CN209371834U - A kind of coating material production cooling water system - Google Patents

A kind of coating material production cooling water system Download PDF

Info

Publication number
CN209371834U
CN209371834U CN201822006435.3U CN201822006435U CN209371834U CN 209371834 U CN209371834 U CN 209371834U CN 201822006435 U CN201822006435 U CN 201822006435U CN 209371834 U CN209371834 U CN 209371834U
Authority
CN
China
Prior art keywords
cooling
back pool
cooling tower
filler
tower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201822006435.3U
Other languages
Chinese (zh)
Inventor
何嘉妍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Heshan Hua Xuan Coating Co Ltd
Original Assignee
Heshan Hua Xuan Coating Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Heshan Hua Xuan Coating Co Ltd filed Critical Heshan Hua Xuan Coating Co Ltd
Priority to CN201822006435.3U priority Critical patent/CN209371834U/en
Application granted granted Critical
Publication of CN209371834U publication Critical patent/CN209371834U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of coating material production cooling water systems, including back pool, the first cooling tower and the controller being erected above back pool, back pool side is additionally provided with the second cooling tower, it is pumped below second cooling tower equipped with secondary cooling, the outlet of secondary cooling pump is connected to the inside top of the second cooling tower by secondary cooling pipe, and it is connected with multiple second spray heads, the second filler is equipped with below second spray head, the second drip tray is equipped with below second filler, second drip tray is equipped with downpipe towards the side of back pool, second cooling tower top center is equipped with the second cooling blower, temperature probe is equipped in back pool, water supply pump, first cooling blower, temperature probe, secondary cooling pump and the second cooling blower are connect with controller, controller is also connect with the timer of coating reaction tank.The utility model can realize reducing temperature twice, effectively reduce back pool water temperature, prevent the initial temperature of cooling water excessively high, to reach faster and better cooling effect.

Description

A kind of coating material production cooling water system
Technical field
The utility model relates to coating material production technical fields, more particularly to a kind of coating material production cooling water system.
Background technique
It needs to lead to cooling water on reactor tank surface after coating reaction and cool down, but existing circulating water system System is only once cooled down, it is difficult to effectively reduce back pool water temperature, the initial temperature of cooling water is higher, it is difficult to reach faster more Good cooling effect.Therefore, it is necessary to improve and optimize to the prior art.
Utility model content
To solve the deficiencies in the prior art, the utility model provides a kind of coating material production cooling water system, secondary to realize Cooling, effectively reduces back pool water temperature, prevents the initial temperature of cooling water excessively high, to reach faster and better cooling effect Fruit.
The technical scheme adopted by the utility model to solve the technical problem is as follows:
A kind of coating material production cooling water system, including back pool, the first cooling tower being erected above back pool and control Device, the back pool bottom side is equipped with to several cooling branch pipes on coating reaction tank surface and provides the water supply pump of cooling water, cold But branch pipe focuses on return pipe and is connected to the first cooling tower inside top, and is connected with multiple first spray heads, the first spray head Lower section is equipped with the first filler, and the cooling tower bottom of first below first filler is equipped with the first drip tray, first water receiving The first scupper is provided in the middle part of disk, first cooling tower top center is equipped with the first cooling blower, and the back pool side is also Equipped with second cooling tower contour with the first cooling tower, it is equipped with below second cooling tower and is connected to the secondary of return water bottom of pond portion The outlet of cooling pump, the secondary cooling pump is connected to the inside top of the second cooling tower by secondary cooling pipe, and is connected with Multiple second spray heads, the second spray head lower section are equipped with the second filler, and the cooling tower bottom of second below second filler is set There is the second drip tray, second drip tray is equipped with the downpipe being connected in back pool towards the side of back pool, and described the Two cooling tower top centers are equipped with the second cooling blower, and temperature probe, the water supply pump, the first cooling are equipped in the back pool Blower, temperature probe, secondary cooling pump and the second cooling blower connect with controller, the controller also with coating reaction tank Timer connection.
It is also equipped with service valve between secondary cooling pump and back pool, the service valve uses electric gate valve, and with Controller electrical connection.
More and the first one-to-one positioning column of cooling tower bottom supports are equipped in the back pool, described first is cooling Tower is mounted on positioning column.
First drip tray and the second drip tray upper end are enclosed equipped with protective net, and the height of the protective net is 1 meter- 1.5 rice.
First cooling tower and the second cooling tower are all made of glass-reinforced plastic material and are made, first filler and the second filler It is all made of oblique mistake filler.
The beneficial effects of the utility model are: when temperature probe detects that water temperature is exceeded in back pool, controller starting Water in back pool, is evacuated to the inside top of the second cooling tower, is then divided downwards by multiple second spray heads by secondary cooling pump Be scattered in the second filler, at this time the second cooling blower starting band leak water in partial heat, cool down to it, after cooling down Water is flow back into back pool by the downpipe of the second drip tray towards the side of back pool, to realize reducing temperature twice, effectively Reduction back pool water temperature, prevent the initial temperature of cooling water excessively high, to reach faster and better cooling effect.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model embodiment.
Specific embodiment
The utility model is described further with reference to the accompanying drawings and examples.
Referring to Fig.1, a kind of coating material production cooling water system including back pool 10, is erected at the first of 10 top of back pool Cooling tower 20 and controller, several cooling branch pipes offers that 10 bottom side of back pool is equipped with to coating reaction tank surface are cold But the water supply pump of water, cooling branch pipe focuses on return pipe and is connected to 20 inside top of the first cooling tower, and is connected with multiple first Spray head, the first spray head lower section are equipped with the first filler, and 20 bottom of the first cooling tower below first filler is equipped with first Drip tray 21, the first scupper is provided in the middle part of first drip tray 21, and 20 top center of the first cooling tower is equipped with first Cooling blower, 10 side of back pool are additionally provided with second cooling tower 30 contour with the first cooling tower 20, and described second is cooling Equipped with the secondary cooling pump 31 for being connected to 10 bottom of back pool below tower 30, the outlet of the secondary cooling pump 31 passes through secondary cold But pipe 32 is connected to the inside top of the second cooling tower 30, and is connected with multiple second spray heads, is equipped with below the second spray head Second filler, 30 bottom of the second cooling tower below second filler are equipped with the second drip tray 33, second drip tray 33 The downpipe that is connected in back pool 10 is equipped with towards the side of back pool 10, and 30 top center of the second cooling tower is equipped with the Two cooling blowers, are equipped with temperature probe in the back pool 10, the water supply pump, the first cooling blower, temperature probe, secondary cold But pump 31 and the second cooling blower are connect with controller, and the controller is also connect with the timer of coating reaction tank.Work as painting When expecting to finish when the timer of reactor tank, controller control water supply pump starts to start to the cooling branch pipe on coating reaction tank surface It supplies water, quickly to reduce coating material temperature, it is cold that the cooling water in cooling branch pipe focuses on return pipe arrival first again after heat absorption But the inside top of tower 20, and be distributed to downwards in the first filler by multiple first spray heads, the first cooling blower starts at this time The partial heat in cooling water back is taken away, is cooled down to it, the cooling water after cooling down passes through in the first drip tray 21 First scupper in portion drops back into back pool.And when temperature probe detects that water temperature is exceeded in back pool 10, controller starting Water in back pool 10, is evacuated to the inside top of the second cooling tower 30, then passes through multiple second spray heads by secondary cooling pump 31 Be distributed in the second filler downwards, at this time the second cooling blower starting band leak water in partial heat, cool down to it, cool down Water later is flow back into back pool 10 by the downpipe of the second drip tray 33 towards side of back pool 10, to realize Reducing temperature twice effectively reduces back pool water temperature, prevents the initial temperature of cooling water excessively high, to reach faster and better cooling Effect, and by setting temperature probe, the reducing temperature twice of automatically starting back pool 10 improves the degree of automation;In addition, returning 10 inside upper part of pond is additionally provided with level radar and water supply pipe, and electronic water compensating valve, the level radar and electricity are housed on water supply pipe Dynamic water compensating valve is connect with controller, timely to supplement cooling water, water level is made to maintain a stable level.
Further, service valve 34, the service valve 34 are also equipped between the secondary cooling pump 31 and back pool 10 Using electric gate valve, and it is electrically connected with the controller.By service valve 34, secondary cooling pump 31 can be replaced or repair at any time, and By setting electric gate valve for service valve, convenient for realizing remote auto control by controller, its automation is further increased Degree.
Further, more and the one-to-one positioning column of 20 bottom supports of the first cooling tower are equipped in the back pool 10 11, first cooling tower 20 is mounted on positioning column 11.In addition, first drip tray 21 and 33 upper end of the second drip tray are equal It encloses and is equipped with protective net, the height of the protective net is 1 meter -1.5 meters, to prevent sundries from entering inside.
Further, first cooling tower 20 and the second cooling tower 30 are all made of glass-reinforced plastic material and are made, and described first Filler and the second filler are all made of the oblique mistake filler of polypropylene material, to mitigate weight, improve cooling efficiency.
The above, the only better embodiment of the utility model, but the utility model is not limited to above-described embodiment, As long as its technical effect for reaching the utility model with any same or similar means, it should all be included in the protection of the utility model Within the scope of.

