conveyer belt 12 is rotatablely connected with the workbench 11, institute
It states reactor tank 20 to be fixedly connected with the workbench 11, and is located at the top of the conveyer belt 12, the heating squeegee apparatus 30
It is fixedly connected with the workbench 11, and is located at the top of the conveyer belt 12, the hot-press arrangement 40 includes baking oven 41, hydraulic
Cylinder 42, top board 43, heating mechanism 44, pedestal 45 and lower platen 46, the baking oven 41 are fixedly connected with the workbench 11,
And the conveyer belt 12 runs through the baking oven 41, the hydraulic cylinder 42 is fixedly connected with the baking oven 41, and is located at the baking
The top of the inside of case 41, the output end of the hydraulic cylinder 42 are fixedly connected with the top board 43, the heating mechanism 44
It is fixedly connected with the top board 43, and is located at the top of the top board 43, the pedestal 45 and the fixed company of the baking oven 41
It connects, and is located at the lower end of the inside of the baking oven 41, the lower platen 46 is fixedly connected with the pedestal 45, and is located at the bottom
The top of seat 45,
The waste gas purification apparatus 50 includes cooler bin 51, cooler 52, purifying box 53 and spraying mechanism 54, the cooling
Case 51 is connected to by conduit with the baking oven 41, and the cooler 52 is located at the inside of the baking oven 41, and the purifying box 53 is logical
It crosses conduit to be connected to the cooler bin 51, the bottom of the purifying box 53 has water storage tank 55, and the top of the water storage tank 55 is set
It is equipped with two layers or more of first adsorption layer 56, is provided with the spraying mechanism 54 between the two neighboring first adsorption layer 56,
The spraying mechanism 54 includes flow pipe 541 and nozzle 542, and one end of the flow pipe 541 is connected to the water storage tank 55, institute
The other end of flow pipe 541 is stated through the purifying box 53, and between the two neighboring first adsorption layer 56, the spray
Mouth 542 is fixedly connected with the flow pipe 541, and is located at the lower section of the flow pipe 541, and is located at two neighboring described first
Between adsorption layer 56.
In the present embodiment, the conveying device 10, the reactor tank 20, the heating squeegee apparatus 30, the heat
Pressure device 40 and the waste gas purification apparatus 50 are electrically connected with controller, when needing to prepare absorbing material, first successively
Water, absorbent, dispersing agent, binder, directing agent and curing agent are added in the reactor tank 20, and driven by motor
Stirring, and thickener is added, slurry is formed after standing one end time, slurry is fixed to described by way of tape casting later
On the PET film of conveyer belt 12, the conveyer belt 12 is driven by motor and is rotated, and then PET film is transported the heating and is scratched
30 lower section of device, and it is scratched by the heating squeegee apparatus 30, and scratch to certain thickness and form wet film, it is wet
Film carries out drying and forms base band, since the base band directly dried has density low, rough surface, and the low feature of performance, in order to change
Kind properties of product carry out lamination hot-pressing processing to the base band of drying, and the base band formed at this time is under the transport of the conveyer belt 12
It into the baking oven 41, and is moved on the lower platen 46, controller controls the heating mechanism 44 on described at this time
Pressing plate 43 heats, and after being heated to certain temperature, the top board 43 is pushed down on by the hydraulic cylinder 42, so that on described
Pressing plate 43 and the lower platen 46 press, and then carry out hot-pressing processing to base band, and be formed by curing absorbing material, in hot pressing
Due to that can generate exhaust gas in journey, exhaust gas can enter cooler bin 51 at this time, and the cooler movement cools down exhaust gas, cooling
Exhaust gas afterwards enters the purifying box 53, since the first adsorption layer 56 is made of active carbon, first layer by the conduit
The first adsorption layer 56 exhaust gas can be adsorbed, play certain clean-up effect, exhaust gas enters the institute of the second layer later
First adsorption layer 56 is stated, the water pump movement in the water storage tank 55, Xiang Suoshu flow pipe 541 send water, and then passes through the nozzle
542 pairs of exhaust gas spray, after first adsorption layer 56 and the spraying mechanism 54 as described in multilayer are to waste gas absorption and spray,
Exhaust gas and the moist surface generation of first adsorption layer 56 come into full contact with, and exhaust gas continues up receives water mist sprinkling washing again, wherein
Impurity dust removed, and then catharsis played to exhaust gas, purified exhaust gas passes through exhaust pipe and is discharged, and guarantees worker
Possess good working environment, is inhaled wherein the bottom that the purifying box 53 is arranged in the water storage tank 55 can recycle described first
The water that attached layer 56 flows down, is used further to spray, be recycled with this, economized on resources.
Further, the heating squeegee apparatus 30 includes cabinet 31, heater 32, knife rest 33 and cutter hub 34, the case
Body 31 is fixedly connected with the workbench 11, and the conveyer belt 12 runs through the cabinet 31, the heater 32 and the case
Body 31 is fixedly connected, and is located at the inside of the cabinet 31, and the knife rest 33 is fixedly connected with the workbench 11, and is located at institute
The top of conveyer belt 12 is stated, the cutter hub 34 is fixedly connected with the knife rest 33, and is located at the top of the conveyer belt 12.
In the present embodiment, the heater 32 is electrically connected with controller, when the slurry of tape casting is described in
When conveyer belt 12 is transported to the lower section of the cutter hub 34, scratched by 34 pairs of the cutter hub molding slurries of curtain coating, and
It scratches certain thickness and forms wet film, wet film enters the cabinet 31, and is added by the heater 32 to its wet film
Heat baking, baking form base band after a certain period of time.
Further, the waste gas purification apparatus 50 further includes air-introduced machine 57 and cyclone separator 58, the air-introduced machine 57
It is connected to, and is respectively positioned between the cooler bin 51 and the purifying box 53 by conduit with the cyclone separator 58.
In the present embodiment, the setting of the air-introduced machine 57 can quickly arrive the gas sampling in the baking oven 41
Adsorption cleaning is carried out in the purifying box 53, accelerates purification efficiency, and the cyclone separator 58 can separate the fiber in exhaust gas
Dust further increases clean-up effect.
Further, the waste gas purification apparatus 50 further includes water collection device 59 and the second adsorption layer 591, the water collection device 59
It is fixedly connected with the purifying box 53, and is located at the inside of the purifying box 53, second adsorption layer 591 and the purifying box
53 are fixedly connected, and are located at the top of the water collection device 59.
In the present embodiment, the water collection device 59 is electrically connected with controller, and the water collection device 59 is located at described first
The top of adsorption layer 56, the water collection device 59 can collect the most of moisture in exhaust gas, and pass through second adsorption layer
591, second adsorption layer 591 is equally made of active carbon, and second adsorption layer 591 can remove the impurity in removing exhaust gas,
Further increase waste gas purification effect.
Further, the quantity of the nozzle 542 is multiple, and multiple nozzles 542 are evenly distributed on the flow pipe 541
On.
In the present embodiment, use can increase the fountain height of water while the multiple nozzle 542, and then play more
Good depositing dust effect, improves waste gas purification rate.
Further, the heating mechanism 44 includes heating shell 441, heat-conducting plate 443 and adding thermal resistance 444, the heating
Shell 441 is fixedly connected with the top board 43, and is located at the top of the top board 43, and the heating shell 441 has heating chamber
442, the heat-conducting plate 443 is fixedly connected with the heating shell 441, and is located at the bottom end of the inside of the heating chamber 442, described
Adding thermal resistance 444 is fixedly connected with the heat-conducting plate 443, and is located at the lower section of the heat-conducting plate 443.
In the present embodiment, the adding thermal resistance 444 is electrically connected with controller, after the adding thermal resistance 444 is powered
Thermal energy is converted electrical energy into, since the inside of the heating shell 441 has the heating chamber 442, so that the adding thermal resistance 444
The thermal energy of generation can more be assembled, and its thermal energy is passed to the top board 43 by the heat-conducting plate 443 and is heated, energy
Enough uniformly by thermal energy dissipation on the top board 43.
Further, the heating mechanism 44 further includes insulating layer 445, and the insulating layer 445 is linked in the heating shell
441 appearance wall.
In the present embodiment, the setting of the insulating layer 445 can increase the heat insulation effect of the heating shell 441, make
Thermal energy in its described heating chamber 442 is not easy dispersion and is lost.
Further, the hot-press arrangement 40 further includes air pressure telescopic link 47, one end of the air pressure telescopic link 47 and institute
It states pedestal 45 to be fixedly connected, the other end of the air pressure telescopic link 47 is fixedly connected with the lower platen 46.
In the present embodiment, the air pressure telescopic link 47 is electrically connected with controller, when base band transports the pushing
When plate 46, the top board 43 is moved down, and the lower platen 46 moves up under the promotion of the air pressure telescopic link 47, into
And the top board 43 and the lower platen 46 carry out hot pressing to base band simultaneously, form absorbing material, pass through the top board
43 and the lower platen 46 move at the same time, can be improved hot pressing efficiency, improve production efficiency.
Further, the hot-press arrangement 40 further includes range sensor 48, the range sensor 48 and the pushing
Plate 46 is fixedly connected, and is located at the inside of the lower platen 46.
In the present embodiment, the range sensor 48 is electrically connected with controller, and the range sensor 48 can
Detection base band transports the position when lower platen 46, and location information is fed back to controller, and controller is according to base band institute
Place position judges whether that controlling the hydraulic cylinder 42 acts.
Further, the hot-press arrangement 40 further includes cushion 49, the cushion 49 and the fixed company of the pedestal 45
It connects, and is located at the lower section of the pedestal 45.
In the present embodiment, when the cushion 49 can reduce hot-pressing processing, the pressure that the pedestal 45 is subject to is risen
To the effect of damping.
Above disclosed is only a kind of preferred embodiment of the utility model, certainly cannot be practical to limit with this
Novel interest field, those skilled in the art can understand all or part of the processes for realizing the above embodiment, and according to
Equivalent variations made by the utility model claims, still falls within the scope of the utility model.
Claims (10)
1. a kind of molding equipment of absorbing material, which is characterized in that
The molding equipment of the absorbing material includes conveying device, reactor tank, heating squeegee apparatus, hot-press arrangement and waste gas purification
Device, the conveying device include workbench and conveyer belt, and the conveyer belt and the workbench are rotatablely connected, the reactor tank
It is fixedly connected with the workbench, and is located at the top of the conveyer belt, the heating squeegee apparatus is fixed with the workbench
Connection, and it is located at the top of the conveyer belt, the hot-press arrangement includes baking oven, hydraulic cylinder, top board, heating mechanism, bottom
Seat and lower platen, the baking oven are fixedly connected with the workbench, and the conveyer belt runs through the baking oven, the hydraulic cylinder
It is fixedly connected with the baking oven, and is located at the top of the inside of the baking oven, the output end of the hydraulic cylinder and the upper pressure
Plate is fixedly connected, and the heating mechanism is fixedly connected with the top board, and be located at the top board top, the pedestal with
The baking oven is fixedly connected, and is located at the lower end of the inside of the baking oven, and the lower platen is fixedly connected with the base, and position
In the top of the pedestal,
The waste gas purification apparatus includes cooler bin, cooler, purifying box and spraying mechanism, and the cooler bin passes through conduit and institute
Baking oven connection is stated, the cooler is located at the inside of the baking oven, and the purifying box is connected to by conduit with the cooler bin, institute
The bottom for stating purifying box has water storage tank, and two layers or more of first adsorption layer is provided with above the water storage tank, two neighboring
The spraying mechanism is provided between the first adsorption layer, the spraying mechanism includes flow pipe and nozzle, the flow pipe
One end be connected to the water storage tank, the other end of the flow pipe runs through the purifying box, and is located at two neighboring described the
Between one adsorption layer, the nozzle is fixedly connected with the flow pipe, and is located at the lower section of the flow pipe, and is located at adjacent two
Between a first adsorption layer.
2. the molding equipment of absorbing material as described in claim 1, which is characterized in that
The heating squeegee apparatus includes cabinet, heater, knife rest and cutter hub, and the cabinet is fixedly connected with the workbench,
And the conveyer belt runs through the cabinet, the heater is fixedly connected with the cabinet, and is located at the inside of the cabinet, institute
It states knife rest to be fixedly connected with the workbench, and is located at the top of the conveyer belt, the cutter hub is fixedly connected with the knife rest,
And it is located at the top of the conveyer belt.
3. the molding equipment of absorbing material as claimed in claim 2, which is characterized in that
The waste gas purification apparatus further includes air-introduced machine and cyclone separator, and the air-introduced machine and the cyclone separator are by leading
Pipe connection, and be respectively positioned between the cooler bin and the purifying box.
4. the molding equipment of absorbing material as claimed in claim 3, which is characterized in that
The waste gas purification apparatus further includes water collection device and the second adsorption layer, and the water collection device is fixedly connected with the purifying box,
And it is located at the inside of the purifying box, second adsorption layer is fixedly connected with the purifying box, and is located at the water collection device
Top.
5. the molding equipment of absorbing material as claimed in claim 4, which is characterized in that
The quantity of the nozzle is multiple, and multiple nozzles are evenly distributed on the flow pipe.
6. the molding equipment of absorbing material as claimed in claim 5, which is characterized in that
The heating mechanism is fixedly connected including heating shell, heat-conducting plate and adding thermal resistance, the heating shell with the top board, and
Positioned at the top of the top board, the heating shell has heating chamber, and the heat-conducting plate is fixedly connected with the heating shell, and position
In the bottom end of the inside of the heating chamber, the adding thermal resistance is fixedly connected with the heat-conducting plate, and is located at the heat-conducting plate
Lower section.
7. the molding equipment of absorbing material as claimed in claim 6, which is characterized in that
The heating mechanism further includes insulating layer, and the insulating layer is linked in the appearance wall of the heating shell.
8. the molding equipment of absorbing material as described in claim 1, which is characterized in that
The hot-press arrangement further includes air pressure telescopic link, and one end of the air pressure telescopic link is fixedly connected with the base, described
The other end of air pressure telescopic link is fixedly connected with the lower platen.
9. the molding equipment of absorbing material as claimed in claim 8, which is characterized in that
The hot-press arrangement further includes range sensor, and the range sensor is fixedly connected with the lower platen, and is located at institute
State the inside of lower platen.
10. the molding equipment of absorbing material as claimed in claim 9, which is characterized in that
The hot-press arrangement further includes cushion, and the cushion is fixedly connected with the base, and is located under the pedestal
Side.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821929210.9U CN209440650U (en) | 2018-11-21 | 2018-11-21 | A kind of molding equipment of absorbing material |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821929210.9U CN209440650U (en) | 2018-11-21 | 2018-11-21 | A kind of molding equipment of absorbing material |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209440650U true CN209440650U (en) | 2019-09-27 |
Family
ID=68012067
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821929210.9U Active CN209440650U (en) | 2018-11-21 | 2018-11-21 | A kind of molding equipment of absorbing material |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209440650U (en) |
-
2018
- 2018-11-21 CN CN201821929210.9U patent/CN209440650U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206695572U (en) | A kind of tea drier | |
CN106403566B (en) | A kind of environment-friendly and energy-efficient grain-drying cooling and dedusting device | |
CN204678856U (en) | A kind of boiler exhaust gas recycling system of density board processing factory | |
CN209440650U (en) | A kind of molding equipment of absorbing material | |
CN205887314U (en) | Fluorine carbon spraying production line | |
CN205482130U (en) | Drying box | |
CN211625913U (en) | Drying device is used in even organic white fungus processing of being heated | |
CN208118678U (en) | A kind of temperature control equipment of press oven | |
CN208133249U (en) | A kind of processing of ceramic tile is with can dry environment-friendly type glaze spraying machine | |
CN207476843U (en) | A kind of unfamiliar to the ear production cleaning device of spices pig | |
CN215792561U (en) | Infrared induction drying equipment of decorating machine | |
CN111135989A (en) | Environment-friendly baking varnish quick drying device for aviation part machining | |
CN208901820U (en) | A kind of auto-parts disturbed flow type drying box | |
CN209501256U (en) | The exhaust treatment system of wood-based plate manufacture | |
CN204693975U (en) | A kind of hot blast dedusting baking oven | |
CN209172935U (en) | A kind of high efficiency machine for coating medicine with thin film with dust-extraction unit | |
CN214412326U (en) | Mobile power supply mainboard paster device | |
CN115289800B (en) | Drying device is used in processing of PCB circuit board | |
CN210980625U (en) | Movable drier for multiple agricultural products | |
CN201042123Y (en) | Forward flow type drier special for post-cover seed | |
CN220417889U (en) | Drying device for corrugated board production | |
CN209715618U (en) | Baking room after a kind of totally-enclosed spray painting of wasted oil bucket cleaning | |
CN215138340U (en) | Oven afterbody waste gas recovery device is used in clothing leather production | |
CN218155367U (en) | Multilayer dryer with inside clean function | |
CN217818010U (en) | Drying equipment for granular medicine production |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |