CN209416349U - A kind of tunnel-side suspension total station centralising device - Google Patents

A kind of tunnel-side suspension total station centralising device Download PDF

Info

Publication number
CN209416349U
CN209416349U CN201920441423.5U CN201920441423U CN209416349U CN 209416349 U CN209416349 U CN 209416349U CN 201920441423 U CN201920441423 U CN 201920441423U CN 209416349 U CN209416349 U CN 209416349U
Authority
CN
China
Prior art keywords
support frame
tunnel
bearing platform
total station
outline border
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920441423.5U
Other languages
Chinese (zh)
Inventor
张阿沛
张依然
李兆奎
王辉
李玉
姚远飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tunnel Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd
Original Assignee
Tunnel Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tunnel Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd filed Critical Tunnel Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd
Priority to CN201920441423.5U priority Critical patent/CN209416349U/en
Application granted granted Critical
Publication of CN209416349U publication Critical patent/CN209416349U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of tunnel-sides to hang total station centralising device, including bearing platform, the fixed frame separated including two with bearing platform and the support rod separated with bearing platform, the support frame that can fold extension is provided on the fixed frame, it is provided with connecting hole on support frame as described above and is used to be fixedly connected with bearing platform by connector, the location hole for connecting with support rod is provided in the supporting table, the other end of support rod is provided with for the connecting pin fixed with outside;The utility model structure is simple, and the fixation of original point type is changed to face formula using separate structure and is fixed, stress is reduced, increases stability;Secondly support frame is changed to tripod by the connection of existing single-point, and improves its structure, so that the tripod that is forced through of bearing platform is decomposed, increase stability.

