CN209429102U - A kind of compound earth work film device of enhancing - Google Patents

A kind of compound earth work film device of enhancing Download PDF

Info

Publication number
CN209429102U
CN209429102U CN201821893600.5U CN201821893600U CN209429102U CN 209429102 U CN209429102 U CN 209429102U CN 201821893600 U CN201821893600 U CN 201821893600U CN 209429102 U CN209429102 U CN 209429102U
Authority
CN
China
Prior art keywords
slot
wall
sliding
membrane body
lock lever
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821893600.5U
Other languages
Chinese (zh)
Inventor
卢征远
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fuzhou Jointer Plastic Welding Equipment Co Ltd
Original Assignee
Fuzhou Jointer Plastic Welding Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fuzhou Jointer Plastic Welding Equipment Co Ltd filed Critical Fuzhou Jointer Plastic Welding Equipment Co Ltd
Priority to CN201821893600.5U priority Critical patent/CN209429102U/en
Application granted granted Critical
Publication of CN209429102U publication Critical patent/CN209429102U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of compound earth work film devices of enhancing, it is related to earth work film device field, the compound earth work film device of the enhancing, including geotechnological membrane body, the inner wall of geotechnique's membrane body and the surface activity of round bar connect, the left end of round bar and right end offer annular groove, the inner wall of annular groove offers circular groove respectively, first sliding groove and second sliding slot, first sliding groove and second sliding slot are located at the front and back of circular groove, first sliding groove is located at the front of second sliding slot, the left end of geotechnological membrane body and right end are flexibly connected with vertical bar close to the side of geotechnological membrane body.The utility model passes through setting round bar, vertical bar, check lock lever, spring and the first sliding block, it solves when the compound geomembrane of enhancing common at present is not laid with and is cylindrical in shape, staff is needed to squat down on the ground the compound geomembrane for moving and moving tubular with hand push when being laid with, the speed for being laid with compound geomembrane is slower, is laid with the lower problem of efficiency so as to cause compound geomembrane.

Description

A kind of compound earth work film device of enhancing
Technical field
The utility model relates to earth work film device technical field, specially a kind of compound earth work film device of enhancing.
Background technique
Compound geomembrane is the impermeable material being combined with geotextile and geomembrane, its barrier performance is main Depending on the barrier performance of geomembrane, had been more and more widely used in the civil engineerings such as water conservancy and hydropower, building, tunnel, Compound geomembrane is cylindrical in shape when not being laid with, is laid with place needed for tubular compound geomembrane is laid on, is laid with and completes Afterwards, prevent the moisture content at the top of compound geomembrane from infiltrating into geomembrane bottom, enhancing is laid with the antiseepage outlet capacity in place.
Enhancing compound geomembrane common at present is cylindrical in shape when not being laid with, needs staff to squat when being laid with to it It moves on the ground, and moves tubular compound geomembrane with hand push, by its drawout, squat down on the ground and move and will be laid with hand The speed of compound geomembrane is slower, lower so as to cause the laying efficiency of compound geomembrane.
Utility model content
(1) the technical issues of solving
In view of the deficiencies of the prior art, the utility model provides a kind of compound earth work film device of enhancing, solves mesh Preceding common enhancing compound geomembrane is cylindrical in shape when not being laid with, is needed staff to squat down on the ground when being laid with and is moved and use hand The compound geomembrane of tubular is pushed, the speed for being laid with compound geomembrane is slower, is laid with and imitates so as to cause compound geomembrane The lower problem of rate.
(2) technical solution
To achieve the above object, the utility model provides the following technical solutions: a kind of compound earth work film device of enhancing, packet Geotechnological membrane body is included, the inner wall of geotechnique's membrane body and the surface activity of round bar connect, and the left end of the round bar and right end are equal Offer annular groove, the inner wall of the annular groove offers circular groove, first sliding groove and second sliding slot respectively, the first sliding groove and Second sliding slot is located at the front and back of circular groove, and the first sliding groove is located at the front of second sliding slot, the geomembrane sheet The left end of body and right end are flexibly connected with vertical bar close to the side of geotechnological membrane body, and it is logical that first is offered on the left of the vertical bar The inner wall of slot, first through slot is flexibly connected with the inner wall of annular groove, the inner wall of the circular groove and the surface activity of check lock lever Connection, the inner wall of first through slot offer card slot, and the check lock lever is plugged to the inside of card slot, and the check lock lever is far from card One end of slot is fixedly connected with spring, and the one end of the spring far from check lock lever is fixed with circular groove inner wall far from the side of check lock lever Connection, the side of the circular groove inner wall offer the second through slot, and the surface of the check lock lever is fixedly connected with movable block, the work The surface of motion block is flexibly connected with the inner wall of the second through slot, the inner wall of first through slot be respectively fixedly connected with the first sliding block and The surface of second sliding block, first sliding block is flexibly connected with the inner wall of first sliding groove, the surface and second of second sliding block The inner wall of sliding slot is flexibly connected, and the vertical bar is fixedly connected with cross bar far from the side of geotechnological membrane body, and the cross bar is located at circle The surface of the top of bar, the cross bar is fixedly attached rubber sleeve.
Preferably, the surface fixing sleeve of the round bar is connected to bearing, the inner wall on the surface of the bearing and geotechnological membrane body It is flexibly connected.
Preferably, first through slot is in horn-like, and the shape of the round bar is adapted with the shape of the first through slot.
Preferably, a left side for second sliding block cuts open that figure is triangular in shape, the shape of the shape of the second sliding slot and the second sliding block Shape is adapted.
Preferably, the one end of the check lock lever far from spring is hemispherical, the shape of the card slot and the shape of check lock lever It is adapted.
(3) beneficial effect
The utility model provides a kind of compound earth work film device of enhancing, have it is following the utility model has the advantages that
The utility model is by setting round bar, vertical bar, check lock lever, spring and the first sliding block, when in use, by round bar from soil It being passed through at the center of work membrane body, vertical bar is actively socketed at the annular groove location of round bar, check lock lever is inserted into the inside of card slot, Vertical bar is fixed, cross bar is held and pulls round bar, it, only need to be by circle when being laid with geotechnological membrane body by geotechnological membrane body drawout Bar passes through from geomembrane body central, then vertical bar is actively socketed on round bar and is fixed, and holds cross bar and pulls round bar i.e. It can be laid with, be squatted down on the ground moving and being broken ground work membrane body with hand push step by step when being laid with without staff, Staff can be laid in the state for walking of standing, and improve the laying speed of geotechnological membrane body, it is compound to have reached raising Geomembrane is laid with the effect of efficiency, solves when the compound geomembrane of enhancing common at present is not laid with and is cylindrical in shape, when being laid with Need staff to squat down on the ground the compound geomembrane for moving and moving tubular with hand push, be laid with the speed of compound geomembrane compared with Slowly, the lower problem of efficiency is laid with so as to cause compound geomembrane.
Detailed description of the invention
Fig. 1 is the utility model overall structure diagram;
Fig. 2 is schematic enlarged-scale view at A in the utility model Fig. 1;
Fig. 3 is that figure is cutd open on a left side at the first slide position of the utility model.
In figure: 1 geotechnological membrane body, 2 round bars, 3 annular grooves, 4 circular grooves, 5 first sliding grooves, 6 second sliding slots, 7 vertical bars, 8 first Through slot, 9 check lock levers, 10 card slots, 11 springs, 12 second through slots, 13 movable blocks, 14 first sliding blocks, 15 second sliding blocks, 16 cross bars, 17 rubber sleeves, 18 bearings.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
As shown in Figure 1-3, the utility model provides a kind of technical solution: a kind of compound earth work film device of enhancing, including Geotechnological membrane body 1, geotechnological membrane body 1 are cylindrical in shape when not being laid with, and the inner wall of geotechnological membrane body 1 is connect with the surface activity of round bar 2, The left end of round bar 2 and right end offer annular groove 3, and the central axis of annular groove 3 is overlapped with the central axis of round bar 2, annular The inner wall of slot 3 offers circular groove 4, first sliding groove 5 and second sliding slot 6 respectively, and the quantity that circular groove 4 is located on same annular groove 3 is Two, first sliding groove 5 and second sliding slot 6 are located at the front and back of circular groove 4, and first sliding groove 5 is being located at second sliding slot 6 just Face, the left end of geotechnological membrane body 1 and right end are flexibly connected with vertical bar 7 close to the side of geotechnological membrane body 1, the left side of vertical bar 7 The first through slot 8 is offered, the inner wall of the first through slot 8 is flexibly connected with the inner wall of annular groove 3, inner wall and the check lock lever 9 of circular groove 4 Surface activity connection, the inner wall of the first through slot 8 offer card slot 10, and check lock lever 9 is plugged to the inside of card slot 10, and check lock lever 9 is remote One end from card slot 10 is fixedly connected with spring 11, and the one end of spring 11 far from check lock lever 9 and 4 inner wall of circular groove are far from check lock lever 9 Side be fixedly connected, the side of 4 inner wall of circular groove offers the second through slot 12, and the surface of check lock lever 9 is fixedly connected with movable block 13, the surface of movable block 13 is flexibly connected with the inner wall of the second through slot 12, and the inner wall of the first through slot 8 has been respectively fixedly connected with first Sliding block 14 and the second sliding block 15, the surface of the first sliding block 14 are flexibly connected with the inner wall of first sliding groove 5, the surface of the second sliding block 15 It being flexibly connected with the inner wall of second sliding slot 6, vertical bar 7 is fixedly connected with cross bar 16 far from the side of geotechnological membrane body 1, and cross bar 16 In the top of round bar 2, the surface of cross bar 16 is fixedly attached rubber sleeve 17.
As a kind of technical optimization scheme of the utility model, the surface fixing sleeve of round bar 2 is connected to bearing 18, bearing 18 Surface is flexibly connected with the inner wall of geotechnological membrane body 1, and bearing 18 reduces the frictional force between round bar 2 and geotechnological membrane body 1.
As a kind of technical optimization scheme of the utility model, the first through slot 8 is in horn-like, the shape of round bar 2 and first The shape of through slot 8 is adapted, and makes vertical bar 7 is more convenient to be stuck at 3 position of annular groove of round bar 2.
As a kind of technical optimization scheme of the utility model, it is triangular in shape that figure is cutd open on a left side for the second sliding block 15, second sliding slot 6 Shape be adapted with the shape of the second sliding block 15, the second sliding block 15 is different from the shape of the first sliding block 14, prevents two vertical bars 7 It is anti-loaded.
As a kind of technical optimization scheme of the utility model, the one end of check lock lever 9 far from spring 11 is hemispherical, card slot 10 shape is adapted with the shape of check lock lever 9, and check lock lever 9 is made to be easier to be plugged to the inside of card slot 10.
When in use, round bar 2 is passed through from the center of geotechnological membrane body 1, by the first sliding block 14 to positive first sliding groove 5 It sets, the second sliding block 15 presses two movable blocks 13 to positive 6 position of second sliding slot, and check lock lever 9 is collapsible into along the inner wall of circular groove 4 In circular groove 4, spring 11 is in compressive state, and vertical bar 7 is actively socketed on to 3 position of annular groove of round bar 2, when vertical bar 7 is close to soil When the side of work membrane body 1 and annular groove 3 are overlapped close to the side of geotechnological membrane body 1, movable block 13 is unclamped, check lock lever 9 is in bullet It is plugged to the inside of card slot 10 under the effect of 11 elastic force of spring, vertical bar 7 is fixed, at this point, holding cross bar 16,16 surface of cross bar is fixed The rubber sleeve 17 of socket increases the frictional force of cross bar 16 and staff's hand, plays anti-skidding effect, holds the pulling of cross bar 16 Round bar 2 makes geotechnological membrane body 1 with the rotation of 2 center of circle of round bar, and bearing 18 is fixedly attached to the surface of round bar 2, reduce round bar 2 with The frictional force of geotechnological membrane body 1, by the first sliding block 14 to positive 5 position of first sliding groove, the second sliding block 15 is to positive second sliding slot 6 It sets, prevents two vertical bars 7 anti-loaded, after the completion of use, press two movable blocks 13, movable block 13 drives check lock lever 9 and card slot 10 separation, pull vertical bar 7, and check lock lever 9 be not generally aligned in the same plane with card slot 10, unclamp movable block 13, pull on vertical bar 7, Vertical bar 7 is separated with round bar 2, vertical bar 7 can be removed from round bar 2, be reduced 2 occupied space of vertical bar 7 and round bar, facilitate vertical bar 7 and the carrying of round bar 2 round bar 2 need to only be passed through from geotechnological 1 center of membrane body, then will erect when being laid with geotechnological membrane body 1 Bar 7 is actively socketed on round bar 2 and fixes, and holds cross bar 16 and pulls round bar 2 that can be laid with to it, is not necessarily to when being laid with Staff squats down on the ground moving and being broken ground work membrane body 1 with hand push step by step, and staff is in the state for walking of standing It can be laid with, improve the laying speed of geotechnological membrane body 1, achieve the effect that the compound geomembrane of raising is laid with efficiency, reduced Intensity of workers, accelerates the integral construction progress of geotechnological membrane body 1, to enhance the work effect of staff Rate.
It can to sum up obtain, the utility model passes through setting round bar 2, vertical bar 7, check lock lever 9, spring 11 and the first sliding block 14, solution It has determined when the current compound geomembrane of common enhancing is not laid with and has been cylindrical in shape, needed staff to squat down on the ground when being laid with and move And the compound geomembrane of tubular is moved with hand push, the speed for being laid with compound geomembrane is slower, so as to cause compound geomembrane It is laid with the lower problem of efficiency.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (5)

1. a kind of compound earth work film device of enhancing, including geotechnological membrane body (1), it is characterised in that: geotechnique's membrane body (1) Inner wall connect with the surface activity of round bar (2), the left end of the round bar (2) and right end offer annular groove (3), the ring The inner wall of shape slot (3) offers circular groove (4), first sliding groove (5) and second sliding slot (6), the first sliding groove (5) and second respectively Sliding slot (6) is located at the front and back of circular groove (4), and the first sliding groove (5) is located at the front of second sliding slot (6), described The left end of geotechnological membrane body (1) and right end are flexibly connected with vertical bar (7) close to the side of geotechnological membrane body (1), the vertical bar (7) it is offered on the left of the first through slot (8), the inner wall of first through slot (8) is flexibly connected with the inner wall of annular groove (3), institute The inner wall for stating circular groove (4) is connect with the surface activity of check lock lever (9), and the inner wall of first through slot (8) offers card slot (10), The check lock lever (9) is plugged to the inside of card slot (10), and the check lock lever (9) is fixedly connected with bullet far from the one end of card slot (10) Spring (11), one end and circular groove (4) inner wall side far from check lock lever (9) of the spring (11) far from check lock lever (9) is fixed to be connected It connects, the side of circular groove (4) inner wall offers the second through slot (12), and the surface of the check lock lever (9) is fixedly connected with activity The surface of block (13), the movable block (13) is flexibly connected with the inner wall of the second through slot (12), the inner wall of first through slot (8) It has been respectively fixedly connected with the first sliding block (14) and the second sliding block (15), the surface and first sliding groove (5) of first sliding block (14) Inner wall be flexibly connected, the surface of second sliding block (15) is flexibly connected with the inner wall of second sliding slot (6), the vertical bar (7) Side far from geotechnique's membrane body (1) is fixedly connected with cross bar (16), and the cross bar (16) is located at the top of round bar (2), described The surface of cross bar (16) is fixedly attached rubber sleeve (17).
2. a kind of compound earth work film device of enhancing according to claim 1, it is characterised in that: the table of the round bar (2) Face fixing sleeve is connected to bearing (18), and the surface of the bearing (18) is flexibly connected with the inner wall of geotechnological membrane body (1).
3. a kind of compound earth work film device of enhancing according to claim 1, it is characterised in that: first through slot (8) In horn-like, the shape of the round bar (2) is adapted with the shape of the first through slot (8).
4. a kind of compound earth work film device of enhancing according to claim 1, it is characterised in that: second sliding block (15) A left side cut open that figure is triangular in shape, the shape of the second sliding slot (6) is adapted with the shape of the second sliding block (15).
5. a kind of compound earth work film device of enhancing according to claim 1, it is characterised in that: the check lock lever (9) is remote One end from spring (11) is hemispherical, and the shape of the card slot (10) is adapted with the shape of check lock lever (9).
CN201821893600.5U 2018-11-17 2018-11-17 A kind of compound earth work film device of enhancing Expired - Fee Related CN209429102U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821893600.5U CN209429102U (en) 2018-11-17 2018-11-17 A kind of compound earth work film device of enhancing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821893600.5U CN209429102U (en) 2018-11-17 2018-11-17 A kind of compound earth work film device of enhancing

Publications (1)

Publication Number Publication Date
CN209429102U true CN209429102U (en) 2019-09-24

Family

ID=67968847

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821893600.5U Expired - Fee Related CN209429102U (en) 2018-11-17 2018-11-17 A kind of compound earth work film device of enhancing

Country Status (1)

Country Link
CN (1) CN209429102U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116657627A (en) * 2023-06-25 2023-08-29 云南联迈土工材料制造有限公司 Ecological geogrid for slope protection and application method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116657627A (en) * 2023-06-25 2023-08-29 云南联迈土工材料制造有限公司 Ecological geogrid for slope protection and application method thereof
CN116657627B (en) * 2023-06-25 2023-12-05 云南联迈土工材料制造有限公司 Ecological geogrid for slope protection and application method thereof

Similar Documents

Publication Publication Date Title
CN110952629B (en) Pipeline for civil construction
CN209429102U (en) A kind of compound earth work film device of enhancing
CN109596386B (en) Surveying equipment and surveying method for geological survey
CN112834282B (en) Soil solution extractor for ecological environment detection
CN212589407U (en) Irrigation and water conservancy circulation irrigation and drainage device
CN209673419U (en) A kind of geotechnical engineering sampler
CN108150715A (en) A kind of locking seismatic method for pipeline suspension and support for facilitating combination
CN217620541U (en) Pipe fitting storage rack for civil engineering
CN207687642U (en) A kind of intelligent smog alarm being easily installed
CN202023211U (en) Sediment collection device
CN209594241U (en) A kind of garden landscape construction digging cave device
CN207092019U (en) A kind of agricultural irrigation ditch lining machine
CN207685891U (en) A kind of garden layout furrow making dveice
CN212742646U (en) Novel vertical ecological barrier seepage-proofing system
CN211447055U (en) Ditching device is used in gardens construction
CN207017397U (en) A kind of shockproof cement culvert pipe of resistance to compression
CN219733418U (en) Waterproof waterstop protection architecture in tunnel
CN205408479U (en) A ditching device for planting chinese yam
CN213869279U (en) A safety protection structure for water conservancy construction
CN210376352U (en) Portable variable slope runoff component survey device
CN216973301U (en) Leveling equipment for channel construction for hydraulic engineering
CN210822337U (en) Displacement mechanism of dust fall equipment for garden construction
CN216505037U (en) Pipe fitting rack for civil engineering
CN210031678U (en) Movable flood prevention wall diagonal brace
CN220394233U (en) Novel highway engineering template supports device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190924

Termination date: 20211117

CF01 Termination of patent right due to non-payment of annual fee