CN209400590U - A kind of Novel anti-electricity-theft batch meter - Google Patents
A kind of Novel anti-electricity-theft batch meter Download PDFInfo
- Publication number
- CN209400590U CN209400590U CN201822028918.3U CN201822028918U CN209400590U CN 209400590 U CN209400590 U CN 209400590U CN 201822028918 U CN201822028918 U CN 201822028918U CN 209400590 U CN209400590 U CN 209400590U
- Authority
- CN
- China
- Prior art keywords
- measuring equipment
- wind gathering
- semicircle
- electricity
- batch meter
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Indicating Or Recording The Presence, Absence, Or Direction Of Movement (AREA)
Abstract
The utility model provides a kind of Novel anti-electricity-theft batch meter, is related to batch meter field.The Novel anti-electricity-theft batch meter, including measuring equipment include gas-permeable nets at the top of the measuring equipment and dust-proof rain-proof shed.The Novel anti-electricity-theft batch meter, pass through the motor of setting, and ball set, fan, first semicircle wind gathering set, free ball, second semicircle wind gathering set, blower, loose slot and wind deflector are equipped with, fan is rotated when motor being enable to open, the first semicircle wind gathering is able to drive when to make the output shaft of motor rotate to cover in the rotation of the top of ball set, top to make the first semicircle wind gathering cover passes through the lower rotation that free ball is covered in the second semicircle wind gathering, to enable the wind of fan rotation output wind gathering output air-flow in the first wind gathering set, to make air-flow rising be blown into the second semicircle wind gathering set, to which the inside inner wall rotation that the air-flow for blowing out fan is covered along the second semicircle wind gathering is blown.
Description
Technical field
The utility model relates to batch meter technical field, specially a kind of Novel anti-electricity-theft batch meter.
Background technique
Batch meter in the prior art is compared, electricity-stealing prevention metering tank outdoors is placed in especially installation, in the mistake used
Cheng Zhong, often because in the hot summer, the temperature drift for keeping it internal leads to the electrical equipment inside electricity-stealing prevention metering tank
It is unable to normal use, therefore it is proposed that a kind of Novel anti-electricity-theft batch meter solves the problems, such as above-mentioned propose.
Utility model content
The purpose of the utility model is to provide a kind of structurally reasonable and novel, body can be effectively to batch meter internal heat dissipating
Novel anti-electricity-theft batch meter.
Technical solution
In order to achieve the above object, the utility model is achieved by the following technical programs: a kind of Novel anti-electricity-theft metering
Case, including measuring equipment include gas-permeable nets at the top of the measuring equipment and dust-proof rain-proof shed, the side of the gas-permeable nets with
The top of measuring equipment is clamped, and the dust-proof rain-proof shed bottom is fixedly connected with the side at the top of measuring equipment, the metering
The lower part of equipment includes fixed case, ball set, motor, fan, the first semicircle wind gathering set, free ball, the second semicircle wind gathering
Set, blower and loose slot, the bottom of the fixed case are fixedly connected with the bottom wall of measuring equipment, the bottom of the ball set with
Side at the top of fixed case is fixedly connected, and is fixedly connected on the inside of the outside of the motor and fixed case, the middle part of the fan
It is fixedly connected with the output shaft of motor, the bottom of the first semicircle wind gathering set and the middle part grafting of motor output shaft, the work
The bottom of dynamic ball is connect with the top slide that the first semicircle wind gathering covers, the bottom of the second semicircle wind gathering set and free ball
Top slide connection, one end of the blower and the second semicircle wind gathering set top grafting, the middle part of the measuring equipment
It include loose slot, the loose slot, which is located in the middle part of measuring equipment, to be opened up, and the top of the measuring equipment includes wind deflector,
It is fixedly connected on the inside of the side of the wind deflector and measuring equipment top.
Further, the side of the measuring equipment includes air inlet funnel and screen pipe, the side of the air inlet funnel
It is fixedly connected on the outside of measuring equipment lower part, one end of the screen pipe and the side grafting of air inlet inner wall of hopper.
Further, the inside of the measuring equipment lower part includes fixed frame, and top and the metering of the fixed frame are set
The side of standby lower part inner roof wall is fixedly connected.
Further, the lower end of the fixed frame includes thread bush and threaded rod, the top of the thread bush and fixation
The lower end of frame is welded, and the outside of the threaded rod and the inside thread of thread bush connect.
Further, the threaded rod includes turning handle and idler wheel, and the side of the turning handle and one end of threaded rod are fixed
Connection, the side of the idler wheel is fixedly connected with the other end of threaded rod.
Further, one end of the screen pipe runs through the side of measuring equipment lower part and extends to the interior of measuring equipment
Portion, the inner cavity of the measuring equipment are connected to the inner cavity of screen pipe.
A kind of Novel anti-electricity-theft batch meter provided by the utility model.Have it is following the utility model has the advantages that
1, the Novel anti-electricity-theft batch meter passes through the motor and ball set of setting, fan, the first semicircle wind gathering set, work
Being equipped with for ball, the second semicircle wind gathering set, blower, loose slot and wind deflector is moved, wind is rotated when motor being enable to open
Fan is covered in the rotation of the top of ball set so that the output shaft of motor be made to be able to drive the first semicircle wind gathering when rotating, to make the
The top of one semicircle wind gathering set passes through the lower rotation that free ball is covered in the second semicircle wind gathering, to make fan rotation output
Wind can the first wind gathering set in wind gathering output air-flow, thus make air-flow rising be blown into the second semicircle wind gathering set in, to make wind
The inside inner wall rotation that the air-flow of fan blowout is covered along the second semicircle wind gathering is blown, to allow the flow to through blower suddenly
The second semicircle wind gathering set is blown out, to make the air-flow of blowout blow on wind deflector, to make wind deflector by air flow guiding to metering
On electrical equipment inside equipment, to enable electrical equipment to be cooled down, so that allowing the flow to will be in measuring equipment
Heat is blown out by gas-permeable nets, so that so that the inside of batch meter is not hoarded heat influences the normal use of electrical equipment,
Solve the problems, such as existing batch meter currently on the market it is interior be easy to hoard heat cause batch meter to be unable to normal use.
2, the Novel anti-electricity-theft batch meter passes through the gas-permeable nets of setting and dust-proof rain-proof shed, air inlet funnel and screen pipe
Be equipped with, so that extraneous air is entered in screen pipe by air inlet funnel, so that screen pipe be made to filter out in air
Dust and impurities, so that the air entered inside measuring equipment by screen pipe be enable to blow out hot gas by gas-permeable nets,
To make at the top of gas-permeable nets it is dust-proof it is rain-proof shed can be by hot gas to the left and right sides water conservancy diversion at the top of measuring equipment, to make dust-proof
It is rain-proof shed also can rain cover and dust fall in measuring equipment, thus while effectively enabling to radiate inside batch meter
It is enough to ensure that inside is not encroached on by rainwater and dust.
Detailed description of the invention
Fig. 1 is the utility model structure sectional view;
Fig. 2 is the utility model structure front view;
Fig. 3 is enlarged drawing at the A in the utility model structure chart 1;
Fig. 4 is that the B in the utility model structure chart 1 removes enlarged drawing.
Wherein, 1 measuring equipment, 2 gas-permeable nets, 3 dust-proof rain-proof shed, 4 air inlet funnels, 5 screen pipes, 6 fixed cases, 7 ball sets,
8 motors, 9 fans, 10 first semicircle wind gathering sets, 11 free balls, 12 second semicircle wind gathering sets, 13 blowers, 14 fixed frames, 15
Thread bush, 16 threaded rods, 17 turning handles, 18 idler wheels, 19 loose slots, 20 wind deflectors.
Specific embodiment
As shown in Figs 1-4, the utility model embodiment provides a kind of Novel anti-electricity-theft batch meter, including measuring equipment 1, meter
The side of amount equipment 1 includes air inlet funnel 4 and screen pipe 5, and the side of air inlet funnel 4 and the outside of 1 lower part of measuring equipment are solid
1 lower part of measuring equipment is run through in one end of fixed connection, one end of screen pipe 5 and the side grafting of 4 inner wall of air inlet funnel, screen pipe 5
Side and extend to the inside of measuring equipment 1, the inner cavity of measuring equipment 1 is connected to the inner cavity of screen pipe 5, to keep outer diameter empty
Gas can be entered in screen pipe 5 by air inlet funnel 4 to be filtered, then the inside of measuring equipment 1 is sent by screen pipe 5, and metering is set
The inside of standby 1 lower part includes fixed frame 14, the fixed company in the top of fixed frame 14 and the side of 1 lower part inner roof wall of measuring equipment
It connecing, the lower end of fixed frame 14 includes thread bush 15 and threaded rod 16, and the top of thread bush 15 and the lower end of fixed frame 14 are welded,
The outside of threaded rod 16 is connect with the inside thread of thread bush 15, and threaded rod 16 includes turning handle 17 and idler wheel 18, turning handle 17
Side is fixedly connected with one end of threaded rod 16, and the side of idler wheel 18 is fixedly connected with the other end of threaded rod 16, to make spiral shell
Rasp bar 16 can left and right adjusting idler wheel 18, thus enable idler wheel 18 adjusted when moving left and right the first semicircle wind gathering set 10 the depth
Highly, the top of measuring equipment 1 includes gas-permeable nets 2 and dust-proof rain-proof shed 3, the side and the top of measuring equipment 1 of gas-permeable nets 2
Clamping, dust-proof rain-proof shed 3 bottom are fixedly connected with the side at 1 top of measuring equipment, and the lower part of measuring equipment 1 includes fixation
Case 6, ball set 7, motor 8, fan 9, the first semicircle wind gathering set 10, free ball 11, the second semicircle wind gathering cover 12, blower 13
It is fixedly connected with the bottom of loose slot 19, fixed case 6 with the bottom wall of measuring equipment 1,6 top of bottom and fixed case of ball set 7
Side be fixedly connected, the outside of motor 8 is fixedly connected with the inside of fixed case 6, the output shaft at the middle part of fan 9 and motor 8
It is fixedly connected, the bottom of the first semicircle wind gathering set 10 and the middle part grafting of 8 output shaft of motor, the bottom of free ball 11 and first
The top slide connection of semicircle wind gathering set 10, the bottom of the second semicircle wind gathering set 12 are connect with the top slide of free ball 11,
The top grafting of one end of blower 13 and the second semicircle wind gathering set 12, the middle part of measuring equipment 1 includes loose slot 19, activity
The middle part that slot 19 is located at measuring equipment 1 opens up, and the top of measuring equipment 1 includes wind deflector 20, the side of wind deflector 20 and meter
Amount is fixedly connected on the inside of 1 top of equipment.
In use, enabling motor 8 to rotate fan 9 when opening, so that the output shaft of motor 8 be made to be able to drive the when rotating
One semicircle wind gathering set 10 rotates at the top of ball set 7, so that the top of the first semicircle wind gathering set 10 be made to pass through free ball 11
In the lower rotation of the second semicircle wind gathering set 12, so that the wind gathering in the first wind gathering set of the wind of the rotation output of fan 9 be enable to produce
Air-flow out, to make air-flow rising be blown into the second semicircle wind gathering set 12, so that the air-flow for blowing out fan 9 is along the second semicircle
The inside inner wall rotation of wind gathering set 12 is blown, to allow the flow to blow out the second semicircle wind gathering set suddenly by blower 13
12, to make the air-flow of blowout blow on wind deflector 20, to make wind deflector 20 by the electricity inside air flow guiding to measuring equipment 1
In device equipment, to enable electrical equipment to be cooled down, to allow the flow to pass through the heat in measuring equipment 1 ventilative
Net 2 is blown out, so that so that the inside of batch meter is not hoarded heat influences the normal use of electrical equipment, enables extraneous air
Entered in screen pipe 5 by air inlet funnel 4, to make screen pipe 5 filter out the dust and impurities in air, to make to pass through
The air that chimney filter 5 enters inside measuring equipment 1 can be blown out hot gas by gas-permeable nets 2, to make the dust-proof of 2 top of gas-permeable nets
Rain-proof shed 3 can be by hot gas to the left and right sides water conservancy diversion at 1 top of measuring equipment, to make dust-proof rain-proof shed 3 can also block rain
Water and dust are fallen in measuring equipment 1.
Claims (6)
1. a kind of Novel anti-electricity-theft batch meter, including measuring equipment (1), it is characterised in that: the top for stating measuring equipment (1) includes
There are gas-permeable nets (2) and dust-proof rain-proof shed (3), the top clamping of the side and measuring equipment (1) of the gas-permeable nets (2), it is described anti-
The bottom of dirt rain-proof shed (3) is fixedly connected with the side at the top of measuring equipment (1), and the lower part of the measuring equipment (1) includes
Fixed case (6), ball set (7), motor (8), fan (9), the first semicircle wind gathering set (10), free ball (11), the second semicircle
Wind gathering set (12), blower (13) and loose slot (19), the bottom of the fixed case (6) and the bottom wall of measuring equipment (1) are fixed
Connection, the bottom of the ball set (7) are fixedly connected with the side at the top of fixed case (6), the outside of the motor (8) and fixation
Case is fixedly connected on the inside of (6), and the middle part of the fan (9) is fixedly connected with the output shaft of motor (8), and first semicircle is poly-
The bottom of windband (10) and the middle part grafting of motor (8) output shaft, the bottom of the free ball (11) and the first semicircle wind gathering
The top slide connection of (10) is covered, the bottom of the second semicircle wind gathering set (12) and the top slide of free ball (11) connect
It connects, the top grafting of one end of the blower (13) and the second semicircle wind gathering set (12), the middle part packet of the measuring equipment (1)
It has included loose slot (19), the loose slot (19), which is located in the middle part of measuring equipment (1), to be opened up, the top of the measuring equipment (1)
Include wind deflector (20), is fixedly connected on the inside of the side and measuring equipment (1) top of the wind deflector (20).
2. a kind of Novel anti-electricity-theft batch meter according to claim 1, it is characterised in that: the one of the measuring equipment (1)
Side includes air inlet funnel (4) and screen pipe (5), and the side of the air inlet funnel (4) and the outside of measuring equipment (1) lower part are solid
Fixed connection, one end of the screen pipe (5) and the side grafting of air inlet funnel (4) inner wall.
3. a kind of Novel anti-electricity-theft batch meter according to claim 1, it is characterised in that: measuring equipment (1) lower part
Inside include fixed frame (14), the top of the fixed frame (14) and the side of measuring equipment (1) lower part inner roof wall are fixed
Connection.
4. a kind of Novel anti-electricity-theft batch meter according to claim 3, it is characterised in that: the lower end of the fixed frame (14)
It include thread bush (15) and threaded rod (16), the top of the thread bush (15) and the lower end of fixed frame (14) are welded, described
The outside of threaded rod (16) is connect with the inside thread of thread bush (15).
5. a kind of Novel anti-electricity-theft batch meter according to claim 4, it is characterised in that: the threaded rod (16) includes
The side of turning handle (17) and idler wheel (18), the turning handle (17) is fixedly connected with one end of threaded rod (16), the idler wheel (18)
Side be fixedly connected with the other end of threaded rod (16).
6. a kind of Novel anti-electricity-theft batch meter according to claim 2, it is characterised in that: one end of the screen pipe (5)
Through measuring equipment (1) lower part side and extend to the inside of measuring equipment (1), the inner cavity of the measuring equipment (1) and mistake
The inner cavity of chimney filter (5) is connected to.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822028918.3U CN209400590U (en) | 2018-12-05 | 2018-12-05 | A kind of Novel anti-electricity-theft batch meter |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822028918.3U CN209400590U (en) | 2018-12-05 | 2018-12-05 | A kind of Novel anti-electricity-theft batch meter |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209400590U true CN209400590U (en) | 2019-09-17 |
Family
ID=67881680
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201822028918.3U Expired - Fee Related CN209400590U (en) | 2018-12-05 | 2018-12-05 | A kind of Novel anti-electricity-theft batch meter |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209400590U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112149196A (en) * | 2020-10-14 | 2020-12-29 | 威海火峰电脑有限公司 | Anti-theft and fireproof protection device for mobile hard disk for computer |
-
2018
- 2018-12-05 CN CN201822028918.3U patent/CN209400590U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112149196A (en) * | 2020-10-14 | 2020-12-29 | 威海火峰电脑有限公司 | Anti-theft and fireproof protection device for mobile hard disk for computer |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205374559U (en) | Novel modified power metering box ventilation structure | |
CN107726526A (en) | A kind of reinforcing underground space ventilation unit based on solar energy and wind energy | |
CN209400590U (en) | A kind of Novel anti-electricity-theft batch meter | |
CN207083314U (en) | Heat dissipation type dustproof electrical cabinet | |
CN206330267U (en) | A kind of air inlet for air-cooled outdoor equipment | |
CN218850222U (en) | Ventilation structure of compact box-type substation | |
CN208012307U (en) | A kind of agricultural cereal drying screening integration apparatus | |
CN207270656U (en) | One kind moves portable blowing device | |
CN207443240U (en) | A kind of cooling frame of SMT patch jigs | |
CN203039322U (en) | Transformer station cable duct ventilation dehumidification apparatus | |
CN214085911U (en) | Fodder storage device with dehumidification dust removal function | |
CN207866576U (en) | A kind of Plastics Combustion fume collection and smoke density detection means | |
CN208686634U (en) | A kind of bladeless fan with purification function | |
CN206963582U (en) | A kind of production of hybrid seeds rice Mechanical Driven pollinating device | |
CN220436745U (en) | Air conditioner air tongue structure | |
CN208821261U (en) | A kind of ventilating mechanisms for silo detection system | |
CN207385015U (en) | A kind of unpowered type dedusting environment friendly device | |
CN207377874U (en) | A kind of intelligent environmental protection type roof ventilation large fan | |
CN209147769U (en) | Cooling device for down products | |
CN205287891U (en) | Tornado formula air purification device | |
CN219781079U (en) | Temperature-control ventilation device for vegetable greenhouse | |
CN220355920U (en) | Drying device for traditional Chinese medicine decoction pieces | |
CN105498376B (en) | A kind of tornado air cleaning unit and purification method | |
CN215724703U (en) | Hot pepper processing sunning frame | |
CN117533166B (en) | Alternating-current charging pile shell convenient to cool |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190917 Termination date: 20201205 |
|
CF01 | Termination of patent right due to non-payment of annual fee |