Description

A kind of tunnel-side suspension total station centralising device
Technical field
The present invention relates to Tunnel Engineering fields, fill particularly with regard to the forced centering for being suspended on side wall total station in tunnel It sets.
Background technique
In major long tunnel construction, the correct perforation in tunnel is directly related with Tunnel inside conductor control measurement accuracy.It is existing There are optical centering mode or ground of the tunnel inside conductor control measurement generally using tripod in conjunction with accurate pedestal in technology strong Observation pier mode processed carries out.
Traditional optical centering measurement method needs to fix using tripod, and in construction environment, the levelness on ground It is unable to get and is accurately controlled, and because the use of the various construction instruments of construction site can destroy measurement environment, because This has biggish actual error for traditional optical centering, will have a direct impact on the piercing error of major long tunnel.There are also tradition Measurement method be to build pressure observation pier on ground, although the observed pattern can eliminate the total station error of centralization because It needs to build additional surface structures in tunnel, the destruction of construction environment can be directly resulted in, influence subsequent construction, especially Very big risk can be brought for the use of engineering machinery, therefore this method not can solve existing problem.
On traditional approach, there is technical staff to propose that fixed platform is arranged in tunnel-side to carry out the placement of total station (publication CN2017210083175), perfectly evade falling in this idea total station in existing work progress because of ring The drawbacks of border is brought.But so there is new problem in the program times, total station is fixed on the apparatus, because of the device and tunnel Fixed structure will lead to total station and occur jitter phenomenon in use, influence measurement accuracy.Therefore need to change the machine dress The fixed structure set solves fixation and the jitter problem of such device.
Summary of the invention
The object of the present invention is to provide a kind of knockdown running gears, realize in ditch body filling process, and length is controllable, It is easy to operate, simple and convenient is dismantled, construction efficiency is improved.
To achieve the goals above, the invention adopts the following technical scheme:
A kind of tunnel-side suspension total station centralising device, including bearing platform, the fixation separated including two with bearing platform Frame and the support rod separated with bearing platform, are provided with the support frame that can fold extension on the fixed frame, on support frame as described above It is provided with connecting hole and is used to be fixedly connected with bearing platform by connector, be provided in the supporting table for being connect with support rod Location hole, the other end of support rod is provided with for the connecting pin fixed with outside.
In the above-mentioned technical solutions, the fixed frame includes outline border and the support frame that is arranged in outline border, support frame as described above One end by rotary connector and cage connection, support frame can be rotated relative to shell, is provided on outline border for connecting Fixed through-hole.
In the above-mentioned technical solutions, the outline border is strip structure, has two states with support frame, when off working state Support frame is arranged in outline border, and when working condition, support frame is rotated by 90 ° by origin of rotary connector, is mutually kept with outline border Vertically.
In the above-mentioned technical solutions, it is provided with slideway in the outline border, sliding strut, the sliding branch are provided in slideway Bar one end is slided in slideway, and the other end for sliding strut is flexibly connected with support frame.
In the above-mentioned technical solutions, in working condition, sliding one end of strut with the enclosed construction of slideway inner end is Supporting point constitutes a tripod between sliding strut, support frame and outline border.
In the above-mentioned technical solutions, be provided with several connecting holes on support frame as described above, bearing platform by from different companies It connects hole connection and adjusts its relative position.
In the above-mentioned technical solutions, described two fixed frames are mutually independent, and described two fixed frames can the company of fixation It connects on different horizontal planes.
In the above-mentioned technical solutions, the connecting hole for fixation total powerstation is provided on the bearing platform.
In conclusion by adopting the above-described technical solution, the beneficial effects of the present invention are:
The present invention is mainly reflected in the stability for improving total station support compared with the prior art, by improving and fixing The fixation of original point type is changed to face formula and fixed, increase fixed-area, reduce stress, increases stability by the structure of junction;Its It is secondary that support frame is changed to tripod by the connection of existing single-point, and its structure is improved, so that bearing platform is forced through three feet Frame is decomposed, and stability is increased;Finally, entire fixed frame can be made to may be mounted at arbitrarily by the design of separate type Tunnel wall surface on, be not protected from environmental, can guarantee normal use, and the foldover design of separate type, can make entire Device is convenient for collecting after removal.
Detailed description of the invention
Examples of the present invention will be described by way of reference to the accompanying drawings, in which:
Fig. 1 is the operation schematic diagram of structure of the invention;
Fig. 2 is the structural schematic diagram of fixed frame;
Wherein: 1 is bearing platform, and 2 be support rod, and 3 be outline border, and 4 be support frame, and 5 be sliding strut, and 6 be slideway, and 7 be solid Determine hole, 8 be connecting hole.
Specific embodiment
All features disclosed in this specification or disclosed all methods or in the process the step of, in addition to mutually exclusive Feature and/or step other than, can combine in any way.
Any feature disclosed in this specification (including any accessory claim, abstract and attached drawing), except non-specifically chatting It states, can be replaced by other alternative features that are equivalent or have similar purpose.That is, unless specifically stated, each feature is only It is an example in a series of equivalent or similar characteristics.
As shown in Figure 1, the present embodiment is combined by three parts, it is a bearing platform, two fixed frames and a support respectively Bar, two of them fixed frame are separated from each other, and mutually independent, and two fixed frames can be fixed on tunnel by fixing screws The side wall in road.Fixed frame generally strip structure, it is convenient for collecting, it is provided with the support frame that can be folded, is set on support frame Several connecting holes are equipped with, for being fixedly connected with bearing platform.In order to guarantee the fixation of bearing platform, using the fixation side of tripod Formula, therefore it is arranged with an independent support rod in bearing platform, one end of support rod is stationary plane, for solid with tunnel-side Fixed, a location hole is arranged for connecting with supporting table, in the corresponding position of supporting table in the other end, and one end of support rod is inserted into Being fixedly connected for supporting table can be realized into location hole.
As shown in Fig. 2, being the structural schematic diagram of the fixed frame in the present embodiment, entire fixed frame includes an outline border and sets The support frame in outline border is set, wherein support frame is attached by rotating connector and outline border, and rotating connector can be axis It holds, is also possible to the connector of slide bolt etc;It certainly is the limitation needed by rotational angle during rotation.Entirely Support frame can only be 90 degree of maximum rotation, so that the supporting plane of support frame is parallel to the horizontal plane.In order to ensure 90 degree of maximum rotation, And stable effect is played for the support frame after rotation, a slideway is provided in outline border, one end of slideway is envelope Close structure.A sliding strut is provided in slideway, the one end for sliding strut is slided in slideway, and the other end is connected by hinge It is connected on support frame.When support frame drives one end of sliding strut to slide in slideway during rotation, when sliding strut When the end that end slides into slideway cannot be slided, a tripod is constituted between sliding strut, support frame and outline border.Tripod The stability that support frame is improved to the pressure of bearing platform can effectively be decomposed.
In Practical Project use process, since it is considered that the not all place of tunnel-side is all plane, therefore Two fixed frames are separately fixed on different places, stretch out after being opened by support frame.Several companies that support frame is arranged above Hole is connect, supporting table is by connecting different connecting holes, so that it may supporting table is fixed on the support frame, realize that fixed frame supports The effect of supporting table.And because sliding the support of strut, can make the stress point of support frame is being not between outline border Tie point, but entire tripod, therefore the stability of entire support frame is very high.And the support rod used is propped up as third Support point supports supporting table, can effectively support supporting table.Even if under tunnel construction environment, because small caused by construction Vibration, through this embodiment in tripod structure effectively can also evade falling, promote the use of total station, guarantee test Reliability and precision.
The structure of each component in the present embodiment is all made of separate structure, and can mutually fold, therefore Storage after use is very convenient, while being also divided into and facilitating secondary use, mounts and dismounts convenient and simple.
The invention is not limited to specific embodiments above-mentioned.The present invention, which expands to, any in the present specification to be disclosed New feature or any new combination, and disclose any new method or process the step of or any new combination.

Claims (8)

1. a kind of tunnel-side hangs total station centralising device, including bearing platform, it is characterised in that including two and bearing platform point From fixed frame and the support rod that is separated with bearing platform, be provided with the support frame that can fold extension on the fixed frame, it is described It is provided with connecting hole on support frame and is used to be fixedly connected with bearing platform by connector, is provided with and is used for and support rod in supporting table The location hole of connection, the other end of support rod are provided with for the connecting pin fixed with outside.
2. a kind of tunnel-side according to claim 1 hangs total station centralising device, it is characterised in that the fixed frame Including outline border and the support frame being arranged in outline border, one end of support frame as described above passes through rotary connector and cage connection, support Frame can be rotated relative to shell, and the through-hole for being connected and fixed is provided on outline border.
3. a kind of tunnel-side according to claim 2 hangs total station centralising device, it is characterised in that the outline border is Strip structure has two states with support frame, and support frame is arranged in outline border when off working state, when working condition, support Frame is rotated by 90 ° by origin of rotary connector, mutually keeps vertical with outline border.
4. a kind of tunnel-side according to claim 2 or 3 hangs total station centralising device, it is characterised in that the outline border It is inside provided with slideway, sliding strut is provided in slideway, described sliding strut one end is slided in slideway, slides the another of strut End is flexibly connected with support frame.
5. a kind of tunnel-side according to claim 4 hangs total station centralising device, it is characterised in that in working condition When, one end of strut is slided using the enclosed construction of slideway inner end as supporting point, is constituted between sliding strut, support frame and outline border One tripod.
6. a kind of tunnel-side according to claim 1 hangs total station centralising device, it is characterised in that support frame as described above On be provided with several connecting holes, bearing platform is by adjusting its relative position from different connecting hole connections.
7. a kind of tunnel-side according to claim 1 hangs total station centralising device, it is characterised in that described two solid Determine frame be it is mutually independent, described two fixed frames can be fixedly connected on different horizontal planes.
8. a kind of tunnel-side according to claim 1 hangs total station centralising device, it is characterised in that the bearing platform On be provided with connecting hole for fixation total powerstation.
CN201920441423.5U 2019-04-03 2019-04-03 A kind of tunnel-side suspension total station centralising device Active CN209416349U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920441423.5U CN209416349U (en) 2019-04-03 2019-04-03 A kind of tunnel-side suspension total station centralising device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920441423.5U CN209416349U (en) 2019-04-03 2019-04-03 A kind of tunnel-side suspension total station centralising device

Publications (1)

Publication Number Publication Date
CN209416349U true CN209416349U (en) 2019-09-20

Family

ID=67946066

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920441423.5U Active CN209416349U (en) 2019-04-03 2019-04-03 A kind of tunnel-side suspension total station centralising device

Country Status (1)

Country Link
CN (1) CN209416349U (en)

Similar Documents

Publication Publication Date Title
CN104614148B (en) A kind of mobile test device applied to relief model wind field characteristic wind tunnel test
CN205372002U (en) Support is used in survey and drawing convenient to remove
CN209416349U (en) A kind of tunnel-side suspension total station centralising device
CN113431991A (en) A mapping device for open-air survey engineering
CN206648658U (en) A kind of civil engineering tripod
CN207776869U (en) A kind of metro shield connecting bridge support step device
CN203908559U (en) Equipment for correcting round bubble of measuring centering rod
CN104501788B (en) Mobile collimation line bracket
CN106092013B (en) A kind of device and measurement method for measuring bridge pier column center
CN205642790U (en) Aircraft strutting arrangement
CN205280074U (en) Laser tracking appearance assembled triangular supports device
CN108867652A (en) A kind of excavation of foundation pit high speed monitor
CN210833560U (en) Surveying instrument positioning device suitable for field
CN209557967U (en) A kind of plotting board that stability is high
CN209894184U (en) Tunnel shaft construction measuring device
CN207332758U (en) A kind of boom device and drill jumbo
CN220868214U (en) Pile foundation construction auxiliary positioning device
CN212513035U (en) Foot stool limiting and reinforcing device
CN214200156U (en) Measuring device for mine surveying and mapping inspection and acceptance
CN207335685U (en) A kind of new fixing and balancing support of surveying and mapping survey stake pole
CN104776860A (en) Measurement centeringrod circular bubble correction equipment
CN215410931U (en) Many topography fixing device for surveying instrument
CN219712801U (en) Mapping support with high strength stability
CN216012192U (en) Ground stretches into fixed theodolite
CN206163110U (en) Drum rack

Legal Events

Date Code Title Description
GR01 Patent grant