Claims (5)

1. a kind of coating material production cooling water system, including back pool (10), the first cooling tower being erected above back pool (10) (20) it is equipped with to several cooling branch pipes on coating reaction tank surface and cooling is provided with controller, back pool (10) bottom side The water supply pump of water, cooling branch pipe focuses on return pipe and is connected to the first cooling tower (20) inside top, and is connected with multiple first Spray head is equipped with the first filler below the first spray head, and the first cooling tower (20) bottom below first filler is equipped with the One drip tray (21), the first drip tray (21) middle part are provided with the first scupper, the first cooling tower (20) top center Equipped with the first cooling blower, it is characterised in that: back pool (10) side is additionally provided with contour with the first cooling tower (20) Two cooling towers (30), the second cooling tower (30) lower section pump (31) equipped with the secondary cooling for being connected to back pool (10) bottom, The outlet of the secondary cooling pump (31) is connected to the inside top of the second cooling tower (30) by secondary cooling pipe (32), and even Multiple second spray heads are connected to, the second filler, the second cooling tower below second filler are equipped with below the second spray head (30) bottom is equipped with the second drip tray (33), and second drip tray (33) is equipped with towards the side of back pool (10) and is connected to back Downpipe in pond (10), the second cooling tower (30) top center are equipped with the second cooling blower, the back pool (10) It is interior to be equipped with temperature probe, the water supply pump, the first cooling blower, temperature probe, secondary cooling pump (31) and the second cooling blower It is connect with controller, the controller is also connect with the timer of coating reaction tank.
2. a kind of coating material production cooling water system according to claim 1, it is characterised in that: the secondary cooling pumps (31) It is also equipped between back pool (10) service valve (34), the service valve (34) uses electric gate valve, and is electrically connected with controller It connects.
3. a kind of coating material production cooling water system according to claim 1, it is characterised in that: set in the back pool (10) There are more and the one-to-one positioning column of the first cooling tower (20) bottom supports (11), first cooling tower (20) is mounted on fixed On position column (11).
4. a kind of coating material production cooling water system according to claim 1 to 3, it is characterised in that: first water receiving Disk (21) and the second drip tray (33) upper end are enclosed equipped with protective net, and the height of the protective net is 1 meter -1.5 meters.
5. a kind of coating material production cooling water system according to claim 1, it is characterised in that: first cooling tower (20) It is all made of glass-reinforced plastic material with the second cooling tower (30) to be made, first filler and the second filler are all made of oblique mistake filler.
CN201822006435.3U 2018-11-30 2018-11-30 A kind of coating material production cooling water system Expired - Fee Related CN209371834U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822006435.3U CN209371834U (en) 2018-11-30 2018-11-30 A kind of coating material production cooling water system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822006435.3U CN209371834U (en) 2018-11-30 2018-11-30 A kind of coating material production cooling water system

Publications (1)

Publication Number Publication Date
CN209371834U true CN209371834U (en) 2019-09-10

Family

ID=67834688

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822006435.3U Expired - Fee Related CN209371834U (en) 2018-11-30 2018-11-30 A kind of coating material production cooling water system

Country Status (1)

Country Link
CN (1) CN209371834U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114623636A (en) * 2022-05-17 2022-06-14 中国空气动力研究与发展中心高速空气动力研究所 Circulating water system for classified regulation of cooling water temperature

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114623636A (en) * 2022-05-17 2022-06-14 中国空气动力研究与发展中心高速空气动力研究所 Circulating water system for classified regulation of cooling water temperature
CN114623636B (en) * 2022-05-17 2023-02-03 中国空气动力研究与发展中心高速空气动力研究所 Circulating water system for classified regulation of cooling water temperature

Similar Documents

Publication Publication Date Title
CN201983650U (en) Separated heat transfer spray closed cooling tower
CN203421872U (en) DC converter station external cooling system
CN209371834U (en) A kind of coating material production cooling water system
CN106091728A (en) The step cooling down water with composite construction prepares cooling tower
CN104315885A (en) Water cooling heat exchanger
CN203964711U (en) A kind of receiving apparatus that cools back
CN203298421U (en) Evaporative cooling type outer cooling system of direct-current converter station
CN206650114U (en) A kind of New-energy electric vehicle battery heat sink
CN104596005A (en) Water-saving pipe-wrapped-by-filler type evaporative cooling air-conditioning system
CN205102630U (en) Improve cooling tower
CN211346412U (en) Cooling tower for central air-conditioning system
CN205317018U (en) Countercurrent type filler cooling tower
CN105042740B (en) The adaptive power conservation air-conditioning system that rock-bed is combined with evaporation cooling
CN210237738U (en) Anti-oxidation device in copper wire production process
CN209415653U (en) A kind of open air humidification radiator
CN209326401U (en) A kind of cooling tower
CN204630466U (en) Servo-controlled air-condition cooling tower
CN102413661A (en) Data center
CN201983664U (en) Combined type spray falling film evaporation cooling device
CN203336995U (en) Direct-current converter station water cooling type outer cooling system
CN204720858U (en) Underground substation
CN213300907U (en) Circulating water cooling device
CN203047869U (en) Butadiene storage tank with cooling function
CN210718721U (en) Water cooling tower with water purification ring
CN207230978U (en) A kind of solar water heater

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190910

Termination date: 20211130

CF01 Termination of patent right due to non-payment of annual fee