CN209385084U - A kind of integrated pressure meter hanger - Google Patents

A kind of integrated pressure meter hanger Download PDF

Info

Publication number
CN209385084U
CN209385084U CN201822078421.2U CN201822078421U CN209385084U CN 209385084 U CN209385084 U CN 209385084U CN 201822078421 U CN201822078421 U CN 201822078421U CN 209385084 U CN209385084 U CN 209385084U
Authority
CN
China
Prior art keywords
hanger
hanger body
liquid outlet
pressure meter
inlet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201822078421.2U
Other languages
Chinese (zh)
Inventor
陈清华
张庆凯
高庆春
陈伟
吴培华
吴建锐
吴培国
何晓波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China France Bohai Geoservices Co Ltd
Original Assignee
China France Bohai Geoservices Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China France Bohai Geoservices Co Ltd filed Critical China France Bohai Geoservices Co Ltd
Priority to CN201822078421.2U priority Critical patent/CN209385084U/en
Application granted granted Critical
Publication of CN209385084U publication Critical patent/CN209385084U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Measuring Fluid Pressure (AREA)

Abstract

The utility model discloses a kind of integrated pressure meter hanger, hanger bodies;Fluid channel is provided with inside the hanger body along the hanger body axis direction;Inlet is provided on the side wall of the hanger body, is located at the hanger body lower part, the inlet and the fluid channel vertical connection;Liquid outlet is provided on the side wall of the hanger body, be located at the hanger body top, and with the fluid channel vertical connection;Wherein, the liquid outlet and the inlet are located at the same side;Stopping step is arranged outside the hanger body, and positioned at the inlet and the liquid outlet between, the stopping step is truncated cone-shaped structure, and the small one end of the stopping step area of section is towards the liquid outlet.This hanger can change fluid flow direction, and be able to bear jarring pressure and connection gravity by the way that stopping step is arranged, and prevent fastening means from moving down.

Description

A kind of integrated pressure meter hanger
Technical field
The utility model relates to a kind of pressure gauge hanger, especially a kind of integrated pressure meter hanger.
Background technique
Pressure gauge hanger pulling device mainly includes that pressure gauge hanger and pulling and running tool etc. are mating.Pressure gauge hanger Also it is oil pipe eyelid retractor, it is mainly made of antidetonation hanger and damper.When entering well ground by downhole electronic pressure bomb with Hanger lower end is connected and fixed.When reaching the pulling position of design, open the slips on hanger by quickly transferring And it is embedded in tube inner wall.The design of pressure gauge hanger has flow channel, is not subject to lens barrel fluid pressure difference.Do not influencing downhole fluid Circulation passage situation under, detect and record the overall process that down-hole pressure temperature changes over time for a long time.When needs are known When down-hole pressure, temperature, domestic pressure gauge hanger and pressure gauge can will be launched from life by steel wire salvaging operation It produces and is freed in tubing string, act well head, the pressure of playback underground acquisition changed over time, temperature data.
Many producers produce the pressure gauge hanger of various structures at present, and purposes is almost the same: the suspension of certain structures Device locking device, prevents hanger from being rushed to summit, but hanger internal flow latus rectum becomes smaller, and generates serious flow restriction effect It answers, seriously affects and measure data quality.The simple hanger of certain structures, although part reduces the influence of flow restriction Its hanging capacity dies down, and easy accident, which is fallen into well, causes to fall well accident.The hanger common ground of these structures is: can only use Steel wire operation specific purpose tool is sent into.This patent is lacked for excellent present in complicated hanger and the simple hanger of structure Point redesigns the pressure gauge hanger of integral type, had not only solved the problems, such as throttling but also had strengthened hanging capacity, while increasing more one Kind feeding mode (means).
Utility model content
The utility model has designed and developed a kind of integrated pressure meter hanger, can change fluid flow direction, and lead to It crosses setting stopping step and is able to bear jarring pressure and connection gravity, prevent fastening means from moving down.
Technical solution provided by the utility model are as follows:
A kind of integrated pressure meter hanger, comprising:
Hanger body;
Fluid channel is provided with inside the hanger body along the hanger body axis direction;
Inlet is provided on the side wall of the hanger body, is located at the hanger body lower part, the feed liquor Mouth and the fluid channel vertical connection;
Liquid outlet is provided on the side wall of the hanger body, be located at the hanger body top, and with it is described Fluid channel vertical connection;
Wherein, the liquid outlet and the inlet are located at the same side;
Stopping step is arranged outside the hanger body, between the inlet and the liquid outlet, institute Stating stopping step is truncated cone-shaped structure, and the small one end of the stopping step area of section is towards the liquid outlet.
Preferably, the hanger body further includes the upper connecting pin that top is arranged in and lower connection arranged at the bottom End.
Preferably, the inlet is identical with the liquid outlet structure, both ends be it is arc-shaped, centre be rectangle.
Preferably, it is provided with external screw thread on the upper connecting pin outer surface, the lower connecting pin is internally provided with interior spiral shell Line.
Preferably, the upper connecting pin is connect with steel wire tool.
Preferably, the upper connecting pin and electronics device of slipping out of the hand are connect.
Preferably, the lower connecting pin is connect with pressure gauge.
Preferably, the hanger is an integral molding structure.
It is described in the utility model the utility model has the advantages that
The integrated pressure meter hanger structure of the utility model design simplifies, and appearance seems very succinct, and succinct is outer See it is easily operated be not easy to go wrong, can especially improve seat and enter success rate.Fluid is arranged in the inside of integrated pressure meter hanger Channel is provided with the import and export of fluid on side wall, allows the liquid to laterally into laterally going out, the hanger of other producers production is big Segment fluid flow direction is longitudinal into longitudinally going out, and this programme is to change fluid flow direction, i.e., laterally into laterally going out, this scheme The advantages of be the case where not reducing fluid area, be achieved upper and lower screw connection structure it is normal excessively and realize integral type Structure.
Stopping step is set in hanger body, moving down for tool can not only be prevented, it is certain also to assign braking step Hanging capacity, be able to bear the gravity in hands free operation from jarring force above and low pressure meter.
Using integral mechanism, ontology is not welded and is connected through a screw thread, and keeps hanger external structure succinct, and Inside setting flow channel, big fluid channel allow large flow fluid to measure test money by not generating throttling action, energy perfection Material solves the technical problem that hanger generates flow restriction, excludes because measuring the underproof matter of data caused by flow restriction effect Measure hidden danger.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of integrated pressure meter hanger described in the utility model.
Fig. 2 is the operation schematic diagram that fluid described in the utility model flows in hanger.
Specific embodiment
The following describes the utility model in further detail with reference to the accompanying drawings, to enable those skilled in the art referring to explanation Book text can be implemented accordingly.
As shown in Figs. 1-2, the utility model provides a kind of integrated pressure hanger, including hanger sheet 100, hanger Ontology 100 is internally provided with fluid channel 130, and 100 top of hanger is provided with connecting pin 110, and lower part side is provided with down Connecting pin 160 offers inlet 140 and liquid outlet 120, inlet 140 and liquid outlet on the side wall of hanger body 100 120 are connected to fluid channel 130, and stopping step 150 is arranged outside hanger body 100, are located in the liquid inlet 140 and liquid outlet It is truncated cone-shaped structure between 120.
The top of hanger body 100 is provided with connecting pin 110, upper company on the top of hanger body 100 It connects and is provided with external screw thread on 110 outer surfaces of end, can be connect with steel wire tool, the device that can also slip out of the hand with electronics is connect, by one Body formula pressure gauge hanger is sent to underground, increases a kind of feeding mode.
In 100 lower part side of hanger body, it is provided with lower connecting pin 160, lower connecting pin 160 is used to connect with pressure gauge It connects.In another embodiment, 100 bottom end of hanger body is closed end.
In the side of hanger body 100, from the bottom to top, inlet 140 and liquid outlet 120 are successively offered, and outstanding The inside of hanging device ontology 100, offers fluid channel 130 in the axial direction, inlet 140 and liquid outlet 120 respectively with fluid Channel 130 is connected to, so that fluid can be realized transverse direction and go out into transverse direction in underground work.Wherein, inlet 140 and liquid outlet 120 structures are identical, and both ends are arcuate structure, and centre is rectangular configuration, and is arranged in parallel, and 140 mouthfuls of feed liquor and liquid outlet 120 are distinguished It is arranged with 130 vertical connection of fluid channel.
It in the outside of hanger body 100, is located in the liquid inlet between 140 and liquid outlet 120, is provided with stopping step 150, Stopping step 150 is truncated cone-shaped structure, and the small one end of 150 area of section of stopping step is towards 120 direction of liquid outlet.Stop Step 150 is the main position of entire hanger body, can not only prevent moving down but also having certain hang for tool Extension ability can bear the weight from jarring force (when hands free operation) and low pressure meter above.
The course of work of integrated pressure meter hanger is as follows:
1) enter well process: being delivered there are two types of mode, one is being delivered with steel wire running tool, another kind is hung with electronics is de- Device is delivered.Former delivery be pressure gauge hanger in place after, jarring under steel wire tool string, steel wire running tool is slipped out of the hand, press Power meter hanger is slipped out of the hand in seating nipple.Latter delivery be pressure gauge hanger in place after, static waiting electronics detaching/attaching device work Make, pressure gauge hanger is slipped out of the hand in seating nipple.
2) hanger and pressure gauge can carry out long-time test jobs after launching in well, both can be with during test jobs The flowing (borehole fluid flowing) that drives a well can terminate fluid flowing again with closing well.It drives a well during flowing since hanger has internal stream Therefore dynamic channel will not influence fluid flow effect, energy perfection measures data.
3) hanger and pressure gauge: after test jobs, will be recovered to together ground by removal process, only a kind of to return Debit's formula is either sent into steel wire tool or is sent into electronics detaching/attaching device, after test assignment, tripping in matched time It puts the tools away and catches pressure gauge hanger that can normally be recovered to ground.
It is not only in the description and the implementation although the embodiments of the present invention have been disclosed as above Listed utilization, it can be applied to various fields suitable for the present invention completely, for those skilled in the art, Other modifications may be easily implemented, therefore without departing from the general concept defined in the claims and the equivalent scope, this reality It is not limited to specific details and legend shown and described herein with novel.

Claims (8)

1. a kind of integrated pressure meter hanger characterized by comprising
Hanger body;
Fluid channel is provided with inside the hanger body along the hanger body axis direction;
Inlet is provided on the side wall of the hanger body, be located at the hanger body lower part, the inlet with The fluid channel vertical connection;
Liquid outlet is provided on the side wall of the hanger body, be located at the hanger body top, and with the fluid Channel vertical connection;
Wherein, the liquid outlet and the inlet are located at the same side;
Stopping step is arranged outside the hanger body, described to stop between the inlet and the liquid outlet Dynamic step is truncated cone-shaped structure, and the small one end of the stopping step area of section is towards the liquid outlet.
2. integrated pressure meter hanger according to claim 1, which is characterized in that the hanger body further includes setting It sets in the upper connecting pin and lower connecting pin arranged at the bottom at top.
3. integrated pressure meter hanger according to claim 2, which is characterized in that the inlet and the liquid outlet Structure is identical, both ends be it is arc-shaped, centre be rectangle.
4. integrated pressure meter hanger according to claim 3, which is characterized in that set on the upper connecting pin outer surface It is equipped with external screw thread, the lower connecting pin is internally provided with internal screw thread.
5. integrated pressure meter hanger according to claim 4, which is characterized in that the upper connecting pin and steel wire tool Connection.
6. integrated pressure meter hanger according to claim 5, which is characterized in that slip out of the hand with electronics the upper connecting pin Device connection.
7. integrated pressure meter hanger according to claim 6, which is characterized in that the lower connecting pin and pressure gauge connect It connects.
8. integrated pressure meter hanger according to claim 7, which is characterized in that the hanger is integrally formed knot Structure.
CN201822078421.2U 2018-12-12 2018-12-12 A kind of integrated pressure meter hanger Active CN209385084U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822078421.2U CN209385084U (en) 2018-12-12 2018-12-12 A kind of integrated pressure meter hanger

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822078421.2U CN209385084U (en) 2018-12-12 2018-12-12 A kind of integrated pressure meter hanger

Publications (1)

Publication Number Publication Date
CN209385084U true CN209385084U (en) 2019-09-13

Family

ID=67871521

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822078421.2U Active CN209385084U (en) 2018-12-12 2018-12-12 A kind of integrated pressure meter hanger

Country Status (1)

Country Link
CN (1) CN209385084U (en)

Similar Documents

Publication Publication Date Title
CN104047580B (en) Movable underground throttler and using method thereof
CN101575951B (en) Petroleum expansion pipe hanger and construction technology
CN209385084U (en) A kind of integrated pressure meter hanger
CN108533187B (en) Water detecting drill rod
CN108894760A (en) Valve pipe combined type underground throttle for gas well production and use method thereof
CN105484711B (en) Rotational flow guiding device
CN104314511B (en) Compression type bottom sealing packer
CN201027522Y (en) Well head device for double-pipe thermal oil-extraction
CN201202466Y (en) Suspension type corrosion monitoring apparatus of gas well downhole oil conduit
CN208966253U (en) Throwing and fishing device and system for blanking plug
CN205858288U (en) Speed string matched plunger gas lift water drainage gas production device
CN202531149U (en) Three-pipe thermal recovery wellhead device shell
CN207080205U (en) Hollow sucker rod pit shaft charge device
CN205243499U (en) Well monitoring hanger
US2916147A (en) Ball guide and screen for deep well jet pump
CN208735006U (en) A kind of ground control test safety valve
CN202125272U (en) Small-clamping-distance fine-dividing water distribution packer
CN204082086U (en) A kind of recoverable hanging packer
RU133188U1 (en) GAS WELL DESIGN
CN208669259U (en) A kind of novel underseal drag fracturing packer of horizontal well
CN205876241U (en) Drilling construction drill way grain slag guiding device
CN203321468U (en) Single-flow double-guide bridge-through eccentric water distribution working barrel
CN208934671U (en) Valve pipe combined type underground throttle for gas well production
CN202832337U (en) Side-open type sucker rod overshot
CN2491623Y (en) Lever pump having weighting tube

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant