CN209413407U - A kind of rail mounted steel tower translation track laying device - Google Patents
A kind of rail mounted steel tower translation track laying device Download PDFInfo
- Publication number
- CN209413407U CN209413407U CN201822129095.3U CN201822129095U CN209413407U CN 209413407 U CN209413407 U CN 209413407U CN 201822129095 U CN201822129095 U CN 201822129095U CN 209413407 U CN209413407 U CN 209413407U
- Authority
- CN
- China
- Prior art keywords
- rail
- sleeper
- laying
- running gear
- laid
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Machines For Laying And Maintaining Railways (AREA)
Abstract
The utility model discloses a kind of rail mounted steel tower translation track laying devices, running gear including prefabricated guide rail and with guide rail cooperation, first driving device drives running gear to walk along prefabricated guide rail, running gear is laterally provided with laying apparatus along prefabricated guide rail, laying apparatus includes that rubble is laid with mechanism and sleeper laying mechanism, rubble is laid with the front end that sleeper laying apparatus is arranged in mechanism, running gear is provided with controller, controller can be remote control apparatus, it is controlled by wireless module technology, the controller and first driving device, first control valve and the coupling of the second driving device, spacing transfers sleeper to the second driving device of controller at equal intervals, in the side of running gear, setting rubble is laid with mechanism and sleeper laying mechanism, it realizes while being laid with ground buffer layer and sleeper, to speed up the work, and it realizes Sleeper automation is laid with, to improve the flatness of buffer layer laying and the accuracy of sleeper laying spacing.
Description
Technical field
The utility model relates to a kind of engineering construction apparatus field, more particularly to a kind of rail mounted steel tower translation
With track laying device.
Background technique
For tower is found under engineering line, innovation proposes a kind of " rail mounted " steel tower translation arrangement and method for construction, and power off time is by original
That comes is reduced to 2 hours for 2 days, solves the problems, such as that construction power failure is difficult under line, with good economic efficiency and social benefit.
Tower is found under its middle line it needs to be determined that temporarily translating tower site, is flattened, is tamped interim tower site and interim tower position and 2#
Channel between tower tower position, lays railway sleepers and rail, on Lai Yidong steel tower to immobilizing foundation.So wherein track laying engineering is
Steel tower translation basis, track lay a railway track engineering be civil engineering and equipment installation project in track construction connecting points, influence to spread
The key of rail construction is construction equipment of laying a railway track.There is the temporary project for taking a long time, and being laid in existing track laying engineering
It is more coarse, cannot accurately carry out laying track, the track smoothness for translating steel tower is not high, cause below steel tower flat
Shaking is easy to happen when shifting.
Utility model content
In view of the deficienciess of the prior art, the purpose of this utility model is to provide a kind of rail mounted steel tower translation rails
Road laying apparatus realizes the laying track of fast accurate.
A kind of rail mounted steel tower translation track laying device is filled including prefabricated guide rail and with the walking of guide rail cooperation
It sets, the running gear is provided with first driving device, which drives running gear to walk along prefabricated guide rail, institute
It states running gear and is laterally provided with laying apparatus along prefabricated guide rail, the laying apparatus includes that rubble is laid with mechanism and sleeper laying
Mechanism, the rubble are laid with the front end that sleeper laying apparatus is arranged in mechanism, and it includes the first storage cavity that the rubble, which is laid with mechanism,
The first storage cavity lower end is provided with along track width direction is laid in long and narrow the first feed opening of bar shaped, which is arranged
There is the first control valve, the sleeper laying mechanism includes the second storage cavity and blanking component, and the blanking component is provided with
Second driving device, second driving device drive blanking component steadily to transfer the sleeper in the second storage cavity to laying rubble
Default channel on, the running gear is provided with controller, the controller and first driving device, the first control valve and the
The coupling of two driving devices, spacing transfers sleeper to second driving device of controller at equal intervals.
The prefabricated guide rail includes two rail disposed in parallel, two bar steels as a further improvement of the utility model,
Rail is provided directly with several parallel connecting rods, and the section of the rail is in " I " fonts, which is provided with two
Guide groove, the running gear include two groups of driving wheel groups being placed equidistant with two rail, if the driving wheel group includes
Dry driving wheel, the driving wheel include the first idler wheel and the second idler wheel, and the connection of connection the first idler wheel and the second idler wheel
Frame, the connection frame are provided with the first connecting pin connecting with running gear and connect respectively with the first idler wheel and the second idler wheel
The second connection end connect and third connecting pin, the connection frame include a transverse slat and are connected to transverse slat two sides extend downwardly two
Block riser, first connecting pin, which is arranged, is separately positioned on riser in transverse slat upper end, the second connection end and third connecting pin
On, first idler wheel and the second idler wheel clamp rail side, and the first idler wheel and the second idler wheel roll in guide groove.
Ball is arranged in the contact surface of the transverse slat and rail as a further improvement of the utility model,.
The lower end front end of the first storage cavity is arranged in first feed opening as a further improvement of the utility model,
Position, first storage cavity are provided with the blanking guide groove of arc-shaped plate in the first feed opening position, which cuts open
Face is strip.
It further includes having pressure roller and under dynamic pressure roller that the rubble, which is laid with mechanism, as a further improvement of the utility model,
The third driving device of pressure, the third driving device and controller couple, and the pressure roller is arranged in blanking guide groove and blanking group
Between part, the pressure roller for depressing and calm down blanking guide groove laying rubble.
Second storage cavity is provided with several layers storage rack as a further improvement of the utility model, the storage rack
Sleeper is placed for tiling to arrange, storage rack described in several layers is provided with conveyer belt, and the conveyer belt of the adjacent number of plies is reversely transported
Dynamic, the storage rack is provided with the second feed opening in the end of its conveyer belt direction of transfer, and sleeper is transferred by the second feed opening
To the conveyer belt of lower layer's storage rack, the transmission speed of the conveyer belt of several layers from top to bottom slows down gradually, undermost
In the second storage cavity close to the first storage cavity side, the blanking component is arranged most for the second feed opening setting of the storage rack
The transmission end of the storage rack conveyer belt of lower layer.
As a further improvement of the utility model, the blanking device include the first slip base, the second slip base and
Part is shoveled, second driving device includes the first driving motor and the second driving motor, and first slip base is fixed at
In the outside wall surface of running gear moving direction, second slip base is slidably connected second storage cavity with the first slip base, edge
It being slid in the vertical direction of ground, the shovel part is slidably connected with the second slip base, slides along ground level direction, and described
One driving motor is fixedly mounted on the second storing cavity outer wall, which drives the second slip base to move up and down, described
Second driving motor is fixed on the second slip base, which drives shovel part horizontal movement, and described first drives
Dynamic motor and the second driving motor and controller couple, and controller controls the first driving motor and the second driving motor interval is transported
Row.
The utility model has the following beneficial effects: by providing prefabricated guide rail, due to track laying device total quality compared with
Gently, lower to the rigidity requirement of prefabricated guide rail, but it is more demanding to its precision, it can be produced and be easy by factory normalization
The prefabricated guide rail of transport, prefabricated guide rail can select the guide rail of pin-connected panel, and in track laying, prefabricated guide rail is set as and needs
The track to be laid with is parallel to each other, and when engineering carries out, is laid with ground and sleeper along prefabricated guide rail by running gear, is walking
The side setting rubble of device is laid with mechanism and sleeper laying mechanism, ground buffer layer and sleeper is realized while being laid with, to accelerate
Project progress, and realize sleeper automation be laid with, with improve buffer layer laying flatness and sleeper laying spacing it is accurate
Degree.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is that the rubble of the utility model is laid with mechanism and sleeper laying mechanism structural schematic diagram;
Fig. 3 is the mounting structure schematic diagram of the utility model prefabricated guide rail and roll wheel assembly.
1, running gear;2, first driving device;3, rubble is laid with mechanism;4, sleeper laying mechanism;5, the first storage cavity;
6, the first feed opening;7, the first control valve;8, the second storage cavity;9, blanking component;10, the second driving device;11, controller;
12, rail;13, guide groove;14, driving wheel;15, transverse slat;16, riser;17, ball;18, blanking guide groove;19, pressure roller;20,
Three driving devices;21, storage rack;22, conveyer belt;23, the second feed opening;24, the first slip base;25, the second slip base;26,
Shovel part.
Specific embodiment
Below in conjunction with attached drawing, the above and other technical features and advantages of the present invention are carried out clearly and completely
Description, it is clear that described embodiment is only the section Example of the utility model, rather than whole embodiments.
Referring to Fig.1 shown in -3, a kind of rail mounted steel tower translation track laying device disclosed in the present embodiment, including it is prefabricated
Guide rail and the running gear 1 cooperated with guide rail, the running gear 1 are provided with first driving device 2, the first driving device
2 drive running gear 1 to walk along prefabricated guide rail, and the running gear 1 is laterally provided with laying apparatus, the paving along prefabricated guide rail
If device includes that rubble is laid with mechanism 3 and sleeper laying mechanism 4, the rubble is laid with mechanism 3 and sleeper laying apparatus is arranged in
Front end, it includes the first storage cavity 5 that the rubble, which is laid with mechanism 3, which is provided with along laying track width side
To in long and narrow the first feed opening of bar shaped 6, which is provided with the first control valve 7, and the sleeper laying mechanism 4 includes
There are the second storage cavity 8 and blanking component 9, the blanking component 9 is provided with the second driving device 10, second driving device 10
Blanking component 9 is driven steadily to transfer the sleeper in the second storage cavity 8 to the default channel of laying rubble, the running gear
1 is provided with controller 11, and controller 11 can be remote control apparatus, is controlled by wireless module technology, the controller
11 couple with first driving device 2, the first control valve 7 and the second driving device 10,11 second driving device of controller
10 at equal intervals spacing transfer sleeper.
By providing prefabricated guide rail, since the total quality of track laying device is lighter, to the rigidity requirement of prefabricated guide rail
It is lower, but it is more demanding to its precision, the prefabricated guide rail for being easy transport, pre- guidance can be produced by factory normalization
Rail can select the guide rail of pin-connected panel, and in track laying, prefabricated guide rail is set as being parallel to each other with the track being laid with is needed,
When engineering carries out, ground and sleeper are laid with along prefabricated guide rail by running gear 1, setting rubble is spread in the side of running gear 1
If mechanism 3 and sleeper laying mechanism 4, realizes while being laid with ground buffer layer and sleeper, to speed up the work, and realize sleeper
Automation is laid with, to improve the flatness of buffer layer laying and the accuracy of sleeper laying spacing.
As a kind of improved specific embodiment, the prefabricated guide rail include two rail 12 disposed in parallel, two
Rail 12 is provided directly with several parallel connecting rods, and the section of the rail 12 is in " I " fonts, which sets
Two guide grooves 13 are equipped with, the running gear 1 includes 14 groups of two groups of driving wheels be placed equidistant with two rail 12, described
14 groups of driving wheel include several driving wheels 14, and the driving wheel 14 includes the first idler wheel and the second idler wheel, and connection first
The connection frame of idler wheel and the second idler wheel, the connection frame be provided with the first connecting pin being connect with running gear 1 and respectively with
The second connection end and third connecting pin of first idler wheel and the connection of the second idler wheel, the connection frame include a transverse slat 15 and connection
In two pieces of risers 16 that 15 two sides of transverse slat extend downwardly, the first connecting pin setting is in 15 upper end of transverse slat, second connection
End and third connecting pin are separately positioned on riser 16, and first idler wheel and the second idler wheel connect with two rotations of riser 16 respectively
It connects, first idler wheel and the second idler wheel clamp 12 side of rail, and the first idler wheel and the second idler wheel roll in guide groove 13
It is dynamic, due to the laterally disposed laying apparatus of running gear 1, preferably balance can be arranged by the other side in running gear 1
Device, which is used to load and the filler of laying apparatus equal quality, by by 14 groups of driving wheel of running gear 1
It is set as clamping with rail 12, so that running gear 1 is relatively steady in moving process, first driving device 2 is preferably twisted
Grinding machine, by being twisted 1 uniform motion of machine travel running gear, as the further improvement of this programme, by running gear 1
Deceleration mechanism is arranged in lower end surface, at the uniform velocity slides to control walking mechanism, the preferred prefabricated guide rail described in deceleration mechanism
Two 12 both ends of rail are extended in the inclined upward slope section in both ends and lower slope section, and when installing running gear 1, idler wheel passes through upper
Slope section enters in guide groove 13, and idler wheel is drawn off from guide groove 13 by lower slope section.
As a kind of improved specific embodiment, ball 17 is arranged in the contact surface of the transverse slat 15 and rail 12, to subtract
Frictional force between small running gear 1 and rail 12.
As a kind of improved specific embodiment, the lower end front end of the first storage cavity 5 is arranged in first feed opening 6
Position, first storage cavity 5 are provided with the blanking guide groove 18 of arc-shaped plate, the blanking guide groove in 6 position of the first feed opening
18 horizontal profiles are strip, which covers the width in track laying face, by setting blanking guide groove 18 to
Arc, preferred blanking guide groove 18 are to play to the curved arc of 1 direction of travel of running gear when blanking guide groove 18 is in blanking
Slow down blowing effect.
As a kind of improved specific embodiment, it further includes having pressure roller 19 and with dynamic pressure that the rubble, which is laid with mechanism 3,
The third driving device 20 that roller 19 pushes, third driving device 20 are linear motor, the third driving device 20 and controller
11 couplings, controller 11 control third driving device 20 when running gear 1 is mobile, and when rubble laying apparatus blanking, under
Press pressure roller 19, when running gear 1 is walked, rubble is laid with uniformly by pressure roller 19, the pressure roller 19 setting blanking guide groove 18 with
Between blanking component 9, the pressure roller 19 for depressing and calm down blanking guide groove 18 laying rubble so that crushed rock base course more consolidation
It is smooth.
As a kind of improved specific embodiment, second storage cavity 8 is provided with several layers storage rack 21, the storing
Frame places sleeper for arrangement of tiling, and storage rack 21 described in several layers is provided with conveyer belt 22, the conveyer belt of the adjacent number of plies
22 counter motions, the storage rack 21 are provided with the second feed opening 23 in the end of its 22 direction of transfer of conveyer belt, and sleeper passes through
The decentralization of second feed opening 23 on the conveyer belt 22 of lower layer's storage rack, the transmission speed of the conveyer belt 22 of several layers by up to
Under slow down gradually, the second feed opening 23 of the undermost storage rack 21 is arranged in the second storage cavity 8 close to the first storage cavity 5
The transmission end of undermost 21 conveyer belt 22 of storage rack is arranged in side, the blanking component 9, by the way that Multilayered storage rack is arranged
21, and heterodromous conveyer belt 22 is set in multilayer magazine, sleeper is sequentially transferred, sleeper is sequentially transmitted down
Material mouth.
As a kind of improved specific embodiment, the blanking device includes the first slip base 24, the second slip base 25
And shovel part 26, second driving device 10 include the first driving motor and the second driving motor, first slip base 24
The second storage cavity 8 is fixed in the outside wall surface of 1 moving direction of running gear, second slip base 25 and the first slip base
24 are slidably connected, and slide in the vertical direction of ground, and the shovel part 26 is slidably connected with the second slip base 25, along the surface water
Square sliding upwards, first driving motor is fixedly mounted on 8 outer wall of the second storage cavity, which drives second
Slip base 25 moves up and down, and second driving motor is fixed on the second slip base 25, which drives
It shovels 26 horizontal movement of part, first driving motor and the second driving motor and controller 11 couples, the control of controller 11 first
Driving motor and the second driving motor interval are run.
When in use, the second slip base 25 of the first driving motor drive will shovel the storage rack 21 of 26 Move To Bottom of part
Second feed opening, 23 horizontal position drives shovel part 26 to the intracavitary movement of the second material stock, shovel part 26 is inserted by the second driving motor
Enter below sleeper, the second driving motor drives shovel part 26 to transfer sleeper to the second material stock chamber outer end, then the first driving motor
Shovel part 26 is driven to transfer sleeper, sleeper is stably placed on crushed rock base course, and controller 11 controls the first driving motor and second and drives
Dynamic motor takes turns doing above-mentioned movement, and will at the uniform velocity carry out, and sleeper is accurately spaced at equal intervals on crushed rock base course.
Above specific embodiment has carried out further the purpose of this utility model, technical scheme and beneficial effects
It is described in detail, it should be understood that the above are only specific embodiments of the present invention, is not used to limit the utility model
Protection scope.It particularly points out, to those skilled in the art, within the spirit and principle of the utility model, is done
Any modification, equivalent substitution, improvement and etc., should be included within the scope of protection of this utility model.
Claims (7)
1. a kind of rail mounted steel tower translation track laying device, which is characterized in that cooperate including prefabricated guide rail and with guide rail
Running gear (1), the running gear (1) is provided with first driving device (2), which drives walking
Device (1) is walked along prefabricated guide rail, and the running gear (1) is laterally provided with laying apparatus, the laying dress along prefabricated guide rail
It sets and is laid with mechanism (3) and sleeper laying mechanism (4) including rubble, the rubble is laid with mechanism (3) and is arranged in sleeper laying apparatus
Front end, it includes the first storage cavity (5) that the rubble, which is laid with mechanism (3), which is provided with along laid rail
Road width direction is in long and narrow the first feed opening of bar shaped (6), which is provided with the first control valve (7), the sleeper
Being laid with mechanism (4) includes the second storage cavity (8) and blanking component (9), and the blanking component (9) is provided with the second driving dress
(10) are set, which drives blanking component (9) steadily to transfer the sleeper in the second storage cavity (8) to laying
On the default channel of rubble, the running gear (1) is provided with controller (11), the controller (11) and first driving device
(2), the first control valve (7) and the second driving device (10) couple, between described (11) second driving device (10) of controller etc.
Compartment is away from decentralization sleeper.
2. a kind of rail mounted steel tower translation track laying device according to claim 1, it is characterised in that: described prefabricated
Guide rail includes two rail (12) disposed in parallel, and two rail (12) are provided directly with several parallel connecting rods, described
The section of rail (12) is in " I " fonts, which is provided with two guide grooves (13), running gear (1) packet
Two groups of driving wheel (14) groups being placed equidistant with two rail (12) are included, driving wheel (14) group includes several driving wheels
(14), the driving wheel (14) includes the first idler wheel and the second idler wheel, and connects the connection frame of the first idler wheel and the second idler wheel,
The connection frame is provided with the first connecting pin connecting with running gear (1) and connects respectively with the first idler wheel and the second idler wheel
The second connection end connect and third connecting pin, the connection frame includes a transverse slat (15) and to be connected to transverse slat (15) two sides downward
The two pieces of risers (16) extended, first connecting pin are arranged in transverse slat (15) upper end, and the second connection end is connected with third
End is separately positioned on riser (16), and first idler wheel and the second idler wheel clamp rail (12) side, and the first idler wheel and
Second idler wheel rolls in guide groove (13).
3. a kind of rail mounted steel tower translation track laying device according to claim 2, it is characterised in that: the transverse slat
(15) ball (17) are set with the contact surface of rail (12).
4. a kind of rail mounted steel tower translation track laying device according to claim 1, it is characterised in that: described first
Feed opening (6) is arranged at the lower end front end position of the first storage cavity (5), and first storage cavity (5) is in the first feed opening (6) position
The blanking guide groove (18) for being equipped with arc-shaped plate is installed, which is strip.
5. a kind of rail mounted steel tower translation track laying device according to claim 1, it is characterised in that: the rubble
Being laid with mechanism (3) further includes the third driving device (20) for having pressure roller (19) and pushing with dynamic pressure roller (19), and the third is driven
Dynamic device (20) and controller (11) couple, and the pressure roller (19) is arranged between blanking guide groove (18) and blanking component (9), should
Pressure roller (19) for depressing and calm down blanking guide groove (18) laying rubble.
6. a kind of rail mounted steel tower translation track laying device according to claim 1, it is characterised in that: described second
Storage cavity (8) is provided with several layers storage rack (21), which places sleeper, storage rack described in several layers for arrangement of tiling
(21) it is provided with conveyer belt (22), conveyer belt (22) counter motion of the adjacent number of plies, the storage rack (21) is in its transmission
The end of band (22) direction of transfer is provided with the second feed opening (23), and sleeper is transferred by the second feed opening (23) to lower layer's storing
On the conveyer belt (22) of frame, the transmission speed of the conveyer belt (22) of several layers from top to bottom slows down gradually, undermost institute
The second feed opening (23) setting of storage rack (21) is stated in the second storage cavity (8) close first storage cavity (5) side, the blanking
Component (9) is arranged in the transmission end of undermost storage rack (21) conveyer belt (22).
7. a kind of rail mounted steel tower translation track laying device according to claim 1, it is characterised in that: the blanking
Component includes the first slip base (24), the second slip base (25) and shovel part (26), and second driving device (10) includes the
One driving motor and the second driving motor, first slip base (24) are fixed at the second storage cavity (8) in running gear
(1) outside wall surface of moving direction, second slip base (25) is slidably connected with the first slip base (24), along ground Vertical Square
Sliding, the shovel part (26) are slidably connected with the second slip base (25), slide along ground level direction, described first upwards
Driving motor is fixedly mounted on the second storage cavity (8) outer wall, which drives the second slip base (25) to move up and down,
Second driving motor is fixed on the second slip base (25), which drives the horizontal fortune of shovel part (26)
Dynamic, first driving motor and the second driving motor and controller (11) couple, and controller (11) controls the first driving motor
It is run with the second driving motor interval.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822129095.3U CN209413407U (en) | 2018-12-18 | 2018-12-18 | A kind of rail mounted steel tower translation track laying device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822129095.3U CN209413407U (en) | 2018-12-18 | 2018-12-18 | A kind of rail mounted steel tower translation track laying device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209413407U true CN209413407U (en) | 2019-09-20 |
Family
ID=67938836
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201822129095.3U Active CN209413407U (en) | 2018-12-18 | 2018-12-18 | A kind of rail mounted steel tower translation track laying device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209413407U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109458033A (en) * | 2018-12-18 | 2019-03-12 | 温州电力设计有限公司 | A kind of rail mounted steel tower translation track laying device |
-
2018
- 2018-12-18 CN CN201822129095.3U patent/CN209413407U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109458033A (en) * | 2018-12-18 | 2019-03-12 | 温州电力设计有限公司 | A kind of rail mounted steel tower translation track laying device |
CN109458033B (en) * | 2018-12-18 | 2024-02-20 | 温州电力设计有限公司 | Rail laying device for rail type iron tower translation |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204002794U (en) | The adjustable comprehensive chassis of a kind of rail formula tunnel cross-section | |
CN202658578U (en) | Channel inverted filter material paving and leveling device | |
CN203726612U (en) | Walking type material distribution machine | |
CN209413407U (en) | A kind of rail mounted steel tower translation track laying device | |
CN102501312B (en) | Template feeding device used for glass magnesium board production line | |
CN110894049A (en) | Intelligence section of track spreading machine | |
CN109458033A (en) | A kind of rail mounted steel tower translation track laying device | |
CN109930440B (en) | Local adjacent line track laying equipment and local adjacent line track laying construction method | |
CN103147437A (en) | Section steel soil cement mixing pile with longitudinal displacement mechanism | |
CN202271436U (en) | Template installing device for glass magnesium board production line | |
CN105544407A (en) | Multifunctional integrated machine for secondary concrete paving and plastering of elevated bridge box beam | |
CN108842537A (en) | Railroad tie is laid with vehicle | |
CN203702187U (en) | Tunnel waterproof plate laying trolley | |
CN107653756A (en) | A kind of city rail U-type groove plate-type ballastless railway roadbed track plates supporting adjuster and its application method | |
CN209195253U (en) | A kind of drilling jumbo being suitble to both wired operation | |
CN211202009U (en) | Automatic laying device for waterproof material in tunnel construction | |
CN113981753A (en) | Maintenance and installation robot for rails | |
CN207273490U (en) | The die station runtime of assembled architecture wallboard | |
CN100448636C (en) | Unfired brick conveyor | |
CN213232986U (en) | Cross-regional seamless turnout laying construction device | |
CN206859012U (en) | A kind of polyurethane pavement construction distance type tamping unit | |
CN217174406U (en) | Steel box girder sliding device | |
CN217527774U (en) | Manual sand making and separating guide device | |
CN210820139U (en) | Fabric machine | |
CN108842539A (en) | A kind of railroad tie laying apparatus |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |