CN209430207U CN201822091335.5U CN201822091335U CN209430207U CN 209430207 U CN209430207 U CN 209430207U CN 201822091335 U CN201822091335 U CN 201822091335U CN 209430207 U CN209430207 U CN 209430207U
Authority
CN
China
Prior art keywords
jurisdiction
tunnel
rubber slab
hexagon section
hexagon
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201822091335.5U
Other languages
Chinese (zh)
Inventor
张志强
罗春
李欣
陈彬科
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southwest Jiaotong University
Original Assignee
Southwest Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southwest Jiaotong University filed Critical Southwest Jiaotong University
Priority to CN201822091335.5U priority Critical patent/CN209430207U/en
Application granted granted Critical
Publication of CN209430207U publication Critical patent/CN209430207U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a kind of hexagon sections of jurisdiction in the tunnel boring machine tunnel on swelled ground stratum, its composition is: opening there are three through hole the hexagon section of jurisdiction end Liang Ge, the upper end of through hole is located at the upper surface of end, and the lower end of through hole is located at the lower end surface of end;Be filled with rubber bar in through hole, and the upper surface of rubber bar, lower end surface with flushed respectively with upper surface, the lower end surface of hexagonal tube piece end;It is bonded on hexagonal tube piece end with the matched rubber slab in hexagonal tube piece end, the water-proof strip that rubber slab is equipped with capillary groove and is adapted to capillary groove;And the capillary groove on the rubber slab of hexagon section of jurisdiction one end bonding is located at the inside of rubber slab, the capillary groove on the rubber slab of hexagon section of jurisdiction the other end bonding is located at the outside of rubber slab.This kind of hexagon section of jurisdiction can reduce the equivalent stiffness of lining cutting, reduce the expansive force in lining cutting, to guarantee the safe and reliable of the tunnel boring machine tunnel for being built in swelled ground stratum.

Description

A kind of hexagon section of jurisdiction in the tunnel boring machine tunnel on swelled ground stratum
Technical field:
The utility model relates to a kind of hexagon sections of jurisdiction in tunnel boring machine tunnel.
Background technique:
The clay ingredient on swelled ground stratum (swelled rock and soil) is mainly made of strongly hydrophilic mineral montmorillonite and illite, this Class mineral have the stronger ability in conjunction with water, water swelling, dehydration shrinkage, and have the characteristic of reciprocal breathing.Expand soil Layer can generate expansive force when water swelling is by external constraint in the soil body.Therefore, tunneling is in swelled ground stratum, Water swelling once occurs for the soil body, and the lining cutting in tunnel can bear the biggish bulbs of pressure, so as to cause lining deformation and destruction.
It is a kind of by rotation that full face tunnel boring machine, which is also known as tunnel boring machine (Tunnel Boring Machine, abbreviation TBM), And cutterhead is promoted, knife fractured rock is rolled by dish type, and the construction of tunnel for keeping tunnel tunneling boring once-forming is mechanical.Tunnel The great advantage of hole tunneler construction is exactly that cavitation speed is fast, wherein to construct the speed of tunnel-liner most using hexagon section of jurisdiction Fastly.Hexagon section of jurisdiction actually precast member for reinforcing bar concrete, (vertical view) is in fan annular in terms of top surface;(facing) is in six in terms of front In " > " shape of protrusion, upper and lower sides are linear type for side shape, i.e. both ends;Therefore claim hexagon section of jurisdiction.The width (six of hexagon section of jurisdiction Distance between two long sides of side shape) it is generally two strokes of tunnel boring machine.The installation exercise of section of jurisdiction is in tunnel boring machine Afterwards in shield, and progress synchronous with tunnel excavation, section of jurisdiction are staggeredly engaged and are assembled into annulus, form the liner structure in tunnel.Due to Section of jurisdiction is that occlusion is assembled, the gap very little between section of jurisdiction, if still using such liner structure, expansive rock on swelled ground stratum Soil body water swelling can generate biggish expansion extruding force to lining cutting, cause lining cutting to generate biggish internal force, thus to lining cutting Mechanical property requirements greatly improve.Though the compressive property of lining cutting can be improved by increasing reinforcing bar amount, section of jurisdiction is increased Preparation and assembled cost.
Utility model content:
The purpose of the utility model is to provide a kind of hexagon section of jurisdiction in the tunnel boring machine tunnel on swelled ground stratum, this kinds Hexagon section of jurisdiction can reduce the equivalent stiffness of lining cutting, effectively reduce the expansive force acted in lining cutting, to guarantee to be built in expansion The tunnel structure in the tunnel boring machine tunnel of soil layer it is safe and reliable;And there is good waterproof performance.
The utility model realizes its goal of the invention the technical scheme adopted is that a kind of tunnel boring machine on swelled ground stratum The hexagon section of jurisdiction in tunnel, it is characterised in that:
The hexagon section of jurisdiction end Liang Ge is opened there are three through hole up and down, and the upper end of through hole is located at end The upper surface in portion, the lower end of through hole are located at the lower end surface of end;Rubber bar, and the upper end of rubber bar are filled in through hole Face, lower end surface are flushed with upper surface, the lower end surface of hexagonal tube piece end respectively;
Be bonded on hexagonal tube piece end with the matched rubber slab in hexagonal tube piece end, rubber slab be equipped with capillary groove and The water-proof strip being adapted to capillary groove;And hexagon section of jurisdiction one end bonding rubber slab on capillary groove and the other end bonding Water-proof strip on rubber slab is located at the ipsilateral of hexagon section of jurisdiction.
Compared with prior art, the utility model has the beneficial effects that
One, the staggeredly occlusion assembly between the hexagonal tube piece end of the utility model is no longer direct rigid between concrete Property splicing, and become the flexible connection between the rubber slab of end.When the generation water swelling of swelled ground stratum, biggish expansion is generated When power, expansive force can be absorbed by rubber slab flexible, effectively reduced the expansive force acted in lining cutting, avoided to liner structure It destroys.When expansive force effect is very big, the through hole of section of jurisdiction end can stress concentrate, occur Local Cracking, formation can be into The end of row maintenance and reinforcement is destroyed, and the tunnel after reinforcement and repair remains to normal use.So as to avoid section of jurisdiction overall structure by It destroys, reinforcing cannot be repaired, tunnel can only be scrapped the problem of abandoning.In short, the utility model reduces the equivalent of lining cutting Rigidity effectively reduces the expansive force acted in lining cutting and the destruction to liner structure, ensure that tunnel structure safety, can It leans on, improves the service life in tunnel.
Two, hexagonal tube piece end rubber slab capillary groove carries out chimeric with adjacent hexagons section of jurisdiction collision mat, can be effective The entrance of water is obstructed, so that the tunnel structure of the utility model has good waterproof performance.
Three, main structure, the size of the hexagon section of jurisdiction of the utility model do not change, and do not have to when production change existing pipe Piece template, preparation cost increase is small, is convenient for promotion and implementation.
The course of work and application method of the utility model are:
A, 3 arc-shaped steel tubes, then casting concrete are vertically fixed respectively at the both ends of the mold of hexagon section of jurisdiction, mix Arc-shaped steel tube is taken out after solidifying earth forming, both ends is obtained and opens that there are three the hexagon sections of jurisdiction of through hole up and down;
B, diameter of section columned rubber bar identical with the internal diameter of arc-shaped steel tube is made using neoprene raw material, Rubber bar is inserted into through hole, and cut rubber bar to make the end face of its end Yu hexagon section of jurisdiction;
C, with neoprene raw material be made with the matched rubber slab in hexagonal tube piece end, and rubber slab with capillary groove and The water-proof strip being adapted to capillary groove;
D, rubber slab is bonded on hexagonal tube piece end using the adhesive of neoprene, and hexagon section of jurisdiction one end Capillary groove on the rubber slab of portion's bonding and the water-proof strip on the rubber slab of the other end bonding are located at hexagon section of jurisdiction rubber slab It is ipsilateral.
This method is simple to operate, and cost low energy rapid build goes out to be used for the tunnel boring machine tunnel on swelled ground stratum Hexagon section of jurisdiction.
The utility model is described in further detail with reference to the accompanying drawings and detailed description.
Detailed description of the invention
Fig. 1 is the schematic perspective view of the utility model embodiment.
Fig. 2 is that the utility model embodiment removes the schematic perspective view after rubber slab.
Specific embodiment:
Fig. 1-2 is shown, a kind of hexagon section of jurisdiction in the tunnel boring machine tunnel on swelled ground stratum, it is characterised in that:
Open the through hole 2 there are three up and down, the upper end position of through hole 2 in the end of hexagon section of jurisdiction 1 two Upper surface 1a in end, the lower end of through hole 2 are located at the lower end surface 1b of end;Rubber bar 3, and rubber are filled in through hole 2 Upper surface, the lower end surface of glue stick 3 are flushed with the upper surface 1a of 1 end of hexagon section of jurisdiction, lower end surface 1b respectively;
It is bonded on 1 end of hexagon section of jurisdiction with the matched rubber slab 4 in 1 end of hexagon section of jurisdiction, rubber slab 4 is equipped with waterproof Slot 5 and the water-proof strip 6 being adapted to capillary groove 5;And 1 one end of hexagon section of jurisdiction bonding rubber slab 4 on capillary groove 5 with it is another Water-proof strip 6 on the rubber slab 4 of end bonding is located at the ipsilateral of hexagon section of jurisdiction 1.That is: when and 1 one end of hexagon section of jurisdiction it is viscous When capillary groove 5 on the rubber slab 4 of knot is located at the outside of fan annular of hexagon section of jurisdiction 1;Then 1 the other end of hexagon section of jurisdiction Water-proof strip 5 on the rubber slab 4 of bonding must be located at the outside of the fan annular of hexagon section of jurisdiction 1;Alternatively, 1 one end of hexagon section of jurisdiction When capillary groove 5 on the rubber slab 4 of portion's bonding is located at the inside of fan annular of hexagon section of jurisdiction 1;Then the hexagon section of jurisdiction 1 is another Water-proof strip 5 on the rubber slab 4 of end bonding must be located at the inside of the fan annular of hexagon section of jurisdiction 1.
The construction method of the hexagon section of jurisdiction in the tunnel boring machine tunnel on the swelled ground stratum of this example, its step are as follows:
A, 3 arc-shaped steel tubes, then casting concrete are vertically fixed respectively at the both ends of the mold of hexagon section of jurisdiction, mix Arc-shaped steel tube is taken out after solidifying earth forming, both ends is obtained and opens that there are three the hexagon sections of jurisdiction 1 of through hole 2 up and down;
B, diameter of section columned rubber bar identical with the internal diameter of arc-shaped steel tube is made using neoprene raw material 3, rubber bar 3 is inserted into through hole 2, and cut rubber bar 3 to make the end face of its end Yu hexagon section of jurisdiction 1;
C, with neoprene raw material be made with the matched rubber slab 4 in 1 end of hexagon section of jurisdiction, and rubber slab 4 have waterproof Slot 5 and the water-proof strip 6 being adapted to capillary groove 5;
D, rubber slab 4 is bonded on 1 end of hexagon section of jurisdiction using the adhesive of neoprene, and hexagon section of jurisdiction 1 Capillary groove 5 on the rubber slab 4 of one end bonding and the water-proof strip 6 on the rubber slab 4 of the other end bonding are located at hexagonal tube 1 rubber slab 4 of piece it is ipsilateral.

Claims (1)

1. a kind of hexagon section of jurisdiction in the tunnel boring machine tunnel on swelled ground stratum, it is characterised in that:
Open the through hole (2) there are three up and down, the upper end of through hole (2) in the end of hexagon section of jurisdiction (1) two Positioned at the upper surface (1a) of end, the lower end of through hole (2) is located at the lower end surface (1b) of end;Rubber is filled in through hole (2) Glue stick (3), and the upper surface of rubber bar (3), lower end surface upper surface (1a), the lower end surface with hexagon section of jurisdiction (1) end respectively (1b) is flushed;
It is bonded on hexagon section of jurisdiction (1) end with the matched rubber slab in hexagon section of jurisdiction (1) end (4), rubber slab (4) is equipped with Capillary groove (5) and the water-proof strip (6) being adapted to capillary groove (5);And on the rubber slab (4) of hexagon section of jurisdiction (1) one end bonding The rubber slab (4) that is bonded with the other end of capillary groove (5) on water-proof strip (6) be located at the ipsilateral of hexagon section of jurisdiction (1).
CN201822091335.5U 2018-12-13 2018-12-13 A kind of hexagon section of jurisdiction in the tunnel boring machine tunnel on swelled ground stratum Withdrawn - After Issue CN209430207U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822091335.5U CN209430207U (en) 2018-12-13 2018-12-13 A kind of hexagon section of jurisdiction in the tunnel boring machine tunnel on swelled ground stratum

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822091335.5U CN209430207U (en) 2018-12-13 2018-12-13 A kind of hexagon section of jurisdiction in the tunnel boring machine tunnel on swelled ground stratum

Publications (1)

Publication Number Publication Date
CN209430207U true CN209430207U (en) 2019-09-24

Family

ID=67971682

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822091335.5U Withdrawn - After Issue CN209430207U (en) 2018-12-13 2018-12-13 A kind of hexagon section of jurisdiction in the tunnel boring machine tunnel on swelled ground stratum

Country Status (1)

Country Link
CN (1) CN209430207U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109519194A (en) * 2018-12-13 2019-03-26 西南交通大学 The hexagon section of jurisdiction in the tunnel boring machine tunnel on swelled ground stratum and construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109519194A (en) * 2018-12-13 2019-03-26 西南交通大学 The hexagon section of jurisdiction in the tunnel boring machine tunnel on swelled ground stratum and construction method
CN109519194B (en) * 2018-12-13 2023-10-20 西南交通大学 Hexagonal duct piece of tunnel boring machine for expanding soil layer and construction method

Similar Documents

Publication Publication Date Title
CN106337690B (en) Fracture zone-crossing tunnel lining waterproof joint structure and construction method thereof
CN107605498B (en) Construction method for horizontal grouting reinforcement structure of end head of shield tunnel in water-rich sandy pebble stratum
CN101603429B (en) Anti-seepage structure of composite lining deformation joints of ground fissure stratum tunnel and construction method thereof
CN109519194A (en) The hexagon section of jurisdiction in the tunnel boring machine tunnel on swelled ground stratum and construction method
CN102787846B (en) Upper-blocking and lower-draining construction method for undersea tunnel fault fracture zone
CN108756894B (en) Tunnel micro- three step top Core Soil construction
CN208793021U (en) A kind of shield tunnel anti-floating control structure
CN105351001B (en) A kind of method based on gob side entry retaining region reinforcement gas pumping
CN104213921A (en) Freezing-type stone door cross-measure coal uncovering method based on hydraulic seam cutting
CN103291354B (en) Floor rock roadway layer-crossing pressure relief drilling filling and reinforcing method
CN209430207U (en) A kind of hexagon section of jurisdiction in the tunnel boring machine tunnel on swelled ground stratum
CN113803074A (en) Construction method of tunnel structure for artificial and mechanical combined obstacle removal of water-rich sand layer
CN204532364U (en) Tunneling boring rock tunnel development machine engineering method subway tunnel pressure release type liner structure
CN105201447B (en) A kind of rapid hardening slurries grouting reinforcement system and its application method
CN111075456A (en) Full-section construction structure and construction method for large-section weak stratum tunnel
CN204984435U (en) Prefabricated inverted arch subassembly
CN103195370B (en) A kind of combination type drill bit
CN112682055A (en) Small-clear-distance parallel tunnel shield tunneling construction method
CN108103959A (en) A kind of hollow slab girder shear-carrying capacity method for improving
CN203925530U (en) A kind of first active relief is pressed the adjustable gob side entry retaining body of wall of supporting
CN115142854B (en) Mine method tunnel single-layer lining structure system and construction method
CN114810110B (en) Shield receiving construction system and construction method suitable for complex stratum
CN207685693U (en) A kind of hollow slab girder shear-carrying capacity ruggedized construction
CN108979690A (en) A kind of shield tunnel anti-floating control structure and application method
CN114352288B (en) Construction structure and construction method for shield tunneling in short distance

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20190924