CN209395119U - Rubber overshoes glazing production line - Google Patents

Rubber overshoes glazing production line Download PDF

Info

Publication number
CN209395119U
CN209395119U CN201920004209.3U CN201920004209U CN209395119U CN 209395119 U CN209395119 U CN 209395119U CN 201920004209 U CN201920004209 U CN 201920004209U CN 209395119 U CN209395119 U CN 209395119U
Authority
CN
China
Prior art keywords
transmission chain
conveyor frame
drying tunnel
steam drying
production line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920004209.3U
Other languages
Chinese (zh)
Inventor
吴英子
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HANGZHOU JINHU SHOES Co Ltd
Original Assignee
HANGZHOU JINHU SHOES Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HANGZHOU JINHU SHOES Co Ltd filed Critical HANGZHOU JINHU SHOES Co Ltd
Priority to CN201920004209.3U priority Critical patent/CN209395119U/en
Application granted granted Critical
Publication of CN209395119U publication Critical patent/CN209395119U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Drying Of Solid Materials (AREA)

Abstract

This rubber overshoes glazing production line includes conveyor frame, transmission chain is equipped in conveyor frame, and the driving mechanism of the driving transmission chain rotation, be equipped in conveyor frame is in horizontally disposed steam drying tunnel, the top of transmission chain passes through steam drying tunnel and is flexibly connected with steam drying tunnel, the lower part of transmission chain is flexibly connected with conveyor frame, one end of steam drying tunnel is upstream end, the other end is outlet end, the blowning installation positioned at outlet end is equipped in conveyor frame, several intervals are connected on transmission chain uniformly and in the suspension arrangement being distributed vertically, the guide rail being located at below steam drying tunnel is equipped in conveyor frame, the directive wheel that can be walked on guide rail is respectively equipped on each suspension arrangement, the conveyor frame is equipped with several sprocket wheels one, several sprocket wheels two are equipped in the inner top of steam drying tunnel, the transmission Chain is wound around on sprocket wheel one and sprocket wheel two.Operation noise is dug and reduced utility model has the advantages that can be effectively relieved.

Description

Rubber overshoes glazing production line
Technical field
The utility model belongs to rubber overshoes manufacturing machine technical field more particularly to a kind of rubber overshoes glazing production line.
Background technique
Rubber overshoes are a kind of using rubber as sole or the shoes of upper of a shoe of shoes.
It in the rainy day can play the role of waterproof to rubber overshoes, and can also play protection outdoors, for example, extraneous Glove incised wound etc..
Rubber overshoes in the fabrication process, need to carry out semi-finished product rubber overshoes upper light processing, and traditional upper light processing uses people Work immerses in upper optical medium, is then re-fed into drying equipment and is dried.
When being sent into drying equipment, rubber overshoes are generally suspension status, and driving chain is in vertical distribution.
It is then dispatched into drying equipment after upper optical medium immerses, split type production, although flexible and convenient, Be, this production line its occupy place it is larger, meanwhile, after rubber overshoes are suspended on hook, since the lateral deviation at center causes to be driven Chain, which is easy to scratch, arrives rubber overshoes, influences rubber overshoes quality.
Utility model content
The purpose of this utility model is in view of the above-mentioned problems, providing a kind of compact-sized and more reasonable rubber overshoes glazing of design Use production line.
In order to achieve the above objectives, the utility model uses following technical proposal: this rubber overshoes glazing includes passing with production line Rack is sent, transmission chain, and the driving mechanism of the driving transmission chain rotation are equipped in conveyor frame, in conveyor frame Being equipped with is in horizontally disposed steam drying tunnel, and the top of transmission chain passes through steam drying tunnel and is flexibly connected with steam drying tunnel, is passed The lower part of chain is sent to be flexibly connected with conveyor frame, one end of steam drying tunnel is upstream end, and the other end is outlet end, in conveyer Frame is equipped with the blowning installation positioned at outlet end, and several intervals are connected on transmission chain uniformly and in the suspension being distributed vertically Device is equipped with the guide rail being located at below steam drying tunnel in conveyor frame, and being respectively equipped on each suspension arrangement can lead The directive wheel walked on rail, the conveyor frame are equipped with several sprocket wheels one, are equipped with several chains in the inner top of steam drying tunnel Wheel two, the transmission chain is wound around on sprocket wheel one and sprocket wheel two.
Together, structure is more compact and virtually reduces occupied area for transmission and drying.
Suspension arrangement, guide rail and directive wheel may insure occur biggish lateral deviation phenomenon during horizontal transmission; Meanwhile being engaged using inner top with transmission chain, it can further prevent occurring lateral deviation phenomenon during horizontal transmission, Overall construction design is more reasonable.
In above-mentioned rubber overshoes glazing production line, the conveyor frame is equipped with a big drive sprocket, described Big drive sprocket is engaged with transmission chain, and the big drive sprocket is connect by belt drive structure with driving motor.
Belt drive structure includes two driving pulleys, and the belt being wound around on driving pulley.
In above-mentioned rubber overshoes glazing production line, the blowning installation includes escape pipe, is connected on escape pipe At least one outlet pipe, the sub- pipe of outlet is for blowing to rubber overshoes outer wall.
In above-mentioned rubber overshoes glazing production line, the suspension arrangement includes that middle part top passes through connecting shaft and transmission The connecting plate that chain is flexibly connected, connecting plate are equipped with hook in being vertically arranged on connecting plate, and connecting shaft is fixed on connecting plate Inner surface middle and upper part is equipped with the protective jacket being set on the outside of connecting shaft in the inner surface middle and upper part of connecting plate and one end inserts in Pressure spring in protective jacket, the other end of pressure spring are resisted against on transmission chain lateral surface, and middle part is equipped with convex shoulder, pressure spring in protective jacket The one end inserted in protective jacket is resisted against on convex shoulder, and compression spring sleeve is in connecting shaft.
It is additionally arranged connecting shaft collaboration protective jacket and pressure spring structure, after hanging rubber overshoes, lateral deviation occurs for center of gravity at this time, and adopts Lateral deviation angle can be effectively reduced with the elastic force of pressure spring, can be with the smooth operation of effective guarantee driving chain, and reduce fortune Noise during row.
In above-mentioned rubber overshoes glazing production line, the axial line of the protective jacket axial line and connecting shaft is overlapped.
Center is overlapped, and operation ride comfort can be improved.
In above-mentioned rubber overshoes glazing production line, it is arranged rubber sleeve in the connecting shaft and rubber sleeve is located at pressure spring It is interior.
It can further reduce internal noise rubber sleeve, and the friction avoided between metal and metal is led Cause abrasion and noise.
In above-mentioned rubber overshoes glazing production line, the rubber sleeve is equipped with fold outward close to one end of transmission chain Flange.
The structure its can equally play the role of Auxiliary support.
In above-mentioned rubber overshoes glazing production line, the connecting plate middle and upper part is equipped with location hole, and connecting shaft outer end is inserted In location hole, the outer aperture of location hole be equipped with several notches one, on the outer end end face of connecting shaft be equipped with it is several with it is described Notch one correspond and the notch two that is connected to notch one, further include a number of locking equal with one quantity of notch Item, one end of locking item are stuck in notch one, and the other end of locking item is stuck in notch two, and the locking item and notch one are logical The connection of bolt one is crossed, the locking item and notch two are connected by bolt two.
It may insure bonding strength to the structure, at the same time it can also easy to disassemble.
The inner end of locking item is separately fixed on disk, and disk is located on the outside of the outer end of connecting shaft.
In above-mentioned rubber overshoes glazing production line, the connecting plate upper inner is equipped with directive wheel.
Guide rail on directive wheel and glazing production line cooperates, and walking may insure stabilization in the process of running on guide rail Property.
In above-mentioned rubber overshoes glazing production line, the hook includes transverse bar, and one end of transverse bar is fixed on company The lower surface lower end of fishplate bar, the other end is hanging, is equipped with hook in the free end of transverse bar.
In above-mentioned rubber overshoes glazing production line, the rubber sleeve outer wall is equipped with several along rubber sleeve length direction The convex ribs of setting.
Convex ribs its can reduce contact area.
In above-mentioned rubber overshoes glazing production line, the end face that the convex shoulder is contacted with pressure spring is equipped with magnetic circle.
Magnetism encloses it prevents the axial float of pressure spring to the full extent.
In above-mentioned rubber overshoes glazing production line, the protective jacket is circumferentially with several radial through-hole, and inserts in Bolt in each through-hole is equipped with the screw hole for being inserted into and connecting one by one with bolt thread for the bolt on convex shoulder.
It is main or for the ease of processing and manufacturing for the structure.
It is of course also possible to use casting integrated structure, protective jacket and convex shoulder integrally casting shaping.
Compared with prior art, the advantages of this rubber overshoes glazing production line, is:
1, suspension arrangement, guide rail and directive wheel may insure that occurring biggish lateral deviation during horizontal transmission shows As;Meanwhile being engaged using inner top with transmission chain, it is existing can to further prevent occurring during horizontal transmission lateral deviation As overall construction design is more reasonable.
2, it is additionally arranged connecting shaft collaboration protective jacket and pressure spring structure, after hanging rubber overshoes, lateral deviation occurs for center of gravity at this time, and Lateral deviation angle can be effectively reduced using the elastic force of pressure spring, can be with the smooth operation of effective guarantee driving chain, and reduce Noise in operational process.
3, structure is simple and easy to manufacture.
Detailed description of the invention
Fig. 1 is suspension arrangement transversal cross-section schematic cross-sectional view provided by the utility model.
Fig. 2 is suspension arrangement side view partial structural diagram provided by the utility model.
Fig. 3 is rubber sleeve structural schematic diagram provided by the utility model.
Fig. 4 is magnetic coil structures schematic diagram provided by the utility model.
Fig. 5 is production line structural schematic diagram provided by the utility model.
Fig. 6 is steam drying tunnel structure schematic diagram provided by the utility model.
Fig. 7 is big drive sprocket driving mechanism structure schematic diagram provided by the utility model.
In figure, connecting shaft a1, two a11 of notch, locking a12, one a13 of bolt, two a14 of bolt, transmission chain a2, connection Plate a3, protective jacket a31, bolt a311, pressure spring a32, convex shoulder a33, magnetic circle a330, location hole a34, one a35 of notch, hook A4, transverse bar a41, hook a42, rubber sleeve a5, flange a51, convex ribs a52, directive wheel a6, conveyor frame 10, guide rail 100, chain Take turns one 101, big drive sprocket 102, driving motor 103, steam drying tunnel 20, sprocket wheel 2 200, top a21, lower part a22, dress of blowing Set the sub- pipe 302 of 30, escape pipe 301, outlet, suspension arrangement a.
Specific embodiment
It is the specific embodiment of utility model and in conjunction with attached drawing below, the technical solution of the utility model is made further Description, but the utility model is not limited to these examples.
As illustrated in figs. 5-7,
This rubber overshoes glazing production line includes conveyor frame 10, transmission chain a2 is equipped in conveyor frame 10, and drive The driving mechanism of the transmission chain a2 rotation is moved, driving mechanism includes the big drive sprocket 102 being arranged in conveyor frame 10, The big drive sprocket 102 is engaged with transmission chain a2, and the big drive sprocket 102 passes through belt drive structure and driving electricity Machine 103 connects.
Being equipped in conveyor frame 10 is in horizontally disposed steam drying tunnel 20, and steam drying tunnel 20 includes metal layer and setting In the steam pipework of metal layer inner wall, asbestos insulating layer is equipped in the outer wall of metal layer.
The top a21 of transmission chain a2 passes through steam drying tunnel 20 and is flexibly connected with steam drying tunnel 20, transmission chain a2's Lower part a22 is flexibly connected with conveyor frame 10, and one end of steam drying tunnel 20 is upstream end, and the other end is outlet end, in conveyer Frame 10 is equipped with the blowning installation 30 positioned at outlet end, and specifically, the blowning installation 30 of the present embodiment includes escape pipe 301, The sub- pipe 302 of at least one outlet is connected on escape pipe 301, the sub- pipe 302 of outlet is for blowing to rubber overshoes outer wall.
Escape pipe 301 is connect with pulsometer.
It is connected with air gun on the sub- pipe 302 of outlet, convenient for alignment rubber overshoes.
The quantity of escape pipe can be set according to actual requirement.
Several intervals are connected on transmission chain a2 uniformly and in the suspension arrangement a being distributed vertically, in conveyor frame 10 It is equipped with the guide rail 100 for being located at 20 lower section of steam drying tunnel, being respectively equipped on each suspension arrangement a can be in 100 uplink of guide rail The directive wheel a6 walked, the conveyor frame 10 are equipped with several sprocket wheels 1, are equipped in the inner top of steam drying tunnel 20 several Sprocket wheel 2 200, the transmission chain a2 are wound around on sprocket wheel 1 and sprocket wheel 2 200.
After rubber overshoes are hung on suspension arrangement, transmission chain a2 at this time is started turning, force rubber overshoes from steam drying tunnel 20 into Entering end to enter, steam drying tunnel 20 dries the rubber overshoes after glazing, when rubber overshoes are rotated to blowning installation 30, blowning installation 30 It blows to rubber overshoes, there is heat dissipation and cooling, at the same time it can also which surface residue blows off, then unload rubber overshoes, That is, completing a whole set of procedure of processing.
Specifically, as shown in Figs 1-4, suspension arrangement a includes that middle part top passes through connecting shaft a1 and transmission chain a2 activity In being vertically arranged, connecting plate a3 upper inner is equipped with directive wheel a6 by the connecting plate a3 of connection, connecting plate a3.
Directive wheel a6 is not contacted with the inner top of steam drying tunnel 20.
Connecting shaft a1 is inserted in the chain-plate pin of transmission chain a2, set between connecting shaft a1 and chain-plate pin there are two interval set The bearing set.
Hook a4 is equipped on connecting plate a3, specifically, the hook a4 of the present embodiment includes transverse bar a41, transverse bar a41 One end be fixed on the lower surface lower end of connecting plate a3, the other end is hanging, is equipped with hook a42 in the free end of transverse bar a41.
It is fixed on the inner surface middle and upper part of connecting plate a3 in connecting shaft a1, is equipped with set in the inner surface middle and upper part of connecting plate a3 It is located at the pressure spring a32 that protective jacket a31 and one end on the outside of connecting shaft a1 are inserted in protective jacket a31, the other end of pressure spring a32 It is resisted against on transmission chain a2 lateral surface, middle part is equipped with convex shoulder a33 in protective jacket a31, and pressure spring a32 is inserted in protective jacket a31 One end be resisted against on convex shoulder a33, pressure spring a32 covers on connecting shaft a1.
The axial line of prioritization scheme, the protective jacket a31 axial line and connecting shaft a1 are overlapped.
Prioritization scheme, is arranged rubber sleeve a5 on connecting shaft a1 and rubber sleeve a5 is located in pressure spring a32.
Secondly, the flange a51 turned down outward is equipped with close to one end of transmission chain a2 in rubber sleeve a5.
In addition, being equipped with location hole a34 in the middle and upper part connecting plate a3, the outer end connecting shaft a1 inserts in location hole a34, is positioning The outer aperture of hole a34 is equipped with several one a35 of notch, and several and described notches one is equipped on the outer end end face of connecting shaft a1 Two a11 of notch that a35 is corresponded and is connected to one a35 of notch, further includes a number of lock equal with one a35 quantity of notch Only a12, one end of locking a12 are stuck in one a35 of notch, and the other end of locking a12 is stuck in two a11 of notch, described Locking a12 connected with one a35 of notch by one a13 of bolt, the locking a12 and two a11 of notch pass through bolt two A14 connection.
Several convex ribs a52 being arranged along rubber sleeve a5 length direction are equipped in rubber sleeve a5 outer wall.
Magnetic circle a330 is equipped on the end face that convex shoulder a33 is contacted with pressure spring a32.
Several radial through-hole are circumferentially in protective jacket a31, and insert in the bolt a311 in each through-hole, in convex shoulder A33 is equipped with the screw hole a331 for being inserted into and being threadedly coupled one by one with bolt a311 for the bolt a311.
In the present embodiment
After rubber overshoes suspension, present apparatus center of gravity can be forced to driving chain side lateral deviation, and designed pressure spring its can play Good resilient support effect, can reduce the more serious technical problem of driving chain lateral deviation to the full extent.
The specific embodiments described herein are merely examples of the spirit of the present invention.The utility model institute Belonging to those skilled in the art can make various modifications or additions to the described embodiments or using similar Mode substitute, but without departing from the spirit of the present application or beyond the scope of the appended claims.

Claims (7)

1. rubber overshoes glazing production line, including conveyor frame (10) are equipped with transmission chain (a2) on conveyor frame (10), and The driving mechanism for driving the transmission chain (a2) to rotate, which is characterized in that be equipped on conveyor frame (10) in horizontally disposed Steam drying tunnel (20), the top (a21) of transmission chain (a2) pass through steam drying tunnel (20) and with steam drying tunnel (20) activity even It connecing, the lower part (a22) of transmission chain (a2) is flexibly connected with conveyor frame (10), and one end of steam drying tunnel (20) is upstream end, The other end is outlet end, the blowning installation (30) positioned at outlet end is equipped on conveyor frame (10), on transmission chain (a2) Several intervals are connected with uniformly and in the suspension arrangement (a) being distributed vertically, is equipped on conveyor frame (10) and is located at steam drying tunnel (20) guide rail (100) below is respectively equipped with the directive wheel that can be walked on guide rail (100) on each suspension arrangement (a) (a6), the conveyor frame (10) is equipped with several sprocket wheels one (101), is equipped with several chains in the inner top of steam drying tunnel (20) Two (200) are taken turns, the transmission chain (a2) is wound around on sprocket wheel one (101) and sprocket wheel two (200).
2. rubber overshoes glazing production line according to claim 1, which is characterized in that the conveyor frame (10) is equipped with One big drive sprocket (102), the big drive sprocket (102) are engaged with transmission chain (a2), the big drive sprocket (102) it is connect by belt drive structure with driving motor (103).
3. rubber overshoes glazing production line according to claim 1, which is characterized in that the blowning installation (30) includes Tracheae (301), is connected at least one outlet pipe (302) on escape pipe (301), and outlet pipe (302) is used for rubber overshoes Outer wall is blown.
4. rubber overshoes glazing production line according to claim 1, which is characterized in that during the suspension arrangement (a) includes Portion top passes through the connecting plate (a3) that connecting shaft (a1) is flexibly connected with transmission chain (a2), and connecting plate (a3) is in be vertically arranged, Hook (a4) is equipped on connecting plate (a3), the connecting shaft (a1) is fixed on the inner surface middle and upper part of connecting plate (a3), The inner surface middle and upper part of connecting plate (a3) inserts in anti-equipped with the protective jacket (a31) and one end being set on the outside of connecting shaft (a1) Pressure spring (a32) in sheath (a31), the other end of pressure spring (a32) is resisted against on transmission chain (a2) lateral surface, in protective jacket (a31) middle part is equipped with convex shoulder (a33) in, and one end that pressure spring (a32) inserts in protective jacket (a31) is resisted against on convex shoulder (a33), presses Spring (a32) covers on connecting shaft (a1).
5. rubber overshoes glazing production line according to claim 4, which is characterized in that be arranged in the connecting shaft (a1) Rubber sleeve (a5) and rubber sleeve (a5) are located in pressure spring (a32).
6. rubber overshoes glazing production line according to claim 5, which is characterized in that the rubber sleeve (a5) is close to transmission One end of chain (a2) is equipped with the flange (a51) turned down outward.
7. rubber overshoes glazing production line according to claim 4, which is characterized in that described middle and upper part connecting plate (a3) is set Have location hole (a34), the outer end connecting shaft (a1) inserts in location hole (a34), is equipped with several lack in the outer aperture of location hole (a34) One (a35) of mouth is equipped with several and described notch one (a35) one-to-one correspondence and and notch on the outer end end face of connecting shaft (a1) The notch two (a11) of one (a35) connection, further includes a number of locking item (a12) equal with (a35) quantity of notch one, lock Only one end of item (a12) is stuck in notch one (a35), and the other end of locking item (a12) is stuck in notch two (a11), described Locking item (a12) and notch one (a35) are connected by bolt one (a13), and the locking item (a12) and notch two (a11) are logical Cross bolt two (a14) connection.
CN201920004209.3U 2019-01-02 2019-01-02 Rubber overshoes glazing production line Expired - Fee Related CN209395119U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920004209.3U CN209395119U (en) 2019-01-02 2019-01-02 Rubber overshoes glazing production line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920004209.3U CN209395119U (en) 2019-01-02 2019-01-02 Rubber overshoes glazing production line

Publications (1)

Publication Number Publication Date
CN209395119U true CN209395119U (en) 2019-09-17

Family

ID=67897613

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920004209.3U Expired - Fee Related CN209395119U (en) 2019-01-02 2019-01-02 Rubber overshoes glazing production line

Country Status (1)

Country Link
CN (1) CN209395119U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111170003A (en) * 2020-01-03 2020-05-19 福建省奔浪体育用品有限公司 Conveyer that swimsuit processing lines used

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111170003A (en) * 2020-01-03 2020-05-19 福建省奔浪体育用品有限公司 Conveyer that swimsuit processing lines used
CN111170003B (en) * 2020-01-03 2021-11-23 福建省奔浪体育用品有限公司 Conveyer that swimsuit processing lines used

Similar Documents

Publication Publication Date Title
CN209395119U (en) Rubber overshoes glazing production line
CN207204453U (en) A kind of paint-spraying production line for industrial valve
CN107055177A (en) A kind of fine-tuning cloth transition frame of lower driving roller easy installation and removal
CN205634550U (en) Rope sheave
CN209112907U (en) One kind having anti-explosion wear-resistant conveyer belt
CN109184078B (en) Assembled cylinder
CN207860303U (en) Magnetic suck crawler belt climbing robot
CN109955229A (en) A kind of industrial robot steering mechanism
CN103803383A (en) Elevator traction system
CN209613328U (en) Surface processing device is used in a kind of production of slider of zipper fastener
CN208948183U (en) Miniature flat belt pipeline
CN107310902B (en) Transmission device for full-automatic hollow glass glue spreader
CN209346185U (en) Light processing suspension arrangement on rubber overshoes
CN205482269U (en) Energy -conserving thermal -insulated hot -blast curtain device of drying of vertical work piece
CN206017597U (en) Chain protection equipment
CN215973427U (en) Novel durable rubber conveyer belt
CN210619307U (en) Reliable-working type steel belt material cooling conveyor with double supporting wheels for limiting and supporting
CN206529198U (en) A kind of layer door gear of convenient disassembly
CN108532460B (en) A kind of catamaran type cable climbing robot
CN209284401U (en) Rubber overshoes leak test p-wire
WO2018035961A1 (en) Protective device for chain
CN207807294U (en) A kind of glass fiber reinforced plastic tank cylinder grinding device
CN206986550U (en) A kind of house hoisting clothes-horse
CN206013754U (en) A kind of limberoller
CN205916874U (en) Elevator traction wheel

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190917