CN209378706U - A kind of flue gas desulfurization device smoke-intake pipe mouth part flow arrangement - Google Patents
A kind of flue gas desulfurization device smoke-intake pipe mouth part flow arrangement Download PDFInfo
- Publication number
- CN209378706U CN209378706U CN201822119755.XU CN201822119755U CN209378706U CN 209378706 U CN209378706 U CN 209378706U CN 201822119755 U CN201822119755 U CN 201822119755U CN 209378706 U CN209378706 U CN 209378706U
- Authority
- CN
- China
- Prior art keywords
- flue gas
- upstream chamber
- room
- connecting plate
- smoke
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Treating Waste Gases (AREA)
Abstract
The utility model discloses a kind of flue gas desulfurization device smoke-intake pipe mouth part flow arrangements, including smoke pipe inlet pipeline, the first upstream chamber of flue gas is equipped with inside the smoke pipe inlet pipeline, fixed block is installed inside its first upstream chamber of flue gas, and fixed block front end is equipped with connection sheet, and the second through-hole is embedded with inside connection sheet, the connection sheet front end connects baffle, and baffle interior is embedded with through-hole, gas inlet room is equipped with below first upstream chamber of flue gas, flue gas shunting room is equipped with below its gas inlet room, and flue gas shunting chamber interior is equipped with connecting plate, and connecting tube is installed below connecting plate.When the flue gas desulfurization device smoke-intake pipe mouth part flow arrangement enters smoke pipe inlet pipeline to its flue gas by the outlet conduit in the fixed block of circular arc block, the through-hole and connecting plate of baffle interior, it slowly enters, then shunted, when solving desulfurization, the gas of entrance is excessive, fast speed, and only one inlet pipe mouth, cause desulfurizing tower have no idea abundant desulfurization the problem of.
Description
Technical field
The utility model relates to part flow arrangement technical field, specially a kind of flue gas desulfurization device smoke-intake pipe mouth shunts dress
It sets.
Background technique
Flue gas is in desulfurization, when entering desulphurization plant from chimney, when rushing in smoke orifice and entering, and only one pipe of smoke orifice
Road, in desulfurization, the gas of entrance is excessive, fast speed, causes desulfurizing tower to be had no idea abundant desulfurization, therefore, this technology is deposited
In defect, need to improve.
Summary of the invention
The purpose of this utility model is to provide a kind of flue gas desulfurization device smoke-intake pipe mouth part flow arrangements, to solve above-mentioned back
When the desulfurization proposed in scape technology, the gas of entrance is excessive, fast speed, and only one inlet pipe mouth, and desulfurizing tower is caused not have
The problem of method abundant desulfurization.
To achieve the above object, the utility model provides the following technical solutions: a kind of flue gas desulfurization device smoke-intake pipe mouth point
Device, including smoke pipe inlet pipeline are flowed, is equipped with the first upstream chamber of flue gas, the first import of flue gas inside the smoke pipe inlet pipeline
Chamber interior is equipped with fixed block, and fixed block front end is equipped with connection sheet, and the second through-hole, the connection are embedded with inside connection sheet
Piece front end connects baffle, and baffle interior is embedded with through-hole, is equipped with gas inlet room, flue gas below first upstream chamber of flue gas
Flue gas shunting room is equipped with below upstream chamber, and flue gas shunting chamber interior is equipped with connecting plate, and the company of being equipped with below connecting plate
Adapter tube, the connecting tube inside are embedded with outlet conduit.
Preferably, first upstream chamber of flue gas and flue gas shunting room are circular configuration, the first upstream chamber of flue gas and
Diameter length between flue gas shunting room is sequentially increased, and the first upstream chamber of flue gas and flue gas shunting room are parallel construction.
Preferably, the connecting plate and connecting tube are T-type structure, and connecting plate and connecting tube are circular configuration, and are connected
Engraved structure inside plate and connecting tube is outlet conduit, and connecting plate is located in flue gas shunting room, and the area of connecting plate is put
It sets and is paved in flue gas shunting room.
Preferably, the through-hole and the second through-hole are respectively uniformly distributed places in baffle and connection sheet, and baffle is located at
On the indoor center line of the first import of flue gas, and connection sheet surrounds baffle rings around placement.
Preferably, the fixed block is circular arc type structure, and fixed block is 0.3 times of circular configuration, and fixed block is uniform
It is distributed in the first upstream chamber of flue gas.
Compared with prior art, the utility model has the beneficial effects that the flue gas desulfurization device smoke-intake pipe mouth part flow arrangement
By the fixed block of circular arc block, baffle interior through-hole and connecting plate in outlet conduit smoke pipe inlet pipeline is entered to its flue gas
When, it slowly enters, is then shunted, when solving desulfurization, the gas of entrance is excessive, fast speed, and only one inlet pipe
Mouthful, cause desulfurizing tower have no idea abundant desulfurization the problem of.The first upstream chamber of flue gas of the device and flue gas shunting room are circle
Shape structure, the diameter length between the first upstream chamber of flue gas and flue gas shunting room are sequentially increased, and the first upstream chamber of flue gas and
Flue gas shunting room be parallel construction, the device when in use, because the diameter between the first upstream chamber of flue gas and flue gas shunting room is long
It is parallel construction that degree, which is sequentially increased with the first upstream chamber of flue gas and flue gas shunting room, so entering the dress in extraneous flue gas
When the smoke pipe inlet pipeline set, by small and big, after entering convenient for gas, the gas velocity of smoke pipe inlet pipeline whole interior reaches
Slow advantage, parallel construction are convenient for the work of device entirety, and the connecting plate and connecting tube of the device are T-type structure, connect
Fishplate bar and connecting tube are circular configuration, and the engraved structure inside connecting plate and connecting tube is outlet conduit, and connecting plate position
In in flue gas shunting room, the area placement of connecting plate is paved in flue gas shunting room, when gas enters flue gas shunting room, is connected
Engraved structure inside fishplate bar and connecting tube is outlet conduit, passes through connecting plate and company convenient for the indoor flue gas of flue gas shunting
The outlet conduit of nozzle interior carries out shunting work, and the area placement of connecting plate is paved in can make flue gas in flue gas shunting room
When carrying out shunting work, the gas not shunted for the first time can be blocked by connecting plate, the device can be made to have item not
Disorderly carries out shunting work, and the through-hole of the device and the second through-hole are respectively uniformly distributed to be placed in baffle and connection sheet, gear
Plate is located on the indoor center line of the first import of flue gas, and connection sheet surrounds baffle rings around placement, first enters in flue gas
When in first upstream chamber of device flue gas, it is buffered by through-hole, baffle, the second through-hole and connection sheet, makes its cigarette
Before gas gas distribution, the speed that reducing smoke gas enters increases the subsequent working efficiency for shunting desulfurization, the fixed block of the device
For circular arc type structure, fixed block is 0.3 times of circular configuration, and fixed block is evenly distributed in the first upstream chamber of flue gas,
When the device enters the flue gas inside the device to it, to gas carry out buffering and simultaneously entrance gas it is more when,
The concentration for reducing gas, makes its gas after shunting, when carrying out desulfurization to it can uniformly sufficient desulfurization, increase service efficiency
And work quality.
Detailed description of the invention
Fig. 1 is the utility model positive structure schematic;
Fig. 2 is the utility model section structural schematic diagram;
Fig. 3 is enlarged structure schematic diagram at A in the utility model Fig. 2;
Fig. 4 is the utility model support tube part connecting structure schematic diagram.
In figure: 1, flue gas first upstream chamber, 2, flue gas shunting room, 3, outlet conduit, 4, smoke pipe inlet pipeline, 5, flue gas into
Mouth room, 6, connecting plate, 7, connecting tube, 8, baffle, 9, through-hole, 10, fixed block, 11, connection sheet, the 12, second through-hole.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
Fig. 1-4 is please referred to, the utility model provides a kind of technical solution: a kind of flue gas desulfurization device smoke-intake pipe mouth shunting dress
It sets, including smoke pipe inlet pipeline 4, the first upstream chamber of flue gas 1 is equipped with inside smoke pipe inlet pipeline 4, in the first upstream chamber of flue gas 1
Portion is equipped with fixed block 10, and 10 front end of fixed block is equipped with connection sheet 11, and the second through-hole 12, cigarette are embedded with inside connection sheet 11
The first upstream chamber of gas 1 and flue gas shunting room 2 are circular configuration, straight between the first upstream chamber of flue gas 1 and flue gas shunting room 2
Electrical path length is sequentially increased, and the first upstream chamber of flue gas 1 and flue gas shunting room 2 are parallel construction, the device when in use, because of flue gas
Diameter length between first upstream chamber 1 and flue gas shunting room 2 is sequentially increased and the first upstream chamber of flue gas 1 and flue gas shunting room 2
For parallel construction, so when extraneous flue gas enters the smoke pipe inlet pipeline 4 of the device, by small and big, it is convenient for gas
After, the gas velocity of 4 whole interior of smoke pipe inlet pipeline reaches slow advantage, and parallel construction is convenient for device entirety
Work, fixed block 10 are circular arc type structure, and fixed block 10 is 0.3 times of circular configuration, and fixed block 10 is evenly distributed on cigarette
In the first upstream chamber of gas 1, when the device enters the flue gas inside the device to it, to gas carry out buffering and simultaneously
When the gas of entrance is more, the concentration of gas is reduced, makes its gas after shunting, it can uniformly adequately when carrying out desulfurization to it
Desulfurization increases service efficiency and work quality, and 11 front end of connection sheet connects baffle 8, and through-hole 9, through-hole 9 are embedded with inside baffle 8
It is respectively uniformly distributed with the second through-hole 12 and is placed in baffle 8 and connection sheet 11, baffle 8 is located in the first upstream chamber of flue gas 1
Center line on, and connection sheet 11 around baffle 8 around place, first enter first import of device flue gas in flue gas
When in room 1, it is buffered by through-hole 9, baffle 8, the second through-hole 12 and connection sheet 11, before shunting its flue gas,
The speed that reducing smoke gas enters increases the subsequent working efficiency for shunting desulfurization, is equipped with flue gas below the first upstream chamber of flue gas 1
Upstream chamber 5 is equipped with flue gas shunting room 2 below gas inlet room 5, and is equipped with connecting plate 6 inside flue gas shunting room 2, and
Connecting tube 7 is installed, connecting plate 6 and connecting tube 7 are T-type structure, and connecting plate 6 and connecting tube 7 are round knot below connecting plate 6
Structure, and the engraved structure inside connecting plate 6 and connecting tube 7 is outlet conduit 3, and connecting plate 6 is located in flue gas shunting room 2,
The area placement of connecting plate 6 is paved in flue gas shunting room 2, when gas enters flue gas shunting room 2, connecting plate 6 and connection
Engraved structure inside pipe 7 is outlet conduit 3, passes through connecting plate 6 and connecting tube 7 convenient for the flue gas in flue gas shunting room 2
Internal outlet conduit 3 carries out shunting work, and the area placement of connecting plate 6 is paved in can make flue gas in flue gas shunting room 2
When carrying out shunting work, the gas not shunted for the first time can be blocked by connecting plate 6, the device can be made to have item not
Disorderly carries out shunting work, is embedded with outlet conduit 3 inside connecting tube 7.
Working principle: when using the flue gas desulfurization device smoke-intake pipe mouth part flow arrangement, flue gas desulfurization dress is first checked for
It whether complete sets each components of smoke-intake pipe mouth part flow arrangement, avoids causing to install out due to the defect of part during the installation process
Existing problem, works after inspection is errorless, and when the device is worked, the integral device of the device opens work, extraneous
Flue gas passes through first to be entered at the top of smoke pipe inlet pipeline 4, and after entering smoke pipe inlet pipeline 4, what is touched first is flue gas
The first upstream chamber of flue gas 1, when flue gas body touches the first upstream chamber 1 of flue gas, because of the fixed block inside the first upstream chamber of flue gas 1
10 be the shape of circular arc block, and the through-hole 9 inside the second through-hole 12 and baffle 8 in connection sheet 11 that fixed block 10 connects is distributed
Even placement when entering to its flue gas, can buffer, and reducing speed is convenient for flue gas after entering the first upstream chamber of flue gas 1,
Before entering 2 internal shunt of flue gas shunting room, there is pre- stream, in flue gas after the outflow of the first upstream chamber of flue gas 1,
It into before flue gas shunting room 2, can enter inside gas inlet room 5, buffer gas, reducing speed, then gas is entering
When in flue gas shunting room 2, after gas can enter on connecting plate 6, by the outlet conduit 3 inside connecting plate 6 to its gas
It is shunted, the gas that connecting plate 6 can will be unable to first enter in outlet conduit 3 blocks, and makes in the slave pipeline 3 of its gas slowly
Into the gas after shunting it can make desulfurizing tower uniform when flowing into flue gas desulfurization device desulfurization out of outlet conduit 3
Desulfurization adequately is carried out to it, here it is the use processes of the flue gas desulfurization device smoke-intake pipe mouth part flow arrangement.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art,
It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired
Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.
Claims (5)
1. a kind of flue gas desulfurization device smoke-intake pipe mouth part flow arrangement, including smoke pipe inlet pipeline (4), it is characterised in that: the cigarette
It is equipped with the first upstream chamber of flue gas (1) inside pipe inlet pipeline (4), fixed block is installed inside the first upstream chamber of flue gas (1)
(10), and fixed block (10) front end is equipped with connection sheet (11), and is embedded with the second through-hole (12) inside connection sheet (11), the company
Contact pin (11) front end connects baffle (8), and is embedded with through-hole (9) inside baffle (8), sets below first upstream chamber of flue gas (1)
Have gas inlet room (5), be equipped with flue gas shunting room (2) below gas inlet room (5), and installation inside flue gas shunting room (2)
Have connecting plate (6), and be equipped with connecting tube (7) below connecting plate (6), outlet conduit is embedded with inside the connecting tube (7)
(3).
2. a kind of flue gas desulfurization device smoke-intake pipe mouth part flow arrangement according to claim 1, it is characterised in that: the flue gas
First upstream chamber (1) and flue gas shunting room (2) are circular configuration, the first upstream chamber of flue gas (1) and flue gas shunting room (2) it
Between diameter length be sequentially increased, and the first upstream chamber of flue gas (1) and flue gas shunting room (2) are parallel construction.
3. a kind of flue gas desulfurization device smoke-intake pipe mouth part flow arrangement according to claim 1, it is characterised in that: the connection
Plate (6) and connecting tube (7) are T-type structure, and connecting plate (6) and connecting tube (7) are circular configuration, and connecting plate (6) and are connected
Managing (7) internal engraved structure is outlet conduit (3), and connecting plate (6) is located in flue gas shunting room (2), connecting plate (6)
Area placement is paved in flue gas shunting room (2).
4. a kind of flue gas desulfurization device smoke-intake pipe mouth part flow arrangement according to claim 3, it is characterised in that: the through-hole
(9) it is respectively uniformly distributed with the second through-hole (12) and is placed in baffle (8) and connection sheet (11), baffle (8) is located at flue gas the
On center line in one upstream chamber (1), and connection sheet (11) surround around baffle (8) and places.
5. a kind of flue gas desulfurization device smoke-intake pipe mouth part flow arrangement according to claim 1, it is characterised in that: the fixation
Block (10) is circular arc type structure, and fixed block (10) is 0.3 times of circular configuration, and fixed block (10) is evenly distributed on flue gas the
In one upstream chamber (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822119755.XU CN209378706U (en) | 2018-12-18 | 2018-12-18 | A kind of flue gas desulfurization device smoke-intake pipe mouth part flow arrangement |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822119755.XU CN209378706U (en) | 2018-12-18 | 2018-12-18 | A kind of flue gas desulfurization device smoke-intake pipe mouth part flow arrangement |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209378706U true CN209378706U (en) | 2019-09-13 |
Family
ID=67872409
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201822119755.XU Expired - Fee Related CN209378706U (en) | 2018-12-18 | 2018-12-18 | A kind of flue gas desulfurization device smoke-intake pipe mouth part flow arrangement |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209378706U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113663497A (en) * | 2021-08-23 | 2021-11-19 | 丁新怡 | Industrial denitration flue gas purification device |
-
2018
- 2018-12-18 CN CN201822119755.XU patent/CN209378706U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113663497A (en) * | 2021-08-23 | 2021-11-19 | 丁新怡 | Industrial denitration flue gas purification device |
CN113663497B (en) * | 2021-08-23 | 2024-05-03 | 秦皇岛市徐山口危险废物处理有限公司 | Industrial denitration flue gas purification device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209378706U (en) | A kind of flue gas desulfurization device smoke-intake pipe mouth part flow arrangement | |
CN203635048U (en) | Guide device for ventilation air methane oxidation | |
CN205720154U (en) | A kind of flue gas inspection equipment and denitrating system | |
CN209591051U (en) | Warning device is used in a kind of detection of natural gas leaking | |
CN203648382U (en) | Semidry-method desulfurization reactor bottom blowing device | |
CN205991989U (en) | A kind of lime stone slurry pH value measures sampler | |
CN204964164U (en) | Mine ventilation network system experimental apparatus | |
CN203768522U (en) | Distributor of carding pipeline of carding machine | |
CN202017680U (en) | Gas flow adjusting device | |
CN112191096A (en) | Ammonia spraying device and ammonia spraying mixing device suitable for SCR denitration | |
CN211963687U (en) | A Y-pipe distributor for PSR polymer deNOx systems | |
CN219391008U (en) | Back blowing device for venturi flowmeter pressure-measuring tube | |
CN210894189U (en) | PH value measurement system used on desulfurization absorption tower | |
CN205155998U (en) | A flue system for export of tower furnace air heater of thermal power factory | |
CN207004617U (en) | A kind of purifying silencing device of plant protection unmanned plane blast pipe | |
CN110141964B (en) | Ammonia spraying system and ammonia spraying method for desulfurization and denitrification system | |
CN209355291U (en) | A kind of STEELMAKING PRODUCTION coal gas diffusion adjustment device | |
CN204973518U (en) | Absorbing device of hydrogen sulfide gas body | |
CN204522750U (en) | A kind of denitrification apparatus of rotary kiln | |
CN204924312U (en) | Be used for ash -laden gas to discharge measuring device | |
CN218855574U (en) | Secondary cooling water pipeline anti-blocking device of slab caster | |
CN205517235U (en) | Gas vent structure is prevented blockking up by desulfurizing tower overflow pipe | |
CN202947322U (en) | Device for reducing hot blast heater waste gas diffusion noise | |
CN203940160U (en) | A kind of biological fuel gas elbow with dedusting function | |
JP3241741U (en) | Annular equal-resistance equal-flow ammonia injection grill with smoke exhaust flow rate adaptation function |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190913 Termination date: 20201218 |