CN209429655U - Structure and the simcity cemetery park with the structure are buried a kind ofly - Google Patents

Structure and the simcity cemetery park with the structure are buried a kind ofly Download PDF

Info

Publication number
CN209429655U
CN209429655U CN201821880968.8U CN201821880968U CN209429655U CN 209429655 U CN209429655 U CN 209429655U CN 201821880968 U CN201821880968 U CN 201821880968U CN 209429655 U CN209429655 U CN 209429655U
Authority
CN
China
Prior art keywords
compressible
cinerary casket
upper cover
tubular hole
buried
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821880968.8U
Other languages
Chinese (zh)
Inventor
沈杰斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongke Jianye Xiaode Cultural Industry Co Ltd
Original Assignee
Zhongke Jianye Xiaode Cultural Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongke Jianye Xiaode Cultural Industry Co Ltd filed Critical Zhongke Jianye Xiaode Cultural Industry Co Ltd
Priority to CN201821880968.8U priority Critical patent/CN209429655U/en
Application granted granted Critical
Publication of CN209429655U publication Critical patent/CN209429655U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Fencing (AREA)

Abstract

Structure and the simcity cemetery park with the structure are buried a kind ofly, it includes the region set by fence or enclosure wall circle, and loaded on the miniature urban landscape in the region, the miniature urban landscape is loaded in the region on earth's surface, and the earth's surface sandy soil layer in the region offers buries structure severally;Structure is buried a kind ofly, it is characterized by: it includes the tubular hole for being opened in earth's surface sandy soil layer, and compressible cinerary casket, deformation upper cover, the compressible cinerary casket is adapted with the tubular hole and can be placed in the tubular hole, the deformation upper cover is then buckled on the upper end opening face of the tubular hole, and structure is buried on the ground for forming burial cinerary casket.

Description

Structure and the simcity cemetery park with the structure are buried a kind ofly
Technical field
The utility model relates to funeral and interment technical fields, bury structure and the simcity mound with the structure especially a kind ofly Garden.
Background technique
Currently, China is generally divided into cemetery park grave and burial in the ground in funeral and interment mode, the harm of burial in the ground is self-evident, mostly Area has been prohibited, therefore country is wideling popularize always cemetery park grave, and cemetery park grave in the prior art is actually not There is solution root problem, exposes a large amount of problems and disadvantages, such as a large amount of waste land resources, waste buildings and resources, and Ecoscape is also affected, cemetery park resource scarcity is caused, the problems such as grave is costly.
Utility model content
To solve technical problem of the existing technology, the utility model discloses buries structure and with the structure a kind ofly Simcity cemetery park can be effectively compressed cinerary casket volume, while promote earth's surface usable floor area, then promote entire city appearance of the city city It is given while looks and holds a memorial ceremony for the good psychological comfort of the person of visiing.
In order to achieve the above objectives, specific technical solution is as follows:
Structure is buried a kind ofly comprising is opened on the tubular hole and compressible cinerary casket, deformation of earth's surface sandy soil layer Lid, in which:
The compressible cinerary casket is adapted with the tubular hole and can be placed in the tubular hole, in the deformation Lid is then buckled on the upper end opening face of the tubular hole, and structure is buried on the ground for forming burial cinerary casket.
Further, the compressible cinerary casket includes box body and upper cover, and the upper cover is incorporated into the upper end opening face of box body, Form the container that can accommodate bone ash, in which:
The box body includes pedestal, compressible ring and fixed ring, two edges up and down of the compressible ring respectively with it is described Pedestal and fixed ring are integrally connected, and the compressible ring is that multiple annular folding lines, the compressible ring are coaxially arranged with along its axis side Along the annular folds when compression, to realize compressive deformation.
Further, the compressible cinerary casket further includes a positioning sleeve, which is sheathed on the outside of the compressible ring, And its lower edges is removably butted on the pedestal and fixed ring edge respectively, which is plastic sheath.
Further, the deformation upper cover is section in the column for being inverted isosceles trapezoid shape, with hollow cavity It is pressed on the compressible cinerary casket.
A kind of simcity cemetery park comprising the region set by fence or enclosure wall circle, and loaded on miniature in the region Urban landscape, the miniature urban landscape are loaded in the region on earth's surface, and the earth's surface sandy soil layer in the region offers several Bury structure in above-mentioned ground.
Compared to existing technologies, as follows the advantages of the utility model:
Structure is buried on the ground that the utility model illustrates, can effectively compress the volume of existing cinerary casket, further promotes ground Table uses probability, while it can be opened in a simcity cemetery park using miniature urban landscape, be to develop " premises for the deceased Produce ", and by among the sandy soil under the deceased's bone ash placement building, traditional " burial brings peace to the deceased " folk custom of Chinese had both been met, The deceased's bone ash can be placed to building again labeled with the name or refined title of the deceased, such as: certain so-and-so villa garden, so-and-so official residence, certain so-and-so island Small island, certain so-and-so coffee shop, so-and-so luxurious house etc., meanwhile, entire simcity cemetery park is one of beautiful Landscape again, is increased City bright spot, and greatly saved a large amount of land resource and buildings and resources, it is that a kind of real ecological environment-friendly type is modern.
Detailed description of the invention
Fig. 1 is to bury structural schematic diagram described in the utility model embodiment (the compressible cinerary casket is uncompressed shape State);
Fig. 2 is to bury structure described in the utility model embodiment to bury status architecture schematic diagram (the compressible cinerary casket Confined state);
Fig. 3 is that compressible cinerary casket described in the utility model embodiment installs structural schematic diagram after the positioning sleeve.
Specific embodiment
It is practical new below in conjunction with this to keep the objectives, technical solutions, and advantages of the embodiments of the present invention clearer Attached drawing in type embodiment, the technical scheme in the utility model embodiment is clearly and completely described, it is clear that is retouched The embodiment stated is the utility model a part of the embodiment, instead of all the embodiments.Based on the implementation in the utility model Example, every other embodiment obtained by those of ordinary skill in the art without making creative efforts belong to The range of the utility model protection.
As shown in Figure 1 to Figure 3, structure is buried a kind ofly comprising is opened in the tubular hole 1, Yi Jike of earth's surface sandy soil layer Compress cinerary casket 2, deformation upper cover 3, in which:
As shown in Figure 1 to Figure 3, the compressible cinerary casket 2 is adapted with the tubular hole 1 and can be placed in the tubular In hole 1, the deformation upper cover 3 is then buckled on the upper end opening face of the tubular hole 1, and the ground for forming burial cinerary casket is buried Structure.
As shown in Figure 1 to Figure 3, the compressible cinerary casket 2 includes box body 21 and upper cover 22, and the upper cover 22 is incorporated into box The upper end opening face of body 21 forms the container that can accommodate bone ash, in which:
As shown in Figure 1 to Figure 3, the box body 21 includes pedestal 211, compressible ring 212 and fixed ring 213, described to press Two edges up and down of contracting ring 212 are integrally connected with the pedestal 211 and fixed ring 213 respectively, and the compressible ring 222 is along it Axis side is coaxially arranged with multiple annular folding lines, along the annular folds when which is pressurized, to realize compression Deformation.
Preferred: as shown in Figure 1 to Figure 3, the compressible cinerary casket further includes a positioning sleeve 4, which is sheathed on 212 outside of compressible ring, and its lower edges is removably butted on 213 edge of the pedestal 211 and fixed ring respectively, The positioning sleeve is plastic sheath.
As shown in Figure 1 to Figure 3, the deformation upper cover 3 is section in the column for being inverted isosceles trapezoid shape, with hollow Inner cavity can be pressed on the compressible cinerary casket 2.
As shown in Figure 1 to Figure 3, it should be understood that
1, the positioning sleeve 4 is preferably plastic sheath, itself has certain elasticity, to adapt to bullet to a certain extent Property deformation, to be able to achieve socket and be misplaced and taken out after being squeezed and deformed;It is needing the compressible cinerary casket 2 loaded on institute Before stating tubular hole 1, the positioning sleeve 4 is removed, then the compressible cinerary casket 2 is placed in the tubular hole 1, this When, the height of the compressible cinerary casket 2 is greater than the depth of the tubular hole 1, therefore uses cinerary casket for compressible bone ash Box has certain compression space while effectively can accommodate bone ash;
2, when the compressible cinerary casket 2 needs to compress, compressible cinerary casket 2 is squeezed using the deformation upper cover 3, with It enables the compressible ring of the cinerary casket 2 carry out compressive deformation, and then the deformation upper cover 3 is embedded in the tubular hole 1 At upper end opening;
3, in order to ensure leakproofness, 1 inner wall of tubular hole has an antiseepage damp-proof layer (not shown), which is docile Cylindrical plastic plate on 1 side wall of tubular hole, the side that the deformation upper cover 3 is contacted with the tubular plastic plate base It is provided with rubber ring (not shown), under conditions of ensuring leakproofness, is effectively compressed;
4, the deformation upper cover 3 be a hollow structure, inside can fill nutrient solution or aqueous solution, be exposed to institute thereon The part for stating ground can install false landscape or true vegetation, when top is provided that true vegetation, need in the deformation The certain nutrition foundation of vegetation is given on upper lid, to ensure its normal growth;In order to effectively irrigate, the surface of the deformation upper cover It is opened in the irrigation mouth of device inner cavity connection.
A kind of simcity cemetery park is the cemetery park of a miniature urban landscape formula, is bone ash and the confession for being exclusively used in burial the deceased Funeral belong to mourn think and miniature urban landscape, be that " real estate " is developed for the deceased;The simcity can be in reality The epitome in any one existing city, including ancient times or modern, also micropolis such as including cities and towns certainly, either Some cell with city function, the city apperance being also possible in entirely virtual paradise or fairyland, as nihility is dimly discernible Heaven in human world, or meet people the imagination in other have fine artistic conception places.
Simcity in the simcity cemetery park of the utility model be equipped with rivers,lakes and seas, mountains and rivers, road, high buildings and large mansions, The buildings such as mountain villa, villa, retail shop, bank, hotel, airport, ship, vehicle or natural landscape, these buildings or natural scape Sight can be existing, and it is virtual for can also having, and have an all mating and feature of city or virtual city, and on State these mating and features can be made using ep-type material model come.
The simcity of the utility model is embodied as building sand table, and the pedestal of sand table is sandy soil, and accumulating on sandy soil has Miscellaneous building or natural landscape suitably open up above-mentioned ground under building or natural landscape and bury structure.Therefore, The deceased's bone ash is put into cylinder base to the folk custom for being achieved that " burial brings peace to the deceased ".Finally corresponding building or nature on cylinder base Name or refined title of the suitable position of landscape labeled with the deceased.Such as: certain so-and-so villa garden, so-and-so official residence, certain so-and-so island, certain so-and-so coffee The coffee Room, so-and-so luxurious house etc. make the deceased relatives can be clearly seen that the deceased grave position.
Simcity in the simcity cemetery park of the utility model can be built into nature hillside or level land, become one The urban landscape of seat concentration, can also build the Underground Tunnels palace indoors or as subway and the cavern as tunnel The inside.Any one of simcity corner can realize remote visible by monitoring device, building thereon or from Right landscape is equipped with the scene renderings equipment such as light;The scene renderings equipment such as light is remote controlled, realizes electronic and intelligentized type pipe Reason.
Finally, it should be noted that the above various embodiments is only to illustrate the technical solution of the utility model, rather than it is limited System;Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should Understand: it is still possible to modify the technical solutions described in the foregoing embodiments, or to some or all of Technical characteristic is equivalently replaced;And these are modified or replaceed, it does not separate the essence of the corresponding technical solution, and this is practical new The range of each embodiment technical solution of type.

Claims (5)

1. burying structure a kind ofly, it is characterised in that: it includes the tubular hole and compressible bone ash for being opened in earth's surface sandy soil layer Box, deformation upper cover, in which:
The compressible cinerary casket is adapted with the tubular hole and can be placed in the tubular hole, and the deformation upper cover is then It is buckled on the upper end opening face of the tubular hole, structure is buried on the ground for forming burial cinerary casket.
2. burying structure according to claim 1ly, it is characterised in that: the compressible cinerary casket includes box body and upper cover, The upper cover is incorporated into the upper end opening face of box body, forms the container that can accommodate bone ash, in which:
The box body includes pedestal, compressible ring and fixed ring, two edges up and down of the compressible ring respectively with the pedestal And fixed ring is integrally connected, the compressible ring is that multiple annular folding lines are coaxially arranged with along its axis side, which is pressurized When along the annular folds, to realize compressive deformation.
3. burying structure according to claim 2ly, it is characterised in that: the compressible cinerary casket further includes a positioning sleeve, The positioning sleeve is sheathed on the outside of the compressible ring, and its lower edges is removably butted on the pedestal and fixed ring side respectively At, which is plastic sheath.
4. burying structure according to claim 1ly, it is characterised in that: the deformation upper cover is section in inversion isosceles trapezoid The column of shape can be pressed on the compressible cinerary casket with hollow cavity.
5. a kind of simcity cemetery park, it is characterised in that: it includes the region set by fence or enclosure wall circle, and is loaded on the region Interior miniature urban landscape, the miniature urban landscape are loaded in the region on earth's surface, and the earth's surface sandy soil layer in the region is opened Structure is buried equipped with ground described in several Claims 1-4 any one.
CN201821880968.8U 2018-11-15 2018-11-15 Structure and the simcity cemetery park with the structure are buried a kind ofly Active CN209429655U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821880968.8U CN209429655U (en) 2018-11-15 2018-11-15 Structure and the simcity cemetery park with the structure are buried a kind ofly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821880968.8U CN209429655U (en) 2018-11-15 2018-11-15 Structure and the simcity cemetery park with the structure are buried a kind ofly

Publications (1)

Publication Number Publication Date
CN209429655U true CN209429655U (en) 2019-09-24

Family

ID=67969144

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821880968.8U Active CN209429655U (en) 2018-11-15 2018-11-15 Structure and the simcity cemetery park with the structure are buried a kind ofly

Country Status (1)

Country Link
CN (1) CN209429655U (en)

Similar Documents

Publication Publication Date Title
CN209429655U (en) Structure and the simcity cemetery park with the structure are buried a kind ofly
CN208650636U (en) The granite slab coffin chamber of bottomless button
CN205531618U (en) Coffin chamber and tomb hat with function of beautifying environment
CN208106047U (en) A kind of tomb that saves land that the honorable and small ability of saving land of project amount is strong
CN205382752U (en) Environmental protection reduces funeral and interment building of land used
CN106760905A (en) Environmental protection reduces the funeral building of land used
CN205577589U (en) Coffin chamber structure that contains built -in tombstone
CN216496385U (en) Corrosion-resistant bamboo joint stone product capable of containing bone ash
CN217023266U (en) Brick box for storing portrait bricks
CN2357722Y (en) Cinerary casket
CN2406007Y (en) Device for placing bone ash
CN216197062U (en) Multifunctional environment-friendly tomb
CN108691453A (en) Multifunction combined ecology cemetery
CN102218003A (en) Small superposable sarcophagus
CN202544477U (en) Magnetic energy cemetery tower based on permanent magnet model constructed according to 12 earthly branches and 24 mountains
CN201406866Y (en) Concealed type combined grave
CN201158959Y (en) Grave
CN208763532U (en) Deep layer coffin chamber
Frank Pictures from Italy: Dickens, Rome, and the Eternal City of the Mind
CN208473429U (en) Multifunction combined ecology cemetery
CN102425329A (en) Magnetic energy cemetery tower based on permanent magnet model with 12 earthly branches and 24 mountains
WO2023047187A2 (en) Underground urn storage facility and method of forming the topography of the earth's surface
CN205135090U (en) Novel wall burial coffin pit
CN204920425U (en) Novel support body drawer type ling gutai
CN205089036U (en) Novel cave formula intelligence memorial park

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant