CN209430183U - A kind of fixed structure of drilling failure complexity real-time early warning device - Google Patents
A kind of fixed structure of drilling failure complexity real-time early warning device Download PDFInfo
- Publication number
- CN209430183U CN209430183U CN201920952042.3U CN201920952042U CN209430183U CN 209430183 U CN209430183 U CN 209430183U CN 201920952042 U CN201920952042 U CN 201920952042U CN 209430183 U CN209430183 U CN 209430183U
- Authority
- CN
- China
- Prior art keywords
- fixed
- fixedly connected
- case
- early warning
- gag lever
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Sampling And Sample Adjustment (AREA)
Abstract
The utility model discloses a kind of fixed structures of drilling failure complexity real-time early warning device, bindiny mechanism including fixed mechanism and body side among main body, main body, the fixed mechanism includes gag lever post, the centre of the main body is fixedly connected with desktop, fixed plate is fixedly connected on the inside of the desktop, connecting plate is fixedly connected among the side of the fixed plate, the connecting plate is connected and fixed with fixed plate by the fixed spring, the gag lever post is located among the side of connecting plate, and the centre of the fixed plate is fixedly connected with adjusting screw rod;Pass through the setting of gag lever post and fixed spring, greatly make the installation fixation for measuring case simple and convenient, pass through being used cooperatively for gag lever post and fixed spring, measurement case can be fixed rapidly, reduce measurement case and the case where sliding is fallen occur, stability is preferable, it is easy to operate, installation separation rapidly, reduces the case where measuring device failure on the inside of case, ensure that running smooth for work.
Description
Technical field
The utility model belongs to petroleum drilling technology field, and in particular to a kind of drilling failure complexity real-time early warning device
Fixed structure.
Background technique
Drilling failure complexity real-time early warning has great importance for the risk during reduction oil-gas exploration, drilling well
Accident complexity real-time early warning relies on logging data to carry out real time threshold analysis with the help of no downhole drilling tool,
In the drilling course of drillng operation, once occur avoiding complicated geological different from the normal variation tendency of data, system and alarm
Adverse effect, is effectively reduced the non-drilling activity duration, has saved drilling cost caused by condition and construction operation.
Existing drilling failure complexity real-time early warning device be there is a problem that certain when in use, often have ignored well site
Drilling well shakes to potential risk brought by source of early warning, due to (receiving data set) the measurement case and table on measuring tool top
Plate does not fix device, and when measuring tool movement or vibration, the measurement case on top is likely to the feelings that sliding is fallen occur
Condition, since device is more close on the inside of measurement case, once scratching damage, not only maintenance cost is high, needs professional staff to it
The problem of repairing, while delaying the normal progression of work, increasing economic cost, thus it is proposed that a kind of drilling failure is multiple
The fixed structure of miscellaneous real-time early warning device.
Utility model content
The purpose of this utility model is to provide a kind of fixed structures of drilling failure complexity real-time early warning device, to solve
Measurement case mentioned above in the background art is likely to the case where sliding is fallen occur, and scratches the problems such as damage maintenance cost is high.
To achieve the above object, the utility model provides the following technical solutions: a kind of drilling failure complexity real-time early warning dress
The fixed structure set, the bindiny mechanism including fixed mechanism and body side among main body, main body, the fixed mechanism include
Gag lever post, the centre of the main body are fixedly connected with desktop, and fixed plate, the fixed plate are fixedly connected on the inside of the desktop
Side among be fixedly connected with connecting plate, the connecting plate is connected and fixed with fixed plate by the fixed spring, the limit
Position bar is located among the side of connecting plate, and the centre of the fixed plate is fixedly connected with adjusting screw rod, the fixed spring it is interior
Corresponding to connecting rope is fixedly connected at the position of adjusting screw rod, the top side of the desktop is connected with measurement case for side,
The bottom end of the measurement case is fixedly connected with limit pedestal, and the top of the desktop, which corresponds to, is equipped with limit at the position of limit pedestal
Position hole.
Further, the bindiny mechanism includes fixing pipe, and the side of the measurement case is fixedly connected with connecting tube, described
The surface activity of connecting tube is connected with thread ring, and the side of the connecting tube is connected with hollow pipe, the fixing pipe position
Correspond at the position of connecting tube among the side of hollow pipe, reset ring be fixedly connected among the inside of the connecting tube,
Correspond on the inside of connecting tube among the side of the fixing pipe and be fixedly connected with connection inner tube, in the side of the connection inner tube
Between correspond to reset ring position at be fixedly connected with the embedded pipe to match.
Further, the bottom end side of the desktop is fixedly connected with base cabinet, and the centre of the desktop is fixedly connected with survey
The intermediate surface of gauge rod, the measurement case is fixedly connected with operation button.Further, the cross section of the limit pedestal is circle
Shape, and the shape size for limiting pedestal is consistent with the shape size of limit hole.
Further, the limit pedestal at the measurement bottom end, which corresponds to, is equipped with fixation hole at the position of gag lever post, described
It measures bottom end and is equipped with magnetite far from the limit base bottom of gag lever post.
Further, the side of the connecting tube is equipped with the first fixture block, and the inside of the thread ring corresponds to the first card
The second fixture block is equipped at the position of block.
Compared with prior art, the utility model has the beneficial effects that
1. passing through the setting of gag lever post and fixed spring, greatly makes the installation fixation for measuring case simple and convenient, pass through
Gag lever post and fixed spring are used cooperatively, and can be fixed rapidly to measurement case, reduce measurement case and occur sliding and fall
Situation, stability is preferable, while simple and convenient, and installation separation rapidly, reduces the case where measuring device failure on the inside of case,
It ensure that running smooth for work.
2. connecting the setting of inner tube and embedded pipe, the practicability of prior-warning device is increased, passes through connection inner tube and embedded pipe
Be used cooperatively so that hollow pipe has dual fixed effect, while leakproofness is preferable, not only simple and convenient, the same to time
Time and efforts has been saved, work difficulty is reduced, has reduced the case where hollow pipe is leaked in connection, has increased work effect
Rate and economic benefit.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the gag lever post, connecting plate, fixed spring top view of the utility model;
Fig. 3 is the limit pedestal, gag lever post, adjusting screw rod cross-sectional view of the utility model;
Fig. 4 is enlarged drawing at A in Fig. 1 of the utility model;
Fig. 5 is the connection inner tube of the utility model, embedded pipe, resets ring cross-sectional view.
In figure: 1, measuring case;2, operation button;3, hollow pipe;4, base cabinet;5, desktop;6, measuring rod;7, limit hole;8,
Gag lever post;9, connecting plate;10, fixed plate;11, connecting rope;12, fixed spring;13, pedestal is limited;14, adjusting screw rod;15,
Connecting tube;16, fixing pipe;17, thread ring;18, inner tube is connected;19, pipe is embedded;20, ring is resetted.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
Fig. 1 to Fig. 5 is please referred to, the utility model provides a kind of technical solution: a kind of drilling failure complexity real-time early warning dress
The fixed structure set, the bindiny mechanism including fixed mechanism and body side among main body, main body, fixed mechanism include limit
Bar 8, the centre of main body are fixedly connected with desktop 5, and the inside of desktop 5 is fixedly connected with fixed plate 10, in the side of fixed plate 10
Between be fixedly connected with connecting plate 9, connecting plate 9 is connected and fixed with fixed plate 10 by fixed spring 12, and gag lever post 8 is located at connecting plate
Among 9 side, the centre of fixed plate 10 is fixedly connected with adjusting screw rod 14, and the inside of fixed spring 12 corresponds to adjusting screw rod
Connecting rope 11 is fixedly connected at 14 position, the top side of desktop 5 is connected with measurement case 1, and the bottom end of measurement case 1 is solid
Surely it is connected with limit pedestal 13, the top of desktop 5, which corresponds to, is equipped with limit hole 7 at the position of limit pedestal 13, pass through gag lever post
8 with the setting of fixed spring 12, greatly make the installation fixation for measuring case 1 simple and convenient, pass through gag lever post 8 and fixed spring
12 are used cooperatively, and can be fixed rapidly to measurement case 1, reduce measurement case 1 and the case where sliding is fallen occur, stability compared with
Good while simple and convenient, installation separation rapidly, reduces the case where measuring 1 inside device failure of case, ensure that work
It runs smooth.
Preferably, bindiny mechanism includes fixing pipe 16, and the side of measurement case 1 is fixedly connected with connecting tube 15, connecting tube 15
Surface activity be connected with thread ring 17, the side of connecting tube 15 is connected with hollow pipe 3, and fixing pipe 16 is located at hollow pipe
Correspond at the position of connecting tube 15 among 3 side, is fixedly connected among the inside of connecting tube 15 and resets ring 20, fixing pipe
The inside for corresponding to connecting tube 15 among 16 side is fixedly connected with connection inner tube 18, and it is right among the side of inner tube 18 to connect
It should be fixedly connected with the embedded pipe 19 to match at the position for resetting ring 20, connect the setting of inner tube 18 and embedded pipe 19, increase
The practicability for having added prior-warning device, by being used cooperatively for connection inner tube 18 and embedded pipe 19 so that hollow pipe 3 have it is dual
Fixed effect, while leakproofness is preferable, it is not only simple and convenient, while time and efforts is saved, work difficulty is reduced,
Reduce the case where hollow pipe 3 is leaked in connection, increases working efficiency and economic benefit.
Preferably, the bottom end side of desktop 5 is fixedly connected with base cabinet 4, and the centre of desktop 5 is fixedly connected with measuring rod 6, surveys
The intermediate surface of measuring tank 1 is fixedly connected with operation button 2, and operation button 2 increases the practicability of prior-warning device.
Preferably, the cross section for limiting pedestal 13 is circle, and limits the shape size of pedestal 13 and the shape of limit hole 7
It is in the same size, so that the surface that measurement case 1 is placed in desktop 5 is more stable.
Preferably, the limit pedestal 13 for measuring 1 bottom end of case, which corresponds to, is equipped with fixation hole at the position of gag lever post 8, measure case 1
Bottom end is equipped with magnetite far from 13 bottom end of limit pedestal of gag lever post 8, may make measurement 1 fixed effect of case more preferably.
Preferably, the side of connecting tube 15 is equipped with the first fixture block, and the inside of thread ring 17 corresponds to the position of the first fixture block
It sets place and is equipped with the second fixture block, increase stability when hollow pipe 3 connects.
The working principle and process for using of the utility model: the measurement installation of case 1 is fixed first, first rotation adjusting screw rod
14, so that adjusting screw rod 14 is by being wound to surface for connecting rope 11 after screw thread rotation, the pulling of connecting rope 11 is so that fixed bullet
12 forced contraction of spring, to connecting plate 9 and gag lever post 8 be pulled to side, so that gag lever post 8 slides out to the top of limit hole 7
At position, the limit pedestal 13 for measuring 1 bottom end of case is aligned at the position of limit hole 7, then slowly measurement case 1 glides, makes
Pedestal 13 must be limited to fit closely with limit hole 7, wrap up the limit pedestal 13 and 7 magnetic connection of limit hole of magnetite, centre is equipped with
Fixation hole limit pedestal 13 is then connected together by gag lever post 8, is fixed to carry out limit to limit pedestal 13, thus will
Measurement case 1 is fixed on the top side of desktop 5, is fixed rapidly to measurement case 1, reduces the measurement appearance sliding of case 1 and falls
The case where, stability is preferable, and installation separation rapidly, reduces the case where measuring 1 inside device failure of case;When connection hollow pipe 3
When, the fixing pipe 16 of 3 side of hollow pipe need to be only aligned at the position of connecting tube 15, so that connection inner tube 18 is located at connecting tube
15 inside then rotates fixing pipe 16, so that fixing pipe 16 is fixed on the inside of connecting tube 15 by screw thread rotation, so that interior
Embedding pipe 19 with reset ring 20 fit closely, then sliding rotation thread ring 17 so that thread ring 17 by screw thread rotation with
The outside of fixing pipe 16 is connected and fixed, so that hollow pipe 3 has dual fixed effect, leakproofness is preferable, not only it is easy to operate just
Victory, while time and efforts is saved, work difficulty is reduced, the case where hollow pipe 3 is leaked in connection is reduced.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art,
It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired
Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.
Claims (6)
1. a kind of fixed structure of drilling failure complexity real-time early warning device, including among main body, main body fixed mechanism and master
The bindiny mechanism of body side, it is characterised in that: the fixed mechanism includes gag lever post (8), and the centre of the main body is fixedly connected
Have desktop (5), is fixedly connected with fixed plate (10) on the inside of the desktop (5), it is fixed among the side of the fixed plate (10)
It is connected with connecting plate (9), the connecting plate (9) is connected and fixed with fixed plate (10) by fixed spring (12), the gag lever post
(8) among the side of connecting plate (9), the centre of the fixed plate (10) is fixedly connected with adjusting screw rod (14), described solid
Determine spring (12) inside correspond to adjusting screw rod (14) position at be fixedly connected with connecting rope (11), the desktop (5)
Top side is connected with measurement case (1), and the bottom end of measurement case (1) is fixedly connected with limit pedestal (13), the table
The top of plate (5), which corresponds at the position of limit pedestal (13), is equipped with limit hole (7).
2. a kind of fixed structure of drilling failure complexity real-time early warning device according to claim 1, it is characterised in that: institute
Stating bindiny mechanism includes fixing pipe (16), and the side of measurement case (1) is fixedly connected with connecting tube (15), the connecting tube
(15) surface activity is connected with thread ring (17), and the side of the connecting tube (15) is connected with hollow pipe (3), described
Fixing pipe (16) is located at the position for corresponding to connecting tube (15) among the side of hollow pipe (3), the connecting tube (15) it is interior
It is fixedly connected among side and resets ring (20), the inside that connecting tube (15) are corresponded among the side of the fixing pipe (16) is fixed
It is connected with connection inner tube (18), corresponds at the position for resetting ring (20) among the side of connection inner tube (18) and is fixedly connected
There is the embedded pipe (19) to match.
3. a kind of fixed structure of drilling failure complexity real-time early warning device according to claim 1, it is characterised in that: institute
The bottom end side for stating desktop (5) is fixedly connected with base cabinet (4), and the centre of the desktop (5) is fixedly connected with measuring rod (6), institute
The intermediate surface for stating measurement case (1) is fixedly connected with operation button (2).
4. a kind of fixed structure of drilling failure complexity real-time early warning device according to claim 1, it is characterised in that: institute
The cross section of limit pedestal (13) is stated as circle, and limits the shape size of pedestal (13) and the shape size one of limit hole (7)
It causes.
5. a kind of fixed structure of drilling failure complexity real-time early warning device according to claim 1, it is characterised in that: institute
The limit pedestal (13) for stating measurement case (1) bottom end, which corresponds to, is equipped with fixation hole, the measurement case (1) at the position of gag lever post (8)
Bottom end is equipped with magnetite far from limit pedestal (13) bottom end of gag lever post (8).
6. a kind of fixed structure of drilling failure complexity real-time early warning device according to claim 2, it is characterised in that: institute
The side for stating connecting tube (15) is equipped with the first fixture block, and the inside of the thread ring (17), which corresponds at the position of the first fixture block, to be set
There is the second fixture block.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920952042.3U CN209430183U (en) | 2019-06-24 | 2019-06-24 | A kind of fixed structure of drilling failure complexity real-time early warning device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920952042.3U CN209430183U (en) | 2019-06-24 | 2019-06-24 | A kind of fixed structure of drilling failure complexity real-time early warning device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209430183U true CN209430183U (en) | 2019-09-24 |
Family
ID=67979576
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920952042.3U Expired - Fee Related CN209430183U (en) | 2019-06-24 | 2019-06-24 | A kind of fixed structure of drilling failure complexity real-time early warning device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209430183U (en) |
-
2019
- 2019-06-24 CN CN201920952042.3U patent/CN209430183U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205506702U (en) | Tunnel crack detecting device | |
CN209430183U (en) | A kind of fixed structure of drilling failure complexity real-time early warning device | |
CN207501924U (en) | Upright bar tilt detecting device | |
CN204373646U (en) | A kind of roller can manual type sliding inclinometer | |
CN108562212A (en) | A kind of detection device for pipe fitting pitch-row | |
CN201202466Y (en) | Suspension type corrosion monitoring apparatus of gas well downhole oil conduit | |
CN108332694B (en) | Geological disaster prevention crack size detection equipment | |
CN216383341U (en) | Mine geology cataloguing measuring device | |
CN216745856U (en) | Ground crack fixed point monitoring devices that sinks | |
CN206709811U (en) | Building inclination dynamic measuring instrument | |
CN203948091U (en) | The analogue experiment installation of high angle hole resistivity logging Influence from Eccentric | |
CN206300642U (en) | A kind of building wall acceptance test device | |
CN102758608B (en) | Ball-throwing type releasing method and drilling tool used for same | |
CN212008560U (en) | Water quality environment monitoring device | |
CN209279872U (en) | A kind of detector for construction engineering quality detection | |
CN209656184U (en) | A kind of structure stress of bridge detection device | |
CN205719488U (en) | Hydraulic centralizing device assay device | |
CN208313593U (en) | A kind of new-energy automobile dynamical system testboard bay | |
CN208653935U (en) | The device for testing tensile force of luggage pull rod | |
CN203811172U (en) | Building perpendicularity tester | |
CN203479222U (en) | Device for detecting sediment thickness on pile bottom of rotary drilling pile | |
CN206756617U (en) | A kind of geology hardness in-situs tester | |
CN201297171Y (en) | Casing falling materials detecting device | |
CN109931108A (en) | A kind of jacking construction compound stratum soil body settlement monitoring method for early warning and observation bar | |
CN205712052U (en) | A kind of constructing device for earth work |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190924 Termination date: 20200624 |