CN209411647U - A kind of hanger that underground piping is temporarily relocated - Google Patents

A kind of hanger that underground piping is temporarily relocated Download PDF

Info

Publication number
CN209411647U
CN209411647U CN201920168421.3U CN201920168421U CN209411647U CN 209411647 U CN209411647 U CN 209411647U CN 201920168421 U CN201920168421 U CN 201920168421U CN 209411647 U CN209411647 U CN 209411647U
Authority
CN
China
Prior art keywords
sunpender
fixed
plate
lifting rope
screw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920168421.3U
Other languages
Chinese (zh)
Inventor
玄甜甜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201920168421.3U priority Critical patent/CN209411647U/en
Application granted granted Critical
Publication of CN209411647U publication Critical patent/CN209411647U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of hangers that underground piping is temporarily relocated, including staking out, pedestal, sunpender, lifting rope, staking out part is filled in underground, staking out material is cement mixed mud, staking out itself provides gravity, for the counterweight to the present apparatus, staking out side is fixed to inlay connection pedestal and is connected by standing screw, pedestal top side is fixedly installed sunpender, sunpender side is equipped with lifting rope, lifting rope is used to move the pipeline changed to needs and be fixed, lifting rope one end is connected with motion bar, motion bar one end is connected with sliding seat, sliding seat connects pedestal top, base engagement motion bar can carry out lifting rope to stretch and fix position, sunpender side is equipped with drawstring, drawstring one end connects sunpender, the other end is connected to staking out side, sunpender can be auxiliarily fixed in lifting rope, prevent pipeline weight from topple over sunpender.The utility model structure is simple, and assembling is simple, and stability is good, is able to solve the meeting that pipeline moves when changing and obvious sedimentation and movement occurs.

Description

A kind of hanger that underground piping is temporarily relocated
Technical field
The utility model belongs to pipeline and relocates technical field, in particular to a kind of hanger that underground piping is temporarily relocated.
Background technique
Municipal construction at present is getting faster, the pipeline often just buried early period, shortly past a period of time just as new Requirement of engineering moving, perhaps plus bury new pipeline relocated to pipeline or add bury other pipelines when, because of work The difference of condition, the requirement to pipeline installation are also not quite similar, and the installation landfill of pipeline is related to the municipal administration in later period and uses pipeline institute Natural gas, drinking water of transport etc., needed for this is concerning the operating and the lives of the people in entire city is arrived, therefore pipeline is relocated Or adds and need high-precision, the feature that the time is short and later period safety is good when burying other pipelines.
Nowadays, no matter the pipeline in pipe built-in hole relocate or add burying other pipelines, can all need to pipeline The hanger lifted, generally when pre-buried pipeline when discovery is with the conflict of other pipelines, it is necessary to in advance The pipeline buried is moved, and often just needs hanger this when, in the prior art in addition to using hanger also to will use crane, but Be originally there is Unpredictability in the engineering of pipe built-in with the conflicting situation of other pipelines, need in discovery to it Crane is looked for when his pipeline moves again to work, can delay many times instead, influence the efficiency of engineering, because This general construction personnel is had found in pre-buried pipeline after having conflict, will be assembled on the spot and be built a hanger, to wanting pre-buried pipeline Conflicting pipeline is fixed, and then pre-buried pipeline will be needed to fill;Many Zhou Suozhi, underground piping are typically all to use To transport natural gas or water supply, therefore special safety guarantee is needed to the pipeline that needs are fixed, i.e., there must not be sedimentation Risk, can not be with carrying out big-movement mobile to it, at the same be also required to avoid during assembling hanger occur welding, electricity Otherwise the fixed form of gas connection etc just will affect needed for municipal administration or cause disaster;Simultaneously as needing the pipe to conflict The fixation that road carries out would have to consider its support problem, and general hanger is difficult to support the weight of these pipelines, in hanger In the limited situation of assembled material, it is necessary to guarantee that the assembling of hanger can bear biggish weight, it is also necessary to which one stable Structure guarantees stability, and general hanger is also only fixedly mounted on ground and then is bundled pipeline by lifting rope, then Pipeline is sling slightly by manpower or other external force, to reache a certain level fixed purpose, very big people can be wasted Power and time.
Summary of the invention
The purpose of the utility model is to overcome deficiencies in the prior art, provide a kind of hanger that underground piping is temporarily relocated, Structure is simple, and assembling is simple, and stability is good, and being able to solve that pipeline moves when changing can there is a situation where settles and mobile.
To achieve the goals above, the technical solution adopted in the utility model is:
A kind of hanger that underground piping is temporarily relocated, including staking out, pedestal, sunpender, lifting rope, the staking out part landfill exist Underground, the staking out material are cement mixed muds, and the staking out itself provides gravity, described vertical for the counterweight to the present apparatus Stake side is fixed to inlay connection pedestal and is connected by standing screw, and the pedestal top side is fixedly installed sunpender, the sunpender Side is equipped with lifting rope, and the lifting rope is used to move the pipeline changed to needs and be fixed, and described lifting rope one end is connected with motion bar, institute It states motion bar one end and is connected with sliding seat, the sliding seat connects pedestal top, and the base engagement motion bar can be to lifting rope Stretch and fixed position, the sunpender side are equipped with drawstring, described drawstring one end connects sunpender, and the other end is connected to staking out Sunpender can be auxiliarily fixed in side, the lifting rope, prevent pipeline weight from topple over sunpender.
Preferably, the staking out includes I-steel, and the I-steel one end is fixed on inside cement clump weight, the water Mud clump weight lower half portion is landfilled in underground, and I-steel is fixed in cement clump weight top half, in the I-steel Web side is fixed with pincers block, and the pincers block can conveniently be fixedly connected with pedestal, and the I-steel wing plate is located at cement clump weight Interior part is equipped with several leak holes, and the leak hole plays the role of convenient when can be to joints cement clump weight, the cement is matched Four side of pouring weight is equipped with limit plate, and cement when can be to immobilization limits, and cement clump weight top is equipped with spiral shell Line column, the threaded post pass through I-steel wing plate and are connected through a screw thread, and the screw thread top end is equipped with hook ring, the threaded post Pass through hook ring connection stay cord one end.
Preferably, the pedestal includes bottom plate, pressing plate, hydraulic pressure lifting device, square socket, and the contacts baseplate ground is described Bottom plate top side is equipped with pressing plate, and described pressing plate one end two sides are respectively equipped with brace, and are connected by screw I I, and the brace top is supported In sunpender bottom end side for supporting to it, the pressing plate is interspersed between pincers block and I-steel bottom flap and by fixed spiral shell for touching Bar is fixedly connected, and described bottom plate one end is fixedly connected with I-steel bottom flap by screw I, right under the cooperation of bottom plate and pressing plate I-steel cramp joint is as far as possible fixed pedestal and maximizes its stability in working condition of increase, the pressing plate top Side is fixed with two square sockets, and for the square socket for being socketed sunpender, the square socket two sides are respectively equipped with screw I II, and And two screw I II height in same square socket are different, square socket is fixedly connected sunpender by screw I II, and The screw I II that different dimensions are arranged in by two is fixed, and further increases its stability, among the pressing plate top side Position is equipped with hydraulic pressure lifting device, and the hydraulic pressure lifting device output end is fixedly connected on sliding seat bottom side.
Preferably, the sunpender includes square column, cross bar, strut, spandrel girder, and the square column is equipped with two sides of being socketed in respectively It is fixed in sleeve and by screw I II, the square column top is set to cross bar, and the cross bar both ends are respectively fixedly connected with two sides Column, the cross bar top central portion are fixedly connected with strut bottom end, and the strut top is fixedly connected with spandrel girder one end, the spandrel girder In vertical state with strut, stiffening plate is equipped between the strut and spandrel girder, the stiffening plate is respectively provided at equipped with two and holds The two sides Chong Liang, and one end is fixed by screw I V, and the stiffening plate other end is fixedly connected on strut side, the stiffening plate It is fixed for the reinforcing to spandrel girder and strut, guarantees stability between the two, avoid spandrel girder meeting and strut after stress Deformation occurs for position, sliding groove is equipped with inside the spandrel girder, be slidably connected motion bar one end on the inside of the sliding groove.
Preferably, described motion bar one end is slidably connected on the inside of sliding groove, and the other end is connected with sliding seat, the activity Seat includes set axis, and the set axis is located between two panels seat board and is rotatablely connected, and described motion bar one end is connected to set axis side wall, Set axis side is equipped with jointing plate I, and the side the jointing plate I is equipped with jointing plate II, between the jointing plate I and jointing plate II Equipped with gap, the gap between the jointing plate I and jointing plate II is socketed in strut lateral wall for work for being socketed strut The limit of dynamic seat, while motion bar work, the jointing plate II are more easily driven by sliding seat by hydraulic pressure lifting device Both ends pass through the end side that screw V is fixedly connected with seat board respectively, and the motion bar other end is equipped with shaft, and institute's both ends of the shaft turns respectively Dynamic to be connected with support rod, the support rod is fixedly connected on the end side of motion bar, and the shaft is slidably connected on the inside of sliding groove, The shaft side is equipped with connecting rod, and the connecting rod two end is connected to support rod side, and the connecting rod is connected with lifting rope, the bottom of at In seat under the action of hydraulic pressure lifting device, it will drive sliding seat and move up and down, while can be existed by the zone of action turn axis of motion bar Sliding, further will drive the movement of lifting rope in sliding groove, drag what bundled pipeline was slightly gone up and down to reach Purpose, can to pipeline carry out stability contorting, also facilitate guarantee pipe movable range, avoid moving change pipeline after backfill when appearance The problem of significantly settling, influencing pipeline robust, the lifting rope pass through spandrel girder end side and are bonded by there is fixed pulley, institute It states fixed pulley and is fixed on spandrel girder end side, the lifting rope extends more and is used for more root canal roads while bundle solid It is fixed, to avoid colliding between pipeline and pipeline or in order to maintain the distance between pipeline, the part that lifting rope extends it Between be equipped with dagger.
Preferably, the dagger both ends are respectively equipped with lock rope frame, and lock rope frame side is threaded with lock rope screw, leads to It crosses and screws lock rope screw and lifting rope can be locked, then cooperate the length of dagger, be able to maintain between the bundled pipeline of lifting rope Distance, avoid it from colliding.
A kind of assemble method for the hanger that underground piping is temporarily relocated, the assemble method the following steps are included:
(1): selection groove side locating for pre-buried pipeline carries out excavation pit, limit plate is fixed in foundation pit, so I-steel is arranged afterwards and is fixed on ground in foundation pit top side, then by concreting in foundation pit, is matched after concrete setting It closes I-steel and forms staking out, cement block has very heavy weight, plays the role of clump weight;
(2): by the pressing plate cramp joint in pedestal in I-steel side, it is placed in I-steel and clamps between block and bottom flap, Then it is screwed by standing screw, the standing screw top is equipped with handwheel, facilitates worker to operate, and lead to It crosses screw I to be fixedly connected with the bottom plate in pedestal with I-steel bottom flap, further increases its stability, increase its assembling Convenience;
(3): the square column in sunpender being injected in pedestal square socket, then the screw of different dimensions is set by two III is fixed, and further increases its stability;
(4): assembling sliding seat, by the fixed hydraulic pressure lifting device output end in the base in sliding seat bottom side, then by jointing plate I is fitted in the side of pillar in hanger, by the fixed jointing plate II of screw V, so that sliding seat is slidably connected pillar, limitation is facilitated to live The position of dynamic seat;
(5): the shaft of motion bar one end is slidably socketed in the sliding groove in sunpender, and connects by installation activity bar Lifting rope is passed through spandrel girder one end and is fitted in fixed pulley, in order to subsequent promotion or sedimentation to pipeline by lifting rope;
(6): adjusting the distance between the branch that lifting rope is extended and be adjusted to dagger mainly by adjusting dagger Behind suitable position, lifting rope is locked by lock rope screw, i.e., the distance between controllable bundled pipeline avoids it from touching It hits and command range.
The hydraulic pressure lifting device is the prior art, and affiliated those skilled in the art can understand, correctly understand that this is practical It is novel, and related data can be obtained in the prior art.
Beneficial effect is shown the utility model compared with prior art:
1) each element of the present apparatus has screw to be fixed, easy for assembly without the position for needing electrically to weld, energy Enough greatly reduce the danger coefficient in assembling process;
2) the utility model staking out has cement clump weight, and I-steel can be good at cramp joint firm banking, it is ensured that pedestal It is firm, and sunpender bottom end there is screw to be fixed can to guarantee that the assembling of hanger can be born in this way in pedestal biggish Weight also guarantees stability with stable structure, while being additionally provided with hydraulic pressure lifting device on pedestal, in the band of hydraulic pressure lifting device Motion bar movement can be controlled under dynamic pipeline is promoted and declined slightly, it is not necessary to hang pipeline slightly by manpower or other external force It rises, a large amount of manpower and time can be saved;
3) present apparatus structure is simple, easy to assembly, the pipeline changed is moved needed for control that can be stable, and lifting rope extends More root canal roads can lift by crane more root canal roads simultaneously, and the dagger being equipped in the present apparatus can be good at controlling each lifting The distance between pipeline avoids it from colliding, and reduces danger coefficient, and facilitates position original when controlling subsequent backfill not It can change.
Detailed description of the invention
Attached drawing 1 is a kind of hanger structure schematic diagram that underground piping is temporarily relocated of the utility model;
Attached drawing 2 is a kind of hanger neutrality pilework schematic diagram that underground piping is temporarily relocated of the utility model;
Attached drawing 3 is i-beam structure schematic diagram in a kind of hanger that underground piping is temporarily relocated of the utility model;
Attached drawing 4 is schematic diagram of base structure in a kind of hanger that underground piping is temporarily relocated of the utility model;
Attached drawing 5 is a kind of hanger middle hanger structural schematic diagram that underground piping is temporarily relocated of the utility model;
Attached drawing 6 is sliding seat structural schematic diagram in a kind of hanger that underground piping is temporarily relocated of the utility model;
Attached drawing 7 is supporting bar structure schematic diagram in a kind of hanger that underground piping is temporarily relocated of the utility model;
Attached drawing 8 is hinge structure schematic diagram in a kind of hanger that underground piping is temporarily relocated of the utility model;
In figure: the ground 1-, 2- staking out, 21- cement clump weight, 22- I-steel, 221- clamp block, 222- leak hole, 23- limit Plate, 24- threaded post, 25- hook ring, 3- pedestal, 31- bottom plate, 311- screw I, 32- pressing plate, 321- screw I I, 322- brace, 33- Hydraulic pressure lifting device, 34- square socket, 341- screw I II, 4- sunpender, 41- square column, 42- cross bar, 43- strut, 44- spandrel girder, 441- sliding groove, 442- fixed pulley, 45- stiffening plate, 5- sliding seat, 51- seat board, 52- cover axis, 53- jointing plate I, 54- jointing plate II, 541- screw V, 6- motion bar, 61- support rod, 62- shaft, 63- connecting rod, 7- lifting rope, 711- dagger, 712- lock rope frame, 713- lock rope screw, 8- pipeline, 9- standing screw, 91- handwheel, 10- drawstring.
Specific embodiment
For convenience of the understanding of those skilled in the art, 1-8 with reference to the accompanying drawing, to the technical solution of the utility model into one Step illustrates.
A kind of hanger that underground piping is temporarily relocated, including staking out 2, pedestal 3, sunpender 4, lifting rope 7,2 part of staking out For landfill in underground, 2 material of staking out is cement mixed mud, and the staking out 2 itself provides gravity, for matching to the present apparatus Weight, 2 side of staking out is fixed to inlay connection pedestal 3 and is connected by standing screw 9, and 3 top side of pedestal is fixedly installed Sunpender 4,4 side of sunpender are equipped with lifting rope 7, and the lifting rope 7 is used to move the pipeline 8 changed to needs and be fixed, the lifting rope 7 One end is connected with motion bar 6, and described 6 one end of motion bar is connected with sliding seat 5, and the sliding seat 5 connects 3 top of pedestal, described Pedestal 3 cooperates motion bar 6 that can carry out stretching and fixing position to lifting rope 7, and 4 side of sunpender is equipped with drawstring 10, the drawing It restricts 10 one end connection sunpender 4, the other end is connected to 2 side of staking out, and the lifting rope 7 can be auxiliarily fixed sunpender 4, prevent 8 weight of pipeline topples over sunpender 4.
The staking out 2 includes I-steel 22, and described 22 one end of I-steel is fixed on inside cement clump weight 21, the water 21 lower half portion of mud clump weight is landfilled in underground, and I-steel 22 is fixed in 21 top half of cement clump weight, the work 22 median ventral plate side of word steel is fixed with pincers block 221, and the pincers block 221 can conveniently be fixedly connected with pedestal 3,22 wing of I-steel Plate is located at the part in cement clump weight 21 equipped with several leak holes 222, when the leak hole 222 can be to joints cement clump weight 21 Play the role of convenient, 21 4 side of cement clump weight is equipped with limit plate 23, and cement when can be to immobilization carries out Limit, 21 top of cement clump weight are equipped with threaded post 24, and the threaded post 24 passes through 22 wing plate of I-steel and passes through screw thread Connection, 24 top of threaded post are equipped with hook ring 25, and the threaded post 24 passes through 25 connection stay cord of hook ring, 10 one end.
The pedestal 3 includes bottom plate 31, pressing plate 32, hydraulic pressure lifting device 33, square socket 34, and the bottom plate 31 contacts ground 1, 31 top side of bottom plate is equipped with pressing plate 32, and 32 one end two sides of pressing plate are respectively equipped with brace 322, and are connected by screw I I321 It connects, 322 top of brace is contradicted in 4 bottom end side of sunpender for supporting to it, and the pressing plate 32 is interspersed in pincers block 221 and work It is fixedly connected between 22 bottom flap of word steel and by standing screw 9, described 31 one end of bottom plate is fixedly connected with work by screw I 311 22 bottom flap of word steel is as far as possible fixed simultaneously pedestal 3 to 22 cramp joint of I-steel under the cooperation of bottom plate 31 and pressing plate 32 It maximizes and increases its stability in working condition, 32 top side of pressing plate is fixed with two square sockets 34, the square set Cylinder 34 is for being socketed sunpender 4, and 34 two sides of square socket are respectively equipped with screw I II341, and two in same square socket 34 Screw I II341 height is different, and square socket is fixedly connected sunpender 4 by screw I II341, and is existed by two settings The screw I II341 of different dimensions is fixed, and further increases its stability, position is equipped among 32 top side of pressing plate Hydraulic pressure lifting device 33,33 output end of hydraulic pressure lifting device are fixedly connected on 5 bottom side of sliding seat.
The sunpender 4 includes square column 41, cross bar 42, strut 43, spandrel girder 44, and the square column 41 is equipped with two and is socketed respectively It is fixed in square socket 34 and through screw I II341,41 top of square column is set to cross bar 42,42 both ends of the cross bar difference Two square columns 41 are fixedly connected with, 42 top central portion of cross bar is fixedly connected with 43 bottom end of strut, and 43 top of strut is fixed to be connected 44 one end of spandrel girder is connect, the spandrel girder 44 in vertical state, is equipped between the strut 43 and spandrel girder 44 and adds with strut 43 Strong plate 45, the stiffening plate 45 is equipped with two and is respectively provided at 44 two sides of spandrel girder, and one end is fixed by screw V541, described 45 other end of stiffening plate is fixedly connected on 43 side of strut, and it is solid that the stiffening plate 45 is used for the reinforcing to spandrel girder 44 and strut 43 Calmly, guarantee stability between the two, avoiding spandrel girder 44 from after stress, deformation occurs with the position of strut 43, the load-bearing Sliding groove 441 is equipped with inside beam 44, be slidably connected 6 one end of motion bar on the inside of the sliding groove 441.
Described 6 one end of motion bar is slidably connected at 441 inside of sliding groove, and the other end is connected with sliding seat 5, the sliding seat 5 include set axis 52, and the set axis 52 is located between two panels seat board 51 and is rotatablely connected, and described 6 one end of motion bar is connected to set 52 side wall of axis, 52 side of set axis are equipped with jointing plate I53, and the side the jointing plate I53 is equipped with jointing plate II54, the fitting Gap is equipped between plate I53 and jointing plate II54, the gap between the jointing plate I53 and jointing plate II54 is for being socketed strut 43,43 lateral wall of strut is socketed in for the limit to sliding seat 5, while work is more easily passed through by hydraulic pressure lifting device 33 Dynamic seat 5 drives motion bar 6 to work, and the both ends the jointing plate II54 pass through the end side that screw V541 is fixedly connected with seat board 51 respectively, 6 other end of motion bar is equipped with shaft 62, and 62 both ends of institute's shaft are rotatably connected to support rod 61 respectively, and the support rod 61 is solid Surely it is connected to the end side of motion bar 6, the shaft 62 is slidably connected at 441 inside of sliding groove, and 62 side of shaft, which is equipped with, to be connected Bar 63,63 both ends of connecting rod are connected to 61 side of support rod, and the connecting rod 63 is connected with lifting rope 7, hydraulic in pedestal 3 Under the action of lifter 33, it will drive sliding seat 5 and move up and down, while can be by the zone of action turn axis 62 of motion bar 6 in cunning Sliding in dynamic slot 441, further will drive the movement of lifting rope 7, slightly be gone up and down to reach and drag bundled pipeline 8 Purpose, can to pipeline 8 carry out stability contorting, also facilitate guarantee the movable range of pipeline 8, avoid moving change pipeline 8 after backfill When the problem of apparent sedimentation occur, influencing pipeline robust, the lifting rope 7 passes through 44 end side of spandrel girder and is bonded by having Fixed pulley 442, the fixed pulley 442 are fixed on 44 end side of spandrel girder, and the lifting rope 7 extends more for more root canal roads 8 Carry out bundled fixed is carried out simultaneously, to avoid colliding between pipeline and pipeline or in order to maintain the distance between pipeline, Dagger 711 is equipped between the part that lifting rope 7 extends.
711 both ends of dagger are respectively equipped with lock rope frame 712, and the lock rope 712 side of frame is threaded with lock rope screw 713, lifting rope 7 can be locked by screwing lock rope screw 713, then cooperate the length of dagger 711, be able to maintain lifting rope 7 The distance between bundled pipeline 8, avoids it from colliding.
A kind of assemble method for the hanger that underground piping is temporarily relocated, the assemble method the following steps are included:
(1): selection groove side locating for pre-buried pipeline 8 carries out excavation pit, and limit plate is fixed in foundation pit, Then I-steel 22 is arranged and is fixed on ground 1 in foundation pit top side, then by concreting in foundation pit, to concrete setting Cooperation I-steel 22 forms staking out 2 afterwards, and cement block has very heavy weight, plays the role of clump weight;
(2): by 32 cramp joint of pressing plate in pedestal 3 in 22 side of I-steel, being placed in I-steel 22 and clamp block 221 and bottom It between portion's wing plate, is then screwed by standing screw 9,9 top of standing screw is equipped with handwheel 91, facilitates worker It is operated, and is fixedly connected with the bottom plate 31 in pedestal 3 with 22 bottom flap of I-steel by screw I 311, further increased Add its stability, increases the convenience of its assembling;
(3): the square column 41 in sunpender 4 being injected in 3 square socket 34 of pedestal, is then arranged by two in different dimensions Screw I II341 be fixed, further increase its stability;
(4): 5 bottom side of sliding seat is fixed on 33 output end of hydraulic pressure lifting device in pedestal 3 by assembling sliding seat 5, then will Jointing plate I53 is fitted in the side of strut 43 in sunpender 4, by the fixed jointing plate II54 of screw V541, connects the sliding of sliding seat 5 Strut 43 is connect, the position of limitation sliding seat 5 is facilitated;
(5): the shaft 62 of 6 one end of motion bar is slidably socketed in the sliding groove 441 in sunpender 4 by installation activity bar 6, And lifting rope 7 is connected, lifting rope 7 is passed through into 44 one end of spandrel girder and is fitted in fixed pulley 442, in order to subsequent mentioning to pipeline 8 It rises or settles;
(6): the distance between the branch that lifting rope 7 is extended is adjusted, mainly by adjusting dagger 711, by dagger After 711 are adjusted to suitable position, lifting rope 7 locked by lock rope screw 713, i.e., between controllable bundled pipeline 8 away from From avoiding it from colliding and command range.
The hydraulic pressure lifting device 33 is the prior art, and affiliated those skilled in the art can understand, correctly understand this reality With novel, and related data can be obtained in the prior art.
A kind of hanger that underground piping is temporarily relocated, the course of work are as follows:
It, will when other pipelines being fixed or be finely tuned when in pre-buried pipeline, discovery has the conflict of other pipelines Using this hanger is arrived, the installation present apparatus is carried out in pipe built-in hole side first, it, need to using lifting rope after the present apparatus is installed The pipeline fixed or finely tuned is bundled, and is then controlled hydraulic pressure lifting device and is carried out Memory control position to pipeline, can also be with It is slightly gone up and down, and can both guarantee that the variation of relatively large deviation will not occur for the position of pipeline, also can guarantee to move to have changed It will not occur significantly to settle at pipeline when backfill.
Above content is only the structure example and explanation to the utility model, the technologies of affiliated the art Personnel make various modifications or additions to the described embodiments or are substituted in a similar manner, without departing from The structure of utility model or beyond the scope defined by this claim, all should belong to the protection range of the utility model.

Claims (6)

1. a kind of hanger that underground piping is temporarily relocated, it is characterised in that including staking out, pedestal, sunpender, lifting rope, the staking out portion Divide landfill in underground, the staking out side is fixed to inlay connection pedestal and connect by standing screw, and the pedestal top side is fixed It is provided with sunpender, the sunpender side is equipped with lifting rope, and described lifting rope one end is connected with motion bar, and described motion bar one end is connected with Sliding seat, the sliding seat connect pedestal top, and the sunpender side is equipped with drawstring, and described drawstring one end connects sunpender, another End is connected to staking out side.
2. the hanger that a kind of underground piping according to claim 1 is temporarily relocated, it is characterised in that the staking out includes I-steel, the I-steel one end are fixed on inside cement clump weight, and cement clump weight lower half portion is landfilled in underground, I-steel is fixed in cement clump weight top half, and I-steel median ventral plate side is fixed with pincers block, the I-steel Wing plate is located at the part in cement clump weight equipped with several leak holes, and four side of cement clump weight is equipped with limit plate, described Cement clump weight top is equipped with threaded post, and the threaded post passes through I-steel wing plate and is connected through a screw thread, the screw thread capital End is equipped with hook ring, and the threaded post passes through hook ring connection stay cord one end.
3. the hanger that a kind of underground piping according to claim 2 is temporarily relocated, it is characterised in that the pedestal includes bottom Plate, pressing plate, hydraulic pressure lifting device, square socket, the contacts baseplate ground, the bottom plate top side are equipped with pressing plate, described pressing plate one end Two sides are respectively equipped with brace, and are connected by screw I I, and the brace top is contradicted in sunpender bottom end side for supporting to it, The pressing plate is interspersed between pincers block and I-steel bottom flap and is fixedly connected by standing screw, and described bottom plate one end passes through spiral shell Silk I is fixedly connected with I-steel bottom flap, and the pressing plate top side is fixed with two square sockets, and the square socket two sides are set respectively There is screw I II, position is equipped with hydraulic pressure lifting device among the pressing plate top side, and the hydraulic pressure lifting device output end is fixedly connected on work Dynamic seat bottom side.
4. the hanger that a kind of underground piping according to claim 3 is temporarily relocated, it is characterised in that the sunpender includes side Column, cross bar, strut, spandrel girder, the square column is equipped with two and is socketed in square socket and is fixed respectively by screw I II, described Square column top is set to cross bar, and the cross bar both ends are respectively fixedly connected with two square columns, and the cross bar top central portion is fixedly connected with branch Bar bottom end, the strut top are fixedly connected with spandrel girder one end, the spandrel girder and strut in vertical state, the strut with hold Stiffening plate is equipped between weight beam, the stiffening plate is equipped with two and is respectively provided at spandrel girder two sides, and one end is solid by screw I V Fixed, the stiffening plate other end is fixedly connected on strut side, and sliding groove, the sliding groove inside are equipped with inside the spandrel girder Be slidably connected motion bar one end.
5. the hanger that a kind of underground piping according to claim 4 is temporarily relocated, it is characterised in that described motion bar one end It is slidably connected on the inside of sliding groove, the other end is connected with sliding seat, and the sliding seat includes set axis, and the set axis is located at two panels It between seat board and is rotatablely connected, described motion bar one end is connected to set axis side wall, and set axis side is equipped with jointing plate I, described The side jointing plate I is equipped with jointing plate II, and gap, the both ends the jointing plate II point are equipped between the jointing plate I and jointing plate II The end side of seat board is not fixedly connected with by screw V, the motion bar other end is equipped with shaft, and institute's both ends of the shaft is rotatablely connected respectively There is support rod, the support rod is fixedly connected on the end side of motion bar, and the shaft is slidably connected on the inside of sliding groove, and described turn Axis side is equipped with connecting rod, and the connecting rod two end is connected to support rod side, and the connecting rod is connected with lifting rope, and the lifting rope is worn It crosses spandrel girder end side and is bonded by there is fixed pulley, the fixed pulley is fixed on spandrel girder end side, and the lifting rope extends more Root is equipped with dagger between the part that lifting rope extends.
6. the hanger that a kind of underground piping according to claim 5 is temporarily relocated, it is characterised in that the dagger both ends point Rope frame She You not be locked, lock rope frame side is threaded with lock rope screw.
CN201920168421.3U 2019-01-30 2019-01-30 A kind of hanger that underground piping is temporarily relocated Expired - Fee Related CN209411647U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920168421.3U CN209411647U (en) 2019-01-30 2019-01-30 A kind of hanger that underground piping is temporarily relocated

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920168421.3U CN209411647U (en) 2019-01-30 2019-01-30 A kind of hanger that underground piping is temporarily relocated

Publications (1)

Publication Number Publication Date
CN209411647U true CN209411647U (en) 2019-09-20

Family

ID=67944699

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920168421.3U Expired - Fee Related CN209411647U (en) 2019-01-30 2019-01-30 A kind of hanger that underground piping is temporarily relocated

Country Status (1)

Country Link
CN (1) CN209411647U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109626232A (en) * 2019-01-30 2019-04-16 玄甜甜 A kind of hanger and its assemble method that underground piping is temporarily relocated
CN112856038A (en) * 2019-11-27 2021-05-28 中国石油天然气集团有限公司 Pipeline assembly device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109626232A (en) * 2019-01-30 2019-04-16 玄甜甜 A kind of hanger and its assemble method that underground piping is temporarily relocated
CN112856038A (en) * 2019-11-27 2021-05-28 中国石油天然气集团有限公司 Pipeline assembly device

Similar Documents

Publication Publication Date Title
CN201826525U (en) Climbing shuttering system device for buildings
CN209411647U (en) A kind of hanger that underground piping is temporarily relocated
CN109626232A (en) A kind of hanger and its assemble method that underground piping is temporarily relocated
CN1057973C (en) Four-bar frame self-lifting type door-base crane
CN203346873U (en) Low-headroom pile frame
CN203452375U (en) Hydraulic self-jacking oblique creeping formwork
CN202785387U (en) Indoor cantilever crane
CN208718334U (en) A kind of support frame of assembled architecture cantilevered plate
CN209686995U (en) A kind of full assembly concrete fence structure
CN103276722A (en) Low-clearance pile frame and application method for same
CN206319628U (en) One kind building assembled wallboard fitting machine
CN105464215A (en) Reverse construction method construction method of hanging structure incapable of being provided with vertical temporary support
CN211849438U (en) Device for pile connection and perpendicularity adjustment
CN204782194U (en) Simple and easy emergency communication tower
CN209780229U (en) Jacking platform system of integrated tower crane
CN204385885U (en) There is the bridge construction tower crane pile foundation sustaining wall of two governor motion
CN210421167U (en) Installation translation device of large-scale prefabricated piping lane
CN108518119B (en) Portable power transmission pole maintenance tool and construction method
CN208501499U (en) A kind of bent cap bracket installation jacking system
CN205973671U (en) Hanging flower basket linkage
CN205530776U (en) Removable formula damping device that trades of rubber support
CN2218221Y (en) Hydraulic propulsion lifting scaffold
CN106703425A (en) Building assembly type wallboard installing machine
CN219952255U (en) Assembled concrete embedded part for civil engineering construction
CN216340793U (en) Novel triangular support device for external scaffold

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190920

Termination date: 20200130

CF01 Termination of patent right due to non-payment of annual fee