CN209393429U - Paint spraying system - Google Patents

Paint spraying system Download PDF

Info

Publication number
CN209393429U
CN209393429U CN201821825055.6U CN201821825055U CN209393429U CN 209393429 U CN209393429 U CN 209393429U CN 201821825055 U CN201821825055 U CN 201821825055U CN 209393429 U CN209393429 U CN 209393429U
Authority
CN
China
Prior art keywords
paint
transparent
spray booth
spray
spraying system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821825055.6U
Other languages
Chinese (zh)
Inventor
于飞
陈益平
孙国俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Smart Car Technology (shanghai) Co Ltd
Original Assignee
Smart Car Technology (shanghai) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Smart Car Technology (shanghai) Co Ltd filed Critical Smart Car Technology (shanghai) Co Ltd
Priority to CN201821825055.6U priority Critical patent/CN209393429U/en
Application granted granted Critical
Publication of CN209393429U publication Critical patent/CN209393429U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Details Or Accessories Of Spraying Plant Or Apparatus (AREA)

Abstract

The utility model embodiment discloses a kind of paint spraying system, including paint spray booth, controlled observation room, spray-painting plant, spray painting control device, wherein: the spray-painting plant is set in the paint spray booth, and the spray painting control device with the spray-painting plant communication connection is provided in the controlled observation room;It is provided with partition between the paint spray booth and the controlled observation room, transparent viewing port at least one is set on the partition, the transparent viewing port is detachably equipped with transparent protective layer.The reduction of transparent viewing port cleaning cost may be implemented in the utility model embodiment, makes personnel that can obviously observe spray painting indoor situations, effective monitoring spraying process from controlled observation room.

Description

Paint spraying system
Technical field
The utility model relates to automobile processing technology, especially a kind of paint spraying system.
Background technique
Automotive lacquer is to show coast of paint on car surface to achieve the effect that protect automobile.Paint spray booth is to carry out spray painting work Important place.Vehicle body spray painting is painted compared to components, and spray area is bigger, and paint consumption is bigger.During spraying, Especially by hand spray operation in the case where, can inevitably generate a large amount of coating clouds, be attached to spray painting chamber interior walls on.Coating cloud It is attached to compare in spray painting chamber interior walls and is difficult to clear up, need to expend a large amount of manpower and material resources, also to sacrifice the valuable production time. A large amount of coating clouds not only cause spray painting indoor environmental quality decline, clean increased costs, the personnel of also causing can not be clearly viewed In paint spray booth, it is unable to effective monitoring spraying process.
Utility model content
The utility model embodiment provides a kind of paint spraying system, and the indoor feelings of spray painting are clearly viewed in the personnel of may be implemented Condition, effective monitoring spraying process.
The paint spraying system of the utility model embodiment, including paint spray booth, controlled observation room, spray-painting plant, spray painting control dress It sets, in which:
The spray-painting plant is set in the paint spray booth, is provided in the controlled observation room logical with the spray-painting plant Interrogate the spray painting control device of connection;
It is provided with partition between the paint spray booth and the controlled observation room, transparent sight at least one is set on the partition Cha Kou, the transparent viewing port are detachably equipped with transparent protective layer.
Optionally, in any of the above-described paint spraying system embodiment of the utility model, the transparent protective layer includes flexible saturating Bright film.
Optionally, in any of the above-described paint spraying system embodiment of the utility model, the flexible transparent film includes and institute State the transparent plastic film that transparent viewing port size matches.
Optionally, in any of the above-described paint spraying system embodiment of the utility model, predeterminable area is arranged on the partition Transparent glass partition window, the transparent viewing port are set on the transparent glass partition window, described in the transparent glass partition window Remove the region coating coating cloud absorbent coating of the transparent viewing port in the side of paint spray booth.
Optionally, in any of the above-described paint spraying system embodiment of the utility model, the inside of the paint spray booth is except described Remaining wall surface of bright glass partition window is equipped with stainless steel panel.
Optionally, in any of the above-described paint spraying system embodiment of the utility model, in the stainless steel panel described in coating Coating cloud absorbent coating.
Optionally, in any of the above-described paint spraying system embodiment of the utility model, the coating cloud absorbent coating includes water-soluble Property dust adhering agent coating.
Optionally, it in any of the above-described paint spraying system embodiment of the utility model, is provided on the floor of the paint spray booth Sink, the sink are covered by grid, track are provided on the grid, is provided with vehicle location on the track Slot.
Optionally, in any of the above-described paint spraying system embodiment of the utility model, it is additionally provided with fan in the paint spray booth, Coating cloud drainage in part is entered sink by the fan.
Based on above-mentioned paint spraying system provided by the embodiment of the utility model, by between paint spray booth and controlled observation room Transparent viewing port is set on partition, can make personnel that can be clearly apparent in paint spray booth in controlled observation room;By in transparent sight The upper detachable installation transparent protective layer of Cha Kou, can enable operator when protective layer, which is painted indoor coating cloud, influences transparency It is enough simply and easily to replace transparent protective layer, it ensures that transparent viewing port can make to obviously observe in paint spray booth, reduces transparent Observation panel cleaning cost.
Below by drawings and examples, the technical solution of the utility model is described in further detail.
Detailed description of the invention
The attached drawing for constituting part of specification describes the embodiments of the present invention, and is used for together with description Explain the principles of the present invention.
The utility model can be more clearly understood according to following detailed description referring to attached drawing, in which:
Fig. 1 is the structural schematic diagram of the paint spraying system of some embodiments of the utility model;
Fig. 2 is the structure side structure schematic view of paint spray booth in other embodiments of the utility model.
Specific embodiment
The various exemplary embodiments of the utility model are described in detail now with reference to attached drawing.It should also be noted that unless another It illustrates outside, the component and the positioned opposite of step, numerical expression and numerical value otherwise illustrated in these embodiments is unlimited The scope of the utility model processed.
Simultaneously, it should be appreciated that for ease of description, the size of various pieces shown in attached drawing is not according to reality Proportionate relationship draw.
Be to the description only actually of at least one exemplary embodiment below it is illustrative, never as to this is practical Novel and its application or any restrictions used.
Technology and equipment known to person of ordinary skill in the relevant may be not discussed in detail, but in appropriate situation Under, the technology and equipment should be considered as part of specification.
It should also be noted that similar label and letter indicate similar terms in following attached drawing, therefore, once a certain Xiang Yi It is defined in a attached drawing, then in subsequent attached drawing does not need that it is further discussed.
Fig. 1 is the structural schematic diagram of the paint spraying system of some embodiments of the utility model.As shown in Figure 1, the present embodiment Paint spraying system includes: paint spray booth 1, controlled observation room 2, spray-painting plant 11, spray painting control device 21, wherein spray-painting plant 11 is set It is placed in paint spray booth 1, the spray painting control device 21 with 11 communication connection of spray-painting plant is provided in controlled observation room 2;Paint spray booth 1 It is provided with partition 3 between controlled observation room 2, transparent viewing port 31 at least one is set on partition 3, transparent viewing port 31 is torn open It unloads and transparent protective layer 32 is installed.
In the present embodiment, monitoring personnel is observed in paint spray booth 1 by transparent viewing port 31 in controlled observation room 2 and is sprayed Paint the spray painting operation situation of device 11.Spray-painting plant 11 is controlled by the spray painting control device 21 being arranged in controlled observation room 2 Movement, for example, spray painting operation starts, spray painting operation terminates, the time interval in painting process between each movement, various originals Whether the stirring ratio and spray-painting plant 11 of speed and spray painting paint vehicle that paint vehicle enters generate failure etc..In addition to this, exist The staff to be painted manually in paint spray booth can also pass through monitoring personnel of the transparent viewing port 31 into controlled observation room 2 The situation in paint spray booth 1 is conveyed, such as after paint spraying personnel have found manual spray gun obstruction unexpected situation in paint spray booth 1, it can be with It avoids leaving paint spray booth 1 and enters back into unexpected situation solution caused by controlled observation room 2 is reported and released to unexpected situation never Timely problem directly carries out signal report by monitoring personnel of the transparent viewing port 31 into controlled observation room 2, saves failure The time of exclusion has ensured the efficiency of spraying operation.
Due in paint spray booth 1 carry out spray area it is larger, to paint vehicle consumption biggish spraying operation when, especially by In the case where hand spray operation, it can inevitably generate a large amount of coating clouds and be attached on the wall surface of 1 inside of paint spray booth, both cause Environmental quality declines in paint spray booth 1, and causes the operator in controlled observation room 2 that can not observe and understand in paint spray booth 1, cannot Reach effective monitoring spraying process.The coating cloud cleaning of attachment is relatively difficult, and the interval short period just needs large area to clear up, and needs A large amount of manpower and material resources are expended, the valuable production time is especially sacrificed, influence production efficiency.
It is opened up on the partition 3 that paint spraying system provided in this embodiment is arranged between paint spray booth 1 and controlled observation room 2 transparent The side of observation panel 31, the paint spray booth 1 at transparent viewing port 31 is detachably installed by transparent protective layer 32.Transparent protective layer 32 It can regularly replace, can both ensure that the monitoring personnel in controlled observation room 2 has enough visuals field and clarity to observe paint spray booth 1 Interior situation, it is thus also avoided that the case where often manpower and material resources caused by avoiding progress large area cleaning in paint spray booth 1 waste;It removes Except this, periodically carrying out replacement to transparent protective layer 32 can be completed or stop the short period without stopping spraying operation It completes, for example, can spend the short period that transparent protective layer can be completed by the operator in paint spray booth 1 after daily stop work 32 replacement, it is simple to operate, the efficiency of spraying operation in paint spray booth 1 is not influenced.
What transparent protective layer 32 was chosen is easily to be adhered to transparent viewing port 31, and conveniently dismantle from transparent viewing port 32 The transparent material to get off.The matter for the paint that material selected by transparent protective layer 32 can not spray spray-painting plant 11 in paint spray booth 1 Amount has an impact, such as certain transparent materials easily have an impact the gas of paint vehicle quality, and painting quality is caused to decline, and influence to spray Apply the quality of effect and product.
Spray-painting plant 11 includes auto spray painting device and manual spray-painting plant, and wherein auto spray painting device can be automatic spray Paint robot.So that auto spray painting machine people is completed auto spray painting work by program setting, the control device that paints can also be passed through 21 control auto spray painting machine people complete spray painting operation, such as control the proportion of auto spray painting machine people original paint and meet to blend Spray desired paint vehicle;For manual spray-painting plant, monitoring personnel is needed before paint vehicle enters paint spray booth 1 by spraying operation institute The paint vehicle needed is configured, which is completed by spray painting control device 21.
The present embodiment by the way that transparent viewing port 31 is arranged on the partition 3 that is arranged between paint spray booth 1 and controlled observation room 2, And regular dismounting installs transparent protective layer 32 in transparent viewing port 31, has both ensured the monitoring personnel energy in controlled observation room 2 The operation observed to enough clear and definites the situation in paint spray booth, control spray-painting plant 11 in time, it is thus also avoided that interval short period Need the case where cleaning to 1 interior sidewall surface of paint spray booth, reduce the manpower and material resources that clean painting room 1 is wasted, save at This, improves the efficiency of spraying operation.
In some embodiments, transparent protective layer 32 includes flexible transparent film.Flexible transparent film needs in the present embodiment There is a degree of adsorptivity, is also possible to that the side of flexible transparent film being bonded with transparent viewing port 31 is provided with one Fixed binder, but the binder does not remain during flexible transparent film is dismantled in transparent viewing port.It can at one In the example of choosing, transparent viewing port 31 be glass, flexible transparent film include match with 31 size of transparent viewing port it is transparent Plastic film, such as preservative film used in production and living decide the size of transparent plastic film and the ruler of transparent viewing port 31 Size very little identical or slightly larger than transparent viewing port 31 ensures that transparent viewing port 31 does not contact i.e. with the coating cloud in paint spray booth 1 It can.By adhering to layer of transparent plastic film in transparent viewing port 31, neither influence monitoring personnel is supervised from transparent viewing port 31 Control paint spray booth 1 in situation clarity, and it is simple to operate, reduce the clean cost of watch window.
In some embodiments, as shown in Figure 1, transparent glass partition window, transparent viewing port is arranged in predeterminable area on partition 3 31 are set on transparent glass partition window, remove the region coating paint of transparent viewing port in the side of the paint spray booth of transparent glass partition window 1 Mist absorbent coating.Three block-shaped identical regions are labeled on partition 3 as shown in Figure 1, which is the present embodiment Related transparent glass partition window.
The present embodiment by the way that transparent glass partition window is arranged on partition 3, can ensure paint spray booth 1 and controlled observation room 2 it Between can improve the quality painted manually with light transmission;Is being carried out to paint spray booth 1, monitoring personnel is also large area coating cloud clean initial stage More wide-field monitoring can be carried out to the situation in paint spray booth 1 by transparent glass partition window.The present embodiment passes through on partition 3 Transparent glass partition window is set, and monitoring personnel can also be by transparent glass observation window after coating cloud is attached on transparent glass observation window It indistinctly observes the situation in paint spray booth 1, is confirmed after finding indeterminate fault by transparent viewing port 31.Improve spray painting The timeliness of indoor 11 fault discovery of spray-painting plant and the quality painted manually.
In some embodiments, remaining wall surface that transparent glass partition window is removed in the inside of paint spray booth 1 is equipped with stainless steel panel. Since its own characteristic advantage is not easily susceptible to chemical attack, the coating cloud that the paint vehicle for spraying operation generates is adhered to not stainless steel It is not easy to generate corrosiveness to stainless steel panel after in rust steel panel, causes the structural damage of stainless steel panel.The present embodiment It can keep wall surface completely not by the corrosion of coating cloud for a long time by installing stainless steel panel in 1 interior sidewall surface of paint spray booth, and Stainless steel panel easy cleaning, reduces the maintenance cost of paint spray booth 1.
In further embodiments, coating cloud absorbent coating, the coating cloud absorbent coating can also be coated in stainless steel panel It can be liquid and be attached to the coating cloud absorbent coating formed in stainless steel panel after brushing, be also possible to flexible plastic film It is pasted onto the coating cloud absorbent coating formed in stainless steel panel by another side after brushing liquid coating cloud absorption coating on one side, may be used also To be it may occur to persons skilled in the art that the coating cloud absorbent coating that is formed in stainless steel panel of other modes, the present embodiment It does not limit this.
The present embodiment can make the spraying operation in paint spray booth 1 by coating coating cloud absorbent coating in stainless steel panel When the coating cloud that generates absorbed by coating cloud absorbent coating, reduce the coating cloud concentration in paint spray booth 1, can extend coating cloud be attached to it is transparent Protective layer 32 causes the time of transparent protective layer 32 translucency difference.
In an optional example, coating cloud absorbent coating can be water-soluble dust adhering agent coating.The present embodiment is by adopting With water-soluble dust adhering agent coating, the coating cloud in paint spray booth 1 can be effectively adsorbed.It only needs to use after coating cloud absorption to a certain extent Water cleans the cleaning operation for just completing wall surface, and then wall surface after the cleaning brushes water-soluble dust adhering agent coating again. The coating cloud in paint spray booth 1 can be not only adsorbed, extension coating cloud is attached to transparent protective layer 32 and causes 32 translucency of transparent protective layer The time of difference, and it is easy to clean.
In some embodiments, as shown in Fig. 2, Fig. 2 is the structure side of paint spray booth in other embodiments of the utility model Depending on structural schematic diagram, the floor of paint spray booth 1 is provided with sink 13, sink 13 is covered by grid 14, is arranged on grid 14 There is track 15, vehicle location slot is provided on track 15.The floor of paint spray booth 1 is covered by grid 14 in the present embodiment, spray painting The coating cloud part generated in operation process is fallen on floor, and sink 13 is arranged on floor and is covered by grid 14.Pass through grid 14 Avoiding vehicle from getting wet sink and vehicle insulation to be sprayed influences coating quality.Coating cloud can also enter sink by grid 14 13, absorbed by the water in sink 13, not only reduce the coating cloud concentration in paint spray booth 1, also extend coating cloud be attached to it is transparent anti- Sheath 32 causes the time of transparent protective layer 32 translucency difference.
In one alternate embodiment, as shown in Fig. 2, being additionally provided with fan 12 in paint spray booth 1, fan 12 paints part Mist drainage enters sink 13, can further decrease the coating cloud concentration in paint spray booth 1, and extension coating cloud is attached to transparent protective layer 32 and makes At the time of transparent protective layer 32 translucency difference, also reduce to a certain extent to the clean investment of 1 inner wall of paint spray booth.
Description of the utility model is given for the purpose of illustration and description, and is not that exhaustively or incite somebody to action this Utility model is limited to disclosed form.Many modifications and variations are obvious for the ordinary skill in the art. Embodiment was chosen and described in order to better illustrate the principle and practical application of the utility model, and makes the common skill of this field Art personnel it will be appreciated that the utility model to designing various embodiments suitable for specific applications with various modifications.

Claims (9)

1. a kind of paint spraying system, which is characterized in that including paint spray booth, controlled observation room, spray-painting plant, paint control device, In:
The spray-painting plant is set in the paint spray booth, is provided in the controlled observation room and is communicated company with the spray-painting plant The spray painting control device connect;
It is provided with partition between the paint spray booth and the controlled observation room, transparent observing at least one is set on the partition Mouthful, the transparent viewing port is detachably equipped with transparent protective layer.
2. paint spraying system according to claim 1, which is characterized in that the transparent protective layer includes flexible transparent film.
3. paint spraying system according to claim 2, which is characterized in that the flexible transparent film includes and the transparent sight Examine the transparent plastic film that mouthful size matches.
4. paint spraying system according to any one of claim 1-3, which is characterized in that predeterminable area is set on the partition Transparent glass partition window is set, the transparent viewing port is set on the transparent glass partition window, in the institute of the transparent glass partition window Remove the region coating coating cloud absorbent coating of the transparent viewing port in the side for stating paint spray booth.
5. paint spraying system according to claim 4, which is characterized in that the inside of the paint spray booth except the transparent glass every Remaining wall surface of window is equipped with stainless steel panel.
6. paint spraying system according to claim 5, which is characterized in that coat the coating cloud absorption in the stainless steel panel Coating.
7. paint spraying system according to claim 5 or 6, which is characterized in that the coating cloud absorbent coating includes water-soluble viscous Dust agent coating.
8. paint spraying system according to claim 1, which is characterized in that the floor of the paint spray booth is provided with sink, institute It states sink to cover by grid, track is provided on the grid, is provided with vehicle location slot on the track.
9. paint spraying system according to claim 8, which is characterized in that be additionally provided with fan, the wind in the paint spray booth Coating cloud drainage in part is entered sink by fan.
CN201821825055.6U 2018-11-07 2018-11-07 Paint spraying system Active CN209393429U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821825055.6U CN209393429U (en) 2018-11-07 2018-11-07 Paint spraying system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821825055.6U CN209393429U (en) 2018-11-07 2018-11-07 Paint spraying system

Publications (1)

Publication Number Publication Date
CN209393429U true CN209393429U (en) 2019-09-17

Family

ID=67879467

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821825055.6U Active CN209393429U (en) 2018-11-07 2018-11-07 Paint spraying system

Country Status (1)

Country Link
CN (1) CN209393429U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110732446A (en) * 2019-10-31 2020-01-31 重庆市佳禾家具制造有限公司 board spraying process
CN113663999A (en) * 2021-08-18 2021-11-19 黑龙江华明管业有限公司 Spout zinc case convenient to clearance is inside

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110732446A (en) * 2019-10-31 2020-01-31 重庆市佳禾家具制造有限公司 board spraying process
CN110732446B (en) * 2019-10-31 2021-09-07 重庆市佳禾家具制造有限公司 Door panel spraying process
CN113663999A (en) * 2021-08-18 2021-11-19 黑龙江华明管业有限公司 Spout zinc case convenient to clearance is inside

Similar Documents

Publication Publication Date Title
US6124044A (en) Polymeric peel-off coating compositions and methods of use thereof
CN209393429U (en) Paint spraying system
CN101450343B (en) Coating method of building materials
CN101341304A (en) Material for indoor decoration, coating method and material thereof
CN101861212A (en) Have the robot of cleaning device and the method for work of attaching troops to a unit
NZ578514A (en) Fluid filter system with filters of three different density materials and method
CN2821006Y (en) Self cleaning building wall material
CN110152955A (en) A kind of intelligent and high-efficiency no sag automobile grid spraying process
CN205392864U (en) Paint spray booth
CN102167522A (en) Method for producing uvioresistant nano self-cleaning automobile glass
CN208810405U (en) A kind of environmental protection type moving paint spray booth
CN206965994U (en) A kind of portable paint spray booth bassinet structure
CN214183726U (en) Quick paint spraying apparatus of surface for hardware component processing
CN204842072U (en) Oil spout workstation
CN207385018U (en) UV coating clouds separate eliminating equipment
CN205833490U (en) A kind of environmental protection paint spraying booth
CN105623450B (en) A kind of environmentally friendly dust-binding membrane and its preparation method and application
EP1333938A1 (en) Polymeric peel-off coating compositions and method of use thereof
JP2707931B2 (en) Ducting equipment for painting
CN108395739A (en) A kind of special self-cleaning protective agent of architecture indoor metope and preparation method and application method
CN109668196A (en) A kind of electron ion purification of waste gas system and its production technology with Nano self-cleaning
CN202099962U (en) Aluminum plate with self-cleaning function
CN207343121U (en) A kind of spray robot
CN105665207A (en) Process for shielding engine part label
CN116200062B (en) Additive for preventing paint surface from being polluted, and preparation method and application thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant