CN209429595U - Integral bathroom bottom for building stiffening device - Google Patents
Integral bathroom bottom for building stiffening device Download PDFInfo
- Publication number
- CN209429595U CN209429595U CN201822060148.0U CN201822060148U CN209429595U CN 209429595 U CN209429595 U CN 209429595U CN 201822060148 U CN201822060148 U CN 201822060148U CN 209429595 U CN209429595 U CN 209429595U
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- ring flat
- plate
- building
- integral bathroom
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Orthopedics, Nursing, And Contraception (AREA)
Abstract
The utility model discloses integral bathroom bottom for building stiffening devices, including first party ring flat-plate, the upper surface of the first party ring flat-plate is fixedly connected with crossbar, the upper surface of the crossbar is fixedly connected with second party ring flat-plate, the upper surface of the second party ring flat-plate passes through the first bolt side of being fixedly connected with notch board, the upper end inner surface of side's notch board is fixedly connected with frame, ceiling, the upper surface of side's notch board is fixedly connected with supporting network by the second bolt, the inner surface of the supporting network and upper surface are covered with waterproof layer, the upper surface of the waterproof layer is equipped with floor tile, the inner surface of side's notch board is fixedly connected with variable diameter fistulae, the integral bathroom bottom for building stiffening device, it is designed using double-layer square ring flat-plate, it is connected and is supported by crossbar, improve bottom strength, supportive is more preferable, the variable diameter designed using bimetallic tube Fistulae is more durable.
Description
Technical field
The utility model relates to integral bathroom technical field, integral bathroom bottom stiffening device specially for building.
Background technique
1964, the Tokyo Olympic Games were to guarantee high-quality, a large amount of athlete apartments' construction are rapidly completed, and Japanese invents
Integral bathroom just can be introduced into China early in nineteen ninety with site-assembled integral bathroom, it is domestic hotel, hospital, ship, fast
Dress room has largely used integral bathroom;
Existing integral bathroom bottom structure supportive for building need to be improved, and the durability of drainage pipeline need to be mentioned
It is high.
Utility model content
The purpose of this utility model is to provide integral bathroom bottom for building stiffening devices, to solve above-mentioned background technique
The problem of middle proposition.
To achieve the above object, the utility model provides the following technical solutions: integral bathroom bottom for building stiffening device,
Including first party ring flat-plate, the upper surface of the first party ring flat-plate is fixedly connected with crossbar, and the upper surface of the crossbar is fixed
It is connected with second party ring flat-plate, by the first bolt side of being fixedly connected with notch board, the side is recessed for the upper surface of the second party ring flat-plate
The upper end inner surface of plate is fixedly connected with frame, ceiling, and the upper surface of side's notch board is fixedly connected with by the second bolt
Supporting network;
The inner surface of the supporting network and upper surface are covered with waterproof layer, and the upper surface of the waterproof layer is equipped with floor tile,
The inner surface of side's notch board is fixedly connected with variable diameter fistulae.
Preferably, the upper end inner surface of the variable diameter fistulae places annulate lamella, and the lower end inside surface of ring flat-plate is fixed to be connected
It is connected to strainer.
Preferably, the variable diameter fistulae includes inner tube, outer tube.
Preferably, said inner tube, outer tube are directly filled with insulating layer.
Preferably, said inner tube, outer tube inner and outer wall surface be covered with the first erosion resistant coating and the second erosion resistant coating.
Compared with prior art, the utility model has the beneficial effects that the integral bathroom bottom for building stiffening device, is adopted
It is designed with double-layer square ring flat-plate, is connected and supported by crossbar, improve bottom strength, supportive is more preferable, using bimetallic tube design
Variable diameter fistulae is more durable.
Detailed description of the invention
Fig. 1 is the overall structure diagram of the utility model;
Fig. 2 is the first party ring flat-plate local structure top view of the utility model;
Fig. 3 is the variable diameter fistulae partial structurtes top cross-sectional view of the utility model;
Fig. 4 is enlarged drawing at the A of the utility model.
In figure: 1 first party ring flat-plate, 2 crossbars, 3 second party ring flat-plates, 4 first bolts, 5 side's notch boards, 6 frames, 7 ceilings, 8
Second bolt, 9 supporting networks, 10 waterproof layers, 11 floor tiles, 12 variable diameter fistulaes, 13 ring flat-plates, 14 strainers, 120 inner tubes, 121 outer tubes, 122
Insulating layer, 123 first erosion resistant coatings, 124 second erosion resistant coatings.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
Fig. 1-4 is please referred to, the utility model provides a kind of technical solution: integral bathroom bottom for building stiffening device, packet
First party ring flat-plate 1 is included, the upper surface of first party ring flat-plate 1 is fixedly connected with crossbar 2, and the upper surface of crossbar 2 is fixedly connected with
Second party ring flat-plate 3, the upper surface of second party ring flat-plate 3 is by 4 side's of being fixedly connected with notch board 5 of the first bolt, in the upper end of square notch board 5
Side surface is fixedly connected with frame 6, ceiling 7, and the upper surface of square notch board 5 is fixedly connected with supporting network 9, bottom by the second bolt 8
Portion is connected using first party ring flat-plate 1 and second party ring flat-plate 3 by crossbar 2, and the first mass is lighter, and the second support force is higher, leads to
5 lower end of external first bolt 4 and 8 side's of being connected to notch board of the second bolt is crossed, it is more convenient to install;
The inner surface of supporting network 9 and upper surface are covered with waterproof layer 10, and the upper surface of waterproof layer 10 is equipped with floor tile 11, side
The inner surface of notch board 5 is fixedly connected with variable diameter fistulae 12, can carry out waterproof by waterproof layer 10, waterproof layer 10 uses asphalt mixtures modified by epoxy resin
Grease coating material, waterproof performance is high, is laid with one layer of supporting network 9, can be supported being laid with waterproof layer 10, it is stronger to grab relay.
The upper end inner surface of variable diameter fistulae 12 places annulate lamella 13, and the lower end inside surface of ring flat-plate 13 is fixedly connected with filter
Net 14, strainer 14 are the filterings that can carry out foreign matter in draining-off sewage, are the prior art.
Variable diameter fistulae 12 includes inner tube 120, outer tube 121, uses inner tube 120, outer tube 121 by the variable diameter fistulae 12 of leak
Double layer design is more durable.
Inner tube 120, outer tube 121 are directly filled with insulating layer 122, and insulating layer 122 can increase thermal insulation property, in severe cold period
It is not easily broken.
Inner tube 120, outer tube 121 inner and outer wall surface be covered with the first erosion resistant coating 123 and the second erosion resistant coating 124, use
Polyamide Epoxy coating, anti-corrosive properties are more preferable, and the sewage after bathing will not corrode variable diameter fistulae 12, other are undeclared
Part is the prior art.
When the utility model is specifically implemented: bottom is connected using first party ring flat-plate 1 and second party ring flat-plate 3 by crossbar 2
It connecing, the first mass is lighter, and the second support force is higher, by 5 lower end of external first bolt 4 and 8 side's of being connected to notch board of the second bolt,
It is more convenient to install, and can carry out waterproof by waterproof layer 10, waterproof layer 10 uses epoxy coating, and waterproof performance is high, is laid with
One layer of supporting network 9 can be supported being laid with waterproof layer 10, grab that relay is stronger, use inner tube by the variable diameter fistulae 12 of leak
120,121 double layer design of outer tube is more durable, and insulating layer 122 can increase thermal insulation property, is not easily broken in severe cold period, and first is anti-
Rotten layer 123 and the second erosion resistant coating 124, using Polyamide Epoxy coating, anti-corrosive properties are more preferable, and the sewage after bathing will not be to change
Diameter fistulae 12 is corroded, more durable.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art,
It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired
Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.
Claims (5)
1. integral bathroom bottom for building stiffening device, including first party ring flat-plate (1), it is characterised in that: the first party ring flat-plate
(1) upper surface is fixedly connected with crossbar (2), and the upper surface of the crossbar (2) is fixedly connected with second party ring flat-plate (3),
The upper surface of the second party ring flat-plate (3) by the first bolt (4) side's of being fixedly connected with notch board (5), side's notch board (5) it is upper
End inner surface is fixedly connected with frame (6), ceiling (7), and the upper surface of side's notch board (5) is fixed by the second bolt (8)
It is connected with supporting network (9);
The inner surface of the supporting network (9) and upper surface are covered with waterproof layer (10), and the upper surface of the waterproof layer (10) is laid with
Have floor tile (11), the inner surface of side's notch board (5) is fixedly connected with variable diameter fistulae (12).
2. integral bathroom bottom for building stiffening device according to claim 1, it is characterised in that: the variable diameter fistulae
(12) upper end inner surface places annulate lamella (13), and the lower end inside surface of ring flat-plate (13) is fixedly connected with strainer (14).
3. integral bathroom bottom for building stiffening device according to claim 1, it is characterised in that: the variable diameter fistulae
It (12) include inner tube (120), outer tube (121).
4. integral bathroom bottom for building stiffening device according to claim 3, it is characterised in that: said inner tube (120),
Outer tube (121) is directly filled with insulating layer (122).
5. integral bathroom bottom for building stiffening device according to claim 3, it is characterised in that: said inner tube (120),
The inner and outer wall surface of outer tube (121) is covered with the first erosion resistant coating (123) and the second erosion resistant coating (124).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822060148.0U CN209429595U (en) | 2018-12-10 | 2018-12-10 | Integral bathroom bottom for building stiffening device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822060148.0U CN209429595U (en) | 2018-12-10 | 2018-12-10 | Integral bathroom bottom for building stiffening device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209429595U true CN209429595U (en) | 2019-09-24 |
Family
ID=67971253
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201822060148.0U Active CN209429595U (en) | 2018-12-10 | 2018-12-10 | Integral bathroom bottom for building stiffening device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209429595U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115279982A (en) * | 2020-04-17 | 2022-11-01 | 松下知识产权经营株式会社 | Sanitary unit structure and construction method thereof |
-
2018
- 2018-12-10 CN CN201822060148.0U patent/CN209429595U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115279982A (en) * | 2020-04-17 | 2022-11-01 | 松下知识产权经营株式会社 | Sanitary unit structure and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209429595U (en) | Integral bathroom bottom for building stiffening device | |
CN208718112U (en) | Novel anti-ponding structure based on toilet geothermal heating ground surface finishing | |
CN210530176U (en) | Multilayer roof waterproof structure | |
CN205896661U (en) | Novel thermal -insulated various steel sheet of cavity | |
CN205822615U (en) | A kind of integrated house corner fittings of special draining | |
CN205444506U (en) | Inside drainage structures of foam concrete wall | |
CN211898929U (en) | Assembled heat preservation energy-saving building | |
CN203270837U (en) | Foam glass heat-insulation board | |
CN205369691U (en) | Multi -use architecture foundatin plate | |
CN217870638U (en) | Basement waterproof construction of engineering is built in room | |
CN201857670U (en) | Fixed pressing piece structure for outer wall for hanging sandwiches | |
CN217537438U (en) | Anti-drop and disassembly-free structure integrated plate cast-in-place concrete heat insulation system structure | |
CN206190122U (en) | Window sill board | |
CN207974397U (en) | A kind of waterproof and thermal insulation structure on building roof | |
CN206034694U (en) | Big module light sound insulation bearing interior wall wall body | |
CN218970416U (en) | Cracking-and-falling-preventing ceramsite concrete prefabricated wall panel | |
CN218970450U (en) | Waterproof heat-insulating roof | |
CN209637126U (en) | A kind of ceiling draining steel construction | |
CN205329893U (en) | Interior wall body of establishing water saving fixtures | |
CN216109086U (en) | Reinforced (rfd) extruded benzene board of ultra high performance concrete protection | |
CN210947147U (en) | Rain corrosion resistant top support frame for steel structure building | |
CN212026657U (en) | Steel wire net frame permanent cast-in-place concrete heat insulation board | |
CN219157779U (en) | Basement bottom plate waterproof construction | |
CN212926744U (en) | A waterproof construction for building engineering | |
CN203583693U (en) | Floor drain heat insulation plate special for bath room |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20211221 Address after: 523000 room 251, No. 183, Chonghuan Middle Road, Shijie Town, Dongguan City, Guangdong Province Patentee after: Guangdong nahui Construction Engineering Co.,Ltd. Address before: 523000 No. 609, 6 / F, Hengshun building, No. 29, Shenghe section, Guantai Road, Nancheng District, Dongguan City, Guangdong Province Patentee before: Zhonghong Construction Co.,Ltd. |
|
TR01 | Transfer of patent right |