CN209413414U - A kind of group of tower guiding device - Google Patents
A kind of group of tower guiding device Download PDFInfo
- Publication number
- CN209413414U CN209413414U CN201821761347.8U CN201821761347U CN209413414U CN 209413414 U CN209413414 U CN 209413414U CN 201821761347 U CN201821761347 U CN 201821761347U CN 209413414 U CN209413414 U CN 209413414U
- Authority
- CN
- China
- Prior art keywords
- plate
- hole
- installation
- bottom plate
- guide plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Suspension Of Electric Lines Or Cables (AREA)
Abstract
The utility model discloses a kind of group of tower guiding device, including installation chassis and guiding carrier;Guiding carrier includes the guide plate of vertical direction and the bottom plate of horizontal direction, and guide plate is perpendicularly fixed at the front end of bottom plate;Bottom plate is equipped with the mounted in pairs through-hole on multiple row vertical direction;Installation chassis includes the top plate of horizontal direction and the support plate of vertical direction, and top plate is equipped with two long round tube holes corresponding with installation through-hole;By passing through, the bolt of long round tube hole and installation through-hole is adjustable to be connected between top plate and bottom plate.Compared with prior art, the utility model has the following beneficial effects: structure is simple, installation chassis and guiding carrier are connected with using long round tube hole and the cooperation of the installation through-hole of multiple row, and the more specification adjustment of installation site of guiding carrier, the iron tower foundation sole size suitable for plurality of specifications may be implemented;Chassis is installed and is equipped with multiple rows of rectangular through-hole, it may be convenient to be bundled on iron tower foundation using strapping, be able to satisfy the steel tower diameter of different-diameter.
Description
Technical field
The utility model relates to group tower installation ancillary technique field more particularly to an a kind of group of tower guiding devices.
Background technique
Group vertical line steel tower when, in order to improve working efficiency, make tower material quick and precisely in place, existing Normal practice be
Guide post is arranged in middle part on iron tower foundation, and tower material is in place along guide post guiding, but since tower material is long, guide post compared with
Short, when erection tower material is installed along guide post, guide post is easy the power lateral by tower material, and guidance is caused to have some setbacks, and therefore, needs
A kind of guiding device is wanted to carry out external auxiliary guiding to tower material.
Summary of the invention
The purpose of this utility model be to provide for it is a kind of it is at low cost, the processing is simple, the accurate quickly group tower of guiding guides
Device.
In order to achieve the above objectives, the utility model is implemented according to following technical scheme: a kind of group of tower guiding device,
Including installation chassis and guiding carrier;The guiding carrier includes the guide plate of vertical direction and the bottom plate of horizontal direction, the guiding
Plate is perpendicularly fixed at the front end of bottom plate;The bottom plate is equipped with the mounted in pairs through-hole on multiple row vertical direction;The installation bottom
Frame includes the top plate of horizontal direction and the support plate of vertical direction, and top plate is fixedly connected with L-shaped, top plate and support with support plate
The two sides of plate pass through a triangular side panels respectively and are fixedly connected;It is respectively equipped on two triangular side panels close to support plate side
The opposite rectangular through-hole of several rows;The top plate is equipped with two long round tube holes corresponding with installation through-hole;The top plate and
By passing through, the bolt of long round tube hole and installation through-hole is adjustable to be connected between bottom plate.
Preferably, guide plate top is an inclined surface, and angle is obtuse angle between inclined surface and guide plate vertical plane.
Preferably, guide plate two side ends are respectively equipped with handle.
Preferably, guide plate and back plate connections are equipped with deep floor.
Compared with prior art, the utility model has the following beneficial effects: structure is simple, chassis and guiding carrier are installed using length
Round tube hole and the cooperation of the installation through-hole of multiple row are connected with, and the more specification adjustment of installation site of guiding carrier may be implemented, be applicable in
In the iron tower foundation sole size of plurality of specifications;Chassis is installed and is equipped with multiple rows of rectangular through-hole, it may be convenient to utilize strapping
It is bundled on iron tower foundation, is able to satisfy the steel tower diameter of different-diameter.
Detailed description of the invention
Fig. 1 is the guiding carrier structural schematic diagram of the utility model.
Fig. 2 is the installation Undercarriage structure schematic diagram of the utility model.
Fig. 3 is the guide device structure signal and usage state diagram of the utility model.
Specific embodiment
The utility model will be further described below with reference to the accompanying drawings and specific embodiments, in the signal of this utility model
Property embodiment and explanation be used to explain the utility model, but be not intended to limit the scope of the present invention.
Such as Fig. 1 a kind of group of tower guiding device shown in Fig. 2, including installation chassis 1 and guiding carrier 2;The guiding carrier 2 wraps
The guide plate 201 of vertical direction and the bottom plate 202 of horizontal direction are included, before the guide plate 201 is perpendicularly fixed at bottom plate 202
End;The bottom plate 202 is equipped with the mounted in pairs through-hole 203 on multiple row vertical direction;The installation chassis 1 includes horizontal direction
Top plate 101 and vertical direction support plate 102, top plate 101 be fixedly connected with support plate 102 it is L-shaped, top plate 101 and branch
The two sides of fagging 102 pass through a triangular side panels 103 respectively and are fixedly connected;Close to support on two triangular side panels 103
102 side of plate is respectively equipped with the opposite rectangular through-hole 104 of several rows;The top plate 101 is equipped with corresponding with installation through-hole two
A long round tube hole 105;Pass through the bolt across long round tube hole 105 and installation through-hole 203 between the top plate 101 and bottom plate 202
Adjustable connection.
More convenient in order to be oriented to, 201 top of guide plate is an inclined surface, angle between inclined surface and guide plate vertical plane
For obtuse angle, which is convenient for the tower material sling to enter in guiding device.
For the ease of carrying and installing and using, 201 two side ends of guide plate are respectively equipped with handle 205.
In order to increase the effect of guiding carrier lateral force resistance, guide plate 201 and 202 junction of bottom plate are equipped with deep floor 204.
As shown in figure 3, multiple installation chassis 1 are bundled on iron tower foundation 4 by strapping 3, root in actual use
According to the diameter of tower material, adjusts guiding carrier 2 and the relative position of chassis 1 is installed, after position is adjusted, bolt passes sequentially through guiding carrier
The long round tube hole 105 on installation through-hole 203 and installation chassis 1 on 2 fixes the two.
The limitation that the technical solution of the utility model is not limited to the above specific embodiments, all skills according to the present utility model
The technology deformation that art scheme is made, each falls within the protection scope of the utility model.
Claims (4)
1. a kind of group of tower guiding device, it is characterised in that: including installation chassis and guiding carrier;The guiding carrier includes vertical side
To guide plate and horizontal direction bottom plate, the guide plate is perpendicularly fixed at the front end of bottom plate;The bottom plate is equipped with multiple row
Mounted in pairs through-hole on vertical direction;The installation chassis includes the top plate of horizontal direction and the support plate of vertical direction, top
Plate is fixedly connected L-shaped with support plate, and top plate passes through a triangular side panels with the two sides of support plate respectively and is fixedly connected;
The opposite rectangular through-hole of several rows is respectively equipped on two triangular side panels close to support plate side;The top plate is equipped with and peace
Fill the corresponding two long round tube holes of through-hole;It can by passing through the bolt of long round tube hole and installation through-hole between the top plate and bottom plate
Adjust connection.
2. according to claim 1 group of tower guiding device, it is characterised in that: the guide plate top is an inclined surface,
Angle is obtuse angle between inclined surface and guide plate vertical plane.
3. according to claim 1 group of tower guiding device, it is characterised in that: the guide plate two side ends, which are respectively equipped with, to be mentioned
Hand.
4. according to claim 1 group of tower guiding device, it is characterised in that: the guide plate and back plate connections are equipped with
Deep floor.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821761347.8U CN209413414U (en) | 2018-10-29 | 2018-10-29 | A kind of group of tower guiding device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821761347.8U CN209413414U (en) | 2018-10-29 | 2018-10-29 | A kind of group of tower guiding device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209413414U true CN209413414U (en) | 2019-09-20 |
Family
ID=67932124
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821761347.8U Active CN209413414U (en) | 2018-10-29 | 2018-10-29 | A kind of group of tower guiding device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209413414U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113668936A (en) * | 2021-08-25 | 2021-11-19 | 国网四川电力送变电建设有限公司 | Auxiliary assembly for erecting and hoisting iron tower |
-
2018
- 2018-10-29 CN CN201821761347.8U patent/CN209413414U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113668936A (en) * | 2021-08-25 | 2021-11-19 | 国网四川电力送变电建设有限公司 | Auxiliary assembly for erecting and hoisting iron tower |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209413414U (en) | A kind of group of tower guiding device | |
CN104690548B (en) | Aligning device for drawn steel wire of turbine partition plate | |
CN202599801U (en) | Test support for checking welding tension of crystalline silicon battery | |
CN202992383U (en) | Oil pipe support, oil pipe installation structure and vehicle | |
CN217539856U (en) | Pipeline connecting device for hydraulic engineering | |
CN215054033U (en) | Steel structure net rack beam column for steel structure factory building | |
CN206466801U (en) | A kind of lift cable unreeling rack | |
CN205226638U (en) | A adjustable bracket for pipe laying | |
CN104005410A (en) | Tensioning and anchoring device based on unbonded prestress reinforced soil technology | |
CN210563705U (en) | Suspended upright post installation auxiliary device | |
CN103601033A (en) | Bundling wire square forming device | |
CN207896912U (en) | A kind of photovoltaic panel Fast Installation pole holder | |
CN106505476B (en) | A kind of dedicated stringing vehicle of distribution line | |
CN206873451U (en) | A kind of sheet pile construction leading truck | |
CN208996021U (en) | A kind of building enclosure of groove Larsen steel sheet pile | |
CN208241219U (en) | A kind of photovoltaic power generation cable clamp device | |
CN113315049A (en) | Secondary cable lays and uses support | |
CN206164458U (en) | Novel biax photovoltaic tracking system | |
CN106760566B (en) | Construction method of height-variable feeding and discharging platform | |
CN106290955B (en) | Wind measuring tower instrument conveying, loading and unloading device and using method | |
CN215833118U (en) | Line wire rod load detection device | |
CN216699890U (en) | Counter weight device of photovoltaic board headwind load | |
CN201688031U (en) | Combination cable bracket | |
CN211441938U (en) | Vehicle and power battery installing support thereof | |
CN108551328A (en) | Photovoltaic module hot spot test equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |